Hatch cover mounting process
Through a multi-step hatch installation process, including assembly positioning, segmented closing and testing, the problems of low installation accuracy and efficiency of the ship hatch cover are solved, and a high-precision and efficient installation process is achieved.
Patent Information
- Application Number
- CN202411255833.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-12-03
AI Technical Summary
The prior art cannot effectively ensure the installation accuracy of the canopy, resulting in difficulty in closing and low installation efficiency.
Using a multi-step hatch installation process, including hatch assembly and positioning, segmentation closing, box foot installation, support leg setting and multiple tests, ensuring accurate docking and balance of each step, and improving installation accuracy and efficiency through calibration and testing. .
It realizes high-precision installation of the canopy, simplifies closing operation, improves installation efficiency, reduces the hassle of rework, and ensures the quality and safety of the product.
Smart Images

Figure CN119058909A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction project in the shipbuilding industry, in particular to a hatch cover installation process. Background Art
[0002] The hatch covers of N1109 are built for the first ship of 77K multi-purpose pulp ship. The project is tight in schedule and large in quantity. Its hatch covers include folding hatch covers and piggyback hatch covers. Its hatch covers HC1 & HC8 are traditional folding hatch covers, and the other hatch covers HC2 & HC3, HC4 & HC5, HC6 & HC7 are three pairs of piggyback hatch covers, which are new types of operating covers. There will be size deviations in the installation of each hatch cover, which makes it difficult to close.
[0003] Related reference document CN101797954A discloses a method for installing a container ship hatch cover. Although it has the steps of adjusting the level of the hatch cover, assembling the triangle blocks between the transverse cover plates, marking and pre-positioning, positioning the box columns on the side deck, and marking and installing the installation positions of the container feet, slide grooves and tension eye plates on the box columns, it cannot ensure the installation accuracy of the N1109 ship hatch cover. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a hatch cover construction process which ensures the installation accuracy of the hatch cover and avoids the difficulty of closing.
[0005] In order to solve the above technical problems, the present invention provides a hatch cover installation process, which is characterized by comprising the following steps: Step 1: Hatch Cover HC1 / Hatch Cover HC8 Assembly Positioning Carry out assembly positioning, roller installation and correction, middle hinge installation and correction, box foot outfitting installation and correction, small assembly, closing, closing limit block installation and correction, pressure test, and folding test in sequence; Step 2: Hatch covers HC2 to HC7 are assembled, positioned and closed in sections Carry out welding and correction of the box foot reinforcement sealing plate at the closing position, welding of the bottom plate at the closing position, installation and correction of the tensioner, installation and correction of the locker outfitting parts, assembly of rollers, assembly of the lifting arm device, pressure test, and back load test in sequence; Step 3: Install the box feet Step 4: Install the support legs A support leg is set on one hatch cover of the back load, and a pad is set on the other hatch cover of the back load; the ends of the surrounding support legs have a 10mm margin, and the ends of the two middle support legs have a 20mm margin; Step 5: Air tightness test, box foot placement test, folding test and back load test.
[0006] By adopting the above technical scheme, the steps are interconnected, one after another, and mutually restrained and balanced, thereby ensuring the installation accuracy of the cabin cover, making production smooth, making the closing operation simple and easy, and improving the efficiency of cabin cover installation.
[0007] Preferably, in step 1, the hatch cover HC1 / hatch cover HC8 assembly positioning is 500 mm apart from the theoretical size.
[0008] By adopting the above technical solution, it is convenient for construction workers to install the structure at the joint of the hatch cover.
[0009] Preferably, in step one, a small assembly is assembled, and the small assembly includes a stainless steel pressure strip and a rubber groove arranged face to face, and a water tank is installed under the stainless steel pressure strip; a rubber is arranged in the rubber groove; the stainless steel pressure strip is arranged on the hatch cover beam on one side through a mounting plate, and the hatch cover beams on both sides are parallel to each other; the rubber groove is installed on the hatch cover beam on the other side through a folding plate; the water tank is checked for straightness less than 6mm during the installation of the small assembly, and the stainless steel pressure strip is also installed to ensure a straightness less than 6mm.
[0010] The adoption of the technical solution is helpful to ensure the compression amount of the hatch cover closing rubber.
[0011] Preferably, in step one, when the joint limit block is installed and corrected, the gap between the limit blocks is 5+ / -1mm up and down, and 5mm iron sheet is used for installation.
[0012] By adopting the above technical solution, since the size of the limit block at this position is difficult to measure and control during the installation process, a 5mm plate is used during the installation process to make it easier to control the size and reduce the trouble of rework due to out-of-tolerance.
[0013] Preferably, in step one, the roller is assembled, the size from the roller to the rubber groove is + / -2mm; the size from the roller to the CVP line is + / -2mm; the verticality deviation of the roller is less than 1 / 1000mm; the size from the roller to the MVP is + / -2mm; the size from the roller to the end plate is + / -5mm.
[0014] By adopting the above technical solution, the rollers provide support and guidance for the hatch cover during opening and closing, so that the hatch cover can be easily opened and closed; it can also withstand the gravity load on the hatch cover, ensuring that the hatch cover can be firmly connected to the hull in the closed state, avoiding accidents due to gravity.
[0015] Preferably, in step 2, the final assembly positioning sections are closed, and the closing margin of 20 mm is added to the bow section.
[0016] By adopting the above technical solution, there is a margin at the closing mouth, and when the two are closed, the trimming margin is adjusted according to the actual production size to ensure the closing seam gap.
[0017] Preferably, in step three, the box feet are installed, and the four outermost box feet are made based on the MVP line and the CVP line; the level and size adjustment of the cross-cover box feet of hatch covers HC2 and HC3 is based on hatch cover HC3, and the hatch covers HC6 and HC7 are based on hatch cover HC7.
[0018] By adopting the above technical solution, the installation of the cross-cover foot is based on the adjacent end plate. Since the horizontal and distance dimensions of a set of foot have tolerance requirements, when installing the cross-cover foot of the hatch cover, the adjacent end plate is selected as the reference and installed according to the tolerance of the theoretical size plus 3. When assembling two covers, first adjust the level of one of the covers, half of the other cover and this cover, and then close it with the other half. Since the cover has a bottom plate and is a closed box structure, once the two covers are closed, the level of the foot cannot be adjusted. If there is a deviation, the box can only be opened for rework, which not only affects the appearance of the product, but also makes rework difficult.
[0019] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention first assembles and positions the hatch cover HC1 / HC8, then assembles and positions the hatch covers HC2 to HC7, closes them in sections, and installs the box feet and support legs, and finally conducts various tests. The steps are interconnected, one after another, and mutually restrain and balance each other to ensure the installation accuracy of the ship hatch cover, make production smooth, make the closing operation simple and easy, and improve the efficiency of hatch cover installation. When closing the sections, it is necessary to strengthen the sealing plate welding and correction of the box feet at the closing position, the installation correction of the tensioner, and the installation correction of the locker outfitting parts to ensure that each section can be accurately docked during assembly to form an integral structure.
[0020] 2. When the joint limit block of the present invention is installed and corrected, the limit block gap is 5+ / -1mm up and down, and 5mm iron sheet is used for installation. Since the size of the limit block at this position is difficult to measure and control during installation, a 5mm plate is used during installation to facilitate size control and reduce the trouble of rework due to tolerance.
[0021] 3. The installation of the box feet of the present invention is based on the MVP line and the CVP line to make the four outermost box feet; the horizontal and size adjustment of the cross-cover box feet of the hatch cover HC2 & hatch cover HC3 is based on the hatch cover HC3, and the hatch cover HC6 & hatch cover HC7 is based on the hatch cover HC7. The installation of the cross-cover box feet of this application is based on the adjacent end plate. Since there are tolerance requirements for the horizontal and distance dimensions of a group of box feet, when installing the cross-cover box feet of the hatch cover, the adjacent end plate is selected as the reference and installed according to the tolerance of the theoretical size plus 3. When assembling two lids, first adjust the level of one of the lids, half of the other lid and this lid, and then it can be closed with the other half. Since the lid has a bottom plate and is a closed box structure, once the two lids are closed, the level of the box feet cannot be adjusted. If there is a deviation, the box can only be opened for rework, which not only affects the appearance of the product, but also makes rework difficult. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the assembly positioning of the hatch cover HC1 / HC8 of the present invention; Figure 2 This is a schematic diagram of a small assembly of a stainless steel layer and a water tank according to the present invention; Figure 3 This is a schematic diagram of the small assembly of the folding plate and rubber groove of the present invention; Figure 4 This is a schematic diagram of the general assembly of the hatch cover HC1 of the present invention; Figure 5 This is a schematic diagram of the general assembly of the hatch cover HC8 of the present invention; Figure 6 This is a schematic diagram of installing a small assembly on a hatch cover beam of the present invention; Figure 7 This is a schematic diagram of the installation of the middle hinge and the end hinge of the present invention; Figure 8 This is a schematic diagram of positioning the cross-cover box feet of HC2 / HC6 based on the hatch cover HC3 / HC7 of the present invention; Fig. 9 It is a schematic diagram of the closure of the hatch cover HC2 / HC6 in sections according to the present invention; In the figure, 1. hatch cover beam, 2. folded plate, 3. stainless steel pressure strip, 4. rubber groove, 5. equal water groove, 6. rubber, 7. mounting plate, 8. middle hinge, 9. end hinge. DETAILED DESCRIPTION
[0023] The hatch cover installation process includes the following steps: Step 1: Hatch Cover HC1 / Hatch Cover HC8 Assembly Positioning Carry out the final assembly positioning, roller installation and correction, middle hinge 8 (male) installation and correction, box foot outfitting parts installation and correction, small assembly, closing, closing limit block installation and correction, pressure test, and folding test in sequence.
[0024] like Figure 1 As shown, the hatch cover HC1 / hatch cover HC8 assembly positioning is 500mm apart from the theoretical size, which is convenient for construction personnel to install the structure at the hatch cover joint. Measure and record the length, width, and diagonal of the hatch cover, compare with the theoretical value, and determine whether it is out of tolerance; measure the center line of the hatch cover, connect the center line of each cover of a hatch with steel wire, adjust the position of the cover, and try to match the center line with the steel wire; adjust the position of the cover to ensure that it is within the tolerance range; recheck the level of the four corners, and punch the MVP and CVP joint line samples. MVP and CVP are the horizontal and vertical center lines of the hatch cover.
[0025] like Figure 2-5 As shown, the small assembly is assembled, and the small assembly includes a stainless steel pressure strip 3 and a rubber groove 4 arranged face to face, and a water tank 5 is installed under the stainless steel pressure strip 3; a rubber 6 is set in the rubber groove 4. The stainless steel pressure strip 3 and the water tank 5 are installed on the mounting plate 7 to form a separate group, and the separate group flows to the final assembly, and the separate group is set on the hatch beam 1 on one side. The rubber groove 4 is installed on the folding plate 2 to form a separate group, and this separate group is installed on the hatch beam 1 on the other side, as shown in FIG. Figure 6 As shown. The hatch cover beams 1 on both sides are parallel to each other. When the water tank 5 is assembled and installed, the straightness is checked to be less than 6mm. The stainless steel pressure strip 3 is also installed to ensure the straightness is less than 6mm, which is conducive to ensuring the compression of the rubber 6 at the hatch cover joint. The size of the stainless steel pressure strip 3 to the opposite rubber groove 4 is + / -2mm, and the center deviation is + / -3mm.
[0026] like Figure 7 As shown, install the middle hinge 8 and the end hinge 9. The middle hinge 8 is used to connect the active and driven hatch covers. The end hinge 9 is used to connect the hatch cover and the hatch coaming end hinge 9 base. The size from the center of the end hinge 9 ear plate to the rubber groove is + / -2mm; the size from the center of the end hinge 9 ear plate to the middle hinge 8 and CVP is + / -2mm; the size from the center of the end hinge 9 ear plate to the MVP is + / -3mm; the size from the center of the end hinge 9 ear plate to the cylinder hinge is + / -1mm up and down and left and right.
[0027] In step 1, when the joint limit block is installed and corrected, the limit block gap is 5+ / -1mm up and down, and 5mm iron sheet is used for installation. Since the size of the limit block at this position is difficult to measure and control during installation, a 5mm plate is used during installation to facilitate size control and reduce the trouble of rework due to tolerance.
[0028] In step 1, the roller is assembled, the size from the roller to the rubber groove is + / -2mm; the size from the roller to the CVP line is + / -2mm; the verticality deviation of the roller is less than 1 / 1000mm; the size from the roller to the MVP is + / -2mm; the size from the roller to the end plate is + / -5mm. The present application provides support and guidance for the hatch cover during opening and closing through the roller, so that the hatch cover can be opened and closed conveniently; it can also withstand the gravity load of the hatch cover, ensuring that the hatch cover can be firmly connected to the hull in the closed state, avoiding accidents caused by gravity.
[0029] Step 2: Hatch covers HC2 to HC7 are assembled, positioned and closed in sections HC3 and HC7 will be assembled and closed first; HC2 and HC6 cabins will be assembled and closed after the cross cover box feet are adjusted to the level.
[0030] First locate the middle L-beam assembly section.
[0031] Measure the dimensions and trim the allowance. The closing allowance is 20mm, which is added to the bow section.
[0032] Position the second section; close the two sections, and fix the top plate joint with a card (every 0.5m section), and attach an oil pump to support it, and push the arch to the pre-arch: 5~10mm. The middle of the closed seam is 5~8mm more arched than the two ends.
[0033] Closed seam assembly welding correction.
[0034] The box feet are reinforced and the sealing plate is welded and corrected at the closed position.
[0035] The bottom plate is welded at the joint.
[0036] Installation and correction of tensioner, installation and correction of locking equipment, roller assembly, arm lifting device assembly, pressure test, and back load test.
[0037] In the step 2, the assembly positioning is segmented and closed, and the closing margin is 20mm, which is added to the bow segment. The closing margin of this application has a margin, and the trimming margin is adjusted according to the actual production size when the two are closed to ensure the closing seam gap.
[0038] Step 3: Install the box feet In step 3, the installation of the box feet is to make the four outermost box feet based on the MVP line and the CVP line; the horizontal and size adjustment of the cross-cover box feet of hatch covers HC2 and HC3 is based on hatch cover HC3, and the hatch covers HC6 and HC7 are based on hatch cover HC7. Figure 8 , 9As shown, the following is an example of hatch cover HC2 & hatch cover HC3: 1) After the hatch cover HC3 is fully closed, the box foot is installed; 2) Based on the CL. and MVP line of hatch cover HC3, the stern section of hatch cover HC2 is positioned, and the level and size of the stern section of hatch cover HC2 embedded in the box foot are adjusted; 3) The bow section and stern section of hatch cover HC2 are closed, and the remaining dovetail groove box feet are marked and installed; hatch cover HC6 & hatch cover HC7 are the same. The installation of the cross cover box foot in this application is based on the adjacent end plate. Since a set of box feet have tolerance requirements for the horizontal and distance dimensions, when installing the hatch cover cross cover box foot, the adjacent end plate is selected as the reference and installed according to the tolerance of the theoretical size plus 3. When assembling two lids, first adjust the level of one lid and half of the other lid before closing them with the other half. Because the lids have a bottom plate and a closed box structure, once the two lids are closed, the level of the box feet cannot be adjusted. If there is a deviation, the box can only be opened for rework, which not only affects the appearance of the product but also makes rework difficult.
[0039] Step 4: Install the support legs A support leg is set on one of the back-loaded hatch covers, and a pad is set on the other back-loaded hatch cover; there is a 10mm margin at the ends of the surrounding support legs, and a 20mm margin at the ends of the two middle support legs. The roller hatch cover support pad is spot welded, and it is adjusted when there is a gap between the support legs during the back-load test. In the back-loaded hatch cover of this application, the support legs play a supporting role when the two covers are stacked up and down. The two back-loaded covers have support legs on the upper one and pads on the lower one. The so-called contact refers to the contact between the support legs and the support leg pads. The support legs on both sides are closer to the hatch enclosure and have less deformation, so the contact between the support legs and the pads can better play a supporting role. Since this hatch cover has a large span and a width of about 28 meters, after being installed on the ship, there will be flexible deformation in the middle of the hatch cover, such as sagging due to the heavy objects on the cover, or arching or sagging due to changes in external weather temperature or cabin temperature. The theoretical arch or sagging amount of the hatch cover design is 10mm, and the gap between the middle support legs does not contact and leaves a gap of 10mm, that is, to compensate for the margin of flexible deformation. It can better ensure that the two covers fit better during use.
[0040] Step 5: Air tightness test, box foot placement test, folding test, and back load test.
[0041] After assembly and before tire removal, an airtight pressure test is carried out, and the welds are checked with soapy water; the test pressure is 0.02 bar (2 KPa); test time: large box structures require the entire night (8 hours), and small box structures require 2 hours.
[0042] After the box feet are inspected and qualified after final assembly, the box feet are placed on the steel frame for testing. Check whether the lower surface of the box feet fits the lock completely and whether the lock can rotate flexibly.
[0043] The folding test is carried out according to the test table.
[0044] For the back-load test, lift the hatch cover HC3 / HC4 / HC6 with a hydraulic flatbed truck, raise the arm for support, and place the hatch cover HC2 / HC5 / HC7 at the bottom. Place support pads at the corresponding positions according to the dimensions on the drawing. Check whether the gaps of the guide devices are consistent and whether they fit.
[0045] These tests ensure the functionality of the hatch cover and any problems can be dealt with promptly during the production process, rather than being found on board to not function properly, which would be difficult and time-consuming to handle.
[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. The hatch cover installation process is characterized by: The steps include: Step 1: Hatch Cover HC1 / Hatch Cover HC8 Assembly Positioning The assembly positioning, roller installation and calibration, intermediate hinge (8) installation and calibration, box foot outfitting parts installation and calibration, small assembly, closing, closing limit block installation and calibration, pressure test, and folding test are carried out in sequence; Step 2: Hatch covers HC2 to HC7 are assembled, positioned and closed in sections Carry out welding and correction of the box foot reinforcement sealing plate at the closing position, welding of the bottom plate at the closing position, installation and correction of the tensioner, installation and correction of the locker outfitting parts, assembly of rollers, assembly of the lifting arm device, pressure test, and back load test in sequence; Step 3: Install the box feet Step 4: Install the support legs A support leg is set on one hatch cover of the back load, and a pad is set on the other hatch cover of the back load; the ends of the surrounding support legs have a 10mm margin, and the ends of the two middle support legs have a 20mm margin; Step 5: Air tightness test, box foot placement test, folding test and back load test.
2. The hatch cover installation process according to claim 1, characterized in that: In the step 1, the hatch cover HC1 / hatch cover HC8 assembly positioning is 500 mm apart from the theoretical size.
3. The hatch cover installation process according to claim 1, characterized in that: In the step 1, a small assembly is performed, and the small assembly includes a stainless steel pressure strip (3) and a rubber groove (4) arranged face to face, and a water tank (5) is installed below the stainless steel pressure strip (3); a rubber (6) is arranged in the rubber groove (4); the stainless steel pressure strip (3) is arranged on the hatch cover beam (1) on one side through a mounting plate (7), and the hatch cover beams (1) on both sides are parallel to each other; the rubber groove (4) is installed on the hatch cover beam (1) on the other side through a folding plate (2); the water tank (5) is checked for a straightness of less than 6 mm during the small assembly installation, and the stainless steel pressure strip (3) is also installed to ensure a straightness of less than 6 mm.
4. The hatch cover installation process according to claim 1, characterized in that: In the step 1, when the joint limit block is installed and corrected, the gap between the limit blocks is 5+ / -1mm up and down, and 5mm iron sheet is used for installation.
5. The hatch cover installation process according to claim 1, characterized in that: In step 1, the roller is assembled, the size from the roller to the rubber groove is + / -2mm; the size from the roller to the CVP line is + / -2mm; the verticality deviation of the roller is less than 1 / 1000mm; the size from the roller to the MVP is + / -2mm; the size from the roller to the end plate is + / -5mm.
6. The hatch cover installation process according to claim 1, characterized in that: In the step 2, the final assembly positioning sections are closed, and the closing margin of 20mm is added to the bow section.
7. The hatch cover installation process according to claim 1, characterized in that: The step three is to install the box feet. The four outermost box feet are made based on the MVP line and the CVP line. The horizontal and size adjustment of the cross-cover box feet of hatch cover HC2 and hatch cover HC3 is based on hatch cover HC3, and the hatch cover HC6 and hatch cover HC7 is based on hatch cover HC7.