Electric energy meter inspection system and method

Through the design of the power meter inspection system, the interconnection between the inspection end and the control end is used to upload the power meter checksum data, which solves the complex and time-consuming problems of traditional verification methods, realizes real-time uploading of data and business processing, and improves the Calibration efficiency and accuracy have promoted the modernization of on-site power inspection.

CN119044879AActive Publication Date: 2024-11-29SHENZHEN POWER SUPPLY BUREAU
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411186188.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-29
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

Traditional power meter verification methods are complex and time-consuming, resulting in data loss and high operation difficulty, and cannot effectively simplify the work flow of grassroots inspectors.

Method used

Design an electric energy meter inspection system to obtain inspection plans through the interconnection of the inspection end and the control end, conduct electricity meter verification, and upload the result data to the marketing system in real time to reduce manual recording and sorting work.

Benefits of technology

It improves the accuracy and reliability of data, simplifies the on-site verification work process, reduces the work burden, and promotes the modern development of on-site power inspection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119044879A_ABST
    Figure CN119044879A_ABST
Patent Text Reader

Abstract

The invention provides an electric energy meter inspection system and method, and the system comprises an inspection end and a control end which are connected with each other, the inspection end is also connected with an electric energy meter, and the control end is also connected with a marketing system. The control end is used for acquiring the inspection plan from the marketing system according to an input acquisition instruction and performing matching verification on the control end and the inspection end; after verification succeeds, the obtained inspection plan is output to the inspection end according to an input issuing instruction; the inspection end is used for performing inspection operation on the connected electric energy meter according to the received inspection plan, receiving related data returned by the electric energy meter, and storing the related data as inspection plan result data; after the check plan result data is stored, a check completion signal is output to the control end; and outputting the stored inspection plan result data to the control end according to the received data acquisition instruction. According to the invention, three-party system interconnection is realized, the digitization level capability is improved, the real-time uploading operation of field calibration work data is completed, and the accuracy and reliability of the data are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric energy meter inspection, and in particular to an electric energy meter inspection system and method. Background Art

[0002] The purpose of the field tester interface device transformation project is to simplify the complexity of the electricity meter calibration business operations and improve the efficiency of front-line operations. As the number of electricity meters in the region continues to increase and the average age of electricity meters increases, the amount of meter calibration tasks that grassroots inspectors need to perform on site will continue to increase. In the traditional operation method, inspectors connect the calibrator and the PC through a data cable to download data, and then upload it again through data items after the operation is completed. Grassroots employees need to manually record and organize a large amount of data, which consumes time and energy. The entire set of operation procedures is difficult and complicated to get started, and it is easy to cause data loss. Summary of the invention

[0003] The purpose of the present invention is to provide an electric energy meter inspection system and method to solve the technical problem of how to simply and conveniently perform electric energy meter inspection.

[0004] In one aspect, an electric energy meter inspection system is provided, comprising:

[0005] An inspection terminal and a control terminal connected to each other, the inspection terminal is also connected to the electric energy meter to be inspected, and the control terminal is also connected to the corresponding marketing system;

[0006] The control terminal is used to obtain the corresponding inspection plan from the marketing system according to the input acquisition instruction, and to match and verify the control terminal with the inspection terminal; when the verification is successful, the obtained inspection plan is output to the inspection terminal according to the input delivery instruction;

[0007] The inspection end is used to perform a verification operation on the connected electric energy meter according to the received inspection plan and send a corresponding verification instruction; receive the relevant data returned by the electric energy meter, and standardize the relevant data according to the inspection plan, and store them as inspection plan result data; when the inspection plan result data is stored, output a verification completion signal to the control end; and output the stored inspection plan result data to the control end according to the received data collection instruction.

[0008] Preferably, the control end is further used to generate and send a data collection instruction to the inspection end according to the input control information after receiving the verification completion signal.

[0009] Preferably, the control end is also used to perform business processing on the received inspection plan result data according to preset business standards to obtain corresponding business information; when the business information is verified to be normal, the business information is output to the marketing system.

[0010] Preferably, the data collection instruction at least includes an incoming parameter description and a return parameter description, wherein the incoming parameter description at least includes a parameter name, type, parameter description and parameter description; the return parameter at least includes a parameter name, type, parameter description and parameter description.

[0011] Preferably, the inspection plan includes at least frame structure information, byte format information, first frame start character information, address field information, second frame start character information, protocol version information, control code information, data length information, data identification information, data field information, check code information, and frame end character information.

[0012] On the other hand, an electric energy meter inspection method is also provided, which is implemented based on the electric energy meter inspection system, and includes:

[0013] Acquire the corresponding inspection plan from the marketing system according to the input acquisition instruction, and match and verify the control end and the inspection end; when the verification is successful, output the acquired inspection plan according to the input delivery instruction;

[0014] Perform verification operations on the connected electric energy meter according to the verification plan and send corresponding verification instructions; and receive relevant data returned by the electric energy meter, perform standard construction on the relevant data according to the verification plan, and store them as verification plan result data;

[0015] When the inspection plan result data is stored, the stored inspection plan result data is output according to the received data collection instruction.

[0016] Preferably, the method further comprises generating and sending a data collection instruction to the inspection terminal according to the input control information after receiving the verification completion signal.

[0017] Preferably, it also includes performing business processing on the received inspection plan result data according to preset business standards to obtain corresponding business information; when the business information is verified to be normal, the business information is output to the marketing system.

[0018] Preferably, the data collection instruction at least includes an incoming parameter description and a return parameter description, wherein the incoming parameter description at least includes a parameter name, type, parameter description and parameter description; the return parameter at least includes a parameter name, type, parameter description and parameter description.

[0019] Preferably, the inspection plan includes at least frame structure information, byte format information, first frame start character information, address field information, second frame start character information, protocol version information, control code information, data length information, data identification information, data field information, check code information, and frame end character information.

[0020] In summary, the implementation of the embodiments of the present invention has the following beneficial effects:

[0021] The electric energy meter inspection system and method provided by the present invention optimize the on-site inspection working mode by integrating modern technical means, provide a data service interface for the on-site calibrator, open up the interconnection between the inspection end, the control end, and the system end, improve the digital level capability, complete the real-time upload operation of the on-site inspection work data, and greatly improve the accuracy and reliability of the data; it can reduce its workload through digital and intelligent scientific and technological means, achieve the goal of "reducing costs and increasing efficiency" in on-site work, and promote the modernization of power on-site inspection work. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, without paying creative labor, other drawings obtained based on these drawings still belong to the scope of the present invention.

[0023] Figure 1 Schematic diagram of an electric energy meter inspection system in an embodiment of the present invention.

[0024] Figure 2 The main flow chart of an electric energy meter inspection method in an embodiment of the present invention is shown in FIG. DETAILED DESCRIPTION

[0025] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings.

[0026] like Figure 1 FIG. 1 is a schematic diagram of an embodiment of an electric energy meter inspection system provided by the present invention.

[0027] In this embodiment, it includes:

[0028] An inspection end and a control end are connected to each other, the inspection end is also connected to the electric energy meter that needs to be inspected, and the control end is also connected to the corresponding marketing system; the control end is used to obtain the corresponding inspection plan from the marketing system according to the input acquisition instruction, and match and verify the control end with the inspection end; when the verification is successful, the obtained inspection plan is output to the inspection end according to the input issuance instruction; the inspection end is used to perform a verification operation on the connected electric energy meter according to the received inspection plan, and send a corresponding verification instruction; receive the relevant data returned by the electric energy meter, and perform standard construction on the relevant data according to the inspection plan, and store it as the inspection plan result data; when the inspection plan result data is stored, a verification completion signal is output to the control end; it is also used to output the stored inspection plan result data to the control end according to the received data collection instruction. Understandably, grassroots personnel obtain operator information through handheld mobile APP and download personal inspection plan through marketing system interface; after mobile App obtains personal inspection plan, it issues instructions, completes matching with the inspection instrument terminal based on mobile Bluetooth technology, and transmits the inspection plan content; after the on-site inspection instrument is connected to the electric energy meter, the electric energy meter is inspected and relevant inspection instructions are sent; the electric energy meter returns relevant data according to the instructions of the on-site inspection instrument; after the on-site inspection instrument receives the electric energy meter parameter data, it realizes local storage and constructs standard data; the mobile App issues data collection instructions based on paired Bluetooth; after the on-site inspection instrument receives the data collection instructions, it returns the collection data of the relevant plan; the mobile App receives the collection data results, implements business processing of the data, displays it on the mobile terminal, and verifies the necessary data; after the operator checks that there is no problem with the collected data, the data is transmitted back to the marketing management system through the mobile App.

[0029] In one embodiment, the control terminal is further used to generate and send a data collection instruction to the inspection terminal according to the input control information after receiving the verification completion signal. The control terminal is also used to perform business processing on the received inspection plan result data according to the preset business standards to obtain corresponding business information; when the business information is verified to be normal, the business information is output to the marketing system.

[0030] In one embodiment, the data collection instruction at least includes an incoming parameter description and a return parameter description, wherein the incoming parameter description at least includes a parameter name, a type, a parameter description, and a parameter description; and the return parameter at least includes a parameter name, a type, a parameter description, and a parameter description. It is understandable that the incoming parameter description and the return parameter description both include a parameter name, a type, a parameter description, and a parameter description. In the incoming parameter description, the parameter names include collectionObjects and operationType, and the types include List and String; in the return parameter description, the parameter names include resultObjects, and the types include List.

[0031] The interface architecture is designed as follows:

[0032] Incoming parameter description Parameter name Type Parameter description Parameter description

[0033] collectionObjects ListFor detailed data, please refer to the interface protocol document collection object

[0034] operationType String Operation type 01 Delivery operation 02 Collection operation

[0035] Return Parameter Description Parameter Name Type Parameter Description Parameter Description

[0036] resultObjects

[0037] ListFor specific data, please refer to the interface protocol document, including basic information of inspection details, basic information of inspection, on-site wiring information, electric energy meter inspection conclusion information, and error information.

[0038] In one embodiment, the inspection plan includes at least frame structure information, byte format information, first frame start character information, address field information, second frame start character information, protocol version information, control code information, data length information, data identification information, data field information, check code information, and frame end character information. Understandably, in the inspection plan, the Bluetooth protocol includes: frame structure, byte format, frame start character 1, address field A0, frame start character 2, protocol version ver, control code C, data length L, data identification, data field, check code, and frame end character. Marks the beginning of a frame, its value is 68H, BIN format, 1 byte. Valid frame assists judgment identification, value 86H, BIN format, 1 byte. Data field length byte number, BIN, 2 bytes; data length should not exceed 65000 bytes, and a length of 0 indicates no data field. When the data format is byte, the data identification is valid. When the data format is JSON, this field is invalid and the default value is 0000H; the data identification is used to identify a single data item or a set of multiple data items, BIN format, 2 bytes.

[0039] The frame structure is as follows: All command frames are initiated by the master station, and the slave station responds to the response frame. Byte format, each byte contains 8-bit binary code, a start bit (0) and a stop bit (1) are added during transmission, no check bit, a total of 10 bits. Its transmission sequence is shown in the figure below. D0 is the least significant bit of the byte, and D7 is the most significant bit of the byte. The low bit is transmitted first, and the high bit is transmitted later. Frame start character 1, marking the beginning of a frame, its value is 68H, BIN format, 1 byte. Address field A0, the address field (A0H) consists of 1 byte. Reserved. Frame start character 2, valid frame auxiliary judgment identifier, value 86H, BIN format, 1 byte. Protocol version ver, current version of the protocol (00H), reserved for subsequent protocol changes and extensions, BIN format, 1 byte. Control code C, command code format is BIN format, 1 byte, D0-D4 identifies the function code. Data length L, 1. Number of bytes of data field length, BIN, 2 bytes. 2. The data length should not exceed 65000 bytes. A length of 0 indicates no data field. Data identifier, 1. When the data format is byte (see 2.3.7.1), the data identifier is valid. When the data format is JSON, this field is invalid and the default value is 0000H; 2. The data identifier is used to identify a single data item or a collection of multiple data items. It is in BIN format and has a 2-byte format. Data field, JSON format. For the specific format, see 3.3 Data field DATA JSON protocol standard description; Check code (CS). Starting from the first frame start character, the sum of all bytes modulo 256 before the check code, BIN format, 1 byte. Frame end character, the value is 0x16, BIN format, 1 byte.

[0040] like Figure 2As shown, an embodiment of the present invention further provides an electric energy meter inspection method, which is implemented based on the electric energy meter inspection system, and is characterized by comprising:

[0041] Acquire the corresponding inspection plan from the marketing system according to the input acquisition instruction, and match and verify the control end and the inspection end; when the verification is successful, output the acquired inspection plan according to the input delivery instruction;

[0042] Perform verification operations on the connected electric energy meter according to the verification plan and send corresponding verification instructions; and receive relevant data returned by the electric energy meter, perform standard construction on the relevant data according to the verification plan, and store them as verification plan result data;

[0043] When the inspection plan result data is stored, the stored inspection plan result data is output according to the received data collection instruction.

[0044] One embodiment further includes, when receiving the verification completion signal, generating and sending a data collection instruction to the inspection terminal according to the input control information. Performing business processing on the received inspection plan result data according to the preset business standard to obtain corresponding business information; when the business information is verified to be normal, outputting the business information to the marketing system.

[0045] In one embodiment, the data collection instruction includes at least an input parameter description and a return parameter description, wherein the input parameter description includes at least a parameter name, type, parameter description and parameter description; the return parameter includes at least a parameter name, type, parameter description and parameter description.

[0046] In one embodiment, the inspection plan includes at least frame structure information, byte format information, first frame start character information, address field information, second frame start character information, protocol version information, control code information, data length information, data identification information, data field information, check code information, and frame end character information.

[0047] It should be noted that the system described in the above embodiment corresponds to the method described in the above embodiment. Therefore, the part of the method described in the above embodiment that is not described in detail can be obtained by referring to the content of the system described in the above embodiment, and will not be repeated here.

[0048] In summary, the implementation of the embodiments of the present invention has the following beneficial effects:

[0049] The electric energy meter inspection system and method provided by the present invention optimize the on-site inspection working mode by integrating modern technical means, provide a data service interface for the on-site calibrator, open up the interconnection between the inspection end, the control end, and the system end, improve the digital level capability, complete the real-time upload operation of the on-site inspection work data, and greatly improve the accuracy and reliability of the data; it can reduce its workload through digital and intelligent scientific and technological means, achieve the goal of "reducing costs and increasing efficiency" in on-site work, and promote the modernization of power on-site inspection work.

[0050] The above disclosure is only the preferred embodiment of the present invention, which certainly cannot be used to limit the scope of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope of the present invention.

Claims

1. An electric energy meter inspection system, characterized in that: include: An inspection terminal and a control terminal connected to each other, the inspection terminal is also connected to the electric energy meter to be inspected, and the control terminal is also connected to the corresponding marketing system; The control terminal is used to obtain the corresponding inspection plan from the marketing system according to the input acquisition instruction, and to match and verify the control terminal with the inspection terminal; When the verification is successful, the obtained inspection plan is output to the inspection end according to the input issuance instruction; The inspection terminal is used to perform inspection operations on the connected electric energy meter according to the received inspection plan and send corresponding inspection instructions; Receiving relevant data returned by the electric energy meter, and constructing the relevant data in accordance with the inspection plan, and storing them as inspection plan result data; when the inspection plan result data is stored, outputting a verification completion signal to the control end; It is also used to output the stored inspection plan result data to the control end according to the received data collection instruction.

2. The system according to claim 1, characterized in that The control end is also used to generate and send a data collection instruction to the inspection end according to the input control information after receiving the verification completion signal.

3. The system according to claim 2, characterized in that The control end is also used to perform business processing on the received inspection plan result data according to preset business standards to obtain corresponding business information; when the business information is verified to be normal, the business information is output to the marketing system.

4. The system according to claim 2, characterized in that The data collection instruction at least includes an input parameter description and a return parameter description, wherein the input parameter description at least includes a parameter name, type, parameter description and parameter description; the return parameter at least includes a parameter name, type, parameter description and parameter description.

5. The system according to claim 1, wherein: The inspection plan includes at least frame structure information, byte format information, first frame start character information, address field information, second frame start character information, protocol version information, control code information, data length information, data identification information, data field information, check code information, and frame end character information.

6. A method for testing an electric energy meter, implemented based on the system according to any one of claims 1 to 5, characterized in that: include: Obtaining the corresponding inspection plan from the marketing system according to the input acquisition instruction, and matching and verifying the control end with the inspection end; When verification is successful, the obtained inspection plan is output according to the input issuance instructions; Perform calibration operations on the connected electric energy meters according to the calibration plan and send corresponding calibration instructions; and receiving the relevant data returned by the electric energy meter, constructing the relevant data in accordance with the inspection plan, and storing the data as inspection plan result data; When the inspection plan result data is stored, the stored inspection plan result data is output according to the received data collection instruction.

7. The method according to claim 6, characterized in that It also includes generating and sending a data collection instruction to the inspection end according to the input control information after receiving the verification completion signal.

8. The method according to claim 7, characterized in that It also includes performing business processing on the received inspection plan result data according to preset business standards to obtain corresponding business information; when the business information is verified to be normal, the business information is output to the marketing system.

9. The method according to claim 7, characterized in that The data collection instruction at least includes an input parameter description and a return parameter description, wherein the input parameter description at least includes a parameter name, type, parameter description and parameter description; the return parameter at least includes a parameter name, type, parameter description and parameter description.

10. The method according to claim 6, characterized in that The inspection plan includes at least frame structure information, byte format information, first frame start character information, address field information, second frame start character information, protocol version information, control code information, data length information, data identification information, data field information, check code information, and frame end character information.

Citation Information

Patent Citations

  • System and method for verifying electric energy meter on site

    CN102375136A

  • Intelligent management system for onsite inspection of electric energy metering device

    CN107884740A

  • Data transmission device and method of electric energy meter on-site calibration instrument

    CN113866706A

  • Management system and method for on-site electricity meter calibrator

    CN116757672A

  • Data collection system for plant equipment

    JP2018060446A