Tower crane base positioning and mounting structure
Through the tower crane base positioning and installation structure, the position adjustment and stable downward movement of the tower crane foundation section is achieved by using square steel plates and positioning mechanisms, which solves the problem of shaking of the tower crane foundation section affecting installation and improves installation speed and safety.
Patent Information
- Application Number
- CN202411543613.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The foundation section of the tower crane is prone to shake during installation, affecting the installation of positioning bolts, especially in windy weather, which leads to slow installation speed and increases the risk of accidents.
A tower crane base positioning and installation structure is designed, including square steel plates, positioning mechanisms and connecting bolts. Through components such as positioning rings, connecting rods, U-shaped fixing plates and threaded rods, the left and right and front and rear positions of the tower crane foundation section are adjusted and stabilized. Move to ensure the accurate installation of the positioning bolts.
Through this structure, the tower crane foundation section can be installed stably and quickly, reducing lifting time, reducing accident risk and improving installation efficiency.
Smart Images

Figure CN119038419A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tower crane installation, in particular to a tower crane base positioning and installation structure. Background Art
[0002] When installing the tower crane foundation section, it is generally installed by hoisting. During the hoisting process of the tower crane foundation section, the tower crane foundation section is very easy to shake, which affects the through-holes set on the tower crane foundation section to pass through the positioning bolts, and in windy weather, the tower crane foundation section will shake more greatly, making it more difficult to stabilize the tower crane foundation section, seriously affecting the installation speed of the tower crane foundation section. The installation time of the tower crane foundation section is long, which means that the hoisting process of the tower crane foundation section is long. A long hoisting process is prone to accidents.
[0003] To this end, we propose a tower crane base positioning and installation structure. Summary of the invention
[0004] The object of the present invention is to provide a tower crane base positioning and installation structure to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a tower crane base positioning and installation structure, comprising square steel plate one, square steel plate two, a tower crane foundation section, a connecting steel plate and connecting bolts, a first positioning mechanism is arranged on the left side of the square steel plate one, a second positioning mechanism is arranged on the front end of the square steel plate, grooves are arranged on the surfaces of the square steel plate one and the square steel plate two, the first positioning mechanism comprises a positioning ring, a connecting rod is arranged on the left end of the positioning ring, a U-shaped fixing plate is arranged on the left end of the connecting rod, a threaded rod is arranged on the U-shaped fixing plate, a connecting rod is arranged on the threaded rod, a moving rod is arranged on the upper part of the connecting rod, a connecting hole is arranged on the lower part of the moving rod, a first through hole is arranged on the upper part of the moving rod, a first bolt is arranged in the first through hole, and a first threaded hole is arranged on the left end of the connecting steel plate.
[0006] Furthermore, the positioning ring includes an upper fixing ring and a lower fixing ring, the upper fixing ring is provided with a second through hole, a second bolt is provided in the second through hole, and the lower fixing ring is provided with a second threaded hole.
[0007] Furthermore, the connecting rod is fixedly connected to the lower fixing ring.
[0008] Furthermore, the left end of the threaded rod passes through the U-shaped fixing plate, a nut is provided at the left end of the threaded rod, and both ends of the threaded rod are connected to the U-shaped fixing plate through bearings.
[0009] Furthermore, a threaded hole matching with the threaded rod is provided at the lower part of the connecting rod, and a sliding groove matching with the connecting rod is provided on the U-shaped fixing plate.
[0010] Furthermore, the second positioning mechanism and the first positioning mechanism adopt the same structure.
[0011] Compared with the prior art, the beneficial effects of the present invention are: the threaded rod is rotated, and a threaded hole matching the threaded rod is provided at the lower part of the connecting rod. During the rotation of the threaded rod, the connecting rod drives the moving rod to move left and right, so that the connecting steel plate drives the tower crane foundation section to move left and right, and the optimal position of the tower crane foundation section is adjusted. At the same time, the second positioning mechanism is operated to adjust the front and rear positions of the tower crane foundation section, and the tower crane foundation section is slowly moved downward so that the through hole provided on the connecting steel plate passes through the positioning bolt. When the inner wall of the through hole provided on the connecting steel plate contacts the positioning bolt, the downward movement of the tower crane foundation section is stopped, the positioning ring is removed, and the first bolt is removed, and the first positioning mechanism and the second positioning mechanism are disassembled. After the first positioning mechanism and the second positioning mechanism are disassembled, the tower crane foundation section continues to be moved downward, and the tower crane foundation section is stably and quickly installed. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a schematic diagram of the positioning mechanism structure of the present invention; Figure 3 This is a schematic diagram of the positioning ring structure of the present invention; Figure 4 This is a schematic diagram of the installation structure of the positioning ring of the present invention; Figure 5 It is a schematic diagram of the connection structure between the connecting rod and the U-shaped fixing plate of the present invention.
[0013] In the figure: 1. square steel plate 1; 2. square steel plate 2; 3. first positioning mechanism; 4. second positioning mechanism; 5. tower crane foundation section; 6. connecting steel plate; 7. connecting bolt; 8. groove; 9. positioning ring; 91. upper fixing ring; 92. lower fixing ring; 93. second through hole; 94. second threaded hole; 95. second bolt; 10. connecting rod; 11. U-shaped fixing plate; 111. slide groove; 12. threaded rod; 13. connecting rod; 14. moving rod; 15. connecting hole; 16. first through hole; 17. first bolt; 18. first threaded hole. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0015] See also Figure 1-5The present invention provides a technical solution: a tower crane base positioning and installation structure, including a square steel plate 1, a square steel plate 2, a tower crane foundation section 5, a connecting steel plate 6 and a connecting bolt 7, a first positioning mechanism 3 is arranged on the left side of the square steel plate 1, a second positioning mechanism 4 is arranged on the front end of the square steel plate 2, a groove 8 is arranged on the surface of the square steel plate 1 and the square steel plate 2, the first positioning mechanism 3 includes a positioning ring 9, a connecting rod 10 is arranged on the left end of the positioning ring 9, a U-shaped fixing plate 11 is arranged on the left end of the connecting rod 10, a threaded rod 12 is arranged on the U-shaped fixing plate 11, a connecting rod 13 is arranged on the threaded rod 12, and the connecting rod 1 3 is provided with a moving rod 14 at the top, a connecting hole 15 is provided at the bottom of the moving rod 14, a first through hole 16 is provided at the top of the moving rod 14, a first bolt 17 is provided in the first through hole 14, a first threaded hole 18 is provided at the left end of the connecting steel plate 6, the tower crane foundation section 5 is installed, the tower crane foundation section 5 is hoisted to the top of the steel plate 1 and the square steel plate 2 2, and slowly lowered, when the connecting steel plate 6 is a small distance away from the connecting bolt 7, the movement of the tower crane foundation section 5 is customized, the positioning ring 9 is installed on the connecting bolt 7, at this time, the positioning ring 9 rotates on the connecting bolt 7, the moving rod 14 is moved, and the U-shaped fixing plate 11 is rotated at the same time , align the first through hole 16 provided on the upper part of the moving rod 14 with the first threaded hole 18, install the first bolt 17 through the first through hole 16 into the first threaded hole 18, tighten the first bolt 17, and then move the U-shaped fixing plate 11 downward, the connecting rod 13 provided on the threaded rod 12 slides in the connecting hole 15, and at the same time pushes the U-shaped fixing plate 11 to place the positioning ring 9 in the groove 8, rotate the threaded rod 12, and the lower part of the connecting rod 13 is provided with a threaded hole matching the threaded rod 12. During the rotation of the threaded rod 12, the connecting rod 13 drives the moving rod 14 to move left and right, so that the connecting steel plate 6 drives the tower crane foundation node 5 moves left and right to adjust the optimal position of the tower crane foundation section 5, and at the same time operate the second positioning mechanism 4 to adjust the front and rear position of the tower crane foundation section 5, and slowly move the tower crane foundation section 5 downward to allow the through hole set on the connecting steel plate 6 to pass through the positioning bolt 7. When the inner wall of the through hole set on the connecting steel plate 6 contacts the positioning bolt 7, stop the downward movement of the tower crane foundation section 5, remove the positioning ring 9, remove the first bolt 17, and disassemble the first positioning mechanism 3 and the second positioning mechanism 4. After the first positioning mechanism 3 and the second positioning mechanism 4 are disassembled, continue to move the tower crane foundation section 5 downward to stably and quickly install the tower crane foundation section.
[0016] Reference embodiment: The positioning ring 9 includes an upper fixing ring 91 and a lower fixing ring 92, the upper fixing ring 91 is provided with a second through hole 93, the second through hole 93 is provided with a second bolt 95, and the lower fixing ring 92 is provided with a second threaded hole 94. The positioning ring 9 is surrounded by the upper fixing ring 91 and the lower fixing ring 92, and is installed and fixed by the second bolt 95. The positioning ring 9 can be flexibly installed and disassembled, and the connecting rod 10 is fixedly connected to the lower fixing ring 92, which will not affect the installation and disassembly of the upper fixing ring 91.
[0017] Reference embodiment: the left end of the threaded rod 12 passes through the U-shaped fixing plate 11, and a nut is provided at the left end of the threaded rod 12. Both ends of the threaded rod 12 are connected to the U-shaped fixing plate 11 through bearings, so that the threaded rod 12 can be rotated by turning the nut with a wrench. A threaded hole matching the threaded rod 12 is provided at the lower part of the connecting rod 13. When the threaded rod 12 rotates, the connecting rod 13 moves left and right. A sliding groove 111 matching the connecting rod 13 is provided on the U-shaped fixing plate 11 to limit the rotation of the connecting rod 13 so that the connecting rod 13 can only move left and right, which is convenient for adjusting the installation position of the tower crane base section 5.
[0018] Reference embodiment: The second positioning mechanism 4 and the first positioning mechanism 3 adopt the same structure. The first positioning mechanism 3 is used to adjust the left and right position of the tower crane base section, and the second positioning mechanism 4 is used to adjust the front and rear position, so that the tower crane base section can be quickly installed.
[0019] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tower crane base positioning and installation structure, comprising a square steel plate 1 (1), a square steel plate 2 (2), a tower crane base section (5), a connecting steel plate (6) and connecting bolts (7), characterized in that: A first positioning mechanism (3) is arranged on the left side of the square steel plate 1 (1), and a second positioning mechanism (4) is arranged at the front end of the square steel plate 2 (2). Grooves (8) are arranged on the surfaces of the square steel plate 1 (1) and the square steel plate 2 (2). The first positioning mechanism (3) comprises a positioning ring (9). A connecting rod (10) is arranged on the left end of the positioning ring (9). A U-shaped fixing plate (11) is arranged on the left end of the connecting rod (10). A threaded rod (12) is arranged on the U-shaped fixing plate (11). A connecting rod (13) is arranged on the threaded rod (12). A moving rod (14) is arranged on the upper part of the connecting rod (13). A connecting hole (15) is arranged on the lower part of the moving rod (14). A first through hole (16) is arranged on the upper part of the moving rod (14). A first bolt (17) is arranged in the first through hole (16). A first threaded hole (18) is arranged on the left end of the connecting steel plate (6).
2. A tower crane base positioning and installation structure according to claim 1, characterized in that: The positioning ring (9) comprises an upper fixing ring (91) and a lower fixing ring (92); the upper fixing ring (91) is provided with a second through hole (93), a second bolt (95) is provided in the second through hole (93), and the lower fixing ring (92) is provided with a second threaded hole (94).
3. A tower crane base positioning and installation structure according to claim 2, characterized in that: The connecting rod (10) is fixedly connected to the lower fixing ring (92).
4. A tower crane base positioning and installation structure according to claim 1, characterized in that: The left end of the threaded rod (12) passes through the U-shaped fixing plate (11), a nut is provided at the left end of the threaded rod (12), and both ends of the threaded rod (12) are connected to the U-shaped fixing plate (11) via bearings.
5. The tower crane base positioning and installation structure according to claim 1, characterized in that: A threaded hole matching the threaded rod (12) is provided at the lower portion of the connecting rod (13), and a sliding groove (111) matching the connecting rod (13) is provided on the U-shaped fixing plate (11).
6. A tower crane base positioning and installation structure according to claim 1, characterized in that: The second positioning mechanism (4) and the first positioning mechanism (3) adopt the same structure.