Intelligent scheduling platform running diagram planning system and method

Through the operation chart planning system of the intelligent scheduling platform, the operation plan of rail transit is adjusted in real time, which solves the problem that traditional scheduling methods cannot cope with changes in different passenger flow periods, improves capacity utilization efficiency and energy saving effect, and reduces operating costs.

CN119058787APending Publication Date: 2024-12-03CRSC URBAN RAIL TRANSIT TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410839129.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Traditional rail transit signal scheduling methods cannot flexibly respond to changes in different passenger flow periods, resulting in low capacity utilization efficiency, energy waste and increased operating costs, and cannot meet the needs of modern urban traffic management.

Method used

Design an intelligent scheduling platform operation diagram planning system, obtain real-time passenger flow data and point information through docking with the line ATS system, and the application service unit adjusts the operation plan map in real time, including increasing or decreasing the train running speed and shifts, and shortening Or extend the operating interval and enable the energy-saving operation curve for transmission to the line ATS system.

Benefits of technology

It has achieved dynamic adjustments based on real-time passenger flow data and train morning and evening information, optimized operation plans, improved train usage efficiency, reduced operating costs, and ensured the optimal coordinated use of capacity and energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119058787A_ABST
    Figure CN119058787A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of rail transit dispatching, in particular to an intelligent dispatching platform running diagram planning system and method, and the system comprises an interface service unit which is used for being in butt joint with a line ATS system to obtain real-time passenger flow data, an actual running diagram and report point information, and transmitting the real-time passenger flow data, the actual running diagram and report point information to an application service unit; the application service unit is used for transmitting the real-time passenger flow data, the actual working diagram and the report point information to a line network working diagram workstation for display, and transmitting the real-time passenger flow data, the actual working diagram and the report point information to the database service unit for storage; the application service unit is also used for acquiring morning and evening point information of each operation line based on the point reporting information of each line, adjusting an operation plan diagram in real time according to the real-time passenger flow data and the morning and evening point information of the train, and transmitting the adjusted operation plan diagram to the interface service unit; and the interface service unit is also used for transmitting the adjusted operation plan diagram to the line ATS system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of rail transit dispatching, and in particular to a system and method for compiling an operation diagram plan for an intelligent dispatching platform. Background Art

[0002] As a public transportation system with large capacity, rail transit plays a vital role in modern cities. It not only provides an efficient and convenient means of transportation, but also makes great contributions to strengthening inter-city linkage and reducing carbon emissions. However, the passenger flow distribution of rail transit sections is uneven during different operating periods throughout the day, and the overall passenger flow is tidal. During peak hours in the morning and evening or temporary high passenger flow periods, the passenger flow intensity is high, the train load rate is high, and even overloading may occur. However, during off-peak periods, the passenger flow is relatively small and the train load rate is insufficient, resulting in a waste of capacity and energy, and also increasing operating costs.

[0003] Traditional signal dispatching methods often rely on pre-set schedules and cannot be adjusted according to real-time traffic conditions. The disadvantage of this fixed-time dispatching is that it cannot adapt to changes in passenger flow and cannot fully utilize passenger flow resources, resulting in low efficiency. Therefore, traditional signal dispatching methods can no longer meet the needs of modern urban traffic management. The contradiction between the capacity demand of large passenger flow, the energy waste of small passenger flow, and the operation service level (operation interval) is becoming more and more obvious.

[0004] In summary, there is an urgent need for a solution that can flexibly respond to the challenges of transport capacity and operational service levels while reducing operating costs. The application of the intelligent dispatching platform has effectively enhanced the efficiency of train utilization during different passenger flow periods. Summary of the invention

[0005] In response to the above problems, the present invention provides an intelligent scheduling platform operation diagram planning system and method, which is used to realize a simple, convenient, flexible, and highly versatile plan diagram preparation and intelligent adjustment function in various conventional and special operation scenarios.

[0006] In a first aspect, a system for adjusting an operation diagram plan of an intelligent scheduling platform includes: Interface service unit, application service unit, line network operation diagram workstation and database service unit; The interface service unit is used to connect with the line ATS system to obtain real-time passenger flow data, actual operation diagram and reporting point information, and transmit them to the application service unit; The application service unit is used to transmit the real-time passenger flow data, the actual operation diagram and the reporting point information to the line network operation diagram workstation for display, and transmit the real-time passenger flow data, the actual operation diagram and the reporting point information to the database service unit for storage; The application service unit is also used to obtain the early and late information of each operating line based on the reporting information of each line, and adjust the operation plan in real time according to the real-time passenger flow data and the early and late information of the train, and transmit the adjusted operation plan to the interface service unit; The interface service unit is also used to transmit the adjusted operation plan diagram to the line ATS system.

[0007] Furthermore, the operation plan is adjusted in real time according to the real-time passenger flow data and train departure and arrival information, including: When the real-time passenger flow data increases, the number of increases is calculated according to the real-time passenger flow data, and the required carrying capacity is calculated by increasing the operation plan speed within a safe range, increasing the operation plan frequency, and / or shortening the train operation interval within the system minimum operation interval allowed.

[0008] Furthermore, the operation plan is adjusted in real time according to the real-time passenger flow data and train departure and arrival information, including: When real-time passenger flow data decreases, the required carrying capacity is calculated based on the number of reductions in real-time passenger flow data, and the operation plan is adjusted with energy saving as the goal.

[0009] Furthermore, the operation plan is adjusted in real time according to the real-time passenger flow data and train departure and arrival information, including: When a train is delayed, the operation plan diagram is adjusted by increasing the operation plan speed within a safe range, and / or shortening the train running interval within the range allowed by the system's minimum running interval.

[0010] Furthermore, the operation plan is adjusted in real time according to the real-time passenger flow data and train departure and arrival information, including: When a train is early, the operation plan diagram is adjusted by reducing the operation plan speed within a safe range, and / or increasing the train running interval within the system minimum running interval allowed.

[0011] Furthermore, it also includes: The application service unit enables the preset ATO energy-saving operation curve according to the adjusted operation plan diagram.

[0012] Furthermore, it also includes: The application service unit transmits the station information, train information, equipment status, alarm information, trend analysis and / or operation diagram to the large-screen terminal workstation, maintenance workstation, global dispatch workstation and / or line network operation diagram workstation for display.

[0013] In a second aspect, a method for adjusting an operation diagram plan of an intelligent scheduling platform includes: Based on the above-mentioned intelligent dispatching platform operation diagram plan adjustment system, the operation diagram plan of rail transit is prepared or adjusted.

[0014] In a third aspect, an electronic device includes a processor, a communication interface, a memory, and a communication bus, wherein the processor, the communication interface, and the memory communicate with each other via the communication bus; a memory storing a computer program; The processor is used to implement the above-mentioned intelligent scheduling platform operation diagram plan adjustment method when executing the computer program stored in the memory.

[0015] In a fourth aspect, a computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned method for adjusting an operation diagram plan of an intelligent scheduling platform.

[0016] The present disclosure includes at least the following beneficial effects: The present invention intelligently adjusts the operation plan according to the information of train early and late times and the congestion of interval trains; optimizes the operation diagram plan to realize functions such as adding trains through the station passenger flow and other conditions fed back by environmental control; saves energy for empty trains such as returning trains through the first and last train plan information; the intelligent operation diagram realizes the adjustment of train operation by adjusting and optimizing the operation plan.

[0017] Other features and advantages of the present disclosure will be described in the following description, and partly become apparent from the description, or be understood by implementing the present disclosure. The purpose and other advantages of the present disclosure can be realized and obtained by the structures indicated in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0019] Figure 1 Adjust the system architecture diagram for the operation diagram plan; Figure 2 It is a schematic diagram of the structure of an electronic device; Figure 3 Intelligently adjust information flow diagrams for online operation diagrams; Figure 4 It is a schematic diagram of the software structure of the intelligent mapping program; Figure 5 This is a schematic diagram of the intelligent scheduling platform operation diagram plan adjustment. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0021] The current traditional way of compiling a timetable is to compile a full-day operation plan, send it to a central server, and arrange the routes through the central control console to ensure that the trains run on time. In this mode, the trains can only run according to the plan and cannot be flexibly adjusted or respond to emergencies.

[0022] At the same time, according to the traditional operation diagram compilation and interaction methods, the trains only have the traditional L1-L4 four-level operation modes, and do not have intelligent adjustment functions such as energy saving, expansion, temporary increase of vehicles, interconnection and cross-line communication. At the same time, it is impossible to optimize the train operation mode according to passenger flow information, line fault information, energy-saving plans, etc.

[0023] like Figure 1 As shown, an intelligent scheduling platform operation diagram plan adjustment system includes: Interface service unit 101, application service unit 102, line network operation diagram workstation 103 and database service unit 104; The interface service unit 101 is used to connect with the line ATS system to obtain real-time passenger flow data, actual operation diagram and reporting point information, and transmit them to the application service unit 102; The application service unit 102 is used to transmit the real-time passenger flow data, the actual operation diagram and the reporting point information to the line network operation diagram workstation 103 for display, and transmit the real-time passenger flow data, the actual operation diagram and the reporting point information to the database service unit 104 for storage; The application service unit 102 is further used to obtain the early and late information of each operating line based on the reporting information of each line, and adjust the operation plan in real time according to the real-time passenger flow data and the early and late information of the train, and transmit the adjusted operation plan to the interface service unit 101; The interface service unit 101 is also used to transmit the adjusted operation plan diagram to the line ATS system.

[0024] In specific implementation, passenger flow monitoring data flows to the application service through the external interface service, and the application service adjusts the operation diagram based on the real-time passenger flow data; the actual diagram and reporting point information are transmitted to the application service through the line interface service, and forwarded to the line network operation diagram workstation for display, and forwarded to the data service for storage. The application service identifies the early and late points of each operating line based on the reporting point information of each line, and makes intelligent adjustments. The application service forwards the adjusted plan diagram to the external interface service that needs the real-time plan diagram.

[0025] In one embodiment, the operation plan is adjusted in real time according to the real-time passenger flow data and the train early and late information, including: When the real-time passenger flow data increases, the number of increases is calculated according to the real-time passenger flow data, and the required carrying capacity is calculated by increasing the operation plan speed within a safe range, increasing the operation plan frequency, and / or shortening the train operation interval within the system minimum operation interval allowed.

[0026] In one embodiment, the operation plan is adjusted in real time according to the real-time passenger flow data and the train early and late information, including: When real-time passenger flow data decreases, the required carrying capacity is calculated based on the number of reductions in real-time passenger flow data, and the operation plan is adjusted with energy saving as the goal.

[0027] In one embodiment, the operation plan is adjusted in real time according to the real-time passenger flow data and the train early and late information, including: When a train is delayed, the operation plan diagram is adjusted by increasing the operation plan speed within a safe range, and / or shortening the train running interval within the range allowed by the system's minimum running interval.

[0028] In one embodiment, the operation plan is adjusted in real time according to the real-time passenger flow data and the train early and late information, including: When a train is early, the operation plan diagram is adjusted by reducing the operation plan speed within a safe range, and / or increasing the train running interval within the system minimum running interval allowed.

[0029] In one embodiment, it further includes: The application service unit enables the preset ATO energy-saving operation curve according to the adjusted operation plan diagram.

[0030] In one embodiment, it further includes: The application service unit transmits the station information, train information, equipment status, alarm information, trend analysis and / or operation diagram to the large-screen terminal workstation, maintenance workstation, global dispatch workstation and / or line network operation diagram workstation for display.

[0031] A method for adjusting an operation diagram plan of an intelligent scheduling platform, comprising: Based on the above-mentioned intelligent dispatching platform operation diagram plan adjustment system, the operation diagram plan of rail transit is prepared or adjusted.

[0032] In the specific implementation, various external information such as passenger flow, power, environmental control, energy saving, etc. are abstracted into flexible map compilation constraints to automatically generate the daily operation map plan. The route information of the planned operation is sent to the vehicle through FEP. The vehicle obtains the train's early and late information feedback through FEP based on the communication information between trains. ISCS obtains real-time passenger flow information feedback through FEP. The operation map is adjusted based on the train's early and late time. The operation map adjustment prompt is based on the train's real-time passenger flow data. The preset ATO energy-saving operation curve is enabled based on the train's early and late time and real-time passenger flow data.

[0033] like Figure 2 As shown, the present disclosure provides an electronic device, including a processor 201, a communication interface 202, a memory 203 and a communication bus 204, wherein the processor 201, the communication interface 202 and the memory 203 communicate with each other through the communication bus 204; Memory 203, storing computer programs; The processor 201 is configured to implement the above method when executing the computer program stored in the memory 203 .

[0034] The present disclosure provides a computer-readable storage medium storing a computer program, wherein the computer program implements the above method when executed by a processor.

[0035] The computer-readable storage medium may be included in the device / apparatus described in the above embodiment; or it may exist independently without being assembled into the device / apparatus. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the method according to the embodiment of the present disclosure is implemented.

[0036] According to an embodiment of the present disclosure, a computer-readable storage medium may be a non-volatile computer-readable storage medium, for example, may include but is not limited to: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, apparatus, or device.

[0037] In order to enable those skilled in the art to better understand the present disclosure, the principles of the present disclosure are described as follows in conjunction with the accompanying drawings: The TIAS system, an intelligent dispatching platform, is a comprehensive information control system for train dispatching for train command and dispatching personnel and plan and map compilation personnel. It integrates informationization, automation, and intelligence. It can achieve the best coordination between passenger flow demand and capacity by flexibly compiling and adjusting operation plans based on the passenger flow characteristics of urban rail transit in different sections and time periods, while ensuring a higher train service frequency. With the increasing demand for rail transit, the latest domestic rail transit lines are all moving towards an interconnected and fully automatic signal system. Therefore, in combination with the current technical requirements for interconnection and fully automatic operation, the signal system is based on the current interconnected and fully automatic operation system, and the functional requirements of the intelligent dispatching platform operation diagram are superimposed. Figure 3 As shown, it includes: 1. Based on various external information such as passenger flow, electricity, environmental control, energy saving, etc., it is abstracted into flexible map compilation constraints to automatically draw the daily operation diagram plan. 2. According to the train early and late points and the crowdedness information of the interval train, the operation plan is intelligently adjusted. It has the function of receiving the global train status, realizing the intelligent adjustment of the plan, receiving the station status feedback, and optimizing the operation diagram plan in real time. 3. When the system is connected to the real-time passenger flow information of the station, it can evaluate the current capacity gap or surplus of each station according to the preset passenger flow congestion model and the historical passenger flow model, and can prompt the number of vehicles to be added and the recommended outbound location; 4. The system should be able to pre-set the ATO energy-saving operation curve parameters of various levels of trains with the automatic adjustment function of the operation diagram, and automatically enable the ATO energy-saving operation curve according to the operation level and the stop time margin, the automatic adjustment optimization target weight and other parameters during the automatic adjustment process. 5. Support the cross-line map compilation function of different manufacturers to coordinate the adjustment of the line network level operation plan. The operation diagram system of the intelligent dispatching platform has the ability to prepare and adjust interconnection plans. The overall goal of the interconnection of urban rail transit systems is to support the networked operation of rail transit and realize resource sharing in the construction and operation of rail transit networks.

[0038] like Figure 4As shown in the figure, the TIAS_CTP intelligent scheduling platform operation chart system software can be divided into front-end software and back-end software according to the deployment method. Front-end software refers to the software for human-computer interface interaction, and other software are back-end software. Front-end software includes Web interface, Qt interface, and mobile App interface. The Web interface can be flexibly deployed, including separate browser deployment, embedded Qt terminal deployment, and embedded mobile App interface deployment. The Qt interface is deployed on the Windows platform or the Linux desktop platform. The mobile App interface can be deployed on mobile platforms such as Android, iOS, and Hongmeng. Back-end software is divided into industrial control software and information architecture software. Industrial control software is deployed on the Linux platform, and Redhat or domestic distribution versions of the Linux platform can be used, which is compatible with x86 and ARM architecture CPUs. The information architecture software is mainly deployed in containers, and Redhat or domestic distribution versions of the Linux platform can be used, which is compatible with x86 and ARM architecture CPUs.

[0039] The operation diagram compilation module is responsible for compiling operation diagram plans, manually / automatically setting train energy-saving modes, adjusting plans according to environmental control conditions, etc. It meets the application requirements of different occasions through different parameter settings and plug-in combinations.

[0040] The operation diagram editing program adopts a plug-in structure design. Through plug-ins, some independent and optional functions are separated to meet the different operation requirements of trains in various situations such as energy saving, additional cars, and increased passenger flow.

[0041] like Figure 5 As shown in the figure, the intelligent dispatching platform operation diagram planning and adjustment function process is briefly described: Planning and automatic adjustment steps: TIAS-CTP automatically generates the daily operation plan based on various external information such as passenger flow, power, environmental control, and energy saving, and abstracts them into flexible map-making constraints. TIAS-CTP sends the planned route information to the vehicle through FEP.

[0042] Based on the communication information between trains, the train feeds back the train's early or late information to TIAS-CTP through FEP.

[0043] ISCS feeds real-time passenger flow information back to TIAS-CTP through FEP.

[0044] TIAS-CTP adjusts the timetable based on the early and late times of trains.

[0045] TIAS-CTP provides timetable adjustment prompts based on real-time train passenger flow data.

[0046] TIAS-CTP uses the preset ATO energy-saving operation curve based on train departure and arrival times and real-time passenger flow data.

[0047] Manual planning and manual adjustment steps: TIAS-CTP abstracts various external information such as passenger flow, electricity, environmental control, energy saving, etc. into flexible mapping constraints, and manually draws the operation diagram for the day based on the constraints.

[0048] TIAS-CTP sends the planned route information to the vehicle through FEP.

[0049] Temporary planned train operation is manually added based on the day's operational needs, and the preset ATO energy-saving operation curve is activated for the train based on the day's energy-saving needs.

[0050] Online operation diagram intelligent adjustment function architecture: Passenger flow monitoring data flows to the application service through the external interface service, and the application service adjusts the operation diagram based on the real-time passenger flow data; The actual diagram and reporting point information are transmitted to the application service through the line interface service, forwarded to the line network operation diagram workstation for display, and forwarded to the data service for storage. The application service identifies the early and late points of each operating line based on the reporting point information of each line, and makes intelligent adjustments.

[0051] The application service forwards the adjusted plan graph to the external interface service that requires the real-time plan graph.

[0052] The present disclosure ensures the flexibility and accuracy of timetable compilation; receives global train status to realize intelligent plan adjustment function; receives station status feedback to optimize the timetable plan in real time; realizes the cross-line function of interconnected timetables and coordinates the adjustment of line network-level operation plans.

[0053] Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present disclosure.

Claims

1. An intelligent scheduling platform operation diagram planning system, characterized in that: include: Interface service unit, application service unit, line network operation diagram workstation and database service unit; The interface service unit is used to connect with the line ATS system to obtain real-time passenger flow data, actual operation diagram and reporting point information, and transmit them to the application service unit; The application service unit is used to transmit the real-time passenger flow data, the actual operation diagram and the reporting point information to the line network operation diagram workstation for display, and transmit the real-time passenger flow data, the actual operation diagram and the reporting point information to the database service unit for storage; The application service unit is also used to obtain the early and late information of each operating line based on the reporting information of each line, and adjust the operation plan in real time according to the real-time passenger flow data and the early and late information of the train, and transmit the adjusted operation plan to the interface service unit; The interface service unit is also used to transmit the adjusted operation plan diagram to the line ATS system.

2. The intelligent scheduling platform operation diagram planning system according to claim 1 is characterized in that: Adjust the operation plan in real time based on real-time passenger flow data and train departure and arrival information, including: When the real-time passenger flow data increases, the number of increases is calculated according to the real-time passenger flow data, and the required carrying capacity is calculated by increasing the operation plan speed within a safe range, increasing the operation plan frequency, and / or shortening the train operation interval within the system minimum operation interval allowed.

3. The intelligent scheduling platform operation diagram planning system according to claim 1 is characterized in that: Adjust the operation plan in real time based on real-time passenger flow data and train departure and arrival information, including: When real-time passenger flow data decreases, the required carrying capacity is calculated based on the number of reductions in real-time passenger flow data, and the operation plan is adjusted with energy saving as the goal.

4. The intelligent scheduling platform operation diagram planning system according to claim 1 is characterized in that: Adjust the operation plan in real time based on real-time passenger flow data and train departure and arrival information, including: When a train is delayed, the operation plan diagram is adjusted by increasing the operation plan speed within a safe range, and / or shortening the train running interval within the range allowed by the system's minimum running interval.

5. The intelligent scheduling platform operation diagram planning system according to claim 1 is characterized in that: Adjust the operation plan in real time based on real-time passenger flow data and train departure and arrival information, including: When a train is early, the operation plan diagram is adjusted by reducing the operation plan speed within a safe range, and / or increasing the train running interval within the system minimum running interval allowed.

6. The intelligent scheduling platform operation diagram planning system according to claim 1 is characterized in that: Also includes: The application service unit enables the preset ATO energy-saving operation curve according to the adjusted operation plan diagram.

7. The intelligent scheduling platform operation diagram planning system according to claim 1 is characterized in that: Also includes: The application service unit transmits the station information, train information, equipment status, alarm information, trend analysis and / or operation diagram to the large-screen terminal workstation, maintenance workstation, global dispatch workstation and / or line network operation diagram workstation for display.

8. A method for compiling an operation diagram plan for an intelligent scheduling platform, characterized in that: include: An intelligent dispatching platform operation diagram planning system according to any one of claims 1 to 7 is used to prepare or adjust the operation diagram plan for rail transit.

9. An electronic device, characterized in that: It includes a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; a memory storing a computer program; The processor is used to implement the method for compiling an operation diagram plan for an intelligent scheduling platform as described in claim 8 when executing the computer program stored in the memory.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by the processor, the method for compiling an operation diagram plan for an intelligent scheduling platform as described in claim 8 is implemented.

Citation Information

Cited By

  • Dynamic loading adjustment method, device and equipment

    CN121106419A

  • Space-time constraint operation scheduling method for urban rail transit and computer program product

    CN121882643A