Method for predicting sand production of gas well of loose sandstone gas reservoir
Through the comprehensive index function of the acoustic time difference method, B index method and S index method, the problem of inconsistent sand output prediction results of loose sandstone gas wells is solved, and more accurate sand output prediction is achieved, ensuring the normal production and efficient development of gas wells.
Patent Information
- Application Number
- CN202410923075.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-29
AI Technical Summary
In the prediction of sand output from gas wells of loose sandstone gas reservoirs, the results of different methods are inconsistent, accurate prediction cannot be achieved, and the combined effect with reality is not good.
The sonic time difference method, B index method and S index method are used to predict the sand output of gas wells, and the accuracy of each method is calculated by comparing and calculating the weight coefficient, and a comprehensive index function with weight is established to accurately predict the sand output of gas wells.
The accuracy of sand output prediction is improved, the calculation results are more accurate and reliable, the process is simple and easy to perform, and it has strong generalization. It can implement sand prevention technology in a timely manner before sand output of gas wells to avoid damage and maintain normal production of gas wells.
Smart Images

Figure CN119047611A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for predicting sand production in a gas well of a loose sandstone gas reservoir, and belongs to the field of oil and gas field development. Background Art
[0002] With the continuous growth of China's demand for oil and gas resources, sand control, sand prevention technology and sand production prediction in loose sandstone gas reservoirs have become the focus of the development of such gas reservoirs. The loose sandstone gas reservoir has a low degree of reservoir cementation. Under the impetus of high-speed airflow, sand particles are easy to fall off and erode the gas well pipe and equipment, causing damage to the gas well and equipment. Therefore, it is necessary to carry out sand production prediction of gas wells and implement sand prevention technology in time before the gas wells produce sand to avoid gas well damage and maintain normal production of gas wells. Accurate sand production prediction is the basis for realizing efficient development of loose sandstone gas reservoirs.
[0003] After extensive research, the patent number CN202211397737.2, "A method for predicting sand production in tight sandstone fracturing gas wells", extracts the causes of sand production in tight sandstone fracturing gas wells, then uses the hierarchical analysis method to calculate the weights of the causes of sand production in tight sandstone fracturing gas wells, and then predicts the sand production risk of tight sandstone fracturing gas wells based on the sand production risk assessment model; the patent number CN202111605136.1, "A method and system for predicting critical sand production pressure difference in fractured sandstone reservoirs", is based on logging and rock mechanics test experimental data, uses Techlog software to establish a full-well profile geomechanical model, and conducts sand production prediction on the full-well profile geomechanical model.
[0004] In general, there are many methods for predicting sand production in gas wells, but they all have their own limitations. There are few comprehensive sand production prediction methods involving loose sandstone gas reservoirs, and the existing technical methods are basically theoretical model research, which is not well combined with the actual mine site. A method that takes into account the loose sandstone reservoir and mechanical characteristics, is easy to use, closely combined with the actual mine site, and has strong operability is needed. Summary of the invention
[0005] The purpose of the present invention is to solve the problem that the sand production prediction results of gas wells in loose sandstone gas reservoirs using different sand production prediction methods are inconsistent, and a single sand production prediction method cannot be selected to accurately predict the sand production of gas wells. The present invention adopts a means of combining theory with practice, and uses three sand production prediction methods, such as an acoustic time difference method, a B index method and an S index method, to respectively predict the sand production of gas wells, and then compares the sand production prediction results of the three methods with the actual sand production of the gas wells, calculates the sand production prediction accuracy of each method, normalizes the accuracy of the three methods, obtains the weight coefficient of the sand production prediction accuracy of each method, and finally performs quantitative normalization on the indicators of the three prediction methods, establishes a comprehensive index function for sand production prediction containing a weight coefficient, and accurately predicts the sand production of gas wells by calculating the comprehensive index of sand production prediction of gas wells.
[0006] To achieve the above object, the present invention provides a method for predicting sand production in a gas well of a loose sandstone gas reservoir, the method comprising the following steps:
[0007] First, three sand production prediction methods, namely, acoustic time difference method, B index method and S index method, were used to predict sand production in gas wells.
[0008] Second, the sand production prediction results of the three methods were compared with the actual sand production of the gas wells, and the sand production prediction accuracy of each method was calculated;
[0009] Third, the accuracy of the three methods was normalized to obtain the weight coefficient of sand prediction accuracy of each method;
[0010] Fourthly, the indicators of the three prediction methods are quantitatively normalized, and a comprehensive indicator function for sand production prediction containing a weight coefficient is established. Thus, the sand production of gas wells can be accurately predicted by calculating the comprehensive indicator for sand production prediction of gas wells.
[0011] In the above-mentioned method for predicting sand production in gas wells in loose sandstone gas reservoirs, the steps of using three sand production prediction methods, namely the acoustic time difference method, the B index method and the S index method, to respectively predict sand production in gas wells are as follows: combining the miracle data of the gas wells, using the three sand production prediction methods, namely the acoustic time difference method, the B index method and the S index method, to respectively predict sand production in gas wells.
[0012] In the above-mentioned method for predicting sand production in a gas well in a loose sandstone gas reservoir, the sand production prediction results of the three methods are compared with the actual sand production of the gas wells in the gas reservoir, and the sand production prediction accuracy of each method is calculated by comparing the sand production prediction results of the acoustic time difference method, the B index method and the S index method with the actual sand production results of the gas wells, and calculating the sand production prediction accuracy of each method.
[0013] In the above-mentioned method for predicting sand production in a gas well of a loose sandstone gas reservoir, the steps of normalizing the accuracy of the three methods and obtaining the weight coefficient of the sand production prediction accuracy of each method are as follows:
[0014] First, sum the accuracy of the three methods, calculate the proportion of the accuracy of each method to the total accuracy, and complete the normalization of the accuracy of the three methods;
[0015] Second, the ratio of the accuracy of each sand prediction method to the total accuracy is the weight coefficient of the sand prediction accuracy of the corresponding sand prediction method.
[0016] In the above-mentioned method for predicting sand production in a gas well of a loose sandstone gas reservoir, the acoustic time difference, the B index and the S index are dimensionless, a comprehensive index function for predicting sand production containing a weight coefficient is established, and the steps for accurately predicting sand production in a gas well are performed by calculating the comprehensive index for predicting sand production in the gas well,
[0017] First, the acoustic time difference, B index and S index are divided by the critical value of sand production prediction of the corresponding method to obtain the dimensionless sand production prediction index of acoustic time difference, B index and S index;
[0018] Second, the acoustic time difference is positively correlated with the sand production of the gas well, while the B index and the S index are negatively correlated with the sand production of the gas well. Therefore, the inverse of the acoustic time difference dimensionless sand production prediction index, the B index dimensionless sand production prediction index and the S index dimensionless sand production prediction index are multiplied by their respective sand production prediction accuracy weight coefficients to establish a comprehensive sand production prediction index function.
[0019] Third, the comprehensive index value of gas well sand production prediction is calculated according to the comprehensive index function of sand production prediction to accurately predict the sand production of the gas well. If the index value is less than or equal to 1, it is predicted that the gas well will produce sand, otherwise, it is predicted that the gas well will not produce sand.
[0020] In the above-mentioned method for predicting sand production in a gas well in a loose sandstone gas reservoir, the acoustic time difference method is the inverse of the propagation speed of the longitudinal wave of the acoustic wave in the direction of the well profile. The acoustic time difference is represented by Dt, and its unit is μs / ft. The acoustic time difference can effectively reflect the rock cementation condition. Usually, 105μs / ft is used as the critical value for judging whether sand is produced. When the acoustic time difference of the gas well is greater than or equal to 105μs / ft, it is predicted that the gas well will produce sand.
[0021] In the above-mentioned method for predicting sand production in a gas well of a loose sandstone gas reservoir, the B index method uses the relationship between the elastic modulus and Poisson's ratio to characterize whether the reservoir is sandy. The B index characterizes the relationship between the rock elastic modulus and the rock strength. The critical sand production index of the B index method is 2.0×10 4 MPa, when the gas well B index is less than or equal to 2.0×10 4 MPa, and its calculation formula is:
[0022]
[0023] Among them, B is the sand production index, the unit is MPa, E is the elastic modulus, the unit is MPa, and μ is the Poisson's ratio, the unit is dimensionless.
[0024] In the above-mentioned method for predicting sand production in a gas well of a loose sandstone gas reservoir, the S index method is as follows: the S sand production index is defined as the product of the bulk elastic modulus and the shear elastic modulus. The S sand production index represents the formation rock strength and reservoir rock stability. The critical sand production index of the S index method is 5.9×10 7 MPa 2 , when the gas well S index is less than or equal to 5.9×10 7 MPa 2 , then the gas well is predicted to produce sand, and the calculation formula is S = K × G, where S is the Schlumberger sand index, in MPa 2, K is the bulk modulus of rock, in MPa, and G is the shear modulus of rock, in MPa.
[0025] In the above-mentioned method for predicting sand production in a gas well of a loose sandstone gas reservoir, the comprehensive index function for predicting sand production containing a weight coefficient is: Where, Y is the comprehensive index for sand production prediction, unit is dimensionless, D t is the acoustic time difference, unit is μs / ft, B is the sand production index, unit is MPa, S is the Schlumberger sand production index, unit is MPa 2 , I t is the acoustic time difference weight coefficient, unit is dimensionless, I B is the B index weight coefficient, unit is dimensionless, I S is the Schlumberger sand production index weight coefficient, and its unit is dimensionless.
[0026] Compared with the prior art, the present invention has the following beneficial effects: (1) the theory is combined with practice, and the calculation results are more accurate and reliable; (2) the calculation process is simple and easy to use; (3) the generalizability is strong. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In the attached picture:
[0028] Figure 1 It is the technical roadmap of this method. DETAILED DESCRIPTION
[0029] The present invention is further described below in conjunction with the embodiments and drawings.
[0030] The present invention provides a method for predicting sand production in a gas well of a loose sandstone gas reservoir. Figure 1 The technical roadmap of this method includes the following steps:
[0031] First, three sand production prediction methods, namely, acoustic time difference method, B index method and S index method, were used to predict sand production in gas wells.
[0032] Second, the sand production prediction results of the three methods were compared with the actual sand production of the gas wells, and the sand production prediction accuracy of each method was calculated;
[0033] Third, the accuracy of the three methods was normalized to obtain the weight coefficient of sand prediction accuracy of each method;
[0034] Fourthly, the indicators of the three prediction methods are quantitatively normalized, and a comprehensive indicator function for sand production prediction containing a weight coefficient is established. Thus, the sand production of gas wells can be accurately predicted by calculating the comprehensive indicator for sand production prediction of gas wells.
[0035] Furthermore, the steps of using the three sand production prediction methods, namely the acoustic time difference method, the B index method and the S index method, to respectively predict the sand production of the gas well are as follows: combining the miracle data of the gas well, using the three sand production prediction methods, namely the acoustic time difference method, the B index method and the S index method, to respectively predict the sand production of the gas well.
[0036] Furthermore, the sand production prediction results of the three methods are compared with the actual sand production of the gas wells in the gas reservoir, and the sand production prediction accuracy of each method is calculated by comparing the sand production prediction results of the acoustic time difference method, the B index method and the S index method with the actual sand production results of the gas wells, and calculating the sand production prediction accuracy of each method.
[0037] Furthermore, the steps of normalizing the accuracy of the three methods and obtaining the weight coefficient of the sand production prediction accuracy of each method are as follows:
[0038] First, sum the accuracy of the three methods, calculate the proportion of the accuracy of each method to the total accuracy, and complete the normalization of the accuracy of the three methods;
[0039] Second, the ratio of the accuracy of each sand prediction method to the total accuracy is the weight coefficient of the sand prediction accuracy of the corresponding sand prediction method.
[0040] Furthermore, the acoustic time difference, B index and S index are dimensionless, a comprehensive index function for sand production prediction containing a weight coefficient is established, and the steps for accurately predicting sand production in a gas well are performed by calculating the comprehensive index for sand production prediction in a gas well.
[0041] First, the acoustic time difference, B index and S index are divided by the critical value of sand production prediction of the corresponding method to obtain the dimensionless sand production prediction index of acoustic time difference, B index and S index;
[0042] Second, the acoustic time difference is positively correlated with the sand production of the gas well, while the B index and the S index are negatively correlated with the sand production of the gas well. Therefore, the inverse of the acoustic time difference dimensionless sand production prediction index, the B index dimensionless sand production prediction index and the S index dimensionless sand production prediction index are multiplied by their respective sand production prediction accuracy weight coefficients to establish a comprehensive sand production prediction index function.
[0043] Third, the comprehensive index value of gas well sand production prediction is calculated according to the comprehensive index function of sand production prediction to accurately predict the sand production of the gas well. If the index value is less than or equal to 1, it is predicted that the gas well will produce sand, otherwise, it is predicted that the gas well will not produce sand.
[0044] Furthermore, the acoustic time difference method is the inverse of the propagation speed of the longitudinal wave of the acoustic wave in the direction of the well profile. The acoustic time difference is represented by Dt, and its unit is μs / ft. The acoustic time difference can effectively reflect the rock cementation condition. Usually, 105μs / ft is used as the critical value for judging whether sand is produced. When the acoustic time difference of the gas well is greater than or equal to 105μs / ft, it is predicted that the gas well will produce sand.
[0045] Furthermore, the B index method uses the relationship between the elastic modulus and Poisson's ratio to characterize whether the reservoir is sandy. The B index characterizes the relationship between the rock elastic modulus and the rock strength. The critical sand index of the B index method is 2.0×10 4 MPa, when the gas well B index is less than or equal to 2.0×10 4 MPa, and its calculation formula is:
[0046]
[0047] Among them, B is the sand production index, the unit is MPa, E is the elastic modulus, the unit is MPa, and μ is the Poisson's ratio, the unit is dimensionless.
[0048] Furthermore, the S index method is defined as the product of bulk elastic modulus and shear elastic modulus. The S sand index represents the formation rock strength and reservoir rock stability. The critical sand index of the S index method is 5.9×10 7 MPa 2 , when the gas well S index is less than or equal to 5.9×10 7 MPa 2 , then the sand production of the gas well is predicted, and the calculation formula is S = K × G, where S is the Schlumberger sand production index, in MPa 2 , K is the bulk modulus of rock, in MPa, and G is the shear modulus of rock, in MPa.
[0049] Furthermore, the comprehensive index function of sand production prediction including weight coefficient is: Where, Y is the comprehensive index for sand production prediction, unit is dimensionless, D t is the acoustic time difference, unit is μs / ft, B is the sand production index, unit is MPa, S is the Schlumberger sand production index, unit is MPa 2 , I t is the acoustic time difference weight coefficient, unit is dimensionless, I B is the B index weight coefficient, unit is dimensionless, I S is the Schlumberger sand production index weight coefficient, and its unit is dimensionless.
[0050] Taking a loose sandstone gas reservoir as an example, there are more than 150 gas wells in the gas reservoir. 94 gas wells were randomly selected. Among the selected gas wells, there are 29 gas wells with sand production. The cumulative gas production of the gas reservoir is 2.074 billion cubic meters. The three sand production prediction methods, namely the acoustic time difference method, the B index method and the S index method, are used to calculate the sand production prediction index of the gas wells. Then, according to the critical value of the acoustic time difference method of 105μs / ft and the critical value of the B index method of 2.0×10 4 MPa and S index method critical value 5.9×10 7 MPa 2 , sand identification was carried out, and the results are as follows.
[0051] Table 1
[0052]
[0053] The prediction results of the three methods were compared with the actual sand production of the gas wells. The acoustic time difference method accurately judged the sand production of 50 gas wells with an accuracy of 53.19%, the B index method accurately judged the sand production of 76 gas wells with an accuracy of 80.85%, and the S index method accurately judged the sand production of 60 gas wells with an accuracy of 63.83%. According to the accuracy of the three methods, the normalized weight coefficient was calculated, and the weight coefficient of the acoustic time difference method was 0.269, the weight coefficient of the B index method was 0.409, and the weight coefficient of the S index method was 0.322. The comprehensive sand production prediction index function of the loose sandstone gas reservoir was established as Y=0.269×105 / D t +0.409×B / (2.0×10 4 )+0.322×S / (5.9×10 7 ), the comprehensive sand production prediction index values of 94 gas wells are calculated according to the above comprehensive sand production prediction index function. If the index value is less than or equal to 1, it is predicted that the gas well will produce sand, otherwise it will not produce sand. The prediction results are as follows.
[0054] Table 2
[0055]
[0056] The comprehensive sand production prediction index can accurately judge the sand production of 88 gas wells with an accuracy rate of 93.62%. Compared with the sand production identification results of a single method, the accuracy of sand production prediction is greatly improved. According to the constructed comprehensive sand production prediction index standard function, more accurate sand production prediction can be made for other gas wells in the gas reservoir, and sand prevention technology can be implemented in time before sand production occurs in the gas well to avoid gas well damage, maintain normal production of the gas well, and realize efficient development of loose sandstone gas reservoirs.
[0057] Compared with the prior art, the present invention has the following beneficial effects: (1) the theory is combined with practice, and the calculation results are more accurate and reliable; (2) the calculation process is simple and easy to use; (3) the generalizability is strong.
[0058] Finally, it should be noted that the above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A method for predicting sand production in a gas well in a loose sandstone gas reservoir, characterized in that: The method comprises the following steps: S100, using three sand production prediction methods, namely, acoustic time difference method, B index method and S index method, to respectively predict sand production in gas wells; S200, comparing the sand production prediction results of the three methods with the actual sand production of gas wells in the gas reservoir, and calculating the sand production prediction accuracy of each method; S300, normalizing the accuracy of the three methods to obtain the weight coefficient of the sand production prediction accuracy of each method is as follows: S301, summing up the accuracy of the three methods, calculating the ratio of the accuracy of each method to the total accuracy, and completing the normalization processing of the accuracy of the three methods; S302, the ratio of the accuracy of each sand production prediction method to the total accuracy, that is, the sand production prediction accuracy weight coefficient of the corresponding sand production prediction method; S400, the acoustic time difference, B index and S index are dimensionless, and a comprehensive index function for sand production prediction containing a weight coefficient is established. By calculating the comprehensive index for sand production prediction of a gas well, the steps for accurately predicting sand production in a gas well are as follows: S401, dividing the acoustic time difference, B index and S index by the critical value of sand production prediction of the corresponding method to obtain dimensionless sand production prediction indicators of the acoustic time difference, B index and S index; S402, the acoustic time difference is positively correlated with the sand production of the gas well, and the B index and the S index are negatively correlated with the sand production of the gas well. Therefore, the inverse of the acoustic time difference dimensionless sand production prediction index, the B index dimensionless sand production prediction index and the S index dimensionless sand production prediction index are multiplied by their respective sand production prediction accuracy weight coefficients to establish a comprehensive index function for sand production prediction; S403, calculating a comprehensive index value for predicting sand production in a gas well according to a comprehensive index function for predicting sand production, and accurately predicting sand production in the gas well. If the index value is less than or equal to 1, it is predicted that the gas well will produce sand; otherwise, it is predicted that the gas well will not produce sand.
2. The method for predicting sand production in a gas well of a loose sandstone gas reservoir according to claim 1, characterized in that: The acoustic time difference method is the reciprocal of the propagation speed of the longitudinal wave of the acoustic wave in the direction of the well profile. The acoustic time difference is expressed by D t It is expressed in μs / ft. The acoustic time difference can effectively reflect the rock cementation condition. Usually 105μs / ft is taken as the critical value for judging whether sand is produced. When the acoustic time difference of a gas well is greater than or equal to 105μs / ft, it is predicted that the gas well will produce sand.
3. The method for predicting sand production in a gas well of a loose sandstone gas reservoir according to claim 1, characterized in that: The B index method uses the relationship between the elastic modulus and Poisson's ratio to characterize whether the reservoir is sandy. The B index characterizes the relationship between the rock elastic modulus and the rock strength. The critical sand index of the B index method is 2.0×10 4 MPa, when the gas well B index is less than or equal to 2.0×10 4 MPa, then the sand production of the gas well is predicted, and the calculation formula is: Among them, B is the sand production index, the unit is MPa, E is the elastic modulus, the unit is MPa, and μ is the Poisson's ratio, the unit is dimensionless.
4. The method for predicting sand production in a gas well of a loose sandstone gas reservoir according to claim 1, characterized in that: The S index method is as follows: the S sand index is defined as the product of the bulk elastic modulus and the shear elastic modulus. The S sand index represents the formation rock strength and reservoir rock stability. The critical sand index of the S index method is 5.9×10 7 MPa 2 , when the gas well S index is less than or equal to 5.9×10 7 MPa 2 , then the sand production of the gas well is predicted, and the calculation formula is S = K × G, where S is the Schlumberger sand production index, in MPa 2 , K is the bulk modulus of rock, in MPa, and G is the shear modulus of rock, in MPa.
5. The method for predicting sand production in a gas well of a loose sandstone gas reservoir according to claim 1, characterized in that: The comprehensive index function of sand production prediction containing weight coefficient is: Where, Y is the comprehensive index for sand production prediction, unit is dimensionless, D t is the acoustic time difference, unit is μs / ft, B is the sand production index, unit is MPa, S is the Schlumberger sand production index, unit is MPa 2 , I t is the acoustic time difference weight coefficient, unit is dimensionless, I B is the B index weight coefficient, unit is dimensionless, I S is the Schlumberger sand production index weight coefficient, and its unit is dimensionless.
