Source network load storage collaborative planning method and system
Through remote sensing image processing and AQPSO algorithm, the problem of the inability to quickly carry out economical source, grid load and storage collaborative planning in the existing technology is solved, and the roof photovoltaic utilization potential assessment and economical photovoltaic grid-connected planning are achieved, which improves the computing efficiency and accuracy.
Patent Information
- Application Number
- CN202411535223.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing source network load storage collaborative planning methods cannot quickly carry out economical planning of source network load storage collaborative planning for the photovoltaic output situation in a certain scenario, and ignore the convenience of satellite film and television views.
By obtaining the remote sensing image of the photovoltaic construction area, using Sobel operator edge detection and Otsu threshold segmentation technology to identify the available area of roof photovoltaics, calculate the roof photovoltaic power generation, and build a two-layer planning model to solve it using the AQPSO algorithm to achieve source network load storage collaboration planning.
The calculation efficiency and accuracy are improved, and a roof photovoltaic utilization potential assessment system has been formed, and the distribution network structure, distributed photovoltaic and energy storage equipment are comprehensively considered, achieving the best overall economical photovoltaic grid-connected planning.
Smart Images

Figure CN119051108A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of distribution network planning, and in particular relates to a source-grid-load-storage collaborative planning method and system. Background Art
[0002] The commonly used methods for the coordinated planning of sources, grids, loads and storage are: coordinated control method based on linear programming, coordinated planning method considering source-load uncertainty, coordinated planning method for sources, grids, loads and storage of distributed photovoltaic access, and coordinated planning method for sources, grids, loads and storage of limited distribution networks considering stakeholders.
[0003] The linear programming method studies and analyzes the coordinated control system from an overall macro perspective, and achieves the planning purpose through choices in transmission paths, management methods, resource allocation, etc. However, it does not provide detailed explanations of the specific planning content and planning direction, and does not elaborate on the four aspects of source-grid-load-storage.
[0004] The coordinated planning method considering source-load uncertainty constructs relevant uncertain scenario modeling methods and corresponding scheduling models, but it has defects in practical application. It is not combined with reality and does not give the impact of actual scenarios on the coordinated planning of source, grid, load and storage. At the same time, the actual economic benefits of this planning method are not analyzed and studied.
[0005] The source-grid-load-storage coordinated planning method for distributed photovoltaic access mainly studies the problems of voltage fluctuation and voltage over-limit, and gives the impact of distributed photovoltaics on the power quality of the power system. The source-grid-load-storage coordinated planning method is not clearly given, and the economic benefit analysis is not considered.
[0006] The collaborative planning method of source, grid, load and storage for limited distribution network considering the stakeholders tends to consider large and complex distribution networks, analyze multiple subjects, and give a planning scheme for source, grid and storage while considering the load. This method mainly considers the interest relationship of each subject and gives an analysis of economic benefits. However, this method is limited to the interest issues in the load aspect and analyzes the economic benefits based on the interests of each load subject.
[0007] In summary, the existing source-grid-load-storage collaborative planning methods are unable to quickly carry out source-grid-load-storage collaborative planning for the purpose of economy for photovoltaic output in a certain scenario, and ignore the convenience of existing satellite image maps. Summary of the invention
[0008] The present invention provides a source-grid-load-storage collaborative planning method and system, which are used to solve the technical problem that it is impossible to quickly carry out source-grid-load-storage collaborative planning for the purpose of economy for photovoltaic output in a certain scenario.
[0009] In a first aspect, the present invention provides a source-grid-load-storage collaborative planning method, comprising: Acquire a remote sensing image of a photovoltaic construction area, use a preset edge recognition strategy to recognize the remote sensing image to obtain an edge contour image, and calculate the roof photovoltaic usable area in the edge contour image; Calculate the power generation of rooftop photovoltaic power generation, and determine the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation; According to the target capacity, a two-layer planning model of the photovoltaic construction area is constructed with the source-grid-load-storage economy being the best, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition; The two-layer planning model is solved according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
[0010] In a second aspect, the present invention provides a source-grid-load-storage collaborative planning system, comprising: The recognition module is configured to obtain a remote sensing image of a photovoltaic construction area, recognize the remote sensing image using a preset edge recognition strategy to obtain an edge contour image, and calculate the roof photovoltaic usable area in the edge contour image; A determination module is configured to calculate the power generation of rooftop photovoltaic power generation, and determine the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation; A construction module is configured to construct a two-layer planning model of a photovoltaic construction area according to the target capacity with the source-grid-load-storage economy being the best, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition; The solution module is configured to solve the two-layer planning model according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
[0011] According to a third aspect, an electronic device is provided, comprising: at least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the steps of the source-grid-load-storage collaborative planning method of any embodiment of the present invention.
[0012] In a fourth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein when the program instructions are executed by a processor, the processor executes the steps of the source-grid-load-storage collaborative planning method of any embodiment of the present invention.
[0013] The source-grid-load-storage collaborative planning method and system of this application obtains regional satellite images, processes the regional satellite images through Sobel operator edge detection and Otsu threshold segmentation technology, obtains the total area of the building roofs in the region using the maximum resolution and pixel value of the image, and introduces parameters such as the roof photovoltaic utilization coefficient to establish a complete evaluation system for the utilization potential of roof photovoltaics. And with the roof photovoltaic evaluation capacity and other constraints as the objective function, the double-layer nested improved quantum behavior particle swarm algorithm is used to study the operating cost problem of the source-grid-load-storage joint planning. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0015] Figure 1 A flow chart of a source-grid-load-storage collaborative planning method provided by an embodiment of the present invention; Figure 2 A structural block diagram of a source-grid-load-storage collaborative planning system provided by an embodiment of the present invention; Figure 3 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0016] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] See also Figure 1 , which shows a flow chart of a source-grid-load-storage collaborative planning method of the present application.
[0018] like Figure 1 As shown, the source-grid-load-storage collaborative planning method specifically includes the following steps: Step S101, obtaining a remote sensing image of a photovoltaic construction area, using a preset edge recognition strategy to recognize the remote sensing image to obtain an edge contour image, and calculating the roof photovoltaic usable area in the edge contour image.
[0019] In this step, the Sobel operator is a classic gradient amplitude detection operator in image edge detection. Its basic principle is: assuming that the function of a continuous image , the function at point The gradient at is a vector containing magnitude and direction, namely: , in, , They are Direction and The unit vector in the direction, because the gradient operators are built on this basis, most of the gradient operators are based on The edge gradient magnitude and direction at are defined as: , , In the formula, is the edge gradient amplitude, is the function gradient, To find the partial derivative of a function f, To find the partial derivative of the variable x, To find the partial derivative of variable y, is the direction of the gradient operator.
[0020] According to the grayscale characteristics of the image, the Otsu threshold segmentation method is used to divide the image into two parts: the target and the background. The larger the inter-class variance between the target and the background, the greater the contrast between the two parts of the image. If the target and the background are more chaotic and the grayscale characteristics are not obvious, the contrast between the two parts will become smaller. Therefore, the segmentation with the largest inter-class variance means the smallest probability of misclassification. Assuming the grayscale level of the original image is , the gray level is The number of pixels is , then the total number of pixels in the image is .
[0021] The probability of each gray level appearing is: , In the formula, The gray level is Probability of occurrence; In image segmentation, the threshold t can be used to divide the gray level into two categories and ,but and The proportions that appear are: , , In the formula, for The proportion of grayscale levels, for The proportion of grayscale occurrences.
[0022] The mean of the two is expressed as: , , In the formula, for The mean of the grayscale occurrence ratio, for The mean of the grayscale occurrence ratio; The average grayscale value of the entire image for: ; Between-class variance for: , To ensure When the maximum value is obtained for: , In the formula, is the moment when the between-class variance reaches its maximum value.
[0023] The remote sensing image is processed according to the Sobel operator edge detection and Otsu threshold segmentation method to obtain an edge contour image, and then the roof photovoltaic usable area in the edge contour image is confirmed by the obtained original image level and unit pixel. The expression for calculating the roof photovoltaic usable area in the edge contour image is: , , In the formula, is the available area of rooftop photovoltaic power generation, is the rooftop photovoltaic utilization coefficient, is the total roof area of the building, is the reduction factor for urban blocks, is the reduction coefficient of rural factors, It is the reduction factor for single building.
[0024] As the urbanization rate continues to increase, the area of building land is becoming increasingly scarce, and the number of high-rise residential buildings, public service land and other buildings is also increasing. Therefore, the reduction factor of urban blocks Take 0.8 (usually between 0.62 and 1); in rural areas, residential buildings are generally not more than three floors, and the supporting public facilities are usually not more than three floors. In addition, the distance between buildings is large, and the problem of mutual shading can be ignored. Therefore, the reduction coefficient of rural factors Take 1; for the influencing factors of single buildings, the main considerations are the orientation of the building roof, whether there is a skylight, and the distance between floors and elevators. The reduction coefficient of single buildings is Take 0.875.
[0025] Step S102, calculating the power generation of rooftop photovoltaic power generation, and determining the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation.
[0026] In this step, the appropriate photovoltaic cell is determined based on technical and economic comparisons based on local solar radiation, site area and other factors.
[0027] The expression for determining the target capacity of rooftop photovoltaics connected to the distribution network is: , , In the formula, is the annual photovoltaic power generation on the building roof, is the total solar radiation of the component installation surface, is the photovoltaic system capacity, is the number of PV panels, is the peak power of the photovoltaic module, is the radiance under standard conditions, The operating efficiency of the photovoltaic system.
[0028] Step S103, constructing a two-layer planning model for the photovoltaic construction area according to the target capacity with the optimal source, grid, load and storage economy, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition.
[0029] In this step, the objective function of the upper-level planning model is: , In the formula, is the annual distribution network investment cost, is the total cost of upgrading and reconstructing the line per unit length, The investment cost of the substation; , In the formula, is the discount rate, is the service life of the line, is the total number of upgraded lines in the network, is the cost of upgrading and reconstructing the line per unit length, For the The decision variables for upgrading and renovating lines are: For the The length of the line, is the line operation rate;
[0030] In the formula, is the service life of the transformer, is the investment cost of the transformer to be built, The operating cost of the transformer to be built; The first constraint condition includes a distribution network investment constraint, and the expression of the distribution network investment constraint is: , In the formula, It is the maximum investment cost of the distribution network framework converted into annual cost.
[0031] The lower-level model transfers the line upgrade and transformation and transformer investment in the upper-level planning to the lower-level model as parameters to evaluate the economic efficiency of the distribution network operation under the planning scheme given by the upper-level planning. The objective function of the lower-level planning model is: , , , , , In the formula, is the total cost of distribution network operation during the entire cycle, is the network loss cost, To purchase electricity from the upper grid, For distributed photovoltaic installation and maintenance costs, The installation and maintenance costs of energy storage are is the cost per unit of network loss electricity, for The system network loss power of the time period, The unit purchase price of electricity from the distribution network to the upper power grid. for Purchase power from superiors during the time period. The unit capacity of distributed photovoltaic installation and operation and maintenance costs, for Total capacity of distributed photovoltaic installations during the period, The installation and maintenance costs of the unit energy storage are: is the total installed capacity of energy storage, is the total time of operation of the distribution network; The second constraint includes: The power flow constraint of the distribution network is expressed as: , In the formula, , They are Time Node The active power and reactive power of the load power, and They are Time Node The voltage of the node With Node The voltage between Representation Node With Node Connected, and Node and between The conductance and susceptance at each moment, is the phase angle difference between node i and node j at time t; Node voltage constraint, expression is: , In the formula, and Node The lower and upper limits of the voltage amplitude; The line transmission power constraint is expressed as: , In the formula, For the The branch road The transmission power of the time period, For the The transmission power upper limit of each branch; Distributed photovoltaic power generation output constraint, expression is: , In the formula, is the maximum permissible installed capacity of distributed photovoltaics, The power output of distributed photovoltaic power; The capacity constraint of distribution transformer is expressed as: , In the formula, For Taiwan Rated capacity of distribution transformers, The number of distributed photovoltaic connected to the distribution transformer, To connect to the transformer Photovoltaic power generation capacity, , Respectively Active power and reactive power of each load; Energy storage battery operation constraints, expressed as: , , , , In the formula, For energy storage system Active power at all times, and are the minimum state of charge and maximum state of charge of the battery respectively. is the maximum discharge power of the energy storage system, is the maximum charging power of the energy storage system, is the discharge efficiency of the energy storage system, For charging efficiency, is the discharge efficiency, is the maximum rated power capacity of the energy storage system, is the state of charge of the battery at time t, is the state of charge of the battery at time t+1, is the difference between time t and time t+1.
[0032] Step S104, solving the two-layer planning model according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
[0033] In this step, the quantum particle swarm algorithm (QPSO) is used for particle swarm systems. If the particles in the particle swarm system have the characteristics of quantum behavior, their states can be characterized based on wave functions. When defining the particle position Then, add the given potential center point , we can get particles in each dimension The wave function of is: , In the formula, is the wave function, For evolution The particle position at that generation, is the evaluation coefficient, For evolution A point in time; The corresponding probability density function and probability distribution function are: , In the formula, is the probability density function, is the probability distribution function.
[0034] Usually, when calculating the particle position, the Mote Carlo method is used to obtain its basic evolution equation: , In the formula, is a random number, To evolve to The random number of the generation, its value range is a random number uniformly distributed on (0,1). It can determine the degree of convergence of the algorithm.
[0035] Given that It is an indispensable parameter in the QPSO evolution equation and needs to be The selected iteration strategy is used to characterize the best position of individual particles in the population. The average , also known as mainstream thought, namely: , In the formula, is the particle number in the population The best position of the individual at the time of maintenance, is the population size, and based on Come to evaluate ,Right now: , In the formula, is the contraction expansion coefficient. The above formula can be updated as follows: , Since the particle swarm does not contain speed value when moving, when the population searches out the individual optimal solution and the global optimal solution, it can be used to update the position. According to the above formula, the position change can be described as the potential center point and contraction and expansion ,Right now: , , In the formula, is the current evolutionary generation The center point of potential, is the current evolutionary generation The individual extreme value of is the current evolutionary generation The global extreme value of ; is the maximum number of generations of evolution; for The maximum value of for In general, When the value is linearly reduced within the range of 1.0 to 0.5, the control effect obtained can meet the requirements.
[0036] And determine The size is mostly reduced linearly, but this method cannot effectively adjust the parameters adaptively.
[0037] Therefore, the AQPSO algorithm is proposed. The key of this algorithm is to reconstruct , the particle aggregation factor is introduced during construction In addition, the weighted average best position is reconstructed ,in particular Reflects the proportion of each particle , thereby introducing structure Taking both aspects into consideration at the same time to form an integrated algorithm, not only the search capability is significantly improved, but also the convergence speed and accuracy are greatly improved. The photovoltaic grid-connected two-level planning model with the goal of optimizing the economic efficiency of source, grid, load and storage is classified as a minimum optimization problem, so it is optimized based on the AQPSO algorithm. is the fitness value corresponding to the global optimal position, is the average value of the fitness value of all particles at the current position, and there is a relationship ,but It is expressed as: , In the formula, The particle aggregation factor introduced for construction; Using the Gaussian curve as the cornerstone, and then integrating , re-adaptively establish the contraction and expansion coefficients , the contraction-expansion coefficient The expression is: , In the formula, is the particle swarm update algebra, is the minimum value of contraction and expansion, is the maximum number of generations of evolution, is the maximum value of contraction and expansion; Optimize the weight of the fitness of the individual and all particles, and determine the average value of the final particle individuals based on the optimized weight. The expression of the weight of the fitness of the individual and all particles is:
[0038] In the formula, is the optimal position fitness of the ith particle, is the weight of each particle, is the population number; The final average value of individual particles is expressed as: , In the formula, is the average value of individual particles, is the best position of individual particles in the population.
[0039] In summary, the method of the present application optimizes the processing of satellite images by using Sobel operator edge detection and OTSU threshold segmentation technology to obtain more accurate building roof area data; on the basis of obtaining the roof area, factors such as building structure, orientation and shadow obstruction are considered to calculate the available roof photovoltaic area and estimate the building roof photovoltaic capacity; a complete roof photovoltaic utilization potential evaluation system is formed to improve calculation efficiency and accuracy; a photovoltaic grid-connected two-layer planning model with the goal of optimizing source, grid, load and storage is established, which comprehensively considers multiple factors such as distribution network structure, distributed photovoltaic and energy storage equipment to achieve overall economic optimization.
[0040] See also Figure 2 , which shows a structural block diagram of a source-grid-load-storage collaborative planning system of the present application.
[0041] like Figure 2 As shown, the source-grid-load-storage collaborative planning system 200 includes an identification module 210 , a determination module 220 , a construction module 230 and a solution module 240 .
[0042] Among them, the identification module 210 is configured to obtain a remote sensing image of a photovoltaic construction area, identify the remote sensing image using a preset edge recognition strategy, obtain an edge contour image, and calculate the roof photovoltaic available area in the edge contour image; the determination module 220 is configured to calculate the power generation of the roof photovoltaic power generation, and determine the target capacity of the roof photovoltaic power generation connected to the distribution network according to the roof photovoltaic available area and the power generation of the roof photovoltaic power generation; the construction module 230 is configured to construct a two-layer planning model of the photovoltaic construction area according to the target capacity with the optimal source, grid, load and storage economy, wherein the two-layer planning model includes an upper-level planning model constructed with a first constraint condition, and a lower-level planning model constructed with a second constraint condition; the solution module 240 is configured to solve the two-layer planning model according to the improved AQPSO algorithm to obtain the source, grid, load and storage collaborative planning result.
[0043] It should be understood that Figure 2Modules and references documented in Figure 1 Therefore, the operations and features described above for the method and the corresponding technical effects are also applicable to Figure 2 The modules in it will not be described in detail here.
[0044] In some other embodiments, the embodiments of the present invention further provide a computer-readable storage medium having a computer program stored thereon, and when the program instructions are executed by a processor, the processor executes the source-grid-load-storage collaborative planning method in any of the above method embodiments; As an implementation mode, the computer-readable storage medium of the present invention stores computer-executable instructions, and the computer-executable instructions are configured as follows: Acquire a remote sensing image of a photovoltaic construction area, use a preset edge recognition strategy to recognize the remote sensing image to obtain an edge contour image, and calculate the roof photovoltaic usable area in the edge contour image; Calculate the power generation of rooftop photovoltaic power generation, and determine the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation; According to the target capacity, a two-layer planning model of the photovoltaic construction area is constructed with the source-grid-load-storage economy being the best, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition; The two-layer planning model is solved according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
[0045] The computer-readable storage medium may include a program storage area and a data storage area, wherein the program storage area may store an operating system and application programs required for at least one function; the data storage area may store data created according to the use of the source-grid-load-storage collaborative planning system, etc. In addition, the computer-readable storage medium may include a high-speed random access memory, and may also include a memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the computer-readable storage medium may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the source-grid-load-storage collaborative planning system via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0046] Figure 3 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, such as Figure 3As shown, the device includes: a processor 310 and a memory 320. The electronic device may also include: an input device 330 and an output device 340. The processor 310, the memory 320, the input device 330 and the output device 340 may be connected via a bus or other means. Figure 3 The example of the connection via bus is taken. The memory 320 is the above-mentioned computer-readable storage medium. The processor 310 executes various functional applications and data processing of the server by running the non-volatile software programs, instructions and modules stored in the memory 320, that is, the source-grid-load-storage collaborative planning method of the above-mentioned method embodiment is implemented. The input device 330 can receive input digital or character information, and generate key signal input related to user settings and function control of the source-grid-load-storage collaborative planning system. The output device 340 may include display devices such as display screens.
[0047] The electronic device can execute the method provided by the embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method. For technical details not described in detail in this embodiment, please refer to the method provided by the embodiment of the present invention.
[0048] As an implementation mode, the electronic device is applied to a source-grid-load-storage collaborative planning system and is used for a client, and includes: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can: Acquire a remote sensing image of a photovoltaic construction area, use a preset edge recognition strategy to recognize the remote sensing image to obtain an edge contour image, and calculate the roof photovoltaic usable area in the edge contour image; Calculate the power generation of rooftop photovoltaic power generation, and determine the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation; According to the target capacity, a two-layer planning model of the photovoltaic construction area is constructed with the source-grid-load-storage economy being the best, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition; The two-layer planning model is solved according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
[0049] Through the description of the above implementation modes, those skilled in the art can clearly understand that each implementation mode can be implemented by means of software plus a necessary general hardware platform, or of course by hardware. Based on such an understanding, the above technical solution can essentially or in other words be embodied in the form of a software product that contributes to the prior art. The computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a magnetic disk, an optical disk, etc., and includes a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods of each embodiment or some parts of the embodiment.
[0050] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A source-grid-load-storage collaborative planning method, characterized in that: include: Acquire a remote sensing image of a photovoltaic construction area, use a preset edge recognition strategy to recognize the remote sensing image to obtain an edge contour image, and calculate the roof photovoltaic usable area in the edge contour image; Calculate the power generation of rooftop photovoltaic power generation, and determine the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation; According to the target capacity, a two-layer planning model of the photovoltaic construction area is constructed with the source-grid-load-storage economy being the best, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition; The two-layer planning model is solved according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
2. A source-grid-load-storage collaborative planning method according to claim 1, characterized in that: The solving of the bi-level programming model according to the improved AQPSO algorithm includes: Based on the AQPSO algorithm, we optimize is the fitness value corresponding to the global optimal position, is the average value of the fitness value of all particles at the current position, and there is a relationship ,but It is expressed as: , In the formula, The particle aggregation factor introduced for construction; Using the Gaussian curve as the cornerstone, and then integrating , re-adaptively establish the contraction and expansion coefficients , the contraction-expansion coefficient The expression is: , In the formula, is the particle swarm update algebra, is the minimum value of contraction and expansion, is the maximum number of generations of evolution, is the maximum value of contraction and expansion; Optimize the weight of the fitness of the individual and all particles, and determine the average value of the final particle individuals based on the optimized weight. The expression of the weight of the fitness of the individual and all particles is: , In the formula, is the optimal position fitness of the ith particle, is the weight of each particle, is the population number; The final average value of individual particles is expressed as: , In the formula, is the average value of individual particles, is the best position of individual particles in the population.
3. A source-grid-load-storage collaborative planning method according to claim 1, characterized in that: The adopting a preset edge recognition strategy to recognize the remote sensing image to obtain an edge contour image comprises: The remote sensing image is processed according to the Sobel operator edge detection and Otsu threshold segmentation method to obtain an edge contour image, wherein the Sobel operator edge detection The edge gradient magnitude and direction at are defined as: , , In the formula, is the edge gradient amplitude, is the function gradient, To find the partial derivative of a function f, To find the partial derivative of the variable x, To find the partial derivative of the variable y, is the direction of the gradient operator.
4. A source-grid-load-storage collaborative planning method according to claim 1, characterized in that: in, The expression for calculating the roof photovoltaic available area in the edge contour image is: , , In the formula, is the available area of rooftop photovoltaic power generation, is the rooftop photovoltaic utilization coefficient, is the total roof area of the building, is the reduction factor for urban blocks, is the reduction coefficient of rural factors, It is the reduction factor for single building.
5. The source-grid-load-storage collaborative planning method according to claim 1 is characterized in that: in, The expression for determining the target capacity of rooftop photovoltaics connected to the distribution network is: , , In the formula, is the annual photovoltaic power generation on the building roof, is the total solar radiation of the component installation surface, is the photovoltaic system capacity, is the number of PV panels, is the peak power of the photovoltaic module, is the radiance under standard conditions, The operating efficiency of the photovoltaic system.
6. A source-grid-load-storage collaborative planning method according to claim 1, characterized in that: The objective function of the upper-level planning model is: , In the formula, is the annual distribution network investment cost, is the total cost of upgrading and reconstructing the line per unit length, The investment cost of the substation; , In the formula, is the discount rate, is the service life of the line, is the total number of upgraded lines in the network, is the cost of upgrading and reconstructing the line per unit length, For the The decision variables for upgrading and renovating lines are: For the The length of the line, is the line operation rate; , In the formula, is the service life of the transformer, is the investment cost of the transformer to be built, The operating cost of the transformer to be built; The first constraint condition includes a power distribution network investment constraint, and the expression of the power distribution network investment constraint is: , In the formula, It is the maximum investment cost of the distribution network framework converted into annual cost.
7. The source-grid-load-storage collaborative planning method according to claim 1 is characterized in that: The objective function of the lower-level planning model is: , , , , , In the formula, is the total cost of distribution network operation during the entire cycle, is the network loss cost, To purchase electricity from the upper grid, For distributed photovoltaic installation and maintenance costs, The installation and maintenance costs of energy storage are is the cost per unit of network loss electricity, for The system network loss power of the time period, The unit purchase price of electricity from the distribution network to the upper power grid. for Purchase power from superiors during the time period. The unit capacity of distributed photovoltaic installation and operation and maintenance costs, for Total capacity of distributed photovoltaic installations during the period, The installation and maintenance costs of the unit energy storage are: is the total installed capacity of energy storage, is the total operation time of the distribution network; The second constraint condition includes: The power flow constraint of the distribution network is expressed as: , In the formula, , They are Time Node The active power and reactive power of the load power, and They are Time Node The voltage of the node With Node The voltage between Representation Node With Node Connected, and Node and between The conductance and susceptance at each moment, is the phase angle difference between nodes i and j at time t; Node voltage constraint, expression is: , In the formula, and Node The lower and upper limits of the voltage amplitude; The line transmission power constraint is expressed as: , In the formula, For the The branch road The transmission power of the time period, For the The transmission power upper limit of each branch; Distributed photovoltaic power generation output constraint, expression is: , In the formula, is the maximum permissible installed capacity of distributed photovoltaics, is the distributed photovoltaic output power; The capacity constraint of distribution transformer is expressed as: , In the formula, For Taiwan Rated capacity of distribution transformers, The number of distributed photovoltaic connected to the distribution transformer, To connect to the transformer Photovoltaic power generation capacity, , Respectively Active power and reactive power of each load; Energy storage battery operation constraints, expressed as: , , , , In the formula, For energy storage system Active power at all times, and are the minimum state of charge and maximum state of charge of the battery respectively. is the maximum discharge power of the energy storage system, is the maximum charging power of the energy storage system, is the discharge efficiency of the energy storage system, For charging efficiency, is the discharge efficiency, is the maximum rated power capacity of the energy storage system, is the state of charge of the battery at time t, is the state of charge of the battery at time t+1, is the difference between time t and time t+1.
8. A source-grid-load-storage collaborative planning system, characterized in that: include: The recognition module is configured to obtain a remote sensing image of a photovoltaic construction area, recognize the remote sensing image using a preset edge recognition strategy to obtain an edge contour image, and calculate the roof photovoltaic usable area in the edge contour image; A determination module is configured to calculate the power generation of rooftop photovoltaic power generation, and determine the target capacity of rooftop photovoltaic power generation to be integrated into the distribution network according to the available area of the rooftop photovoltaic power generation and the power generation of the rooftop photovoltaic power generation; A construction module is configured to construct a two-layer planning model of a photovoltaic construction area according to the target capacity with the source-grid-load-storage economy being the best, wherein the two-layer planning model includes an upper-layer planning model constructed with a first constraint condition and a lower-layer planning model constructed with a second constraint condition; The solution module is configured to solve the two-layer planning model according to the improved AQPSO algorithm to obtain the source-grid-load-storage collaborative planning result.
9. An electronic device, characterized in that: include: At least one processor, and a memory communicatively connected to the at least one processor, wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to execute the method described in any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Power distribution network source-network-load-storage joint planning method considering comprehensive performance
CN116073417A
Distributed photovoltaic monitoring identification method, device, equipment and storage medium
CN117173586A
Roof photovoltaic resource evaluation method and device, computer equipment and storage medium
CN117498314A
Output prediction device for solar photovoltaic power generation system, and supply and demand control system using the same
JP2009252940A
Cited By
An industrial park power distribution station source network load storage collaborative planning method and system
CN123092684A