Elevator pod installation method and pod device
Through the combination technology of auxiliary beams and retaining ropes, the car suspension process in the elevator shaft is simplified, the problem of time spent on connecting operations in the prior art is solved, and the efficiency and stability of the crane suspension car is achieved.
Patent Information
- Application Number
- CN202311132954.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-06-02
- Filing Date
- 2023-09-04
- Publication Date
- 2024-12-03
AI Technical Summary
In the existing construction methods in elevator shafts, prior investigation and processing of the car is required to connect the crane, resulting in an increase in the connection operation.
The steps of auxiliary beam configuration, support, main rope cutting, auxiliary beam connection and crane connection are adopted to achieve easy suspension of the car by keeping the rope suspended and using the crane to suspend the auxiliary beam.
The connection process between the car and the crane is simplified, the processing demand for the car is reduced, the efficiency and stability of the crane suspended car is improved, and the component cost is reduced.
Smart Images

Figure CN119059393A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a car installation method and a car device of an elevator in which a car is suspended as a car by a crane. Background Art
[0002] Patent document 1 discloses a method for constructing an elevator shaft using a car as a scaffold for operators in order to carry out elevator renovation work. In the conventional method for constructing an elevator shaft disclosed in Patent document 1, a traction machine support beam disposed above the shaft is connected to the car in the shaft by a crane, and the car is moved up and down by the driving force of the crane. Thus, even in a state where the traction machine and the like are removed, the operator can carry out work in the shaft by riding on the upper part of the car and moving the car up and down.
[0003] Prior art literature
[0004] Patent Literature
[0005] Patent Document 1: Japanese Patent Application Laid-Open No. 8-2850 Summary of the invention
[0006] Problems to be solved by the invention
[0007] However, in the conventional elevator shaft construction method disclosed in Patent Document 1, in order to connect the crane to the car, it is necessary to conduct a preliminary investigation of the car and process the car based on the investigation on site. Therefore, the operation of connecting the crane to the car takes time.
[0008] The present disclosure is made to solve the above-mentioned problems, and an object of the present disclosure is to provide an elevator car installation method and a car device that can easily suspend a car using a crane.
[0009] Means for solving problems
[0010] The elevator car installation method disclosed in the present invention includes: an auxiliary beam configuration process, in which an auxiliary beam is configured above a car suspended by a main rope; a supporting process, in which the car is supported by a supporting body different from the main rope; a main rope cutting process, in which, after the supporting process, a part of the main rope is cut to use as a retaining rope; an auxiliary beam connecting process, in which, after the auxiliary beam configuration process and the main rope cutting process, the retaining rope is configured at a position capable of suspending the car, and the retaining rope is connected to the auxiliary beam; a crane connecting process, in which, after the auxiliary beam configuration process, the auxiliary beam is connected to a fixed part fixed above the car by a crane; and a support releasing process, in which, after the auxiliary beam connecting process and the crane connecting process, the support of the car by the supporting body is released, thereby suspending the car as a car from the auxiliary beam using the retaining rope, and suspending the auxiliary beam from the fixed part using the crane.
[0011] In addition, the pod device of the present invention comprises: a car as a pod; an auxiliary beam, which is arranged above the car; a holding rope, which suspends the car from the auxiliary beam; and a crane, which connects the auxiliary beam to a fixed part fixed above the car and suspends the auxiliary beam from the fixed part to move the auxiliary beam in the upward and downward directions.
[0012] Effects of the Invention
[0013] According to the elevator car installation method and car device disclosed in the present invention, the car can be easily suspended using a crane. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a diagram showing the structure of an elevator to which the elevator car installation method according to the first embodiment is applied.
[0015] Figure 2 This is a flowchart showing the elevator car installation method according to the first embodiment.
[0016] Figure 3 It means in Figure 1 A structural diagram showing a state in which an auxiliary beam is arranged above the car.
[0017] Figure 4 Yes means Figure 3 Structural diagram of the state where the main rope is cut.
[0018] Figure 5 Yes means Figure 4 Structural diagram of the state in which the retaining rope is connected to the auxiliary beam.
[0019] Figure 6 Yes means Figure 5 Structural diagram of the auxiliary beam being connected to the lifting beam through a crane.
[0020] Figure 7 This is a configuration diagram showing another example of the pod device according to the first embodiment.
[0021] Description of symbols
[0022] 1: hoistway, 2: car, 4: main rope, 4a: first end, 4b: second end, 5: car guide rail (support body), 8: first rope end fixing device (first rope connecting member), 9: second rope end fixing device (second rope connecting member), 10: auxiliary beam, 11: lifting beam (fixed part), 12: crane, 20: holding rope, 20a: one end, 20b: other end, 21: car body, 22: car suspension wheel, 121: crane body, 122: lifting rope. DETAILED DESCRIPTION
[0023] The method for implementing the object of the present disclosure is described with reference to the accompanying drawings. In each figure, the same or equivalent parts are marked with the same reference numerals, and repeated descriptions are appropriately simplified or omitted. In addition, the object of the present disclosure is not limited to the following embodiments, and any constituent element of the embodiment can be deformed or omitted without departing from the scope of the present disclosure.
[0024] Implementation method 1.
[0025] Figure 1 1 is a block diagram showing an elevator to which the elevator car installation method of Embodiment 1 is applied. In a hoistway 1, a car 2 and a counterweight 3 are suspended by a main rope 4. In addition, a pair of car guide rails 5 and a pair of counterweight guide rails 6 are provided in the hoistway 1. The car 2 is arranged between the pair of car guide rails 5. The counterweight 3 is arranged between the pair of counterweight guide rails 6.
[0026] The car 2 includes a car body 21 and a pair of car suspending sheaves 22. The pair of car suspending sheaves 22 are provided at the lower portion of the car body 21.
[0027] The car body 21 has a car room 23 and a car frame 24. Passengers can get on and off the car room 23. The car frame 24 is a frame surrounding the car room 23. The car frame 24 supports the car room 23. A pair of car suspension wheels 22 are provided at the lower part of the car frame 24 so as to be separated from each other in the horizontal direction.
[0028] The counterweight 3 has a counterweight body 31 and a counterweight suspension wheel 32. The counterweight suspension wheel 32 is arranged on the upper part of the counterweight body 31.
[0029] A hoisting machine 7, a first rope-end fixing device 8, and a second rope-end fixing device 9 are provided above the hoistway 1. The hoisting machine 7, the first rope-end fixing device 8, and the second rope-end fixing device 9 are supported by a support beam (not shown) fixed in the hoistway 1.
[0030] The hoisting machine 7 is a driving device that generates a driving force for moving the car 2 and the counterweight 3. The hoisting machine 7 includes a hoisting machine body 71 and a driving sheave 72.
[0031] The driving sheave 72 is rotatably provided on the hoisting machine body 71. The hoisting machine body 71 includes a motor and a brake. The motor of the hoisting machine body 71 generates a driving force for rotating the driving sheave 72. The brake of the hoisting machine body 71 applies a braking force to the driving sheave 72.
[0032] The main rope 4 has a first end 4a and a second end 4b. The first end 4a of the main rope 4 is connected to the first rope end fixing device 8. The second end 4b of the main rope 4 is connected to the second rope end fixing device 9. The main rope 4 is wound from the first rope end fixing device 8 in the order of a pair of car suspension wheels 22, a drive rope wheel 72, and a counterweight suspension wheel 32, and reaches the second rope end fixing device 9. Thus, the main rope 4 suspends the car 2 and the counterweight 3 in the hoistway 1. That is, in the present embodiment, the suspension method of the main rope 4 for the car 2 and the counterweight 3 is a 2:1 rope winding method.
[0033] When the driving sheave 72 is rotated by the driving force of the hoisting machine body 71, the car 2 and the counterweight 3 move in the vertical direction. The car 2 moves in the vertical direction while being guided by a pair of car guide rails 5. The counterweight 3 moves in the vertical direction while being guided by a pair of counterweight guide rails 6.
[0034] A control device (not shown) is provided in the hoistway 1. The control device controls the operation of the elevator. For example, the movement of the car 2 and the counterweight 3 is controlled by the control device controlling the traction machine 7.
[0035] An emergency stop device (not shown) is provided in the car 2. The emergency stop device is provided at the lower part of the car body 21. When the downward speed of the car 2 reaches an excessive speed, the emergency stop device performs a gripping operation to grip a pair of car guide rails 5. The car 2 is stopped urgently by the gripping operation of the emergency stop device.
[0036] The gripping operation of the emergency stop device can also be performed manually. The emergency stop device grips the pair of car guide rails 5, and the car 2 is supported by the pair of car guide rails 5 via the emergency stop device.
[0037] Here, in the elevator, sometimes a renovation project is performed due to aging of the equipment, etc. In the renovation project of the elevator, an operator riding on the upper part of the car 2 performs renovation work in the hoistway 1. That is, in the renovation project of the elevator, the car 2 is used as a scaffold for the operator.
[0038] In the renovation of the elevator, for example, the existing hoisting machine 7 may be removed in order to install a new hoisting machine. In this case, since the car 2 cannot be moved by the driving force of the hoisting machine 7, a pod installation project is performed in which the car 2 is suspended as a scaffolding pod by a crane different from the hoisting machine 7. After the pod installation project is completed, the car 2 can be moved by the driving force of the crane. The operator moves the car 2 by the driving force of the crane while riding on the upper part of the car 2, thereby performing work in the hoistway 1.
[0039] Next, a method of installing a car of an elevator in which the car 2 is suspended by a crane as a car for a scaffold will be described.
[0040] Figure 2 This is a flowchart showing the elevator car installation method according to Embodiment 1. The elevator car installation method includes an auxiliary beam configuration step S1, a support step S2, a main rope cutting step S3, an auxiliary beam connection step S4, a crane connection step S5, and a support release step S6. Hereinafter, the elevator car installation method is referred to as a "car installation method".
[0041] <Auxiliary beam arrangement step S1>
[0042] When the car installation method is implemented, the auxiliary beam placement step S1 is first implemented. In the auxiliary beam placement step S1, the auxiliary beam is placed above the car 2. The auxiliary beam is moved from the landing in the building to the top of the car 2. In the present embodiment, the auxiliary beam is moved from the landing on the top of the car 2 to the top of the car 2 while the car 2 is stopped with the upper part of the car 2 aligned with the height of the landing floor on the top floor.
[0043] Figure 3 It means in Figure 1 The structure diagram of the state where the auxiliary beam is arranged above the car 2. The car 2 is suspended by the portion of the main rope 4 from the first end 4a to the drive sheave 72. The counterweight 3 is suspended by the portion of the main rope 4 from the second end 4b to the drive sheave 72.
[0044] The portion of the main rope 4 that suspends the car 2 includes a first lateral car suspending portion 41 , a lower car suspending portion 42 , and a second lateral car suspending portion 43 .
[0045] The first lateral car suspension portion 41 is a portion of the main rope 4 from the first end 4a to the car suspension pulley 22 on one side. The lower car suspension portion 42 is a portion of the main rope 4 from the car suspension pulley 22 on one side to the car suspension pulley 22 on the other side. The second lateral car suspension portion 43 is a portion of the main rope 4 from the car suspension pulley 22 on the other side to the drive sheave 72.
[0046] The main rope 4 is connected from the first end 4a to the driving sheave 72 in the order of the first lateral car suspension part 41, the lower car suspension part 42 and the second lateral car suspension part 43. The first lateral car suspension part 41 and the second lateral car suspension part 43 extend in the up-down direction respectively. The car 2 is arranged between the first lateral car suspension part 41 and the second lateral car suspension part 43. The lower car suspension part 42 extends in the horizontal direction below the car 2.
[0047] In the auxiliary beam placement step S1, the auxiliary beam 10 is placed on the top of the car body 21 via a raised platform, etc. Thus, the auxiliary beam 10 is placed above the car 2. The length of the auxiliary beam 10 is longer than the horizontal distance between the first lateral car suspension part 41 and the second lateral car suspension part 43.
[0048] <Supporting Step S2>
[0049] After the auxiliary beam configuration step S1, the support step S2 is performed. In the support step S2, the car 2 is moved to a set support position by the driving force of the traction machine 7. The set support position is a position of the car 2 where an operator riding on the upper part of the car 2 can touch the first rope end fixing device 8, the second rope end fixing device 9 and the lifting beam described later.
[0050] In addition, in the supporting step S2, the car 2 is supported at the set supporting position by a supporting body different from the main rope 4. In the present embodiment, the emergency stop device is manually held, so that the car 2 is supported by the pair of car guide rails 5 by the emergency stop device. That is, in the present embodiment, the pair of car guide rails 5 are used as the supporting body for supporting the car 2. Thus, the load of the car 2 is not applied to the main rope 4.
[0051] In the supporting step S2, the load of the counterweight 3 is also not applied to the main ropes 4. Therefore, in the supporting step S2, the counterweight 3 is supported by a support body different from the main ropes 4.
[0052] When the car 2 is located at the set support position, the counterweight 3 is located at the lower part of the shaft 1. In the present embodiment, the counterweight support platform is interposed between the bottom surface of the shaft 1 and the counterweight 3, so that the counterweight 3 is supported by the counterweight support platform. That is, in the present embodiment, the counterweight support platform is used as a support body for supporting the counterweight 3. Thus, the load of the counterweight 3 is not applied to the main rope 4.
[0053] <Main rope cutting process S3>
[0054] After the supporting step S2, the main rope cutting step S3 is performed. In the main rope cutting step S3, the main rope 4 is cut so that a part of the main rope 4 is used as a holding rope.
[0055] Figure 4 Yes means Figure 3 In the main rope cutting process S3, the middle position of the second side car suspension part 43 is set as the cutting position P, and the main rope 4 is cut at the cutting position P. At this time, the first side car suspension part 41 and the second side car suspension part 43 are temporarily fixed to the auxiliary beam 10 respectively so that the main rope 4 does not fall from the car 2.
[0056] In the main rope cutting step S3, the portion of the main rope 4 from the cutting position P to the first end 4a is used as the holding rope 20. That is, in the main rope cutting step S3, the portion of the main rope 4 closer to the car 2 than the cutting position P is used as the holding rope 20.
[0057] The length of the holding rope 20 is the holding set length. The holding set length is the length of the holding rope 20 from one end of the auxiliary beam 10 to the other end of the auxiliary beam 10 after being wound around the pair of car suspension wheels 22 in sequence. The cutting position P is determined so that the length of the holding rope 20 becomes the holding set length. In addition, the portion of the main rope 4 other than the holding rope 20 is removed.
[0058] <Auxiliary beam connection step S4>
[0059] After the main rope cutting step S3 , the auxiliary beam connecting step S4 is performed. In the auxiliary beam connecting step S4 , the holding rope 20 is arranged at a position where the car 2 can be suspended, and the holding rope 20 is connected to the auxiliary beam 10 .
[0060] Figure 5 Yes means Figure 4 FIG. 1 is a structural diagram of a state in which the holding rope 20 is connected to the auxiliary beam 10. The first end 4a of the main rope 4 is retained in the holding rope 20 as one end 20a of the holding rope 20. The other end 20b of the holding rope 20 is a cut portion of the main rope 4. Therefore, in the auxiliary beam connecting step S4, the other end 20b of the holding rope 20 is subjected to rope end processing.
[0061] In the auxiliary beam connection step S4, the first rope fixing device 8 and the second rope fixing device 9 are removed from the support beam disposed above the hoistway 1. At this time, the one end 20a of the holding rope 20 is kept connected to the first rope fixing device 8.
[0062] The auxiliary beam 10 includes a first mounting portion and a second mounting portion. The first mounting portion of the auxiliary beam 10 has a structure for mounting the first rope end fixing device 8. The second mounting portion of the auxiliary beam 10 has a structure for mounting the second rope end fixing device 9. In this embodiment, one end of the auxiliary beam 10 becomes the first mounting portion, and the other end of the auxiliary beam 10 becomes the second mounting portion.
[0063] In the auxiliary beam connection step S4, the first rope end fixing device 8 removed from the upper part of the hoistway 1 is installed as a first rope connector on the first mounting portion of the auxiliary beam 10. In the present embodiment, the first rope end fixing device 8 is installed on the first mounting portion of the auxiliary beam 10 while one end 20a of the holding rope 20 is connected to the first rope end fixing device 8. At this time, the first rope end fixing device 8 is transported to the first mounting portion of the auxiliary beam 10 while releasing the temporary fixation of the holding rope 20 relative to the auxiliary beam 10 and moving the holding rope 20. In addition, at this time, the holding rope 20 is moved while keeping the holding rope 20 wound around a pair of car suspension wheels 22. As a result, the holding rope 20 is arranged at a position where the car 2 can be suspended. In this way, in the auxiliary beam connection step S4, the one end 20a of the holding rope 20 is connected to the auxiliary beam 10 through the first rope end fixing device 8.
[0064] In addition, in the auxiliary beam connection step S4, the second rope end fixing device 9 removed from the upper part of the hoistway 1 is installed as a second rope connecting member on the second mounting portion of the auxiliary beam 10. Then, the other end 20b of the holding rope 20 is connected to the second rope end fixing device 9. In this way, in the auxiliary beam connection step, the other end 20b of the holding rope 20 is connected to the auxiliary beam 10 through the second rope end fixing device 9.
[0065] That is, in the auxiliary beam connecting step S4 , the one end portion 20 a and the other end portion 20 b of the holding rope 20 are connected to the auxiliary beam 10 , respectively, in a state where the holding rope 20 is wound around the pair of car suspending sheaves 22 .
[0066] <Crane connection process S5>
[0067] After the auxiliary beam connection step S4, the crane connection step S5 is performed. In the crane connection step S5, the auxiliary beam 10 is connected to the lifting beam as the fixing portion by a crane.
[0068] Figure 6 Yes means Figure 5 FIG. 1 is a structural diagram of a state in which the auxiliary beam 10 is connected to the lifting beam 11 by a crane 12. The lifting beam 11 is fixed to the upper part of the shaft 1 as a fixing part. Therefore, the lifting beam 11 is fixed above the car 2. When the car 2 is located at the set support position, the operator riding on the upper part of the car 2 can touch the lifting beam 11. In this embodiment, in the crane connection step S5, the auxiliary beam 10 is connected to the lifting beam 11 by two cranes 12.
[0069] Each crane 12 has a crane body 121, a hoisting rope 122, and a hoisting connection 123. The hoisting beam 11 has a structure to which the crane body 121 is mounted.
[0070] The hoisting rope 122 is provided on the crane body 121. The hoisting rope 122 is a suspending body capable of suspending the auxiliary beam 10. The suspending body of the crane 12 may be a chain.
[0071] The crane body 121 has a motor. The motor of the crane body 121 generates a driving force to move the hoisting rope 122. The crane body 121 moves the hoisting rope 122 relative to the crane body 121 by winding and feeding the hoisting rope 122. An operating unit (not shown) is connected to the crane body 121 via a cable. Thus, the operating unit can be operated at a position away from the crane body 121. The crane body 121 moves according to the operation of the operating unit.
[0072] The lifting connector 123 is a connector that connects the lifting rope 122 to the auxiliary beam 10. The auxiliary beam 10 has a third mounting portion. The third mounting portion of the auxiliary beam 10 has a structure for mounting the lifting connector 123. In this embodiment, the middle portion of the auxiliary beam 10 serves as the third mounting portion. The lifting connector 123 is mounted on the third mounting portion of the auxiliary beam 10. The lifting rope 122 is connected to the lifting connector 123. Thus, the lifting rope 122 is connected to the auxiliary beam 10 through the lifting connector 123.
[0073] In the crane connection step S5, the crane body 121 is mounted on the hoisting beam 11. In addition, in the crane connection step S5, the hoisting rope 122 sent out from the crane body 121 is connected to the third mounting portion of the auxiliary beam 10 through the hoisting connector 123. Thus, the auxiliary beam 10 is connected to the hoisting beam 11 through the crane 12.
[0074] <Support release step S6>
[0075] After the crane connection step S5, the support release step S6 is performed. In the support release step S6, the support of the car 2 by the support body is released. That is, in the support release step S6, the support of the car 2 by the pair of car guide rails 5 is released.
[0076] When the pair of car guide rails 5 support the car 2, the car 2 is moved upward by the driving force of the crane 12. Thus, the state in which the pair of car guide rails 5 are held by the emergency stop device is released, and the pair of car guide rails 5 support the car 2.
[0077] When the support of the car 2 by the pair of car guide rails 5 is released, the auxiliary beam 10 is suspended from the lifting beam 11 by the crane 12, and the car 2 is suspended from the auxiliary beam 10 by the holding rope 20 as a scaffolding pod. The raised platform placed on the upper part of the car body 21 is removed after the support of the car 2 is released. Thus, a pod device for suspending the car 2 as a scaffolding pod by the crane 12 is provided.
[0078] Next, a pod device obtained by the pod installation method will be described.
[0079] Pod device such as Figure 6 As shown, there are a car 2, an auxiliary beam 10, a holding rope 20 and a crane 12. In the car device, the car 2 is used as a scaffolding car.
[0080] The auxiliary beam 10 is arranged above the car 2. The auxiliary beam 10 is suspended from the hoisting beam 11 by a crane 12. The crane 12 connects the auxiliary beam 10 to the hoisting beam 11. That is, the auxiliary beam 10 is connected to the hoisting beam 11 by the crane 12. In this embodiment, a crane body 121 is mounted on the hoisting beam 11, and a hoisting rope 122 is connected to the auxiliary beam 10 by a hoisting connector 123.
[0081] The crane 12 moves the hoist rope 122 in the vertical direction by the driving force of the crane body 121. As a result, the auxiliary beam 10 moves in the vertical direction relative to the hoist beam 11.
[0082] The car 2 is suspended from the auxiliary beam 10 by the holding rope 20 . Thus, the car 2 , the holding rope 20 , and the auxiliary beam 10 are suspended from the hoisting beam 11 by the crane 12 .
[0083] The holding rope 20 is wound around a pair of car suspension wheels 22. One end 20a of the holding rope 20 is connected to the auxiliary beam 10 through a first rope end fixing device 8 as a first rope connecting member. The other end 20b of the holding rope 20 is connected to the auxiliary beam 10 through a second rope end fixing device 9 as a second rope connecting member. The holding rope 20 is wound around a pair of car suspension wheels 22 in sequence from the one end 20a to the other end 20b.
[0084] The car 2 and the holding rope 20 do not move relative to the auxiliary beam 10. Thus, the position of the car 2 relative to the auxiliary beam 10 is maintained. Therefore, the car 2 as a scaffolding pod moves vertically relative to the lifting beam 11 together with the auxiliary beam 10 by the driving force of the crane 12.
[0085] When an operator performs work in the hoistway 1 after installing the nacelle device, the operator riding on the upper portion of the car 2 operates the operating unit of the crane 12 to move the car 2 in the vertical direction.
[0086] In such a car installation method, in the auxiliary beam placement step S1, the auxiliary beam 10 is placed above the car 2, and in the main rope cutting step S3, the main rope 4 is cut to use a part of the main rope 4 as the holding rope 20. In addition, in the auxiliary beam connection step S4, the holding rope 20 is connected to the auxiliary beam 10, and in the crane connection step S5, the auxiliary beam 10 is connected to the lifting beam 11 fixed above the car 2 by the crane 12. Therefore, the auxiliary beam 10 can be suspended by the crane 12 in a state where the car 2 is suspended from the auxiliary beam 10 by the holding rope 20. Thus, the car 2 can be suspended by the crane 12 as a scaffolding car without processing the car 2. Therefore, it is unnecessary to conduct a preliminary investigation of the car 2, process the car 2 based on the investigation, and the like, and the car 2 can be easily suspended by the crane 12.
[0087] Furthermore, in the auxiliary beam connection step S4, the one end 20a and the other end 20b of the holding rope 20 are connected to the auxiliary beam 10 respectively, with the holding rope 20 wound around the pair of car suspension pulleys 22. Therefore, the state of the car 2 suspended by the main rope 4 during normal operation can be directly reproduced as the state of the car 2 suspended from the auxiliary beam 10 by the holding rope 20. Thus, the holding rope 20 can suspend the car 2 at a position where the weight of the car 2 is well balanced, and the state of the car 2 can be stabilized. Therefore, the stability of the work of the operator riding on the upper part of the car 2 can be improved.
[0088] In addition, the main rope 4 when the supporting step S2 is implemented is connected to the first rope end fixing device 8 and the second rope end fixing device 9 respectively provided at the upper part of the hoistway 1. In the auxiliary beam connecting step S4, the first rope end fixing device 8 removed from the upper part of the hoistway 1 is installed on the auxiliary beam 10, and the one end 20a of the holding rope 20 is connected to the auxiliary beam 10. Therefore, as the first rope connector for connecting the one end 20a of the holding rope 20 to the auxiliary beam 10, the existing first rope end fixing device 8 can be used. Thus, the cost of components can be reduced.
[0089] In addition, the main rope 4 when the supporting step S2 is implemented is connected to the first rope end fixing device 8 and the second rope end fixing device 9 respectively provided at the upper part of the hoistway 1. In the auxiliary beam connecting step S4, the other end 20b of the holding rope 20 is connected to the auxiliary beam 10 by attaching the second rope end fixing device 9 removed from the upper part of the hoistway 1 to the auxiliary beam 10. Therefore, as the first rope connector for connecting the other end 20b of the holding rope 20 to the auxiliary beam 10, the existing second rope end fixing device 9 can be used. Thus, the cost of components can be reduced.
[0090] In addition, in the main rope cutting step S3, the first end 4a of the main rope 4 is retained as the one end 20a of the holding rope 20. Therefore, the one end 20a of the holding rope 20 can be used in a state where the rope end processing has been completed. As a result, it is not necessary to re-process the one end 20a of the holding rope 20, and the labor of processing the holding rope 20 can be reduced. Therefore, the operation of suspending the car 2 by the crane 12 can be performed more easily.
[0091] In addition, in such a pod device, the car 2 is suspended from the auxiliary beam 10 by the holding rope 20, and the auxiliary beam 10 is suspended from the lifting beam 11 arranged at the upper part of the hoistway 1 by the crane 12. Therefore, the car 2 can be suspended as a pod for scaffolding by the crane 12 without processing the car 2. Thus, the car 2 can be easily suspended by the crane 12.
[0092] In addition, the holding rope 20 is wound around a pair of car suspension sheaves 22. Therefore, the car 2 can be suspended by the holding rope 20 at a position where the weight of the car 2 is well balanced, and the state of the car 2 can be stabilized. Therefore, the stability of the work of the operator riding on the upper part of the car 2 can be improved.
[0093] In addition, the crane body 121 is attached to the hoisting beam 11 fixed above the car 2. And the hoisting rope 122 is connected to the auxiliary beam 10. Therefore, the auxiliary beam 10 can be easily connected to the hoisting beam 11 by the crane 12.
[0094] In the above embodiment, the crane body 121 is mounted on the lifting beam 11, and the lifting rope 122 is connected to the auxiliary beam 10. However, the crane body 121 may be mounted on the auxiliary beam 10, and the lifting rope 122 may be connected to the lifting beam 11. In this case, Figure 7 As shown, the hoist rope 122 is connected to the hoist beam 11 through the hoist connector 123. In addition, in this case, the hoist beam 11 has a structure for installing the hoist connector 123. Moreover, in this case, the third mounting portion of the auxiliary beam 10 has a structure for installing the crane body 121. In this way, the auxiliary beam 10 can also be easily connected to the hoist beam 11 by the crane 12.
[0095] In addition, it is possible to select which one of the lifting beam 11 and the auxiliary beam 10 to attach the crane body 121 to, depending on the space in the hoistway 1. Thus, the operation of connecting the auxiliary beam 10 to the lifting beam 11 by the crane 12 can be performed more easily.
[0096] In the above-mentioned embodiment, the car installation method is implemented for an elevator in which the main rope 4 is wound around a pair of car suspension sheaves 22. That is, the car installation method is implemented for an elevator in which the suspension method of suspending the car 2 by the main rope 4 is a 2:1 roping method. However, the elevator in which the car installation method is implemented is not limited to this.
[0097] For example, the car installation method can also be implemented for an elevator in which the main rope 4 is connected to the upper part of the car 2. That is, the car installation method can also be implemented for an elevator in which the suspension method of the main rope 4 suspending the car 2 is a 1:1 roping method. In this case, in the main rope cutting step S3, a part of the main rope 4 connected to the upper part of the car 2 is used as a holding rope. The holding rope is connected to the upper part of the car 2 and is therefore arranged at a position where the car 2 can be suspended. In addition, in this case, in the auxiliary beam connecting step S4, the upper end of the holding rope is connected to the auxiliary beam 10 by a rope connector. In this way, the car 2 can be suspended as a car for scaffolding by the crane 12 without processing the car 2.
[0098] In addition, in the pod device, the holding rope for suspending the car 2 from the auxiliary beam 10 may be connected to the upper part of the car 2. In this case, the upper end of the holding rope is connected to the auxiliary beam 10 via a rope connector. In the pod device, the car 2 can be suspended as a pod for scaffolding by the crane 12 without processing the car 2.
[0099] In addition, in the above-mentioned embodiment, the car installation method is implemented for the elevator in which the hoisting machine 7 is installed at the upper part of the hoistway 1. However, it is not limited to this. For example, the car installation method can also be implemented for the elevator in which the hoisting machine 7 is installed at the lower part of the hoistway 1. In this case, a car side return pulley and a counterweight side return pulley are installed at the upper part of the hoistway 1. In addition, in this case, the main rope 4 is wound from the first end 4a in the order of a pair of car suspension wheels 22, a car side return pulley, a driving sheave 72, a counterweight side return pulley, and a counterweight suspension wheel 32, and reaches the second end 4b. And, in this case, in the main rope cutting step S3, the middle position of the part of the main rope 4 from the other car suspension wheel 22 to the car side return pulley is set as the cutting position P.
[0100] In the above-described embodiment, in the auxiliary beam connection step S4, the first rope end fixing device 8 is installed as the first rope connection member on the auxiliary beam 10, and the second rope end fixing device 9 is installed as the second rope connection member on the auxiliary beam 10. However, a new rope connection member different from the first rope end fixing device 8 may be installed as the first rope connection member on the auxiliary beam 10. In addition, a new rope connection member different from the second rope end fixing device 9 may be installed as the second rope connection member on the auxiliary beam 10.
[0101] In the above-mentioned embodiment, in the main rope cutting step S3, the first end 4a of the main rope 4 is retained as the one end 20a of the holding rope 20. However, the first end 4a of the main rope 4 may be not retained, and the main rope 4 may be cut at the middle position of each of the first side car suspension part 41 and the second side car suspension part 43 in the main rope 4. In this case, since the one end 20a and the other end 20b of the holding rope 20 become the cut portions of the main rope 4, the one end 20a and the other end 20b of the holding rope 20 are respectively subjected to rope end processing. In this way, a part of the main rope 4 can also be used as the holding rope 20.
[0102] In the above-mentioned embodiment, in the supporting step S2, the car 2 is supported by the pair of car guide rails 5 through the emergency stop device. However, as a supporting body for supporting the car 2, a rope-like body such as a rope or a chain may be used. In this case, in the supporting step S2, the rope-like body hanging downward from the lifting beam 11 is wound around the car frame 24 and connected to the car 2. The car 2 is supported by being suspended from the lifting beam 11 by the rope-like body. In this way, the car 2 can be supported without relying on the main rope 4.
[0103] In the above-mentioned embodiment, the auxiliary beam arranging step S1 is performed before the supporting step S2. However, the auxiliary beam arranging step S1 may be performed at any time as long as it is performed before each of the auxiliary beam connecting step S4 and the crane connecting step S5. Therefore, for example, the auxiliary beam arranging step S1 may be performed after the supporting step S2 and before the main rope cutting step S3, or the auxiliary beam arranging step S1 may be performed after the main rope cutting step S3 and before the auxiliary beam connecting step S4.
[0104] In the above-described embodiment, the auxiliary beam connecting step S4 is performed before the crane connecting step S5. However, the auxiliary beam connecting step S4 may be performed after the crane connecting step S5 and before the support releasing step S6.
[0105] In the above-described embodiment, the crane connection step S5 is performed after the auxiliary beam connection step S4. However, the crane connection step S5 may be performed at any time as long as it is performed after the auxiliary beam placement step S1 and before the support release step S6.
[0106] The above-mentioned structure shown in the above-mentioned embodiment is an example of the content of this disclosure. The embodiment can be combined with other well-known technologies. Part of the structure of the embodiment can be omitted or changed within the scope of not departing from the gist of this disclosure.
Claims
1. A method for setting a car of an elevator, comprising: an auxiliary beam disposing step of disposing an auxiliary beam above the car suspended by the main ropes; A supporting step of supporting the car using a supporting body different from the main rope; a main rope cutting step of cutting the main rope after the supporting step to use a part of the main rope as a holding rope; an auxiliary beam connecting step of, after the auxiliary beam disposing step and the main rope cutting step, disposing the holding rope at a position capable of suspending the car and connecting the holding rope to the auxiliary beam; a crane connecting step of connecting the auxiliary beam to a fixing portion fixed above the car by a crane after the auxiliary beam disposing step; and A support release step is performed after the auxiliary beam connection step and the crane connection step to release the support of the car by the support body, thereby suspending the car as a pod from the auxiliary beam using the holding rope and suspending the auxiliary beam from the fixed portion using the crane.
2. The elevator car installation method according to claim 1, wherein: The car comprises a car body and a car suspension wheel arranged on the car body. In the supporting step, the car is supported by the supporting body different from the main rope wound around the car suspending pulley, In the auxiliary beam connecting step, with the holding rope wound around the car suspending pulley, one end of the holding rope is connected to the auxiliary beam through a first rope connector, and the other end of the holding rope is connected to the auxiliary beam through a second rope connector.
3. The elevator car installation method according to claim 2, wherein: The main rope during the supporting process is connected to a first rope end fixing device and a second rope end fixing device respectively provided at the upper part of the hoistway. In the auxiliary beam connection step, the first rope fixing device removed from the upper part of the hoistway is installed on the auxiliary beam as the first rope connector, and the second rope fixing device removed from the upper part of the hoistway is installed on the auxiliary beam as the second rope connector.
4. The method for installing a car of an elevator according to claim 3, wherein: In the main rope cutting step, the first end portion of the main rope connected to the first rope end fixing device is used as one end portion of the holding rope.
5. A pod device, comprising: The car as a pod; an auxiliary beam disposed above the car; a retaining rope suspending the car from the auxiliary beam; and A crane connects the auxiliary beam to a fixing portion fixed above the car, suspends the auxiliary beam from the fixing portion, and moves the auxiliary beam in a vertical direction.
6. The pod device according to claim 5, wherein: The car comprises a car body and a car suspension wheel arranged on the car body. The holding rope is wound around the car suspension wheel. The pod device comprises: a first rope connector connecting one end of the holding rope to the auxiliary beam; and A second rope connecting member connects the other end of the holding rope to the auxiliary beam.
7. The pod device according to claim 5 or 6, wherein: The crane comprises: a suspension body capable of suspending the auxiliary beam; and a crane body capable of moving the suspension body in an upward and downward direction. The crane body is mounted on one of the fixing portion and the auxiliary beam, and the suspension body is connected to the other of the fixing portion and the auxiliary beam.