Cargo loading and unloading equipment for port logistics

The cargo handling equipment addresses inefficiencies in port logistics by enabling flexible handling of small and block-shaped dry bulk cargoes, enhancing efficiency and safety through adaptable grab buckets and dust suppression.

CN119059306APending Publication Date: 2024-12-03SHANDONG JIAOTONG UNIV
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411400253.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing port loading and unloading machinery faces inefficiencies when dealing with small-sized dry bulk cargoes that get squeezed into blocks, necessitating frequent changes in equipment, which disrupts port scheduling and increases unloading difficulty.

Method used

A cargo handling equipment with a grain suction pipeline and grab buckets equipped with a driving mechanism, arc-shaped plugs, and a dust reduction mechanism, allowing for flexible adaptation to different cargo sizes and types, including both small and block-shaped dry bulk cargoes, and preventing cargo loss during transport.

Benefits of technology

Enhances loading and unloading efficiency by allowing a single crane to handle multiple cargo types without needing to switch workstations, reducing cargo waste and improving safety by preventing dust and leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059306A_ABST
    Figure CN119059306A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of cargo loading and unloading, and particularly relates to cargo loading and unloading equipment for port logistics, which comprises a grain suction pipeline and a feeding mechanism, movable hinge seats are slidably connected in sliding grooves, threaded columns are rotatably mounted in the sliding grooves, grab buckets are rotatably mounted on the movable hinge seats, and steel wire ropes are mounted on the sides, away from each other, of the two grab buckets; an arc-shaped inserting block is fixedly mounted on the grab bucket, a push plate is slidably connected into the mounting groove, a plurality of first springs are mounted between the push plate and the mounting groove, a baffle is slidably connected into the grab bucket, a pull rope is connected between the baffle and the push plate, and a plurality of second springs are mounted on the baffle. The use mode of the grab bucket and the grain suction pipeline can be adjusted according to dry bulk cargos, the situation that fine dry bulk cargos cannot be conveyed through the feeding mechanism after being extruded into blocks is avoided, the grab bucket can loosen the extruded cargos, blocky dry bulk cargos can be loaded and unloaded more flexibly, and the working efficiency is improved. Tediousness caused by the fact that stations of a port need to be switched in the loading and unloading process is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of cargo loading and unloading, and in particular relates to cargo loading and unloading equipment for port logistics. Background Art

[0002] Ports are transport hubs located along the coasts of seas, rivers, lakes and reservoirs, with water-land transport facilities and conditions for ships to enter, exit and berth safely. Ports are the gathering points and hubs of water and land transportation, the distribution centers of industrial and agricultural products and foreign trade import and export materials, and the places where ships berth, load and unload goods, get on and off passengers, and replenish supplies. In China, the construction of coastal ports focuses on the construction of transportation systems such as coal, containers, imported iron ore, grain, land-island roll-on / roll-off, and deep-water sea channels.

[0003] Port loading and unloading machinery can be divided into three basic types: lifting machinery, conveying machinery, and loading and unloading machinery. There are more than 100 types of loading and unloading machinery used in ports, of which about 30 are widely used. Select high-efficiency loading and unloading equipment according to different goods. For example, when loading and unloading grain in dry bulk cargo, a grain suction machine and a belt conveyor are usually used together to unload the grain. Because of the small size of grain, the grain suction machine can improve the efficiency of unloading. However, due to the long-term accumulation of grain, the grain at the bottom will be squeezed into blocks and cannot be transported by the grain suction machine. At this time, it is necessary to switch the loading and unloading machinery to continue unloading. Changing the loading and unloading machinery usually requires changing the loading and unloading station of the berthed port, which will affect the efficiency of unloading and increase the difficulty of port scheduling, so it needs to be improved. Summary of the invention

[0004] The purpose of the present invention is to provide a cargo loading and unloading equipment for port logistics, so as to solve the problems existing in the background technology.

[0005] In order to achieve the above technical objectives, the technical solution adopted by the present invention is as follows:

[0006] A cargo handling equipment for port logistics, comprising a grain suction pipeline, a feeding mechanism is installed inside the grain suction pipeline, a mounting cylinder is fixedly installed at the lower part of the grain suction pipeline, the mounting cylinder is symmetrically provided with slide grooves, two movable hinge seats are slidably connected inside the two slide grooves, threaded columns threadedly connected to the movable hinge seat are rotatably installed inside the two slide grooves, a driving mechanism is installed together with the two threaded columns, grab buckets are rotatably installed on the two movable hinge seats, and a steel wire rope connected to the grain suction pipeline is installed on the side of the two grab buckets away from each other;

[0007] Two arc-shaped plugs are fixedly installed on the sides of the two grab buckets that are close to each other, and two arc-shaped plugs are provided with inclined surfaces on the sides away from each other. A first through groove is penetrated through the upper sides of the two grab buckets, and a slot matching the arc-shaped plug is provided on the lower sides of the two grab buckets. An installation groove connected to the slot is provided inside the two grab buckets, a push plate is slidably connected inside the installation groove, and a plurality of first springs are installed between the push plate and the installation groove. A baffle matching the first through groove is slidably connected inside the grab bucket, a pull rope is connected to the baffle plate and the push plate, and a plurality of second springs are installed on the baffle plate.

[0008] The driving mechanism includes a driving motor installed inside the grain suction pipe, the output end of the driving motor is transmission-connected with a driving gear, the lower end of the threaded column is fixedly installed with a first gear, the grain suction pipe is rotationally connected with a gear ring meshing with two first gears, and the driving gear is meshed with one of the first gears.

[0009] The grab bucket is equipped with a dust reduction mechanism, which includes a water hose connected to the grab bucket, an L-shaped channel connected to the water hose is opened inside the grab bucket, a water spraying platform is fixedly installed at the lower end of the grab bucket, a water storage tank connected to the L-shaped channel is opened inside the water spraying platform, a one-way valve is installed at the connection of the L-shaped channel, a plurality of atomizing nozzles connected to the water storage tank are installed at the lower end of the water spraying platform, a slide plate is sealingly and slidably connected inside the L-shaped channel, the slide plate is fixedly connected to a piston sealingly and slidably connected to the L-shaped channel, and the piston is equipped with a moving mechanism.

[0010] The moving mechanism includes a threaded rod threadedly connected to the piston, the threaded rod is fixedly installed with a rotating gear connected to the grab bucket for rotation, the moving articulated seat is installed with a rotating shaft connected to the grab bucket for rotation, a plurality of meshing teeth are fixedly installed on the circumference of the rotating shaft, the grab bucket is rotatably connected to a second gear meshing with the meshing teeth, and a speed-increasing rotation mechanism is installed between the second gear and the rotating gear.

[0011] The speed increasing rotation mechanism comprises a large gear meshing with the driving gear, the large gear and the second gear are both fixedly mounted with a transmission wheel connected to the grab bucket for rotation, and a transmission belt is connected between the two transmission wheels for transmission.

[0012] A rotating ring is commonly installed on several of the atomizing nozzles, a connecting hose is installed between several of the atomizing nozzles and the water storage tank, a connecting plate is fixedly installed on the rotating ring, a second transmission wheel is fixedly installed on the connecting plate and the transmission wheel, two of the second transmission wheels are commonly connected by a second transmission belt, and an opening is opened on the water spraying platform.

[0013] The wire rope is installed with a winding mechanism, and the winding mechanism includes a mounting box installed on the upper end of the mounting cylinder, a rotating motor is installed on the side of the mounting plate, and two third transmission wheels are rotatably connected inside the mounting box. The two third rotating wheels are commonly connected to the third transmission belt, and the two third transmission wheels are respectively connected to the winding wheels fixedly connected to the wire rope.

[0014] A second through groove is symmetrically provided on the upper side of the grab bucket, and the baffle is fixedly connected with a U-shaped plate which is slidably connected with the grab bucket, and the U-shaped plate matches the second through groove.

[0015] The present invention can adjust the use of the grab bucket and the grain suction pipe according to different dry bulk cargoes, so as to prevent the small dry bulk cargoes from being squeezed into blocks and unable to be transported through the feeding mechanism. The grab bucket can not only loosen the squeezed cargoes, but also load and unload the block-shaped dry bulk cargoes. In this way, one crane can be adapted to two loading and unloading methods, which is more flexible and avoids the tediousness caused by switching work stations in the port during the loading and unloading process. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention is further illustrated by means of the non-limiting examples given in the accompanying drawings.

[0017] Figure 1 This is a schematic structural diagram of a cargo loading and unloading device for port logistics of the present invention;

[0018] Figure 2 It is a partial cross-sectional structural schematic diagram of a cargo loading and unloading equipment for port logistics of the present invention;

[0019] Figure 3 This is a schematic diagram of the first cross-sectional structure of a cargo handling equipment for port logistics of the present invention;

[0020] Figure 4 This is a second cross-sectional structural schematic diagram of a cargo handling equipment for port logistics of the present invention;

[0021] Figure 5 for Figure 4 A schematic diagram of the enlarged structure at A in the middle;

[0022] Figure 6 for Figure 4 A schematic diagram of the enlarged structure at B in the middle;

[0023] Figure 7 It is a third cross-sectional structural schematic diagram of a cargo handling equipment for port logistics of the present invention;

[0024] Figure 8 for Figure 7 Schematic diagram of the enlarged structure at C in the middle;

[0025] Fig. 9This is a fourth cross-sectional structural schematic diagram of a cargo handling equipment for port logistics of the present invention;

[0026] Fig.10 for Fig. 9 Schematic diagram of the enlarged structure at D in the middle.

[0027] The main component symbols are described as follows:

[0028] Grain suction pipeline 1, installation cylinder 11, movable hinge seat 12, threaded column 13, grab bucket 14, wire rope 15, arc-shaped plug block 16, first through groove 17, slot 18, push plate 19, first spring 20, baffle 21, pull rope 22, drive motor 23, drive gear 24, first gear 25, gear ring 26, second spring 27, water hose 30, L-shaped channel 31, water spraying platform 32, water storage tank 33, one-way valve 34, atomizing nozzle 35, slide plate 36, piston 37, threaded rod 38, rotating gear 39, rotating shaft 40, meshing teeth 41, second gear 42, large gear 43, transmission wheel 44, transmission belt 45, rotating ring 50, connecting hose 51, connecting plate 52, second transmission wheel 53, second transmission belt 54, installation box 55, rotating motor 56, third transmission wheel 57, third transmission belt 58, winding wheel 59, U-shaped plate 60. DETAILED DESCRIPTION

[0029] In order to enable those skilled in the art to better understand the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0030] Example 1: Figure 1-10 As shown, a cargo loading and unloading equipment for port logistics of the present invention comprises a grain suction pipeline 1, a feeding mechanism is installed inside the grain suction pipeline 1, a mounting cylinder 11 is fixedly installed at the lower part of the grain suction pipeline 1, the mounting cylinder 11 is symmetrically provided with slide grooves, two slide grooves are slidably connected with movable hinge seats 12, threaded columns 13 threadedly connected with the movable hinge seats 12 are rotatably installed inside the two slide grooves, a driving mechanism is installed together with the two threaded columns 13, grab buckets 14 are rotatably installed on the two movable hinge seats 12, and a steel wire rope 15 connected with the grain suction pipeline 1 is installed on the side of the two grab buckets 14 away from each other;

[0031] Two arc-shaped plug blocks 16 are fixedly installed on the sides of the two grab buckets 14 close to each other, and the two arc-shaped plug blocks 16 are provided with inclined surfaces on the sides away from each other. A first through groove 17 is penetrated through the upper side of the two grab buckets 14, and a slot 18 matching the arc-shaped plug block 16 is provided on the lower side of the two grab buckets 14. An installation groove connected to the slot 18 is provided inside the two grab buckets 14, and a push plate 19 is slidably connected inside the installation groove. A plurality of first springs 20 are installed between the push plate 19 and the installation groove. A baffle 21 matching the first through groove 17 is slidably connected inside the grab bucket 14, a pull rope 22 is connected to the baffle 21 and the push plate 19, and a plurality of second springs 27 are installed on the baffle 21.

[0032] The grain suction pipe 1 is installed together with the crane of the port, and can also be used in conjunction with the conveyor belt conveying equipment, so that the input dry bulk cargo is output on the surface of the conveying equipment for subsequent transportation, and the feeding mechanism can convey the dry bulk cargo entering the grain suction pipe 1 upward, and then output it from the end of the grain suction pipe 1. When unloading small dry bulk cargo, such as grains and cereals, the two grab buckets 14 are in an open state in the initial state, and the elastic force of the first spring 20 overcomes the elastic force of the second spring 27 to pull the pull rope 22 out of the first through groove 17, which is convenient for the dry bulk cargo to be unloaded from the ship. The first through groove 17 enters, and the movable hinge seat 12 is located at the bottom of the slide groove at this time, so that the length limit of the wire rope 15 can be matched to make the grab bucket 14 in an open state, and it is also convenient for the grain suction pipe 1 to approach the dry bulk cargo. When unloading, the grain suction pipe 1 and the feeding mechanism can be used to cooperate with each other to unload small dry bulk cargo. However, since the dry bulk cargo is accumulated inside the cabin for a long time, the closer to the bottom, the stronger the cargo is. Because the long-term accumulation will squeeze the cargo into blocks, the cooperation between the grain suction pipe 1 and the feeding mechanism cannot transport the squeezed dry bulk cargo.

[0033] At this time, the feeding mechanism is stopped and the position of the grab bucket 14 is controlled by the crane, so that the arc-shaped plug 16 of the grab bucket 14 is inserted into the cargo. Then the driving mechanism is started to drive the threaded column 13 to rotate in the opposite direction, so that the movable hinge seat 12 threadedly connected thereto moves upward. Since the length of the wire rope 15 remains unchanged, when the movable hinge seat 12 moves upward, the two open grab buckets 14 will rotate with the hinge axis of the movable hinge seat 12, and at the same time, the four arc-shaped plugs 16 will be driven to loosen the dry bulk cargo. After loosening, the fine dry bulk cargo will enter the two grab buckets 14 from the first through groove 17. At the same time, the two grab buckets 14 will grab the dry bulk cargo in the process of approaching each other and abutting and closing. In this way, the crane drives the grab bucket 14 to move downward, so that the fine dry bulk cargo squeezed into blocks can be grabbed. Inside the two grab buckets 14, and because the lower parts of the two grab buckets 14 are both arc-shaped with the same diameter, the arc-shaped plug block 16 will be inserted into the slot 18, and the inclined surface of the arc-shaped push block 16 will abut against the push plate 19, and then the continuous movement of the arc-shaped plug block 16 will drive the push plate 19 to overcome the rebound force of the first springs 20 and move away from each other under the pushing force of the inclined surface, and then the rebound force of the second spring 27 drives the pull rope 22 and the baffle 21 to approach the first through groove 17, and then block the first through groove 17. At this time, the two grab buckets 14 are in a closed state. At this time, the grab bucket 14 can be driven by a crane to move to other equipment. In the process of moving the grab bucket 14, since the first through groove 17 has been blocked by the baffle 21, the goods will not leak out due to the movement of the grab bucket 14, thereby avoiding waste of goods. If the fine dry bulk cargo becomes loose after the grab bucket 14 has been working for a period of time, the working mode can be switched, the initial state of the grab bucket 14 can be restored, and the feeding mechanism and the grain suction pipeline 1 can be started to load and unload the dry bulk cargo to improve the loading and unloading efficiency.

[0034] When unloading larger cargoes, the working state of the grab 14 can be directly adjusted, and the cargoes can be directly grabbed by the grab 14. Moreover, the first through-groove 17 makes it more convenient for the cargoes to enter the interior of the grab 14. When the grab 14 is moved, the first through-groove 17 is closed to prevent the cargoes from falling from the first through-groove 17 to the ground and causing waste, especially for heavier cargoes such as ore, from falling from the interior of the grab 14 to the ground and injuring workers.

[0035] The present invention can adjust the use of the grab bucket 14 and the grain suction pipe 1 according to different dry bulk cargoes, so as to avoid the small dry bulk cargoes being squeezed into blocks and unable to be transported by the feeding mechanism. The grab bucket 14 can not only loosen the squeezed cargoes, but also load and unload the block-shaped dry bulk cargoes. In this way, one crane can be adapted to two loading and unloading methods, which is more flexible and avoids the tediousness caused by switching the workstations in the port during the loading and unloading process.

[0036] Embodiment 2: Based on Embodiment 1, further improvements are made, wherein the driving mechanism comprises a driving motor 23 installed inside the grain suction pipe 1, the output end of the driving motor 23 is transmission-connected with a driving gear 24, a first gear 25 is fixedly installed at the lower end of the threaded column 13, a gear ring 26 meshing with two first gears 25 is rotationally connected inside the grain suction pipe 1, and the driving gear 24 meshes with one of the first gears 25;

[0037] When the driving motor 23 is working, it drives the driving gear 24 to rotate. Since the driving gear 24 is engaged with one of the first gears 25, it will drive the gear ring 36 and the other first gear 25 to rotate, and then drive the two first gears 25 and the threaded column 13 to rotate forward and reverse at the same time, and then drive the movable hinge seat 12 to move up and down through the forward and reverse rotation of the threaded column 13.

[0038] The grab bucket 14 is equipped with a dust suppression mechanism, which includes a water hose 30 connected to the grab bucket 14, an L-shaped channel 31 connected to the water hose 30 is provided inside the grab bucket 14, a water spraying platform 32 is fixedly installed at the lower end of the grab bucket 14, a water storage tank 33 connected to the L-shaped channel 31 is provided inside the water spraying platform 32, a one-way valve 34 is installed at the connection of the L-shaped channel 31, a plurality of atomizing nozzles 35 connected to the water storage tank 33 are installed at the lower end of the water spraying platform 32, a slide plate 36 is sealed and slidably connected inside the L-shaped channel 31, a piston 37 sealed and slidably connected to the L-shaped channel 31 is fixedly connected to the slide plate 36, and a moving mechanism is installed on the piston 37;

[0039] The water hose 30 is connected to an external water source so that clean water can be input into the L-shaped channel 31 and the water tank 33 for storage through the water hose 30. In the process of the grab bucket 14 moving from closing to opening, the moving mechanism will drive the piston 37 to move toward the one-way valve 34, so that the clean water inside the L-shaped channel 31 moves to the water tank 33 through the squeezing of the piston 37, and then the water inside the water tank 33 is squeezed out from the atomizing nozzle 35, so that the atomizing nozzle 35 sprays a mist of water to suppress dust. The one-way valve 34 can only allow water to enter the L-shaped horizontal pipe, so that the piston 37 can only push water into the water tank 33 when it moves, and the grab bucket 14 will move in the process of closing to drive the piston 37 away from the one-way valve 34, so that the clean water inside the L-shaped vertical pipe will refill the L-shaped channel 31 for the next use.

[0040] The moving mechanism includes a threaded rod 38 threadedly connected to the piston 37, the threaded rod 38 is fixedly installed with a rotating gear 39 rotatably connected to the grab bucket 14, the mobile hinge seat 12 is installed with a rotating shaft 40 rotatably connected to the grab bucket 14, a plurality of meshing teeth 41 are fixedly installed on the circumference of the rotating shaft 40, the grab bucket 14 is rotatably connected with a second gear 42 meshing with the meshing teeth 41, and an increasing speed rotation mechanism is installed between the second gear 42 and the rotating gear 39; when the grab bucket 14 rotates, it will drive the second gear 42 to rotate. Since the rotating shaft 40 and the meshing teeth 41 are stationary, when the grab bucket 14 rotates, it will drive the second gear 42 to rotate under the restriction of the meshing teeth 41, and then drive the rotating gear 39 and the threaded rod 38 to rotate through the increasing speed rotation mechanism. Since the threaded rod 38 is threadedly connected to the piston 37, the threaded rod 38 will rotate in the forward direction, that is, the process of the grab bucket 14 from closing to opening will drive the piston 37 to approach the one-way valve 34, and when the grab bucket 14 rotates from opening to closing, the piston 37 will be moved away from the one-way valve 34.

[0041] The speed increasing rotation mechanism comprises a large gear 43 meshing with the driving gear 39, the large gear 43 and the second gear 42 are both fixedly mounted with a transmission wheel 44 rotatably connected to the grab bucket 14, and a transmission belt 45 is transmission-connected between the two transmission wheels 44;

[0042] The transmission wheel 44 can drive the large gear 43 to rotate through the transmission belt 45, and then drive the driving gear 39 to rotate through the transmission of the large gear 43 and the driving gear 39, so that the large gear 43 rotates one circle and the driving gear 39 rotates multiple circles, thereby cooperating with the pitch of the threaded rod 38 to increase the moving distance of the piston 37.

[0043] A plurality of atomizing nozzles 35 are commonly installed with a rotating ring 50, a connecting hose 51 is installed between the plurality of atomizing nozzles 35 and the water storage tank 33, a connecting plate 52 is fixedly installed on the rotating ring 50, a second transmission wheel 53 is fixedly installed on the connecting plate 52 and the transmission wheel 44, the two second transmission wheels 53 are commonly connected with a second transmission belt 54, and the water spraying platform 32 is provided with an opening;

[0044] When the grab bucket 14 rotates, it will drive the transmission wheel 44 to rotate, and then drive the second transmission wheel 53 to rotate synchronously. Since the two second transmission wheels 53 are transmission-connected with the second conveyor belt 54, the rotation of the grab bucket 14 will drive the rotating ring 50 to rotate, and the rotation direction of the rotating ring 50 is opposite to the rotation direction of the grab bucket 14, that is, in the process from closing to opening of the grab bucket 14, the atomizing nozzle 35 rotates toward the direction of the grab bucket 14, so that the spraying direction of the atomizing nozzle 35 is always toward the ground. In this way, when the grab bucket 14 opens and leaks goods to cause dust, the vertical water mist barrier formed by the atomizing nozzle 35 can effectively prevent the dust from flying.

[0045] The steel wire rope 15 is equipped with a winding mechanism, which includes a mounting box 55 mounted on the upper end of the mounting cylinder 11, a rotating motor 56 is mounted on the side of the mounting plate 55, and two third transmission wheels 57 are rotatably connected inside the mounting box 55, and the two third rotating wheels 57 are jointly connected to a third transmission belt 58, and the two third transmission wheels 57 are respectively connected to winding wheels 59 fixedly connected to the steel wire rope 15;

[0046] When the grain suction pipe 1 and the feeding mechanism are in operation, the winding wheel 59 can be driven to rotate by the rotating motor 56, and the driving mechanism can drive the movable hinged seat 12 to move upward, so that the grab bucket 14 is in an open state and moves upward as a whole, which facilitates the contact between the grain suction pipe 1 and the goods.

[0047] A second through groove is symmetrically provided on the upper side of the grab bucket 14, and a U-shaped plate 60 which is slidably connected to the grab bucket 14 is fixedly connected to the baffle plate 21, and the U-shaped plate 60 matches the second through groove;

[0048] The second through groove can increase the feeding area, making it easier for the cargo to enter the grab bucket 14 , and the U-shaped plate 60 cooperates with the baffle 21 to shield the second through groove.

[0049] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the technical field without departing from the spirit and technical ideas disclosed by the present invention should still be covered by the claims of the present invention.

Claims

1. A cargo handling equipment for port logistics, comprising a grain suction pipeline, wherein a feeding mechanism is installed inside the grain suction pipeline, characterized in that: A mounting cylinder is fixedly installed at the lower part of the grain suction pipeline, and the mounting cylinder is symmetrically provided with slide grooves, and a movable hinge seat is slidably connected inside the two slide grooves, and a threaded column threadedly connected to the movable hinge seat is rotatably installed inside the two slide grooves, and a driving mechanism is installed together on the two threaded columns, and grab buckets are rotatably installed on the two movable hinge seats, and a steel wire rope connected to the grain suction pipeline is installed on the side of the two grab buckets away from each other; Two arc-shaped plugs are fixedly installed on the sides of the two grab buckets that are close to each other, and two arc-shaped plugs are provided with inclined surfaces on the sides away from each other. A first through groove is penetrated through the upper sides of the two grab buckets, and a slot matching the arc-shaped plug is provided on the lower sides of the two grab buckets. An installation groove connected to the slot is provided inside the two grab buckets, a push plate is slidably connected inside the installation groove, and a plurality of first springs are installed between the push plate and the installation groove. A baffle matching the first through groove is slidably connected inside the grab bucket, a pull rope is connected to the baffle plate and the push plate, and a plurality of second springs are installed on the baffle plate.

2. The cargo handling equipment for port logistics according to claim 1, characterized in that: The driving mechanism includes a driving motor installed inside the grain suction pipe, the output end of the driving motor is transmission-connected with a driving gear, the lower end of the threaded column is fixedly installed with a first gear, the grain suction pipe is rotationally connected with a gear ring meshing with two first gears, and the driving gear is meshed with one of the first gears.

3. The cargo handling equipment for port logistics according to claim 1, characterized in that: The grab bucket is equipped with a dust reduction mechanism, which includes a water hose connected to the grab bucket, an L-shaped channel connected to the water hose is opened inside the grab bucket, a water spraying platform is fixedly installed at the lower end of the grab bucket, a water storage tank connected to the L-shaped channel is opened inside the water spraying platform, a one-way valve is installed at the connection of the L-shaped channel, a plurality of atomizing nozzles connected to the water storage tank are installed at the lower end of the water spraying platform, a slide plate is sealingly and slidably connected inside the L-shaped channel, the slide plate is fixedly connected to a piston sealingly and slidably connected to the L-shaped channel, and the piston is equipped with a moving mechanism.

4. The cargo handling equipment for port logistics according to claim 3, characterized in that: The moving mechanism includes a threaded rod threadedly connected to the piston, the threaded rod is fixedly installed with a rotating gear connected to the grab bucket for rotation, the moving articulated seat is installed with a rotating shaft connected to the grab bucket for rotation, a plurality of meshing teeth are fixedly installed on the circumference of the rotating shaft, the grab bucket is rotatably connected to a second gear meshing with the meshing teeth, and a speed-increasing rotation mechanism is installed between the second gear and the rotating gear.

5. The cargo handling equipment for port logistics according to claim 4, characterized in that: The speed increasing rotation mechanism comprises a large gear meshing with the driving gear, the large gear and the second gear are both fixedly mounted with a transmission wheel connected to the grab bucket for rotation, and a transmission belt is connected between the two transmission wheels for transmission.

6. The cargo handling equipment for port logistics according to claim 5, characterized in that: A rotating ring is commonly installed on several of the atomizing nozzles, a connecting hose is installed between several of the atomizing nozzles and the water storage tank, a connecting plate is fixedly installed on the rotating ring, a second transmission wheel is fixedly installed on the connecting plate and the transmission wheel, two of the second transmission wheels are commonly connected by a second transmission belt, and an opening is opened on the water spraying platform.

7. The cargo handling equipment for port logistics according to claim 1, characterized in that: The wire rope is installed with a winding mechanism, and the winding mechanism includes a mounting box installed on the upper end of the mounting cylinder, a rotating motor is installed on the side of the mounting plate, and two third transmission wheels are rotatably connected inside the mounting box. The two third rotating wheels are commonly connected to a third transmission belt, and the two third transmission wheels are respectively connected to winding wheels fixedly connected to the wire rope.

8. The cargo handling equipment for port logistics according to claim 1, characterized in that: A second through groove is symmetrically provided on the upper side of the grab bucket, and the baffle is fixedly connected with a U-shaped plate which is slidably connected with the grab bucket, and the U-shaped plate matches the second through groove.

Citation Information

Patent Citations

  • Movable multifunctional pneumatic grain handling machine

    CN108584441A

  • Material taking system and ship unloader

    CN115724237A

  • Gantry type chain bucket ship unloader

    CN115724242A

  • Dredging device for river channel dredging and dredging method thereof

    CN116575533A

  • Grab bucket crane for slag transportation

    CN212127313U