Control method and system for monitoring snow accumulation state of turnout in real time
By acquiring and processing switch images in real time, identifying snow accumulation data and controlling snow melting systems, the energy waste and safety hazards caused by relying on artificial and inaccurate meteorological information in the existing technology are solved, and accurate monitoring of the snow accumulation status of switches is achieved and Fine control improves the safety of rail transit.
Patent Information
- Application Number
- CN202411261365.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-29
AI Technical Summary
The existing switch snow melting system relies on manual control and inaccurate information provided by weather stations, and cannot accurately judge the snow state of the switch, resulting in energy waste and safety hazards, and cannot meet the real-time monitoring needs of rail transit safety and equipment status.
By obtaining the switch area images in real time, identifying snow accumulation data using image processing models, calculating the snow melting index, and controlling the opening and stop of the heating device of the snow melting system according to the index to ensure accurate heating and monitoring of the snow melting effect.
Accurate monitoring and refined control of the snow-covered state of the switch is achieved, energy waste is reduced, and the safety of rail transit and equipment status monitoring capabilities are improved.
Smart Images

Figure CN119041254A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of rail transit safety, and in particular relates to a control method and system for real-time monitoring of snow accumulation status of a turnout. Background Art
[0002] In recent years, turnout snow melting systems have ushered in broader market opportunities, but also face more severe market competition. If a product is to be recognized by customers, it must be able to respond quickly to market changes. How to use information technology and control technology to improve the informatization level of systems and platforms, and thus improve the comprehensive competitiveness of products, is an important issue currently faced by many manufacturers.
[0003] The electric heating turnout snow melting system adopts electric heating. It is an integrated system based on computer technology, network technology, automation technology and information technology. When snowfall or temperature changes occur, the system can automatically or manually start and stop the electric heating snow melting circuit. The system consists of a turnout snow melting remote control center workstation, a station control terminal, a snow melting control cabinet, an environmental detection device, electric heating elements and installation fixtures, an isolation transformer, connecting cables and information channels. The selected straight, U-shaped and other flat electric heating elements can meet the needs of installation and snow melting in different parts of various types of turnouts. The snow melting monitoring system adopts a modular design, which is convenient for users to operate and maintain, and has complete diagnosis, detection, alarm, remote monitoring and management functions. It is widely used in passenger dedicated lines, railway trunk lines, heavy-load lines and urban rail transit, and is suitable for various types of turnouts in electrified and non-electrified traction sections.
[0004] At present, most mainstream turnout snow-melting systems rely on manual control systems to start. The turnout temperature collected by the temperature sensor controls the start and stop of the heating device of the snow-melting system, and the meteorological station equipment senses the meteorological information. However, the snowfall information provided by the meteorological station cannot accurately judge the type and intensity of snowfall. At the same time, there is a deviation between the snow accumulation time and the snowfall time, and it is impossible to accurately judge whether there is snow accumulation on the turnout. After heating, it is not convenient for station personnel to observe the heating effect, resulting in energy waste and safety hazards.
[0005] The turnout snow melting system has multiple functions, mainly including: system parameter configuration function, multiple mode control function, input and output function, interface function and emergency heating function.
[0006] 1. System parameter configuration function: The snow melting system has a system parameter configuration function, which can configure the heating circuit enable, temperature parameters, heating rated power, and external communication interface parameters.
[0007] 2. Multi-mode control function: It has remote monitoring, station monitoring, control cabinet (on-site) operation functions and manual and automatic control modes, and the manual control mode takes priority. When in manual control mode, automatic control is invalid.
[0008] 3. Input and output functions: The snow melting monitoring system adopts a modular design, and controls the trackside signal equipment of the turnout through the monitoring module. The system collects the rail temperature for logical judgment, and can automatically or manually start and stop the heating circuit of the on-site snow melting control cabinet to melt the snow or freezing rain in the active part of the turnout, ensuring the normal conversion of the turnout in rainy and snowy weather. At the same time, the system can monitor the analog quantity, switch quantity and other information of the control cabinet in real time, and save and manage relevant information, and can give an alarm message when the control information is inconsistent with the execution result.
[0009] 4. Interface function: The system can form a network through the communication interface, and the remote control center can monitor the control information of each station.
[0010] 5. Emergency heating function: The station control terminal of the snow melting system is equipped with an emergency control panel. When the computer system, control module and other components fail, the emergency heating button can be used to start the heating circuit and achieve system heating.
[0011] 6. Meteorological monitoring function: Collect outdoor meteorological information including snowfall, rainfall status, temperature, humidity, etc.
[0012] The existing turnout snow melting system is equipped with a meteorological station device that detects meteorological information. The meteorological information obtained by the meteorological station includes data such as precipitation weather phenomena / precipitation types, precipitation particle spectrum distribution, precipitation intensity and status. Through the above information, the snow melting system can determine the snowfall status of the outdoor snow melting equipment operating environment and control the opening and closing of the snow melting equipment. Since the meteorological station cannot obtain outdoor snowfall intensity information, the snow melting system cannot accurately obtain the snow accumulation status of each turnout and perform accurate heating control at the same time. In addition, the operation of the train will also cause the snow to cover the turnout, causing safety hazards. It cannot meet the safety of rail transit, the functionality of real-time monitoring of equipment status information, and the need to improve energy efficiency. Summary of the invention
[0013] In view of the above problems, the present invention provides a control method for real-time monitoring of snow accumulation status of turnouts, comprising:
[0014] Acquire turnout area images in real time;
[0015] Determine snow accumulation data of the turnout area by identifying the turnout area image;
[0016] Control the snow melting action in the turnout area according to the snow accumulation data;
[0017] Wherein, determining the snow accumulation data of the turnout area by identifying the turnout area image includes: processing the image information of each turnout area into computer-readable quantitative data through an image processing model, and the quantitative data includes a snowmelt index.
[0018] Furthermore, real-time acquisition of turnout area images includes:
[0019] Images captured within a specified shooting angle range of the turnout area are acquired through an image acquisition device, including: a first image captured in a direction parallel to the rail direction and directly opposite to the turnout that meets a first shooting angle, and a second image captured in a direction not directly opposite to the turnout that meets a second shooting angle; wherein the first shooting angle is smaller than the second shooting angle.
[0020] Furthermore, the first shooting angle is not less than 45°, and the second shooting angle is not less than 60°.
[0021] Furthermore, the snowmelt index is negatively correlated with the amount of snow on the turnout.
[0022] Furthermore, before identifying the snow index, the collected images are preprocessed, including:
[0023] Delineate the snowmelt area; set auxiliary lines for turnout identification.
[0024] Further, the coverage area of the heating device of the snow melting system is taken as the snow melting range;
[0025] Identify the rails in the heating area and outline the rail lines as auxiliary lines.
[0026] Further, controlling the snow melting action in the turnout area according to the snow accumulation data includes:
[0027] The heating device for controlling the snow melting system uses the temperature of the rail as the heating start and stop condition, and uses the snow melting data as the auxiliary start and stop condition of the heating device of the snow melting system.
[0028] Further, controlling the snow melting action in the turnout area according to the snow accumulation data includes:
[0029] When the snowmelt index is lower than the specified threshold, the heating device of the snowmelt system is triggered to be turned on early or turned off late.
[0030] Furthermore, it also includes:
[0031] The snow melting data is sent to the snow melting system, and the snow melting effect of the snow melting system is monitored according to the snow melting data.
[0032] The present invention also provides a control system for real-time monitoring of snow accumulation status of a turnout, comprising:
[0033] Image acquisition equipment, used to obtain turnout area images in real time;
[0034] An image processing device, used to determine snow accumulation data of the turnout area by identifying the turnout area image, and to control snow melting action of the turnout area according to the snow accumulation data;
[0035] Wherein, determining the snow accumulation data of the turnout area by identifying the turnout area image includes: processing the image information of each turnout area into computer-readable quantitative data through an image processing model, and the quantitative data includes a snowmelt index.
[0036] Furthermore, the image acquisition device can be used to obtain images of the turnout area captured within a specified shooting angle range, including: a first image captured in a direction parallel to the rail direction facing the turnout that satisfies a first shooting angle and a second image captured in a direction not facing the turnout that satisfies a second shooting angle; wherein the first shooting angle is not less than 45° and the second shooting angle is not less than 60°.
[0037] Furthermore, the snowmelt index is negatively correlated with the amount of snow on the turnout.
[0038] Furthermore, the image processing device is used to pre-process the collected image before identifying the snow accumulation index, including:
[0039] Delineate the snowmelt area; set auxiliary lines for turnout identification.
[0040] Furthermore, the image processing device is used for:
[0041] The coverage area of the heating device of the snow melting system is regarded as the snow melting area;
[0042] Identify the rails in the heating area and outline the rail lines as auxiliary lines.
[0043] Furthermore, the image processing device is used for:
[0044] The heating device for controlling the snow melting system uses the temperature of the rail as the heating start and stop condition, and uses the snow melting data as the auxiliary start and stop condition of the heating device of the snow melting system.
[0045] Furthermore, the image processing device is used for:
[0046] When the snowmelt index is lower than the specified threshold, the heating device of the snowmelt system is triggered to be turned on early or turned off late.
[0047] Furthermore, the image processing device is also used to send snow melting data to the snow melting system for monitoring the snow melting effect of the snow melting system.
[0048] Furthermore, the system also includes a data transmission device,
[0049] The data transmission device includes one or more levels of data transmission modules, each level of data transmission module is used to receive image information from one or more image acquisition modules and send it to the next level of data transmission module or image processing device;
[0050] Data transmission between data transmission equipment at each level is carried out through optical fiber and / or network.
[0051] Furthermore, the image acquisition device can share a power supply device and a mounting bracket with the weather station;
[0052] The data transmission equipment can be installed in each isolation transformer box or control cabinet and connected to the indoor terminal through an existing line path.
[0053] The control method and system for real-time monitoring of snow accumulation status of turnouts of the present invention monitors the snow accumulation images of each turnout in real time, and converts the images into data information to provide to the snow melting control system for accurate judgment of the snow accumulation status of each turnout, accurately heats the turnouts with snow accumulation, and evaluates the effect after heating, thereby realizing the refined and accurate control and monitoring functions of the turnout snow melting system.
[0054] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0056] Figure 1 A schematic diagram showing examples of shooting angles in facing and non-facing directions of image acquisition according to an embodiment of the present invention is shown;
[0057] Figure 2 A schematic diagram of the structure of a control system for real-time monitoring of snow accumulation status of a turnout according to an embodiment of the present invention is shown;
[0058] Figure 3 shows a preprocessed turnout region image according to an embodiment of the present invention;
[0059] Figure 4 Another pre-processed turnout region image according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0060] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0061] The embodiment of the present invention provides a control method and system for real-time monitoring of the snow accumulation state of a turnout, which realizes real-time monitoring of snow accumulation on a turnout based on image acquisition equipment and computer image recognition technology, makes up for the snow accumulation information on the turnout that is not covered by the existing snow melting system, especially the snow coverage state of each turnout, and provides the accuracy of snow monitoring and snow melting control. Without loss of generality, the control method for real-time monitoring of the snow accumulation state of a turnout in the embodiment of the present invention can be realized by a control system for real-time monitoring of the snow accumulation state of a turnout.
[0062] A control method for real-time monitoring of the snow accumulation status of a turnout according to an embodiment of the present invention comprises: acquiring a turnout area image in real time; determining the snow accumulation data of the turnout area by identifying the turnout area image; and controlling the snow melting action of the turnout area according to the snow accumulation data. Among them, determining the snow accumulation data of the turnout area by identifying the turnout area image comprises: processing the image information of each turnout area into computer-readable quantitative data through an image processing model, and the quantitative data includes a snowmelt index. In an embodiment of the present invention, real-time acquisition of the turnout area image means collecting images according to a specified period to ensure that the latest snow accumulation data can be obtained in time when the snow accumulation status of the turnout area changes. Exemplarily, the turnout area image is collected every few minutes.
[0063] Among them, real-time acquisition of the turnout area image includes capturing images of the target turnout area to be melted by shooting. The image acquisition of the embodiment of the present invention performs direct visual image acquisition and recognition on the snow melting object, i.e., the turnout, rather than image acquisition on the snow thickness measurement tool, so that the snow accumulation condition of the turnout can be acquired more intuitively. When the train moves and strong winds bring snow to the turnout area, traditional methods are often difficult to monitor. Through image recognition, the snow in the turnout area can be accurately identified, and then the snow melting system can be controlled to turn on the heating device to eliminate safety hazards.
[0064] In the embodiment of the present invention, an image captured by an image acquisition device in a specified shooting angle range of a turnout area is obtained, including a first image captured in a direction parallel to the rail direction and directly opposite to the turnout that satisfies a first shooting angle and a second image captured in a direction not directly opposite to the turnout that satisfies a second shooting angle, wherein the first shooting angle is smaller than the second shooting angle. For example, the first shooting angle is not less than 45°, and the second shooting angle is not less than 60°. Figure 1The resolution of the image collected at the snow melting area of the turnout is not less than 1024x1024 pixels.
[0065] Determining the snow accumulation data of the turnout area by identifying the turnout area image includes: processing the image information of each turnout area into computer-readable quantitative data through an image processing model. Without loss of generality, the quantitative data includes a snowmelt index, such as 0 to 100, where the larger the number, the less snow accumulation and the higher the degree of snowmelt. In an embodiment of the present invention, before identifying the snow accumulation index, the collected image is preprocessed to improve the recognition accuracy, including: defining the snowmelt range; setting the turnout identification auxiliary line. The preprocessing can be implemented through a neural network model, or by obtaining configuration data input by the user through a software interface. Exemplarily, the coverage area of the heating device is used as the snowmelt range, such as Figure 3 Shown and Figure 4 By identifying the rails in the heating area and outlining the rail lines as auxiliary lines (broken lines in the figure), the invalid image recognition range is reduced, the accuracy of model training and recognition is improved, and the identified snowmelt index is sent to the control terminal of the snowmelt system for heating control and effect monitoring.
[0066] Controlling the snow melting action in the turnout area according to the snow accumulation data includes: adjusting the heating action logic of the heating device of the snow melting system in real time according to the snow accumulation data. Exemplarily, the heating device uses the temperature of the rail as the heating start and stop condition, and the snow melting data is used as the auxiliary start and stop of the heating device. When the temperature of the rail does not reach the start condition or has reached the stop condition, if it is judged according to the snow melting data that there is obvious snow accumulation on the turnout, the heating device is turned on in advance or delayed to ensure the snow melting effect. Without loss of generality, the snow melting data of the embodiment of the present invention includes a snow melting index, and the snow melting index is negatively correlated with the amount of snow accumulated on the turnout, that is, the more snow accumulates, the lower the snow melting index. When the snow melting index is lower than the specified threshold, it is considered that the snow accumulation is obvious, triggering the early start or delayed shutdown of the heating device. Among them, the advance and delay are compared with the heating interval obtained based on the rail temperature.
[0067] The control method also includes fault detection of the snow melting system heating device based on image recognition: collecting images of the turnout area before and after heating, obtaining snow melting data respectively, and obtaining snow melting effect data by comparing the snow melting data before and after heating. When the snow melting effect does not meet expectations, feedback is given. The control method of the embodiment of the present invention can more intuitively observe the heating effect at the turnout through image acquisition and recognition functions. If the snow melting effect does not meet expectations due to suspected damage to the heating device or other reasons, the snow melting system will issue an alarm in combination with the image information, and locate and handle the problem after manual confirmation.
[0068] like Figure 2As shown, the control system for real-time monitoring of the snow accumulation status of a turnout in an embodiment of the present invention includes: a pattern acquisition device, a data transmission device and an image processing device.
[0069] Image acquisition equipment: used to collect images of turnouts. The collected image information can clearly show the state of the turnout before and after being covered by snow. The image acquisition equipment can adjust the acquisition interval according to the transmission rate. At the same time, in order to ensure the reliability and readability of the turnout image information, the minimum shooting angle and the maximum shooting distance of the turnout are specified according to actual needs.
[0070] The best shooting angle of the image acquisition device for the turnout area is when it is parallel to the rail direction and facing the turnout. When facing, the shooting angle (pitch angle) is not less than 45°, and when not facing (for example, perpendicular to the facing direction), the shooting angle is not less than 60°. The resolution of the image collected at the snow-melting part of the turnout is not less than 1024x1024 pixels. The installation method of the image acquisition device is not limited to fixed shooting or rotating scanning shooting. The image acquisition device installed outdoors can collect clear image information of each turnout with a heating unit installed, which is used by the snow melting system to determine the snow accumulation status of the turnout, and allocate different heating times according to the snow accumulation status of the turnout. At the same time, the snow accumulation status of each turnout before and after heating is monitored, thereby realizing the precise control of the heating device by the turnout snow melting system.
[0071] The data transmission equipment includes one or more levels of data transmission modules, and each level of data transmission module is used to receive image information from one or more image acquisition modules and send it to the next level of data transmission module or image processing equipment (terminal). Data transmission is performed between data transmission equipment at each level through optical fiber and / or network. Based on the number of image acquisition devices equipped, there are at least 1 level to at most n (n is greater than 1) levels of data transmission modules, and each level of data transmission module includes one or more data transmission modules. In other embodiments, the data transmission equipment can also adopt video baseband transmission, microwave transmission, twisted pair balanced transmission, broadband co-cable transmission, etc. The image processing equipment is arranged indoors and connected to the control terminal of the snow melting system. The data transmission module and the image acquisition equipment are arranged outdoors.
[0072] When arranging data transmission equipment, full consideration is given to utilizing existing equipment and cables to reduce the need for new equipment. The corresponding image acquisition equipment can share power equipment and mounting brackets with the meteorological station. Data transmission equipment can be installed in each isolation transformer box or control cabinet and connected to the indoor terminal through existing line paths, reducing installation and maintenance costs.
[0073] The turnout snow melting system obtains images of all turnouts installed with turnout snow melting devices at each station through image acquisition equipment. Since there are a large number of turnouts that need to be collected at the station, in order to ensure the clarity and reliability of the collected images, the installation height of the image acquisition equipment and its distance from the collected turnouts meet the equipment standards to ensure that the images provided to the turnout snow melting system for processing can be correctly recognized by the system. At the same time, the turnout snow melting system also has the ability to quickly transmit, store and reliably process these image data in combination with the corresponding data characteristics, thereby meeting the needs of timeliness and reliability of data processing.
[0074] The image processing equipment has a built-in algorithm model. The algorithm model uses a deep learning method and is configured in the image processing terminal software to process the collected turnout snow images. Before use, the algorithm model is trained with images with snow collected on site. The model parameters are trained by extracting the eigenvalues of the image and the manually measured snow index as labels. The trained model is used to identify real-time snow images on site. Without loss of generality, the algorithm model uses a neural network structure (CNN, Convolutional Neural Network, Convolutional Neural Network) based on image recognition / classification technology to identify snow, such as VGG (Visual Geometry Group Network), ResNet (Residual Network, Deep Residual Network), etc.
[0075] The image processing device is used to receive and process the image information of each turnout and perform preprocessing, and the image information of each turnout is processed into computer-readable quantitative data through the image processing model. Without loss of generality, the quantitative data includes a snowmelt index, such as 0 to 100, where a larger number indicates less snow accumulation and a higher degree of snowmelt. In an embodiment of the present invention, the collected image is preprocessed, including: defining a snowmelt range, such as Figure 3 Shown and Figure 4 As shown. For example, the coverage area of the heating device is used as the snow melting range. Furthermore, the preprocessing also includes: setting a turnout identification auxiliary line. Specifically, by identifying the rails in the heating area and outlining the rail lines as auxiliary lines, the invalid image recognition range is reduced, the accuracy of model training and recognition is improved, and the identified snow melting index is sent to the control terminal of the snow melting system for heating control and monitoring.
[0076] The control logic of the control system for real-time monitoring of the snow accumulation state of the turnouts of the embodiment of the present invention can be implemented based on the control method of the embodiment of the present invention, and the snow accumulation state of each group of turnouts can be monitored in real time to ensure that the snow accumulation state of each group of turnouts can be fed back to the indoor snow melting system control terminal in a timely and accurate manner, so that the system can issue heating instructions in a timely manner, which can meet the requirements of high-speed safe operation of trains in rainy and snowy weather in winter and the normal switching of turnouts not being affected by snow accumulation and icing in rainy and snowy weather. It has high maintainability and high safety, ensuring driving safety. At the same time, the snow accumulation state based on visual judgment can also provide the snow melting system with an evaluation of the snow melting effect after the heating is completed, which can be used to assist the system in judging whether the heating device has failed or cannot achieve the heating effect, so as to facilitate the station personnel to handle it in a timely manner.
[0077] The control method and system for real-time monitoring of the snow accumulation status of switches in the embodiments of the present invention propose a real-time monitoring solution for the snow accumulation status of switches based on computer vision, which realizes the function of real-time monitoring of the snow accumulation status information of each group of switches required by the switch snow melting system while ensuring the timeliness and reliability of data access, and ensures the readability and reliability of image data and improves the intelligence level of the system through computer vision (CV) image processing.
[0078] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A control method for real-time monitoring of snow accumulation status of turnouts, characterized in that: include: Acquire turnout area images in real time; Determine snow accumulation data of the turnout area by identifying the turnout area image; Control the snow melting action in the turnout area according to the snow accumulation data; Wherein, determining the snow accumulation data of the turnout area by identifying the turnout area image includes: processing the image information of each turnout area into computer-readable quantitative data through an image processing model, and the quantitative data includes a snowmelt index.
2. The control method for real-time monitoring of snow accumulation status of turnouts according to claim 1 is characterized in that: Real-time acquisition of turnout area images includes: Images captured within a specified shooting angle range of the turnout area are acquired through an image acquisition device, including: a first image captured in a direction parallel to the rail direction and directly opposite to the turnout that meets a first shooting angle, and a second image captured in a direction not directly opposite to the turnout that meets a second shooting angle; wherein the first shooting angle is smaller than the second shooting angle.
3. The control method for real-time monitoring of snow accumulation status of turnouts according to claim 1 is characterized in that: The first shooting angle is not less than 45°, and the second shooting angle is not less than 60°.
4. The control method for real-time monitoring of snow accumulation status of turnouts according to claim 1 is characterized in that: The snowmelt index is negatively correlated with the amount of snow on the turnout.
5. The control method for real-time monitoring of snow accumulation status of turnouts according to claim 4 is characterized in that: Before identifying the snow index, the collected images are preprocessed, including: Delineate the snowmelt area; set auxiliary lines for turnout identification.
6. The control method for real-time monitoring of snow accumulation status of turnouts according to claim 5 is characterized in that: The coverage area of the heating device of the snow melting system is regarded as the snow melting area; Identify the rails in the heating area and outline the rail lines as auxiliary lines.
7. The control method for real-time monitoring of snow accumulation status of a turnout according to any one of claims 4 to 6, characterized in that: Controlling snow melting actions in the turnout area based on snow accumulation data includes: The heating device for controlling the snow melting system uses the temperature of the rail as the heating start and stop condition, and uses the snow melting data as the auxiliary start and stop condition of the heating device of the snow melting system.
8. The control method for real-time monitoring of snow accumulation status of turnouts according to claim 7 is characterized in that: Controlling snow melting actions in the turnout area based on snow accumulation data includes: When the snowmelt index is lower than the specified threshold, the heating device of the snowmelt system is triggered to be turned on early or turned off late.
9. The control method for real-time monitoring of snow accumulation status of a turnout according to any one of claims 1 to 6, characterized in that: Also includes: The snow melting data is sent to the snow melting system, and the snow melting effect of the snow melting system is monitored according to the snow melting data.
10. A control system for real-time monitoring of snow accumulation status of turnouts, characterized in that: include: Image acquisition equipment, used to obtain turnout area images in real time; An image processing device, used to determine snow accumulation data of the turnout area by identifying the turnout area image, and to control snow melting action of the turnout area according to the snow accumulation data; Wherein, determining the snow accumulation data of the turnout area by identifying the turnout area image includes: processing the image information of each turnout area into computer-readable quantitative data through an image processing model, and the quantitative data includes a snowmelt index.
11. The control system for real-time monitoring of turnout snow accumulation status according to claim 10, characterized in that: The image acquisition device can be used to obtain images of the turnout area within a specified shooting angle range, including: a first image captured in a direction parallel to the rail direction facing the turnout that meets a first shooting angle and a second image captured in a direction not facing the turnout that meets a second shooting angle; wherein the first shooting angle is not less than 45° and the second shooting angle is not less than 60°.
12. The control system for real-time monitoring of turnout snow accumulation status according to claim 10, characterized in that: The snowmelt index is negatively correlated with the amount of snow on the turnout.
13. The control system for real-time monitoring of turnout snow accumulation status according to claim 12, characterized in that: The image processing device is used to pre-process the collected image before identifying the snow accumulation index, including: Delineate the snowmelt area; set auxiliary lines for turnout identification.
14. The control system for real-time monitoring of turnout snow accumulation status according to claim 13, characterized in that: The image processing device is used for: The coverage area of the heating device of the snow melting system is regarded as the snow melting area; Identify the rails in the heating area and outline the rail lines as auxiliary lines.
15. The control system for real-time monitoring of turnout snow accumulation status according to claim 10, characterized in that: The image processing device is used for: The heating device for controlling the snow melting system uses the temperature of the rail as the heating start and stop condition, and uses the snow melting data as the auxiliary start and stop condition of the heating device of the snow melting system.
16. The control system for real-time monitoring of turnout snow accumulation status according to claim 15, characterized in that: The image processing device is used for: When the snowmelt index is lower than the specified threshold, the heating device of the snowmelt system is triggered to be turned on early or turned off late.
17. The control system for real-time monitoring of turnout snow accumulation status according to any one of claims 10 to 16, characterized in that: The image processing device is also used to send snow melting data to the snow melting system for monitoring the snow melting effect of the snow melting system.
18. The control system for real-time monitoring of turnout snow accumulation status according to any one of claims 10 to 16, characterized in that: Also includes data transmission equipment, The data transmission device includes one or more levels of data transmission modules, each level of data transmission module is used to receive image information from one or more image acquisition modules and send it to the next level of data transmission module or image processing device; Data transmission between data transmission equipment at each level is carried out through optical fiber and / or network.
19. The control system for real-time monitoring of turnout snow accumulation status according to claim 18, characterized in that: The image acquisition device can share power supply equipment and mounting bracket with the weather station; The data transmission equipment can be installed in each isolation transformer box or control cabinet and connected to the indoor terminal through an existing line path.
Citation Information
Cited By
Snow-proof shed heat regulation and control method based on snow covering feature image recognition
CN122082549A
A method for heat regulation of snow shelters based on snow cover feature image recognition
CN122082549B
Method and system for controlling real-time monitoring of snow accumulation state on turnout
WO2026056769A1