Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

41 results about "Snowmelt system" patented technology

A snowmelt system prevents the build-up of snow and ice on cycleways, walkways, patios and roadways, or more economically, only a portion of the area such as a pair of 2-foot (0.61 m)-wide tire tracks on a driveway or a 3-foot (0.91 m) center portion of a sidewalk, etc. They function even during a storm thus improve safety and eliminate winter maintenance labor including shoveling or plowing snow and spreading de-icing salt or traction grit (sand). A snowmelt system may extend the life of the concrete, asphalt or under pavers by eliminating the use of salts or other de-icing chemicals, and physical damage from winter service vehicles.

High-pressure hot-blowing deicing and snow removing vehicle

The invention relates to a high-pressure hot-blowing deicing and snow removing vehicle, and belongs to the technical field of snow removal equipment. The high-pressure hot-blowing deicing and snow removing vehicle comprises a vehicle body, a driving cab (1) and water absorption and dust absorption equipment, and is characterized in that: a high-pressure hot-wind snow melting system is arranged in the front of the vehicle body, the water absorption and dust absorption equipment is arranged on the middle part of the vehicle body, and a low-pressure drying system is arranged in the rear of the vehicle body; and the high-pressure hot-wind snow melting system, the water absorption and dust absorption equipment and the low-pressure drying system are connected with an electric control cabinet (16) and a generator set (17) respectively. The high-pressure hot-blowing deicing and snow removing vehicle has a simple structure and is easy to manufacture, and due to the adoption of a diesel generator set serving as power, the deicing and snow removing vehicle is low in running cost and convenient to maintain; and the high-pressure hot-blowing deicing and snow removal vehicle has high snow removal efficiency, cleans road surfaces clearly and completely, and can clear away ice and snow and dry the road surfaces quickly at the speed of between 20 and 40 kilograms/hour.
Owner:信会东

Roof snow-melting system of transformer substation

InactiveCN107060229ANo heavy physical labor requiredRealize automatic snow meltingSnow trapsExpansion tankSnowmelt system
The invention relates to a roof snow melting system of a substation, which includes a transformer, the transformer is provided with a radiator and an oil conservator, cooling oil is stored in the oil conservator, the radiator has a radiator oil channel, and also includes a snow melting oil pipe and a second oil pipe, an oil conservator, a heat dissipation The oil passage and the snow melting oil pipe are connected in series to form the first circuit, and the snow melting oil pipe extends through the roof of the substation building; the second oil pipe connects the oil conservator and the cooling oil passage in series to form the second circuit, and the circuit is provided with pumps and valves. The above-mentioned snow melting system uses pipes to transport the cooling oil of the transformer to the snow-covered roof of the building. The cooling oil releases heat to melt the snow, and realizes the cooling of the cooling oil, and then returns to the transformer to form a cycle. The system recycles and utilizes the heat dissipation of the transformer to melt snow, which can save energy and kill two birds with one stone. In addition, the staff does not need heavy physical labor, and the snow melting operation is safer. In the optimal mode, the snow thickness can be monitored to realize automatic snow melting.
Owner:四川电力设计咨询有限责任公司

Roof snow melting system

ActiveCN104831874AImprove snow melting effectSolve technical problems with low resource utilizationSnow trapsThermal energySnowmelt system
The invention is suitable for a construction method, and discloses a roof snow melting system, which comprises a water storage tank and a circulating pipeline, wherein the water storage tank is buried under the ground; the circulating pipeline is used for conveying water in the water storage tank, and comprises a heating pipe, a heat discharging pipe and a recovery pipe; the heating pipe is used for conveying the water in the water storage tank to a roof; the heat discharging pipe is paved at the roof; the recovery pipe is used for recovering the melted snow water at the roof into the water storage tank; the heating pipe is provided with a multi-stage water pipe heating system for heating water; the heat discharging pipe is provided with a rotary spray head for spraying the hot water. The roof snow melting system has the advantages that the energy-saving and environment-friendly effects are realized, the snow water is recycled and reutilized, the heat energy is sufficiently utilized, the waste of electric energy and heat energy is reduced, the safety and controllability are realized, the snow melting effect of the snow melting system is improved, the technical problem of low utilization rate of resources in the existing snow melting system is solved, and the comprehensive property and market competitiveness of the snow melting system are favorably improved.
Owner:太仓市大烨建筑工程有限公司

Air discharge pipe structure for melting snow on road surface, road surface material for melting snow, and system for melting snow on road surface

ActiveCN103946451ASuppression of uneven snowmeltEasy constructionPaving detailsSnowmelt systemSnow melting
Provided are: an air discharge pipe structure for melting snow on a road surface, the air discharge pipe structure being configured so that the air discharge pipe structure can more evenly discharge snow melting air into an area underneath the road surface on which the snow to be melted is present than conventional structures to prevent the uneven melting of the snow, so that the air discharge pipe structure can be built more easily, and so that the air discharge pipe structure can be built in a reduced time and at reduced cost; a road surface material for melting snow; and a system for melting snow on a road surface. An air discharge pipe structure for melting snow on a road surface is provided with: perforated pipes (7, 7, ...) which have air ejection holes (6) formed therein and which are laid in a predetermined area underneath the road surface (5) on which the snow to be melted is present; a pair of connection pipes (8, 8) for air flow, connecting the opposite ends of each of the perforated pipes (7, 7, ...) in a pneumatically communicable manner; and an air supply pipe (9) which connects one end of each of the connection pipes (8, 8) for air flow in a pneumatically communicable manner and which is provided with an air supply opening (11) for supplying air. The other end (81) of each of the pair of connection pipes (8, 8) for air flow is connected to each other in a closed state or is connected to each other by an end air-flow pipe (10) in a pneumatically communicable manner.
Owner:HOKUSUI SEKKEI CONSUL

Road snow melting system with inorganic medium heat pipe based on ground temperature and solar energy and using method of road snow melting system

The invention discloses a road snow melting system with inorganic medium heat pipes based on ground temperature and solar energy and a using method of the road snow melting system. The road snow melting system comprises a bridge bedding course, wherein the bridge bedding course is provided with the inorganic medium heat pipes; each inorganic medium heat pipe comprises a heat pipe heating section,a heat dissipation section and an endothermic section; the heat pipe heating sections are provided with electric heating wires; the heat pipe heating sections are wrapped by flexible solar panels andconnected to the electric heating wires; the heat dissipation sections are uniformly arranged on the bridge bedding course; the heat pipe heating sections are also provided with auxiliary power interfaces; a lapping ring and a lapping hook are arranged between every two adjacent flexible solar panels; and the solar panels can expand in the case of lack of sunshine. The road snow melting system with the inorganic medium heat pipes based on ground temperature and solar energy realizes the advantage of fast and convenient melting of snow according to weather conditions without damaging road surfaces.
Owner:SHANDONG TRAFFIC PLANNING DESIGN INST

Photovoltaic power station efficient snow melting system and management method thereof

The invention discloses a photovoltaic power station efficient snow melting system and a management method thereof.The photovoltaic power station efficient snow melting system comprises a bottom plate, a liquid storage box is arranged at the top of the bottom plate, a stirring assembly is arranged in the liquid storage box, an electric heating disc is arranged at the bottom in the liquid storage box, a temperature control assembly is arranged in the liquid storage box, an infusion pump is arranged in the liquid storage box, and a hose is connected to the infusion pump; and the right side of the top of the bottom plate is provided with an adjusting assembly, the top of the adjusting assembly is provided with a driving assembly, the adjusting assembly is connected with a mounting plate, the mounting plate is provided with a buffer box, the buffer box is provided with multiple sets of nozzles, the mounting plate is connected with an elastic telescopic rod, and the end of the elastic telescopic rod is connected with a cleaning assembly. The driving assembly drives the adjusting assembly to work, the position height and the inclination angle of the mounting plate can be adjusted through the adjusting assembly, snow melting agent mixed liquid in a liquid storage tank is pumped out through a liquid pump for snow melting, and the temperature control assembly can control the temperature of the snow melting agent mixed liquid. And accumulated snow and water stains remaining on a photovoltaic panel are cleaned through the cleaning assembly.
Owner:韩鹏

Pipe-laying construction method under road surface for fluid heating road snow melting system

The invention provides a pipe-laying construction method under a road surface for a fluid heating road snow melting system. The method includes a straight pipe type pipe-laying construction method anda coil pipe type pipe-laying construction method; the straight pipe type pipe-laying construction method adopts a pipe to cross pipe-laying construction of the road surface, needs to pass through anadjacent concrete construction warehouse, first width is utilized as a construction warehouse and concrete is poured along a traveling direction of a vehicle, and in the case of no need to cross a road, each of construction warehouses are separately and independently constructed by utilizing second width as a unit; in the case of need to cross the road, multiple construction warehouses are simultaneously constructed at an interval, and when steel bars are bound and a formwork is supported, steel sleeves with a larger diameter than a heat exchange tube is pre-buried in the construction warehouses where concrete is poured first, and mortar for strengthening a thermal conductive material is filled in and added between the inner walls of the steel sleeves and the outer walls of heating tubes;and the coil pipe type pipe-laying construction method does not need to pass through the adjacent concrete construction warehouse, and concrete pouring construction of each of the construction warehouses is carried out independently, coil pipes of each of the construction warehouses are an independent system, and a flexible connection is established between the adjacent construction warehouses y employing PE pipes.
Owner:CHINA IPPR INT ENG

Optimization method of operating parameters of fluid-heated snow melting system based on multi-objective programming

ActiveCN109063919AImplement the buildFast calculation and outputForecastingMarketingHeat flowHeat flux
The invention relates to an optimization method for operating parameters of a fluid heating snow melting system based on a multi-objective programming, and relates to an optimization method for operating parameters of the fluid heating snow melting system. The invention solves the problems that the prior art can not calculate the snow melting effect and the operation cost of the system and can notdetermine the optimal operation parameters. The invention comprises the following steps: 1. Establishing a snow melting effect database of a fluid heating snow melting system; 2, calculate that snowmelting effect of the fluid heat snow melting system under a certain working condition; 3, obtain that operating cost M of the fluid heat snow melting system in the range of the unit area road body according to the heat flux q; IV. Evaluation of M; 5. Establishing the optimization model of the operation strategy of the fluid heating snow melting system by using the method of multi-objective programming; 6, obtaining the optimal operation parameters of the fluid heat snow melting system under a certain working condition; 7, repeat that step 6 to obtain the control chart of the operation parameters of the fluid heat snow melting system under the full working condition. The invention is used in the field of transportation engineering.
Owner:HARBIN INST OF TECH

A roof snow melting system

ActiveCN104831874BImprove snow melting effectSolve technical problems with low resource utilizationSnow trapsThermal energySnowmelt system
The invention is suitable for a construction method, and discloses a roof snow melting system, which comprises a water storage tank and a circulating pipeline, wherein the water storage tank is buried under the ground; the circulating pipeline is used for conveying water in the water storage tank, and comprises a heating pipe, a heat discharging pipe and a recovery pipe; the heating pipe is used for conveying the water in the water storage tank to a roof; the heat discharging pipe is paved at the roof; the recovery pipe is used for recovering the melted snow water at the roof into the water storage tank; the heating pipe is provided with a multi-stage water pipe heating system for heating water; the heat discharging pipe is provided with a rotary spray head for spraying the hot water. The roof snow melting system has the advantages that the energy-saving and environment-friendly effects are realized, the snow water is recycled and reutilized, the heat energy is sufficiently utilized, the waste of electric energy and heat energy is reduced, the safety and controllability are realized, the snow melting effect of the snow melting system is improved, the technical problem of low utilization rate of resources in the existing snow melting system is solved, and the comprehensive property and market competitiveness of the snow melting system are favorably improved.
Owner:太仓市大烨建筑工程有限公司

Long-term self-snow-melting method and system for road in winter

The invention relates to a long-term self-snow-melting method and system for a road in winter. The long-term self-snow-melting method for the road in winter comprises the steps that heat-transfer vertical wells are arranged under an asphalt pavement or a concrete pavement and arranged in the positions, on the two sides of lanes, under the pavement of the road in a staggered mode with equal distances, and heat-transfer aluminum plate strips are arranged in the longitudinal direction of the heat-transfer vertical wells and fixedly connected with well lids of the heat-transfer vertical wells through bolts. According to the long-term self-snow-melting system for the road in winter, a heat-transfer snow-melting structure is arranged under the pavement and comprises the heat-transfer vertical wells and the heat-transfer aluminum plate strips; the heat-transfer vertical wells are arranged in the positions, on the two sides of the lanes, under the pavement of the road in the staggered mode with the equal distances; and the heat-transfer aluminum plate strips are arranged in the longitudinal direction of the heat-transfer vertical wells and fixedly connected with well lids of the heat-transfer vertical wells. According to the long-term self-snow-melting method and system for the road in winter, energy sources such as electric energy and devices such as a heat-exchange pump are not needed, the advantages of zero energy consumption, simple construction and long life are achieved, environment pollution is avoided, and economy and practicability are achieved.
Owner:SHIHEZI UNIVERSITY

Method for generating operation strategy of fluid heating road snow-melting system

The invention provides a method for generating an operation strategy of a fluid heating road snow melting system. The method is used for estimating heat required by road surface snow melting accordingto different snowfall intensities. The method comprises the following steps: step 1, testing a region where the road section is located to obtain snow melting data, including the input heat power when different snow melting effects are generated at different preheating time are included, wherein the snow melting effects refer to the snow-free time ratio of a certain snow melting target, that is,in the snowfall process, the percentage of the time reaching or superior to the target road surface snow-free rate in the total snowfall time serves as an evaluation index; 2, fitting the coupling rule between the snow melting load of the target pavement and the preheating time of the target pavement by adopting the snow melting data to form a fitting curve; and 3, checking the overlapping degreeof the test point and the fitting curve, if the overlapping degree is high, proving that the fitting method is effective, and carrying out numerical analysis according to the coupling rule between thetarget road surface snow melting load and the target road surface preheating time to obtain the heat required by target road surface snow melting.
Owner:CHINA IPPR INT ENG

Water-pumping-type inorganic medium heat pipe snow-melting system for river-crossing bridge deck and arranging method of water-pumping-type inorganic medium heat pipe snow-melting system

The invention discloses a water-pumping-type inorganic medium heat pipe snow-melting system for a river-crossing bridge deck and an arranging method of the water-pumping-type inorganic medium heat pipe snow-melting system. The water-pumping-type inorganic medium heat pipe snow-melting system comprises a bridge deck bed course and bridge side wall plates, and is characterized in that inorganic medium heat pipes are arranged on the bridge deck bed course, water pump circulators and water flow circulating transduction cavities are formed in the bridge side wall plates, the inorganic medium heat pipes are connected with the water flow circulating transduction cavities, the water flow circulating transduction cavities are connected with the water pump circulators through water pipes, and waterpipes inserted into a river water constant-temperature layer are arranged on the lower parts of the water pump circulators. The working principle and the high heat conducting efficiency of the inorganic medium heat pipes are utilized, the geological position characteristics of a river-crossing bridge are fully utilized, river water serves as a heat pipe heat source, and effective work of the inorganic medium heat pipes is achieved; and through reasonable arrangement of heat pipe heat-absorption sections, the snow-melting effect of the heat pipes is optimized, convection heat exchange of the river water is fully utilized, and the advantages of environment friendliness and energy saving are achieved.
Owner:SHANDONG TRAFFIC PLANNING DESIGN INST

Highway old road reconstruction inorganic medium heat pipe road snow melting system and construction method thereof

ActiveCN108611950ARealize active continuous snow melting and ice meltingRealize force protectionPaving detailsGround temperatureSheet steel
The invention discloses a highway old road reconstruction inorganic medium heat pipe road snow melting system and a construction method thereof. The highway old road reconstruction inorganic medium heat pipe road snow melting system comprises a highway, a plurality of inorganic medium heat pipes and a heat pipe protection frame. A plurality of drilling holes are formed in the surface of the highway in the vertical direction downwards. The inorganic medium heat pipes are vertically arranged in the drilling holes of the highway, the heat absorption sections of the inorganic medium heat pipes extend into a stratum constant temperature layer of the highway, and the heat dissipation sections of the inorganic medium heat pipes are located on road surface layers and roadbed layers of the highway.The heat pipe protection frame is provided with a protection layer shell, an insulating rubber layer and a heat conducting resin later from outside to inside in sequence. The heat dissipation sections of the inorganic medium heat pipes are located in the enclosure of the heat conducting resin layer. A protection steel plate is arranged on the end face of the upper portion of the heat conducting resin layer of the heat pipe protection frame in the horizontal direction. The highway old road reconstruction inorganic medium heat pipe road snow melting system rebuilds a highway old road reconstruction ground temperature heat pipe road snow melting system and designs the protection frame of heat dissipation sections of the heat pipes, can effectively concentrate the heat energy of the heat dissipation sections on the road surface and realizes continuous snowmelt and ice melting.
Owner:SHANDONG TRAFFIC PLANNING DESIGN INST

Efficient snow melting system of photovoltaic power station and management method of efficient snow melting system

The invention discloses a photovoltaic power station efficient snow melting system and a management method thereof, and relates to the technical field of photovoltaic power station maintenance equipment.The photovoltaic power station efficient snow melting system comprises a solar panel, a supporting assembly is arranged at the bottom of the solar panel, and an outer frame fixed to the ground is arranged on the outer side of the solar panel; an electric telescopic rod is arranged at the top of an inner cavity of the outer frame, a snow melting assembly is arranged at the telescopic end of the bottom of the electric telescopic rod and comprises a wedge-shaped base block, a first hot cutter is arranged at one end of the wedge-shaped base block, multiple sets of partition blocks are evenly arranged at the top of the wedge-shaped base block, and a second hot cutter is arranged at one end of each set of partition blocks. An electric heating plate is arranged at the bottom of the wedge-shaped base block. Through the design of the weighing sensor, snow melting operation can be carried out in time according to the bearing capacity of the solar panel in the snowfall process, the risk that the solar panel is damaged due to the fact that the accumulated snow pressure received by the top power generation face is too large is reduced, and the service life of the solar panel is prolonged.
Owner:山西勤思睿达科技有限公司

Intelligent gutter snow melting system

The invention provides an intelligent gutter snow melting system. The intelligent gutter snow melting system comprises a power supply module, a heating module, an environment monitoring module and an intelligent control module, wherein the power supply module is used for providing electric energy, the heating module is used for converting the electric energy into heat energy for melting ice and snow, the environment monitoring module is used for collecting current temperature data and current environment state parameters of a preset monitoring point in real time, the intelligent control module comprises a microcontroller and a control circuit, the microcontroller is used for comparing the current temperature data and the environment state parameters with preset environment parameters and outputting corresponding control signals according to comparison results, and the control circuit is used for controlling the heating module to be turned on or turned off according to the control signal. According to the intelligent gutter snow melting system, the problem of electric energy waste caused by manual operation of the gutter snow melting system in the prior art is solved, intelligent operation of the gutter snow melting system is achieved, electric energy consumed by work of the heating module under the condition that the temperature is higher than a set value or no rain or snow weather exists is avoided, and energy is saved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Exhaust pipe structure for road surface snow melting, road surface member for snow melting, and road surface snow melting system

ActiveCN103946451BSuppression of uneven snowmeltEasy constructionPaving detailsSnowmelt systemSnow melting
[Problem] Provided are: an air discharge pipe structure for melting snow on a road surface, the air discharge pipe structure being configured so that the air discharge pipe structure can more evenly discharge snow melting air into an area underneath the road surface on which the snow to be melted is present than conventional structures to prevent the uneven melting of the snow, so that the air discharge pipe structure can be built more easily, and so that the air discharge pipe structure can be built in a reduced time and at reduced cost; a road surface material for melting snow; and a system for melting snow on a road surface. [Solution] An air discharge pipe structure for melting snow on a road surface is provided with: perforated pipes (7, 7, ...) which have air ejection holes (6) formed therein and which are laid in a predetermined area underneath the road surface (5) on which the snow to be melted is present; a pair of connection pipes (8, 8) for air flow, connecting the opposite ends of each of the perforated pipes (7, 7, ...) in a pneumatically communicable manner; and an air supply pipe (9) which connects one end of each of the connection pipes (8, 8) for air flow in a pneumatically communicable manner and which is provided with an air supply opening (11) for supplying air. The other end (81) of each of the pair of connection pipes (8, 8) for air flow is connected to each other in a closed state or is connected to each other by an end air-flow pipe (10) in a pneumatically communicable manner.
Owner:HOKUSUI SEKKEI CONSUL
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products