MES (Manufacturing Execution System)-based multi-stage monitoring method for cold stamping process of high-strength steel material

Through the multi-stage monitoring method of cold stamping process of high-strength steel materials based on MES system, the problem of real-time data monitoring and verification processing in the cold stamping process of aluminum alloy is solved, and the monitoring of multi-stage and multi-type data is realized, ensuring the compliance of process standards and improve manufacturing quality.

CN119058159APending Publication Date: 2024-12-03TIANJIN TAIZHENG MACHINERY
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411496350.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the aluminum alloy cold stamping process, it is difficult for the prior art to realize real-time data monitoring and related data verification processing, resulting in difficult to ensure manufacturing quality.

Method used

The multi-stage monitoring method of high-strength steel material cold stamping process based on the MES system is adopted. By obtaining real-time basic data, a real-time status monitoring database is established, and multi-level screening and analysis are carried out to achieve accurate monitoring of multi-level and multi-type data.

Benefits of technology

Through real-time data monitoring and abnormal handling, we ensure compliance with process standards, provide safety and quality assurance, and improve the safety and quality of the manufacturing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119058159A_ABST
    Figure CN119058159A_ABST
Patent Text Reader

Abstract

The invention relates to the field of high-strength steel material cold stamping process monitoring, in particular to a high-strength steel material cold stamping process multi-stage monitoring method based on an MES system, and the method comprises the steps: S1, obtaining the real-time basic data of a high-strength steel material cold stamping process based on the MES system; s2, establishing a real-time state monitoring database of the cold stamping process of the high-strength steel material by utilizing the real-time basic data; s3, according to the real-time state monitoring database, performing multi-stage screening analysis processing to obtain a multi-stage monitoring result of the cold stamping process of the high-strength steel material, performing state acquisition and subsequent pre-screening on the attribute characteristics of the cold stamping process of the high-strength steel material based on MES, considering various influence factors, and after data acquisition and rechecking, obtaining a multi-stage monitoring result of the cold stamping process of the high-strength steel material; and after confirmation, according to cross comparison among process flow data and environment characteristic introduction consideration, alarm processing is carried out when any comparison abnormity exists based on insurance, and meanwhile, the abnormity is rechecked subsequently, so that effective safety guarantee is provided for the process safety of the stamping process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of high-strength steel material cold stamping process monitoring, and in particular to a high-strength steel material cold stamping process multi-level monitoring method based on a MES system. Background Art

[0002] The development of new materials with low cost, light weight and good manufacturing quality is an inevitable trend in the future industrial market demand. Aluminum alloy materials are widely used in the automotive industry, aerospace industry, mechanical engineering industry and other fields due to their excellent properties (low density, specific strength and specific stiffness, good elasticity, good stamping performance, etc.). In the actual process of cold stamping of aluminum alloys, a practical solution is needed for real-time monitoring of key data and rational verification and processing of relevant data. Summary of the invention

[0003] In view of the shortcomings of the prior art, the present invention provides a multi-level monitoring method for cold stamping process of high-strength steel materials based on MES system, which realizes accurate monitoring of multi-level and multi-type data by combining and processing the real-time data of cold stamping process and its related data.

[0004] To achieve the above object, the present invention provides a multi-level monitoring method for cold stamping process of high-strength steel materials based on MES system, comprising: S1. Obtain real-time basic data of cold stamping process of high-strength steel materials based on MES system; S2. Using the real-time basic data to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials; S3. Perform multi-level screening and analysis processing according to the real-time status monitoring database to obtain multi-level monitoring results of the cold stamping process of high-strength steel materials.

[0005] Preferably, the real-time basic data of the cold stamping process of high-strength steel materials obtained based on the MES system includes: S1-1. Based on the MES system, high-strength steel material size data, cold stamping parameter data and cold stamping process hardware type of high-strength steel material cold stamping process are obtained as basic data; S1-2. Establish real-time basic data of the cold stamping process of high-strength steel materials according to the basic data and the corresponding time.

[0006] Furthermore, the real-time basic data of the cold stamping process of high-strength steel materials established according to the basic data and the corresponding time include: S1-2-1, judging whether the high-strength steel material size data of the real-time basic data is abnormal in the process standard, if so, outputting the high-strength steel material size data that currently exceeds the process standard, otherwise, executing S1-2-2; S1-2-2, judging whether the cold stamping parameter data of the real-time basic data matches the high-strength steel material size data normally, if so, executing S1-2-3, otherwise, outputting the currently unmatched cold stamping parameter data; S1-2-3. Determine whether the cold stamping process hardware type of the real-time basic data and the cold stamping parameter data match abnormally. If so, output the currently unmatched cold stamping parameter data. Otherwise, output the basic data and the corresponding moment as the real-time basic data of the cold stamping process of high-strength steel materials.

[0007] Preferably, using the real-time basic data to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials includes: S2-1. When all the real-time basic data correspond to normal, a real-time status monitoring database for the cold stamping process of high-strength steel materials is established using the real-time basic data; S2-2. When the real-time basic data does not all correspond to the exception, the processing is abandoned.

[0008] Furthermore, the use of real-time basic data to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials includes: Establishing a first real-time status monitoring database using the high-strength steel material dimension data of the real-time basic data; Establishing a second real-time status monitoring database using the cold stamping parameter data of the real-time basic data; The first real-time status monitoring database and the second real-time status monitoring database are used as real-time status monitoring databases for the cold stamping process of high-strength steel materials.

[0009] Furthermore, using the high-strength steel material size data of the real-time basic data to establish a first real-time status monitoring database includes: The process start time of the current high-strength steel material cold stamping process is used as the standard time; Using the high-strength steel material size data of the real-time basic data, a first real-time state monitoring data set is sequentially established according to standard time; The real-time basic data and the corresponding first real-time status monitoring data set are used as a first real-time status monitoring database.

[0010] Furthermore, using the cold stamping parameter data of the real-time basic data to establish a second real-time status monitoring database includes: Obtain corresponding real-time process environment data based on the current high-strength steel material cold stamping process; Acquire real-time process environment data and corresponding time points to sequentially establish a second real-time status monitoring data set; Using the standard process environment data and the second real-time status monitoring data set as a second real-time status monitoring database; The standard process environment data are standard process environment data corresponding to the cold stamping process of high-strength steel materials, and the process environment data include temperature data and humidity data.

[0011] Furthermore, the multi-level monitoring results of the cold stamping process of high-strength steel materials obtained by multi-level screening and analysis processing according to the real-time status monitoring database include: S3-1, determining whether the first real-time status monitoring database and the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material completely correspond to each other, if so, executing S3-2, otherwise, issuing an alarm; S3-2, judging whether there is an abnormality in the first real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material, if so, giving an alarm and executing S3-3, otherwise, directly executing S3-3; S3-3, judging whether the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material is abnormal, if so, giving an alarm and executing S3-4, otherwise, directly outputting the multi-level monitoring result of the cold stamping process of the high-strength steel material as normal; S3-4. Obtain the real-time basic data corresponding to the current moment to obtain the multi-level monitoring results of the cold stamping process of high-strength steel materials.

[0012] Furthermore, the acquisition of the real-time basic data corresponding to the current moment to obtain the multi-level monitoring results of the cold stamping process of high-strength steel materials includes: S3-4-1, judging whether the real-time basic data corresponding to the current moment completely corresponds to the first real-time status monitoring database of the real-time status monitoring database of the cold stamping process of high-strength steel materials, if so, executing S3-4-2, otherwise, outputting the multi-level monitoring result of the cold stamping process of high-strength steel materials as abnormal; S3-4-2. Determine whether the real-time basic data corresponding to the current moment is completely consistent with the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of high-strength steel materials. If so, return to S2-1; otherwise, output the multi-level monitoring result of the cold stamping process of high-strength steel materials as abnormal.

[0013] Compared with the closest prior art, the present invention has the following beneficial effects: Based on MES, the status of the property characteristics of the cold stamping process of high-strength steel materials is collected and subsequently pre-screened. Taking various influencing factors into consideration, after data collection and review, it is confirmed that there are no errors and then cross-comparison between process flow data and environmental characteristics are introduced. For the sake of insurance, when there are any comparison anomalies, an alarm is issued, and the anomalies are subsequently reviewed to make effective safety guarantees for the process safety of the stamping process. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a flow chart of a multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system provided by the present invention. DETAILED DESCRIPTION

[0015] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0016] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] Embodiment 1: The present invention provides a multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system, such as Figure 1 As shown, including: S1. Obtain real-time basic data of cold stamping process of high-strength steel materials based on MES system; S2. Using the real-time basic data to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials; S3. Perform multi-level screening and analysis processing according to the real-time status monitoring database to obtain multi-level monitoring results of the cold stamping process of high-strength steel materials.

[0018] S1 specifically includes: S1-1. Based on the MES system, high-strength steel material size data, cold stamping parameter data and cold stamping process hardware type of high-strength steel material cold stamping process are obtained as basic data; S1-2. Establish real-time basic data of the cold stamping process of high-strength steel materials according to the basic data and the corresponding time.

[0019] S1-2 specifically includes: S1-2-1, judging whether the high-strength steel material size data of the real-time basic data is abnormal in the process standard, if so, outputting the high-strength steel material size data that currently exceeds the process standard, otherwise, executing S1-2-2; S1-2-2, judging whether the cold stamping parameter data of the real-time basic data matches the high-strength steel material size data normally, if so, executing S1-2-3, otherwise, outputting the currently unmatched cold stamping parameter data; S1-2-3. Determine whether the cold stamping process hardware type of the real-time basic data and the cold stamping parameter data match abnormally. If so, output the currently unmatched cold stamping parameter data. Otherwise, output the basic data and the corresponding moment as the real-time basic data of the cold stamping process of high-strength steel materials.

[0020] S2 specifically includes: S2-1. When all the real-time basic data correspond to normal, a real-time status monitoring database for the cold stamping process of high-strength steel materials is established using the real-time basic data; S2-2. When the real-time basic data does not all correspond to the exception, the processing is abandoned.

[0021] S2-1 specifically includes: S2-1-1, establishing a first real-time status monitoring database using the high-strength steel material dimension data of the real-time basic data; S2-1-2, using the cold stamping parameter data of the real-time basic data to establish a second real-time status monitoring database; S2-1-3. Use the first real-time status monitoring database and the second real-time status monitoring database as real-time status monitoring databases for the cold stamping process of high-strength steel materials.

[0022] S2-1-1 specifically includes: S2-1-1-1. Use the process start time of the current high-strength steel material cold stamping process as the standard time; S2-1-1-2, using the high-strength steel material size data of the real-time basic data to sequentially establish a first real-time status monitoring data set according to standard time; S2-1-1-3. Utilize the real-time basic data and the corresponding first real-time status monitoring data set as a first real-time status monitoring database.

[0023] S2-1-2 specifically includes: S2-1-2-1. Obtain corresponding real-time process environment data according to the current high-strength steel material cold stamping process; S2-1-2-2, acquiring real-time process environment data and establishing a second real-time status monitoring data set in sequence at corresponding times; S2-1-2-3, using the standard process environment data and the second real-time status monitoring data set as a second real-time status monitoring database; The standard process environment data are standard process environment data corresponding to the cold stamping process of high-strength steel materials, and the process environment data include temperature data and humidity data.

[0024] S3 specifically includes: S3-1, determining whether the first real-time status monitoring database and the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material completely correspond to each other, if so, executing S3-2, otherwise, issuing an alarm; S3-2, judging whether there is an abnormality in the first real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material, if so, giving an alarm and executing S3-3, otherwise, directly executing S3-3; S3-3, judging whether the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material is abnormal, if so, giving an alarm and executing S3-4, otherwise, directly outputting the multi-level monitoring result of the cold stamping process of the high-strength steel material as normal; S3-4. Obtain the real-time basic data corresponding to the current moment to obtain the multi-level monitoring results of the cold stamping process of high-strength steel materials.

[0025] S3-4 specifically includes: S3-4-1, judging whether the real-time basic data corresponding to the current moment completely corresponds to the first real-time status monitoring database of the real-time status monitoring database of the cold stamping process of high-strength steel materials, if so, executing S3-4-2, otherwise, outputting the multi-level monitoring result of the cold stamping process of high-strength steel materials as abnormal; S3-4-2. Determine whether the real-time basic data corresponding to the current moment is completely consistent with the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of high-strength steel materials. If so, return to S2-1; otherwise, output the multi-level monitoring result of the cold stamping process of high-strength steel materials as abnormal.

[0026] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0027] The present invention is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0028] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0029] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0030] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A multi-level monitoring method for cold stamping process of high-strength steel materials based on MES system, characterized in that: include: S1. Obtain real-time basic data of cold stamping process of high-strength steel materials based on MES system; S2. Using the real-time basic data to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials; S3. Perform multi-level screening and analysis processing according to the real-time status monitoring database to obtain multi-level monitoring results of the cold stamping process of high-strength steel materials.

2. The multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system as claimed in claim 1, characterized in that: The real-time basic data of the cold stamping process of high-strength steel materials obtained based on the MES system include: S1-1. Based on the MES system, high-strength steel material size data, cold stamping parameter data and cold stamping process hardware type of high-strength steel material cold stamping process are obtained as basic data; S1-2. Establish real-time basic data of the cold stamping process of high-strength steel materials according to the basic data and the corresponding time.

3. The multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system as claimed in claim 2, characterized in that: The real-time basic data of the cold stamping process of high-strength steel materials established according to the basic data and the corresponding time include: S1-2-1, judging whether the high-strength steel material size data of the real-time basic data is abnormal in the process standard, if so, outputting the high-strength steel material size data that currently exceeds the process standard, otherwise, executing S1-2-2; S1-2-2, judging whether the cold stamping parameter data of the real-time basic data matches the high-strength steel material size data normally, if so, executing S1-2-3, otherwise, outputting the currently unmatched cold stamping parameter data; S1-2-3. Determine whether the cold stamping process hardware type of the real-time basic data and the cold stamping parameter data match abnormally. If so, output the currently unmatched cold stamping parameter data. Otherwise, output the basic data and the corresponding moment as the real-time basic data of the cold stamping process of high-strength steel materials.

4. The multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system as claimed in claim 1, characterized in that: The real-time basic data is used to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials, including: S2-1. When all the real-time basic data correspond to normal, a real-time status monitoring database for the cold stamping process of high-strength steel materials is established using the real-time basic data; S2-2. When the real-time basic data does not all correspond to the exception, the processing is abandoned.

5. The multi-level monitoring method for cold stamping process of high-strength steel material based on MES system as claimed in claim 4 is characterized in that The method of using real-time basic data to establish a real-time status monitoring database for the cold stamping process of high-strength steel materials includes: Establishing a first real-time status monitoring database using the high-strength steel material dimension data of the real-time basic data; Establishing a second real-time status monitoring database using the cold stamping parameter data of the real-time basic data; The first real-time status monitoring database and the second real-time status monitoring database are used as real-time status monitoring databases for the cold stamping process of high-strength steel materials.

6. The multi-level monitoring method for cold stamping process of high-strength steel material based on MES system as claimed in claim 5, characterized in that , using the high-strength steel material size data of the real-time basic data to establish a first real-time status monitoring database includes: The process start time of the current high-strength steel material cold stamping process is used as the standard time; Using the high-strength steel material size data of the real-time basic data, a first real-time state monitoring data set is sequentially established according to standard time; The real-time basic data and the corresponding first real-time status monitoring data set are used as a first real-time status monitoring database.

7. The multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system as claimed in claim 5, characterized in that , using the cold stamping parameter data of the real-time basic data to establish a second real-time status monitoring database includes: Obtain corresponding real-time process environment data based on the current high-strength steel material cold stamping process; Acquire real-time process environment data and corresponding time points to sequentially establish a second real-time status monitoring data set; Using the standard process environment data and the second real-time status monitoring data set as a second real-time status monitoring database; The standard process environment data are standard process environment data corresponding to the cold stamping process of high-strength steel materials, and the process environment data include temperature data and humidity data.

8. The multi-level monitoring method for cold stamping process of high-strength steel material based on MES system as claimed in claim 5, characterized in that: The multi-level monitoring results of the cold stamping process of high-strength steel materials obtained by multi-level screening and analysis based on the real-time status monitoring database include: S3-1, determining whether the first real-time status monitoring database and the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material completely correspond to each other, if so, executing S3-2, otherwise, issuing an alarm; S3-2, judging whether there is an abnormality in the first real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material, if so, giving an alarm and executing S3-3, otherwise, directly executing S3-3; S3-3, judging whether the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of the high-strength steel material is abnormal, if so, giving an alarm and executing S3-4, otherwise, directly outputting the multi-level monitoring result of the cold stamping process of the high-strength steel material as normal; S3-4. Obtain the real-time basic data corresponding to the current moment to obtain the multi-level monitoring results of the cold stamping process of high-strength steel materials.

9. The multi-level monitoring method for cold stamping process of high-strength steel materials based on the MES system as claimed in claim 8, characterized in that: The acquisition of the real-time basic data corresponding to the current moment to obtain the multi-level monitoring results of the cold stamping process of high-strength steel materials includes: S3-4-1, judging whether the real-time basic data corresponding to the current moment completely corresponds to the first real-time status monitoring database of the real-time status monitoring database of the cold stamping process of high-strength steel materials, if so, executing S3-4-2, otherwise, outputting the multi-level monitoring result of the cold stamping process of high-strength steel materials as abnormal; S3-4-2. Determine whether the real-time basic data corresponding to the current moment is completely consistent with the second real-time status monitoring database of the real-time status monitoring database of the cold stamping process of high-strength steel materials. If so, return to S2-1; otherwise, output the multi-level monitoring result of the cold stamping process of high-strength steel materials as abnormal.

Citation Information

Cited By

  • High-frequency communication control detection method for pressure feedback type composite actuator

    CN119402381A

  • Real-time data analysis and evaluation method for pressing process monitoring system

    CN119536103A