Industrial robot cluster control method and system and network server

By acquiring and analyzing industrial robot status data, performing feature extraction and risk prediction, and dynamically adjusting control strategies, the problems of instability of communication networks and insufficient energy consumption management in underground mining environments are solved, and more efficient communication and energy consumption management is achieved.

CN119057790AActive Publication Date: 2024-12-03IPLOOK NETWORKS CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411370382.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-12-03
Estimated Expiration
2044-09-29

AI Technical Summary

Technical Problem

In underground mining environments, existing communication networks are difficult to provide stable communication connections, especially in complex geological structures and harsh environments, resulting in signal attenuation, limited transmission distance and high communication delays, and static energy-saving strategies fail to fully consider the real-time environment. Changes and equipment health conditions lead to insufficient communication efficiency and energy consumption management.

Method used

By obtaining data on the current state of the robot, performing feature extraction and risk prediction, dynamically adjusting the control strategies of communication and working state, including device layer and network layer policies, to optimize communication signal transmission and energy consumption management.

Benefits of technology

It improves the stability and energy-saving effect of industrial robot communication, ensuring the reliability and scientific management of communication networks in complex environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119057790A_ABST
    Figure CN119057790A_ABST
Patent Text Reader

Abstract

The invention discloses an industrial robot cluster control method and system and a network server, an industrial robot cluster comprises a plurality of robots, and the control method comprises the following steps: obtaining state data influencing communication or working states of the robots to obtain an initial data set; performing feature extraction processing on the initial data set to extract key features reflecting various states of the robot in the initial data set, and forming a feature data set based on the key features; processing the feature data set based on a prediction model of a neural network architecture to predict the risk degree of the robot related to communication interruption; based on the risk degree, a control strategy for the robot is adjusted, and the control strategy is used for controlling the communication state and the working state of the robot. According to the control method, the stability of robot communication can be effectively improved, and the energy consumption of the robots can be within a reasonable range by adjusting the working states of the robots, so that the energy-saving effect of the industrial robot cluster is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of robot control technology, and in particular to an industrial robot cluster control method, system and network server based on mobile communication. Background Art

[0002] Underground mining operations are complex and challenging tasks, often carried out in extreme environments. This work covers multiple stages, including searching, monitoring, preparation, processing, maintenance, drilling, loading and transporting underground materials to surface stations. These operating environments often face harsh temperature conditions, high humidity, high pressure, and complex and unstable geological structures, which pose severe challenges to the normal operation of equipment and the stability of communication networks.

[0003] To improve the safety, efficiency and productivity of mining operations, robotics and IoT devices have been introduced into the mining industry. These robots are able to perform automated tasks in underground environments, such as environmental monitoring, equipment inspection and material transportation. However, the smooth execution of these tasks depends on efficient communication networks to ensure reliable data transmission and timely response. In underground tunnels, communication sub-networks are usually formed in series, such as environmental IoT devices, which usually only require intermittent communication.

[0004] Although these network architectures can provide the necessary coverage and data transmission capabilities, they have many problems when facing complex underground environments. These technologies generally face problems such as severe signal attenuation, limited transmission distance, and high communication latency, making it difficult to provide stable communication connections in long-distance tunnels or multi-node complex environments. In addition, these network architectures usually adopt static energy-saving strategies and fail to fully consider real-time environmental changes and dynamic changes in equipment health, resulting in deficiencies in energy consumption optimization and communication efficiency. Summary of the invention

[0005] The object of the present invention is to provide an industrial robot cluster control method, system and network server which can dynamically adjust the communication and working status of the robots based on the current status of the robots.

[0006] In order to achieve the above object, the present invention provides an industrial robot cluster control method based on mobile communication, wherein the industrial robot cluster includes a plurality of robots that can move independently and are connected to a mobile communication network, and the control method includes:

[0007] Acquire status data affecting the communication or working status of the robot to obtain an initial data set;

[0008] Performing feature extraction processing on the initial data set based on the computing power nodes in the mobile communication network to extract key features in the initial data set that reflect various states of the robot, and forming a feature data set based on the key features;

[0009] Processing the feature data set based on a pre-trained prediction model based on a neural network architecture to predict the risk of the robot associated with communication interruption;

[0010] Based on the risk level, a control strategy for the robot is adjusted, where the control strategy is used to control a communication state and a working state of the robot.

[0011] Preferably, the status data includes one or more of the following four types of data: first data related to the current geographical location of the robot, second data related to the current communication status of the robot, third data related to the current health status of the robot, and fourth data related to the environmental status of the robot's current environment.

[0012] Preferably, the control strategy includes a first strategy for adjusting a single robot according to status data of the robot; and a plurality of sets of the first strategies associated with different levels of risk are preset.

[0013] Preferably, the first strategy includes a device layer strategy and a network layer strategy, the device layer strategy is used to control the working state of the robot, and the second strategy is used to control the communication state of the robot.

[0014] Preferably, the device layer strategy is used to adjust the execution task of the robot to change the power consumption; the network layer strategy is used to adjust the signal transmission rate, frequency, path and redundancy of the communication network to which the robot belongs.

[0015] Preferably, the control strategy includes a second strategy for adjusting the working state and communication state of each robot at a global level according to the state data of the plurality of robots in the industrial robot cluster, and the priority of the second strategy is higher than that of the first strategy.

[0016] Preferably, the second strategy coordinates and schedules the computing resources, network bandwidth and energy allocated to each of the robots in the industrial robot cluster.

[0017] The present invention also provides a network server based on mobile communication, which is used to manage and control an industrial robot cluster connected thereto, wherein the industrial robot cluster includes several robots, and the network server controls the working status and communication status of the robots based on the industrial robot cluster control method as described above.

[0018] The present invention also provides an industrial robot cluster control system, which comprises:

[0019] one or more processors;

[0020] Memory;

[0021] and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, the programs including instructions for executing the industrial robot cluster control method as described above.

[0022] The present invention also provides a computer-readable storage medium, which includes a computer program, and the computer program can be executed by a processor to implement the industrial robot cluster control method as described above.

[0023] Compared with the prior art, the industrial robot cluster control method disclosed in the above technical solution of the present invention obtains the status data of the robot during its working process, and obtains the feature data set that affects the interruption of the robot's communication through precise feature extraction, and then processes the feature data set through a prediction model to obtain the current risk level, and then dynamically adjusts the control strategy according to the risk level, thereby effectively improving the stability of the robot's communication, and also adjusting the robot's working state so that the robot's energy consumption is within a reasonable range, thereby improving the energy-saving effect of the industrial robot cluster. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a flow chart of the industrial robot cluster control method in an embodiment of the present invention.

[0025] Figure 2 The figure is a flow chart of execution signaling of a network server in an embodiment of the present invention. DETAILED DESCRIPTION

[0026] In order to explain the technical content, structural features, achieved objectives and effects of the present invention in detail, the following is a detailed description in conjunction with the implementation methods and the accompanying drawings.

[0027] This embodiment discloses a method for controlling an industrial robot cluster based on mobile communication, so as to dynamically control the communication state and working state of the robot to ensure the communication stability and energy saving effect of the robot. The robot in this embodiment can be used for underground mining, but is not limited thereto.

[0028] like Figure 1 , the control method comprises the following steps:

[0029] S1: Acquire status data that affects the communication or working status of the robot to obtain an initial data set.

[0030] S2: Perform feature extraction processing on the initial data set based on the computing power node in the mobile communication network to extract the key features in the initial data set that reflect the various states of the robot, and form a feature data set based on the key features. The computing power node in this embodiment is a centralized edge technology node set in the base station, which receives and processes the initial data set sent by all robots in the industrial robot cluster. The centralized edge technology node performs feature extraction processing on the initial data set through an intelligent model with learning ability. Specifically, the linear regression model Lasso (Least Absolute Shrinkage and Selection Operator) is used for feature selection to automatically select important features, that is, key features.

[0031] It should also be noted that after the initial data set is sent to the centralized edge technology node, the data in the initial data set can also be filtered to remove data whose timestamps do not meet the requirements, data with too low signal strength, and data with missing important fields due to communication delays, etc., to ensure the accuracy of subsequent feature extraction. Then, the Z-Score (standard score) method is used to select outliers, and points with an absolute value of Z greater than the preset value are considered abnormal and deleted to prevent abnormal data from interfering with the analysis results.

[0032] S3: Processing the feature data set based on the pre-trained prediction model based on the neural network architecture to predict the risk of the robot related to communication interruption. The prediction model in this embodiment is preferably a random forest model, which is also set in the base station, and of course, can also be set in other network elements in its core network.

[0033] S4: Based on the risk level, adjusting a control strategy for the robot, wherein the control strategy is used to control a communication state and a working state of the robot.

[0034] Based on the above industrial robot cluster control method, first, the robot collects a variety of status data that affect communication or working status, and these data are filtered through feature extraction to form a feature data set. This process enhances data quality and accurately locates factors that affect communication stability, providing a reliable data basis for subsequent risk prediction. The accuracy of the feature data set improves the accuracy of identifying communication interruption risks and helps prevent potential communication interruptions.

[0035] Specifically, the feature data set is processed using a pre-trained neural network-based prediction model. By fully learning and training the model, the risk associated with communication interruption can be predicted more accurately. This enables timely adjustment of communication-related control strategies before communication interruption occurs, including switching communication paths, increasing signal transmission strength, etc., thereby reducing or avoiding actual interruption and improving the stability of the entire communication network.

[0036] Secondly, when the prediction model predicts that the robot faces different communication interruption risks, the robot's control strategy related to the working state can also be dynamically adjusted. For example, for low-risk situations, the current state can be maintained to avoid unnecessary energy consumption, or communication consumption can be reduced. For medium-risk and high-risk situations, moderate adjustments and emergency measures can be taken respectively to maximize energy efficiency while ensuring communication stability. For example, in medium-risk situations, alternative communication paths and data compression strategies may be selected to save energy; in high-risk situations, some non-core tasks may be delayed or stopped to concentrate energy on maintaining communication for critical tasks. This risk adjustment strategy makes energy management more scientific and avoids the inefficiency and waste of resources of traditional static strategies.

[0037] In general, the above control methods have significant improvements in both robot communication and energy consumption management.

[0038] On the other hand, the status data includes one or more of the following four data: first data related to the current geographical location of the robot, second data related to the current communication status of the robot, third data related to the current health status of the robot, and fourth data related to the environmental status of the robot's current environment.

[0039] Specifically, 1. The first data includes one or more of the following items:

[0040] 1.1. The absolute position of the robot, such as longitude, latitude and altitude;

[0041] 1.2. Relative position: the distance and direction between the robot and the base station, other robots or fixed reference objects;

[0042] 1.3. Position change rate: The speed and direction of the robot’s movement, which helps determine the robot’s trajectory and predict its future position;

[0043] 1.4. Area identification: The specific area identification of the robot’s current working area (such as a mine), such as the mine number, working face number, etc.

[0044] It should be noted that the absolute position and area identification of the robot are first-hand data collected directly from the robot, and the relative position and position change rate are second-hand data calculated based on the positions of all robots and the base station.

[0045] 2. The second data includes one or more of the following items:

[0046] 2.1. Signal strength: including received signal strength indication (RSSI) and signal-to-noise ratio (SNR);

[0047] 2.2 Data transmission rate: including uplink and downlink data transmission rates;

[0048] 2.3. Communication delay: the delay in data transmission from the robot to the base station, usually measured in milliseconds;

[0049] 2.4. Packet loss rate: the proportion of data packets lost during data transmission;

[0050] 2.5. Connection status: whether the device is currently connected and the stability of the connection.

[0051] 3. The third data includes one or more of the following items:

[0052] 2.1. Battery power: the remaining power and estimated endurance of the battery used as the power source in the current robot;

[0053] 2.2. Running time: the cumulative working time of the robot since the last charging;

[0054] 2.3. Hardware health log: includes status monitoring data of various hardware components in the robot, such as temperature, vibration, wear degree, etc.

[0055] 2.4. Fault logs: including recent and historical error logs and fault records of the robot, which are used to determine possible hardware problems.

[0056] 4. The third data includes one or more of the following items:

[0057] 4.1. Temperature: The temperature of the robot’s current working environment;

[0058] 4.2. Humidity: The humidity level of the robot's current working environment;

[0059] 4.3. Air pressure: the air pressure value of the robot’s current working environment;

[0060] 4.4 Air quality: gas composition and concentration in the robot’s current operating environment, such as carbon dioxide, carbon monoxide and other harmful gases;

[0061] 4.5. Light intensity: The lighting conditions in the robot’s current working environment.

[0062] The acquisition of the first data on the robot's geographic location is significant in that:

[0063] First, the robot’s geographical location and its relative position to the base station will directly affect the transmission quality of the communication signal;

[0064] Secondly, by tracking the robot's position in real time, network resources can be dynamically allocated through control strategies. This ensures that robots that are far from the base station and have weaker signals get more bandwidth or lower latency communication support. This helps the centralized edge computing nodes of the base station predict the robot's movement path and perform load balancing based on this.

[0065] Furthermore, some tasks may have higher requirements for the location of the robot. Therefore, the control strategy can be adjusted to adjust the priority of the task according to the location of the robot to ensure that the robot in the key position can perform high-priority tasks first. For robots in non-critical areas, the system can postpone the execution of their tasks. In addition, if the robot is located in an area far away from the base station or in a place with poor signal, it may choose to reduce the task load of the robot and give priority to tasks with lower communication requirements to avoid task failure due to communication interruption.

[0066] Finally, the relative position of the robot and the base station affects the energy consumed by its communication. Robots that are farther away from the base station need to consume more energy to maintain signal transmission. Through position detection, the control strategy can be dynamically adjusted according to the communication consumption in different areas to reduce energy consumption. For robots at long distances, it may be chosen to switch to a more energy-saving communication mode, such as reducing the communication frequency or delaying non-critical tasks to reduce energy consumption.

[0067] Based on the above-mentioned relationship between the robot position and communication status, before transmitting the initial data set to the centralized edge technology node in the base station, the data can also be pre-processed by the lightweight edge computing node located in the robot to associate the position data with the signal strength, so that the key features extracted by the centralized edge technology node are more accurate and effective.

[0068] On the other hand, the control strategy includes a first strategy for adjusting a single robot according to the state data of the robot. In this regard, multiple sets of the first strategies associated with different levels of risk are preset. Specifically, when the risk includes three levels: low risk, medium risk, and high risk, three sets of first strategies corresponding to low risk, medium risk, and high risk are generated in advance, so that when the prediction model outputs the risk, a suitable first strategy can be selected according to the risk and sent to the robot.

[0069] Furthermore, the first strategy includes a device layer strategy and a network layer strategy, the device layer strategy is used to control the working state of the robot, and the second strategy is used to control the communication state of the robot.

[0070] Specifically, the device layer strategy is used to adjust the execution task of the robot to change the power consumption. The network layer strategy is used to adjust the signal transmission rate, frequency, path and redundancy of the communication network to which the robot belongs.

[0071] For example, when the risk level (<30%) is at a low risk level, it means that the current communication status, environmental conditions, and robot health are good. At this time, the main goal is to maintain the stability of the existing status and ensure maximum energy efficiency. In this case, the control strategy mainly focuses on robot energy saving and communication resource optimization. The content of the device layer strategy and network layer strategy is as follows:

[0072] Device-level strategy: Choose to reduce the robot's power consumption, such as reducing the sampling frequency of data sensors and reducing the robot's non-critical tasks. For example, for a sensor that monitors temperature, the detection can be reduced from once a minute to once every 5 minutes. This can save power without affecting the robot's health and monitoring effect.

[0073] Network layer strategy: Maintain the current communication path and frequency, but reduce the frequency of data transmission appropriately, especially when the environment is relatively stable and the data does not change much. For example, if the distance between robots is fixed and they do not move, the frequency of uploading position data can be reduced to once every 10 minutes or more.

[0074] When the risk level (30% to 70%) is at a medium risk level, it means that the communication and robot health may be threatened to some extent, but it has not reached an emergency situation. At this time, the control strategy needs to be adjusted to a certain extent to prevent the risk from escalating. At this time, the control strategy is mainly to prevent in advance and optimize the execution of the current task. The content of the device layer strategy and network layer strategy is as follows:

[0075] Device-level strategy: Perform more self-checks on the robot's health status and prioritize the robot's core tasks. Some minor tasks can be reduced or delayed to ensure that the robot focuses its resources on key tasks. For example, a mining robot may temporarily stop unimportant inspection tasks and focus on the current material transportation task. At the same time, increase the frequency of battery status monitoring to ensure stable power supply.

[0076] Network layer strategy: Communication path adjustments can be made in advance to prevent potential communication interruptions. For example, it may be possible to switch to a backup communication path or temporarily increase the data transmission frequency to ensure that critical data can be transmitted in a timely manner. If the current signal strength begins to weaken, a repeater or signal amplifier can be activated in advance to extend the communication distance.

[0077] When the risk level (>70%) is at a high risk level, emergency response measures need to be taken immediately to prevent major communication failures or equipment failures. The strategy at this time focuses on emergency handling and restoring the stability of communication or robot operation. For this, the content of the device layer strategy and network layer strategy is as follows:

[0078] Device-level strategy: The robot immediately enters low-power mode and stops all non-critical tasks. For example, the robot will suspend most sensor data collection and only retain core health monitoring and self-checking functions. The robot may reduce the operating frequency and reduce tasks that consume a lot of power, such as material transportation, to ensure that the battery can last longer.

[0079] Network layer strategy: In a high-risk state, the communication path may have been severely disturbed or is about to be interrupted. At this time, you should switch to the most stable communication path, or use redundant communication means, such as using relay stations or adding signal amplifiers to enhance the current communication quality. At the same time, the data transmission frequency may be increased to ensure that as much important data as possible is transmitted during the last stable communication time.

[0080] On the other hand, the control strategy includes a second strategy for adjusting the working status and communication status of each robot at a global level according to the status data of the plurality of robots in the industrial robot cluster, and the priority of the second strategy is higher than that of the first strategy.

[0081] Specifically, the second strategy coordinates and schedules the computing resources, network bandwidth, and energy allocated to each robot in the industrial robot cluster.

[0082] In this embodiment, the second strategy is a system-level strategy. Through the global resource management of the second strategy, the overall energy consumption and performance of the entire industrial robot cluster can be maintained at a reasonable level under high load conditions. For example, at certain moments, the number of robots in the industrial robot cluster surges or encounters a communication scenario with a harsh environment, and computing resources or bandwidth may face bottlenecks. At this time, through the global resource management strategy, resources are preferentially allocated to links with higher communication loads to ensure uninterrupted communication and reduce energy consumption.

[0083] The second strategy based on the system level does not focus on solving the problem of a certain robot, but considers the service quality and resource allocation of the entire industrial robot cluster. In high-load situations (such as multiple robots transmitting a large amount of data to the base station at the same time), the QoS adjustment strategy can be used to temporarily reduce the communication quality of low-priority tasks, thereby ensuring the communication stability of high-priority tasks (such as emergency fault alarms).

[0084] More specifically, the second strategy can determine which tasks of the robot should be executed first and which tasks can be postponed, ensuring that key tasks are completed first with limited resources. When a mining robot encounters communication failure or equipment failure in a harsh environment, based on the second strategy, resources will be dispatched to handle these urgent tasks first to ensure that the robot can resume normal working status in time; and some non-urgent data collection tasks can be delayed and processed when resources are sufficient.

[0085] In another preferred embodiment of the present invention, a network server based on mobile communication is also disclosed, characterized in that the network server is used to manage and control an industrial robot cluster connected thereto, the industrial robot cluster comprising a number of robots, and the network server controls the working status and communication status of the robots based on the industrial robot cluster control method in the above-mentioned embodiment.

[0086] Specifically, Figure 2 The robot sends the collected initial data set to the base station, and the computing nodes set in the base station perform feature extraction and risk prediction to obtain the risk level, and then transmit the risk level to the access and mobility management function AMF in the 5G core network or the new generation evolved core network. AMF then forwards the risk level to the policy control function PCF. PCF selects the corresponding control strategy based on the received risk level and sends the control strategy to the robot.

[0087] The present invention also discloses an industrial robot cluster control system, which includes one or more processors, a memory and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the program includes instructions for executing the industrial robot cluster control method as described above. The processor can adopt a general central processing unit (CPU), a microprocessor, an application specific integrated circuit (ASIC), or one or more integrated circuits, for executing related programs to implement the functions required to be executed by the modules in the industrial robot cluster control system of the embodiment of the present application, or to execute the industrial robot cluster control method of the method embodiment of the present application.

[0088] The present invention also discloses a computer-readable storage medium, which includes a computer program, and the computer program can be executed by a processor to complete the industrial robot cluster control method as described above. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or a data center that includes one or more available media integrated. The available medium can be a read-only memory (ROM), or a random access memory (RAM), or a magnetic medium, such as a floppy disk, a hard disk, a tape, a magnetic disk, or an optical medium, such as a digital versatile disc (DVD), or a semiconductor medium, such as a solid state disk (SSD), etc.

[0089] The embodiment of the present application also discloses a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. A processor of an electronic device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the electronic device executes the above-mentioned industrial robot cluster control method.

[0090] The above disclosure is only the preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the scope of the patent application of the present invention are still within the scope covered by the present invention.

Claims

1. A method for controlling industrial robot clusters based on mobile communication. It is characterized in that The industrial robot cluster includes a number of robots that can move autonomously and access a mobile communication network, and the control method includes: Acquire status data affecting the communication or working status of the robot to obtain an initial data set; Performing feature extraction processing on the initial data set based on the computing power nodes in the mobile communication network to extract key features in the initial data set that reflect various states of the robot, and forming a feature data set based on the key features; Processing the feature data set based on a pre-trained prediction model based on a neural network architecture to predict the risk of the robot associated with communication interruption; Based on the risk level, a control strategy for the robot is adjusted, where the control strategy is used to control a communication state and a working state of the robot.

2. The industrial robot cluster control method based on mobile communication according to claim 1, It is characterized in that The status data includes one or more of the following four data: first data related to the current geographical location of the robot, second data related to the current communication status of the robot, third data related to the current health status of the robot, and fourth data related to the environmental status of the robot's current environment.

3. The industrial robot cluster control method based on mobile communication according to claim 1, It is characterized in that The control strategy includes a first strategy for adjusting a single robot according to status data of the robot; and a plurality of sets of the first strategies associated with different levels of risk are preset.

4. The industrial robot cluster control method based on mobile communication according to claim 3, It is characterized in that The first strategy includes a device layer strategy and a network layer strategy. The device layer strategy is used to control the working state of the robot, and the second strategy is used to control the communication state of the robot.

5. The industrial robot cluster control method based on mobile communication according to claim 4, It is characterized in that The device layer strategy is used to adjust the execution task of the robot to change the power consumption; the network layer strategy is used to adjust the signal transmission rate, frequency, path and redundancy of the communication network to which the robot belongs.

6. The industrial robot cluster control method based on mobile communication according to claim 4, It is characterized in that The control strategy includes a second strategy for adjusting the working state and communication state of each robot at a global level according to the state data of the plurality of robots in the industrial robot cluster, and the priority of the second strategy is higher than that of the first strategy.

7. The industrial robot cluster control method based on mobile communication according to claim 6, It is characterized in that The second strategy coordinates and schedules the computing resources, network bandwidth, and energy allocated to each robot in the industrial robot cluster.

8. A network server based on mobile communication, It is characterized in that The network server is used to manage and control an industrial robot cluster connected thereto, wherein the industrial robot cluster includes a plurality of robots, and the network server controls the working status and communication status of the robots based on the industrial robot cluster control method described in any one of claims 1 to 7.

9. An industrial robot cluster control system, It is characterized in that include: one or more processors; Memory; And one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the programs include instructions for executing the industrial robot cluster control method as described in any one of claims 1 to 7.

10. A computer-readable storage medium, It is characterized in that It includes a computer program, which can be executed by a processor to complete the industrial robot cluster control method as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Robot anomaly handling method, robot and dispatch server

    CN107685342A

  • Logistics transfer robot work abnormity detection method and system based on image processing

    CN117774007A

  • Industrial robot state monitoring method and system of distributed intelligent network

    CN118092242A

  • Abnormality processing apparatus, network system, and method for providing procedure with respect to abnormality having occurred in robot system

    US20240280979A1