Foundation pit recharge bagged sand well hanging bracket device and method thereof
Through the foundation pit backfilling bagged sand well hanging device, the problem of backfilling well blockage is solved, the foundation drainage conditions are improved, the drainage path is shortened, the return injection efficiency is improved, and the stability and safety of the foundation pit is ensured.
Patent Information
- Application Number
- CN202411435771.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-12-03
AI Technical Summary
The backfilling wells are often blocked in foundation pit precipitation refilling projects, resulting in a decrease in soil permeability, a decrease in porosity, a decrease in refilling efficiency, and heating and overload operation of the equipment, affecting the stability and safety of the foundation pit.
The hanger device of sand well loading back-filled pit bagging is adopted, including a mobile machine, a hoisting rack and a lifting drive frame. The position of the hook body is moved and adjusted through the adjustment device to shorten the drainage path, and is carried out through auxiliary devices and limiting devices. The protective limit of the hook body ensures the accuracy and stability of the sand bag hoisting into the sand well.
By improving foundation drainage conditions, shortening drainage paths, avoiding equipment overload, improving refilling efficiency, and ensuring the stability and safety of foundation pits.
Smart Images

Figure CN119061901A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit recharging, and in particular to a foundation pit recharging bagged sand well hanger device and a method thereof. Background Art
[0002] Foundation pit dewatering and recharging is the process of replenishing the groundwater extracted from the foundation pit into the aquifer outside the foundation pit. Due to the existence of the foundation pit water stop curtain, the groundwater extracted from the pit and recharged outside the pit can not only avoid wasting groundwater resources, but also increase the groundwater level around the recharging point, maintain the effective stress of the soil, reduce differential settlement, and weaken the impact of foundation pit dewatering on surrounding buildings. It is more common in the construction of building foundation pit recharging.
[0003] Prior art, such as the invention with publication number CN108643209A, discloses a device and method for treating water recharging from a construction foundation pit. The patent comprises an outer box, wherein the four bottom corners of the outer box are rotatably connected to rollers through brackets, a filter box is fixedly connected to the middle position of the bottom of the inner wall of the outer box, a water filter device is fixedly connected to the bottom end between the two sides of the inner wall of the filter box, a water pump is fixedly connected to one end of the bottom of the inner wall of the outer box, a first water pipe is connected to the water inlet of the water pump, an end of the first water pipe away from the water pump penetrates the outer box and extends to the outside of the outer box, and an end of the first water pipe located outside the outer box is connected to a suction pipe through a telescopic pipe. The invention relates to the technical field of construction equipment. The device and method for treating water recharging from a construction foundation pit can reuse the recharging water after simple filtration, thereby reducing pollution to the environment and avoiding waste of resources, so that the device can be easily moved and the suction pipe can be easily placed in an accurate position. During the construction of building foundation pit recharge, it was found that in the foundation pit dewatering and recharge project, the recharge well will be blocked. When the foundation pit dewatering and recharge is blocked, it is generally manifested as the permeability coefficient of the soil layer continues to decrease, the porosity gradually decreases, the recharge efficiency continues to decrease, the recharge equipment heats up and overloads, which leads to poor drainage of the foundation pit, causing the groundwater level to rise, and affecting the stability and safety of the foundation pit.
[0004] The present application provides a technical solution to the technical problem, aiming to provide technical personnel in the field with a variety of options for solving the problem. Summary of the invention
[0005] The purpose of the present invention is to solve the problem of blockage of recharging wells in foundation pit dewatering and recharging projects in the prior art. When blockage occurs in foundation pit dewatering and recharging, it is generally manifested as a continuous decrease in the permeability coefficient of the soil layer, a gradual decrease in the porosity, a continuous decrease in the recharging efficiency, heating and overload operation of the recharging equipment, which in turn leads to poor drainage of the foundation pit, causing the groundwater level to rise, and affecting the stability and safety of the foundation pit.
[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a foundation pit recharging bagged sand well hanger device, comprising a mobile platform, a hanging frame is installed on the upper surface of the mobile platform, a lifting drive frame is installed on the upper end surface of the hanging frame, a hanging rope is installed inside the lifting drive frame, the bottom end of the hanging rope is fixedly connected with a mounting column, a mounting frame is installed on the lower surface of the mounting column, and an adjustment device is provided on all four surfaces of the mounting frame, the adjustment device comprises a fixing rod, the two ends of the fixing rod are fixedly connected to the side inner wall of the mounting frame, the circular arc surface of the fixing rod is slidably connected to the moving frame, the inner wall of the moving frame is rotatably connected with pulleys on both sides, and the circular arc surface of the pulley is slidably connected to the circular arc surface of the fixing rod, The top end of the sliding panel also is connected with the sliding panel, and the bottom end of the sliding panel is connected with the sliding panel, and the bottom end of the sliding panel is connected with the sliding panel.
[0007] The effects achieved by the above components are: in the foundation pit backfilling construction operation, the sand well is used to improve the drainage conditions of the foundation and shorten the drainage path. In this process, it is necessary to use lifting equipment to lift the sand bags into the sand well. At this time, the mobile machine, lifting frame and lifting drive frame can be matched to drive the installation frame at the bottom of the lifting rope to perform lifting and lowering control of the position, and the adjustment device set in the installation frame is used to operate to move and adjust the position of the entire hook body, so as to facilitate the hook limit operation between the entire hook body and the sand bag.
[0008] Preferably, both upper surfaces of the connecting plate are fixedly connected with magnetic blocks, and both lower surfaces of the sliding plate are fixedly connected with magnetic sheets.
[0009] The effect achieved by the above components is that when the position of the sliding plate is stretched and moved, the magnetic blocks on both sides of the connecting plate and the magnetic sheets on both sides of the sliding plate can be used for temporary position limiting adsorption and fixation.
[0010] Preferably, a plurality of friction pads are fixedly connected to the arc surface of the pulley, and the plurality of friction pads are all rubber pads.
[0011] The effect achieved by the above components is that the rubber friction pad can be used to effectively protect the pulley when it is in use.
[0012] Preferably, a fixing frame is fixedly connected to the upper surface of the hook body, a rotating frame is rotatably connected to the surface of the fixing frame, an extrusion rod is threadedly penetrated through one side of the rotating frame, a fixing hole is opened on the surface of the hook body, and the inner wall of the fixing hole abuts against one end of the extrusion rod.
[0013] The effect achieved by the above components is: when the hook body is in use, in order to prevent the sand bag from falling off from the hook body, the rotating frame on the surface of the hook body is used for protection, and the extrusion rod on one side of the rotating frame is used for extrusion limiting, so as to facilitate better protection between the sand bag and the hook body.
[0014] Preferably, an auxiliary device is provided at a position corresponding to the mounting column on the upper surface of the mounting frame, and the auxiliary device comprises a docking rod, the bottom end of the docking rod is fixedly connected to the upper surface of the mounting frame, and the lower surface of the mounting column is fixedly connected to an auxiliary rod, the arc surface of the auxiliary rod is clamped with the inner wall of the docking rod, and the two side surfaces of the docking rod are fixedly connected with a connecting plate, the cross-section of the connecting plate is "L"-shaped, and a connecting hole is provided on the short arm end surface of the connecting plate, and a moving rod is slidably penetrated by the inner wall of the connecting hole, and an auxiliary block is fixedly connected to an auxiliary block at one end of the moving rod close to the docking rod, the cross-section of the auxiliary block is arc-shaped, and a tension spring is sleeved on the arc surface of the moving rod, and the two ends of the tension spring are respectively fixedly connected to the connecting plate and the auxiliary block, and auxiliary holes are provided on both sides of the arc surface of the auxiliary rod, and the inner wall of the auxiliary hole is plugged into the surface of the auxiliary block, and a sliding groove is provided on the upper surface of the auxiliary rod, and a slip ring is slidably connected to the inner wall of the sliding groove, and the inner wall of the slip ring is threadedly connected to the arc surface of the docking rod.
[0015] The effect achieved by the above-mentioned components is: when the hook body on the surface of the entire installation frame is operated for a long time, the installation frame needs to be replaced and maintained to avoid damage to the installation frame due to aging and wear. At this time, the auxiliary rod at the bottom of the installation column can be used to dock and limit the position with the docking rod on the surface of the installation frame, and then the moving rods on both sides of the docking rod can be used to drive the auxiliary block and the auxiliary holes opened on both sides of the auxiliary rod to be plugged and limited, and then the slip ring is used to perform threaded docking with the docking rod, so as to effectively and conveniently protect the entire installation frame from replacement after long-term use.
[0016] Preferably, auxiliary plates are fixedly connected to both sides of the arc surface of the moving rod, and the surface of the auxiliary plate slides through the inner wall of the connecting hole.
[0017] The effect achieved by the above components is that when the positions of the moving rod and the auxiliary block are slid, the auxiliary plates on both sides of the moving rod can be used to limit the position to avoid the position deviation of the auxiliary block.
[0018] Preferably, the auxiliary block is a cemented carbide block, and the cross-sectional size of the auxiliary block is matched with the cross-sectional size of the auxiliary hole.
[0019] The effect achieved by the above components is that the auxiliary block made of cemented carbide can be used for a long time without deformation.
[0020] Preferably, the surrounding surfaces of the mounting frame are provided with limiting devices, and the limiting devices include a fixing frame, the arc surface of the inner wall of the fixing frame is rotatably connected with a rotating plate, the cross-section of the rotating plate is "L"-shaped, and the upper surface of the short arm end of the rotating plate is fixedly connected with a mosaic frame, the cross-section of the mosaic frame is "U"-shaped, the cross-sections of both sides of the mosaic frame are arc-shaped, and both sides of the inner wall of the mosaic frame are fixedly connected with extrusion blocks, the cross-section of the extrusion blocks is semicircular, and the extrusion blocks are silicone blocks, and the bottom surface of the inner wall of the mosaic frame is fixedly connected with a fixing ring, the cross-section of the fixing ring is arc-shaped, and the cross-sectional size of the inner wall of the mosaic frame is compatible with the cross-sectional size of the hook body.
[0021] The effect achieved by the above-mentioned components is: in the process of using the hook body adjusted on the lower surface of the mounting frame, in order to prevent the hook body from shaking as a whole, an auxiliary limiting operation is performed with the help of a rotating plate and an inlay frame. The inlay frame on the surface of the short arm is driven by the rotation of the mounting frame surface in the fixed frame to clamp and limit the upper arc surface of the hook body, thereby effectively and conveniently protecting and limiting the position of the entire hook body.
[0022] Preferably, both ends of the inner wall of the fixing frame are sleeved with coil springs, and both ends of the coil spring are fixedly connected to the rotating plate and the fixing frame respectively.
[0023] The effect achieved by the above-mentioned components is that the torsional force generated by the coil spring can effectively squeeze and limit the rotating plate and the inlay frame when they are clamped together.
[0024] A method for using a weathered bedrock coring recharging well comprises the following steps: S1. Level the ground: clean and level the original ground, remove all the silt, tree roots, grass, humus, etc. on the original ground within the roadbed range, and level the site for the construction of bagged sand wells.
[0025] Spread the lower sand cushion layer: Use qualified sand to lay the sand cushion layer on the constructed road arch. The paving should be even and flat to form a two-way cross slope that meets the design requirements, and use a roller to statically press it to the required density.
[0026] Machine positioning: During positioning, ensure that the center of the casing and the ground pile are at the same point, and the pile position deviation does not exceed 100mm. Start the hydraulic system to control the verticality of the guide frame and control it within 1.5%.
[0027] Driving the casing: Select the casing diameter according to the diameter of the sand well. The diameter of the steel pipe used should be slightly larger than the diameter of the sand well, but not too large. Before driving, use paint to mark the scale line for controlling the elevation on the casing.
[0028] Sinking sandbags: Use permeable geotextile elongated sandbags as vertical drainage channels and sink them to the designed depth through casing.
[0029] Pull out the casing: slowly pull out the casing, leaving the sand bags, and the bagged sand well is formed.
[0030] Machine shifting: After completing a process cycle, move the machine to the next construction location.
[0031] Bury the sandbag head: bury the top of the sandbag in the sand cushion layer to ensure that the sandbag is firmly connected to the sand cushion layer.
[0032] Laying the upper sand cushion: Set up a sand cushion on the top of the bagged sand well as a horizontal drainage channel to ensure the uniformity and density of the sand cushion.
[0033] S2. Key points of construction method: on the compacted sand cushion layer, accurately lay out the position and spacing of the sand well plan layout in the design drawing, mark the pile position, and mark the sand well position with bamboo sticks. Move the sand well pile driver according to the laid out position to align the casing with the sand well position, adjust the verticality of the guide frame, and clean the pile tip. During construction, a dedicated person should be assigned to record the length, inclination, sand well diameter, sand filling rate and other construction data of each bagged sand well. The steel casing is driven into the soil by a vibrating hammer. When sinking the pile, the verticality of the steel casing should be controlled by a theodolite or plumb bob, and the driving depth should be controlled by the scale on the steel casing to ensure that the bottom elevation of the well meets the design requirements. The sand bag is sunk into the casing using the frame roller and manual transportation. When the sand bag is completely sunk into the casing, the steel casing can be pulled out, the machine tool is moved to the next pile position, and the mud and other debris on the sand bag head are manually removed. After the sand well construction is completed, the machine tool enters the next cycle. The construction sequence is to inject sand from one side to the other side horizontally, and move to the second row after one row is completed; in order to ensure the amount of sand filled and improve the efficiency of sand loading, mechanical sand loading must be used. The height of the sand loading machine should be slightly higher than half the length of the sand well, and two outlets should be left on the lower side of the sand loading bucket, and a vibrator should be attached to the bucket wall. When loading sand, first connect the two ends of the sand bag to the outlet of the sand bucket and tie it tightly, then put the sand that meets the requirements into the sand bucket, lift the hopper, and start the vibrator to make the sand in the bucket flow into the sand bag, lift the sand bucket until the whole sand bag is suspended in the air, vibrate to fill the sand bag with sand, then put down the hopper, untie the sand bag, manually fill the bag with sand and shake it, and then tie the bag mouth.
[0034] S3. Construction precautions: When laying out the bagged sand wells, arrange them according to the horizontal S and vertical 0.866S of the route (the sand wells (S is the sand well spacing), and pay attention to arranging them in an equilateral triangle; the design length of the bagged sand wells in the drawings is determined according to the existing geological data, some are average values, and some are larger values. There may be a certain deviation from the design length during specific construction. During construction, the length of the bagged sand wells should be adjusted in time according to the injection situation; the construction of bagged sand wells should be carried out after laying the first layer of sand cushion and before laying geogrids.
[0035] In summary, the beneficial effects of the present invention are: In the present invention, during the foundation pit recharging construction operation, the drainage condition of the foundation is improved by means of a sand well, and the drainage path is shortened. In this process, the sand bags need to be hoisted into the sand well with the help of hoisting equipment. At this time, the mobile machine, the hoisting frame and the lifting drive frame can be matched to drive the installation frame at the bottom of the lifting rope to perform lifting and lowering control of the position. By operating the adjusting device, the adjusting device arranged in the installation frame can be operated, and the position of the entire hook body can be moved and adjusted, which is convenient for the hook limit operation between the entire hook body and the sand bag.
[0036] In the present invention, when the hook body on the surface of the entire installation frame is operated for a long time, the installation frame needs to be replaced and maintained to avoid damage to the installation frame due to aging and wear. At this time, the auxiliary rod at the bottom of the installation column can be used to dock and limit the position with the docking rod on the surface of the installation frame, and then the moving rods on both sides of the docking rod can be used to drive the auxiliary block to be plugged and limited with the auxiliary holes opened on both sides of the auxiliary rod, and then the slip ring is used to perform threaded docking with the docking rod. Through the operation of the auxiliary device, the replacement protection of the entire installation frame after long-term use is effectively and conveniently achieved.
[0037] In the present invention, during the use of the hook body regulated by the lower surface of the mounting frame, in order to prevent the hook body from shaking as a whole, an auxiliary limiting operation is performed with the help of a rotating plate and an inlay frame. The inlay frame on the surface of the short arm is driven by the rotation of the mounting frame surface in the fixed frame to clamp and limit the upper arc surface of the hook body. By operating the limiting device, the position of the entire hook body can be conveniently protected and limited by the ground effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Attached Figure 1 It is a three-dimensional structural schematic diagram of the present invention; Attached Figure 2 It is a left structural schematic diagram of the three-dimensional structure of the present invention; Attached Figure 3 It is a partial schematic diagram of the three-dimensional structure of the present invention; Attached Figure 4 is a schematic structural diagram of the regulating device of the present invention; Attached Figure 5 It is a partial structural schematic diagram of the regulating device of the present invention; Attached Figure 6 It is a schematic diagram of the disassembled structure of the regulating device of the present invention; Attached Figure 7 The present invention Figure 6 A schematic diagram of the enlarged structure at B; Attached Figure 8 is a schematic structural diagram of the auxiliary device of the present invention; Attached Fig. 9 The present invention Figure 8 A schematic diagram of the enlarged structure at C; Attached Fig.10 The present invention Figure 3 A is an enlarged structural diagram of FIG.
[0039] Numbers shown in the accompanying drawings: 1, mobile platform; 2, lifting frame; 3, lifting drive frame; 4, lifting rope; 5, mounting frame; 6, adjusting device; 601, fixed rod; 602, mobile frame; 603, pulley; 604, friction pad; 605, rotating frame; 606, hook body; 607, fixed frame; 608, rotating frame; 609, extrusion rod; 610, fixing hole; 611, block; 612, protective pad; 613, connecting rod; 614, sliding plate; 615, magnetic sheet; 6 16. Connecting plate; 617. Magnetic block; 618. Spring; 7. Auxiliary device; 701. Auxiliary rod; 702. Docking rod; 703. Slide groove; 704. Slip ring; 705. Auxiliary hole; 706. Moving rod; 707. Auxiliary block; 708. Tension spring; 709. Auxiliary plate; 710. Connecting plate; 711. Connecting hole; 8. Limiting device; 81. Fixed frame; 82. Coil spring; 83. Rotating plate; 84. Inlay frame; 85. Extrusion block; 86. Fixed ring; 9. Mounting column. DETAILED DESCRIPTION
[0040] The present invention will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms fall within the scope limited by the appended claims of the application equally.
[0041] Reference Figures 1 to 10As shown, the present invention provides a technical solution: a foundation pit recharging bagged sand well hanger device and method, comprising a mobile platform 1, a hanging frame 2 is installed on the upper surface of the mobile platform 1, a lifting drive frame 3 is installed on the upper end surface of the hanging frame 2, a lifting rope 4 is installed inside the lifting drive frame 3, a mounting column 9 is fixedly connected to the bottom end of the lifting rope 4, a mounting frame 5 is installed on the lower surface of the mounting column 9, an adjusting device 6 is provided on the surrounding surfaces of the mounting frame 5, an auxiliary device 7 is provided on the upper surface of the mounting frame 5 corresponding to the mounting column 9, and a limiting device 8 is provided on the surrounding surfaces of the mounting frame 5.
[0042] The specific arrangement and functions of the adjusting device 6, the auxiliary device 7 and the limiting device 8 are described in detail below.
[0043] Reference Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 As shown, in this embodiment: the adjusting device 6 includes a fixed rod 601, both ends of the fixed rod 601 are fixedly connected to the side inner wall of the installation frame 5, the circular arc surface of the fixed rod 601 is slidably connected to the moving frame 602, the inner wall of the moving frame 602 is rotatably connected with pulleys 603, the circular arc surface of the pulley 603 is slidably connected to the circular arc surface of the fixed rod 601, the lower surface of the moving frame 602 is fixedly connected to a connecting rod 613, the surface of the connecting rod 613 is slidably connected to the lower surface of the installation frame 5, and a sliding plate 614 is slidably penetrated through the surface of the connecting rod 613, and the upper end cross-section of the sliding plate 614 is conical, and a plurality of clamping blocks 611 are fixedly connected to the position of the lower surface of the installation frame 5 corresponding to the connecting rod 613, and the cross-section of the plurality of clamping blocks 611 is pointed cone-shaped, and a protective pad 612 is fixedly connected to the surface of the clamping block 611, and the surface of the clamping block 611 is clamped with the upper end conical tooth surface of the sliding plate 614, and the connecting rod 613 The bottom end is fixedly connected with a connecting plate 616, the surface of the connecting rod 613 is sleeved with a spring 618, the two ends of the spring 618 are respectively fixedly connected with the connecting plate 616 and the sliding plate 614, the bottom end of the connecting rod 613 is rotatably connected with a rotating frame 605, the inner wall of the rotating frame 605 is rotatably connected with the hook body 606, the upper surfaces of both sides of the connecting plate 616 are fixedly connected with magnetic blocks 617, the lower surfaces of the sliding plate 614 are fixedly connected with magnetic sheets 615, the arc surface of the pulley 603 is fixedly connected with a plurality of friction pads 604, and the plurality of friction pads 604 are all rubber pads, the upper surface of the hook body 606 is fixedly connected with a fixing frame 607, the surface of the fixing frame 607 is rotatably connected with a rotating frame 608, one side of the rotating frame 608 is threaded with an extrusion rod 609, and the surface of the hook body 606 is provided with a fixing hole 610, and the inner wall of the fixing hole 610 abuts against one end of the extrusion rod 609.
[0044] Reference Figure 8 and Fig. 9As shown, in this embodiment: the auxiliary device 7 includes a docking rod 702, the bottom end of the docking rod 702 is fixedly connected to the upper surface of the mounting frame 5, the lower surface of the mounting column 9 is fixedly connected with an auxiliary rod 701, the arc surface of the auxiliary rod 701 is snap-fitted with the inner wall of the docking rod 702, and both side surfaces of the docking rod 702 are fixedly connected with a connecting plate 710, the cross-section of the connecting plate 710 is "L"-shaped, and a connecting hole 711 is provided on the short arm end surface of the connecting plate 710, and a moving rod 706 is slidably penetrated through the inner wall of the connecting hole 711, and an auxiliary block 707 is fixedly connected to the end of the moving rod 706 close to the docking rod 702, the cross-section of the auxiliary block 707 is arc-shaped, and a tension spring is sleeved on the arc surface of the moving rod 706 708, both ends of the tension spring 708 are fixedly connected to the connecting plate 710 and the auxiliary block 707 respectively, auxiliary holes 705 are provided on both sides of the arc surface of the auxiliary rod 701, the inner wall of the auxiliary hole 705 is plugged into the surface of the auxiliary block 707, and a slide groove 703 is provided on the upper surface of the auxiliary rod 701. The inner wall of the slide groove 703 is slidably connected with a slip ring 704, and the inner wall of the slip ring 704 is threadedly connected to the arc surface of the docking rod 702. Auxiliary plates 709 are fixedly connected on both sides of the arc surface of the moving rod 706, and the surface of the auxiliary plate 709 slides through the inner wall of the connecting hole 711. The auxiliary block 707 is a hard alloy block, and the cross-sectional size of the auxiliary block 707 is adapted to the cross-sectional size of the auxiliary hole 705.
[0045] Reference Fig.10 As shown, in this embodiment: the limiting device 8 includes a fixed frame 81, the inner wall arc surface of the fixed frame 81 is rotatably connected to a rotating plate 83, the cross-section of the rotating plate 83 is "L"-shaped, the upper surface of the short arm end of the rotating plate 83 is fixedly connected to an inlay frame 84, the cross-section of the inlay frame 84 is "U"-shaped, and the cross-sections of both sides of the inlay frame 84 are arc-shaped, and both sides of the inner wall of the inlay frame 84 are fixedly connected with extrusion blocks 85, the cross-section of the extrusion block 85 is semicircular, and the extrusion block 85 is a silicone block, and the bottom surface of the inner wall of the inlay frame 84 is fixedly connected with a fixing ring 86, the cross-section of the fixing ring 86 is arc-shaped, and the cross-section size of the inner wall of the inlay frame 84 is compatible with the cross-section size of the hook body 606, which is characterized in that: both ends of the inner wall of the fixed frame 81 are covered with coil springs 82, and the two ends of the coil spring 82 are respectively fixedly connected to the rotating plate 83 and the fixed frame 81.
[0046] Detailed description of usage: During the foundation pit recharging construction operation, sand wells are used to improve the drainage conditions of the foundation and shorten the drainage path. In this process, the sand bags need to be hoisted into the sand wells with the help of lifting equipment. At this time, the mobile machine 1, the lifting frame 2 and the lifting drive frame 3 can be matched to drive the installation frame 5 at the bottom of the lifting rope 4 to perform lifting and lowering adjustments. First, the position of the hook body 606 on the lower surface of the installation frame 5 is moved and adjusted. First, the sliding plate 614 on the surface of the connecting rod 613 is pulled to separate the upper surface of the sliding plate 614 from the block 611 on the lower surface of the installation frame 5, and then the sliding plate 614 is used with the help of the magnetic sheets 615 on both sides. The magnetic blocks 617 on both sides of the connecting plate 616 at the bottom end of the connecting rod 613 are adsorbed, and then the entire hook body 606 is pulled to the specified position, and then the sliding plate 614 is pulled to engage and limit the block 611. In this process, the position of the sliding plate 614 can be squeezed with the help of the tensile force generated by the spring 618 on the surface of the connecting rod 613, and at the same time, the movable frame 602 at the upper end of the entire connecting rod 613 is allowed to slide along the fixed rod 601 with the help of the pulley 603 for auxiliary operation. At this time, the position of the entire hook body 606 will be moved and adjusted, which is convenient for the hook limiting operation between the entire hook body 606 and the sandbag.
[0047] When the hook body 606 on the surface of the entire installation frame 5 is operated for a long time, the installation frame 5 needs to be replaced and maintained to prevent the installation frame 5 from being damaged due to aging and wear. At this time, the auxiliary rod 701 at the bottom of the installation column 9 can be used to dock and limit the position with the docking rod 702 on the surface of the installation frame 5, and then the moving rods 706 on both sides of the docking rod 702 can be used to drive the auxiliary block 707 to be plugged and limited with the auxiliary holes 705 opened on both sides of the auxiliary rod 701, and then the slip ring 704 is used to threadably dock with the docking rod 702, so as to effectively and conveniently protect the entire installation frame 5 after long-term use.
[0048] During the use of the hook body 606 that is adjusted on the lower surface of the mounting frame, in order to prevent the hook body 606 from shaking as a whole, an auxiliary limiting operation is performed with the help of the rotating plate 83 and the inlay frame 84. The inlay frame 84 on the surface of the short arm end is driven by the rotation of the fixing frame 81 on the surface of the mounting frame 5 to clamp and limit the upper arc surface of the hook body 606. In this process, the torsional force generated by the coil spring 82 can effectively squeeze and limit the rotating plate 83 and the inlay frame 84 when they are clamped, thereby effectively and conveniently protecting and limiting the position of the entire hook body 606.
Claims
1. A foundation pit recharging bagged sand well hanger device and method, comprising a mobile platform (1), Features: A hanging frame (2) is installed on the upper surface of the mobile platform (1), a lifting drive frame (3) is installed on the upper end surface of the hanging frame (2), a hanging rope (4) is installed inside the lifting drive frame (3), the bottom end of the hanging rope (4) is fixedly connected to a mounting column (9), a mounting frame (5) is installed on the lower surface of the mounting column (9), and an adjustment device (6) is provided on all four sides of the mounting frame (5), the adjustment device (6) comprises a fixing rod (601), the two ends of the fixing rod (601) are fixedly connected to the inner wall of the side of the mounting frame (5), the circular arc surface of the fixing rod (601) is slidably connected to the mobile frame (602), the inner walls of the mobile frame (602) are rotatably connected to pulleys (603), the circular arc surface of the pulley (603) is slidably connected to the circular arc surface of the fixing rod (601), and the lower surface of the mobile frame (602) is fixedly connected to a connecting rod (613), the surface of the connecting rod (613) is connected to the mounting rod (613), and the surface of the connecting rod (613) is connected to the mounting rod (613). The lower surface of the frame (5) is slidably connected, the surface of the connecting rod (613) is slidably penetrated by a sliding plate (614), the upper end cross section of the sliding plate (614) is in the shape of a conical tooth, and the lower surface of the installation frame (5) is fixedly connected with a plurality of clamping blocks (611) at positions corresponding to the connecting rod (613), the cross sections of the plurality of clamping blocks (611) are in the shape of a pointed cone, and the surface of the clamping blocks (611) is fixedly connected with a protective pad (612), and the surface of the clamping blocks (611) is in the shape of a conical tooth. The upper conical tooth surfaces of the movable plate (614) are engaged with each other, the bottom end of the connecting rod (613) is fixedly connected to the connecting plate (616), the surface of the connecting rod (613) is sleeved with a spring (618), the two ends of the spring (618) are respectively fixedly connected to the connecting plate (616) and the sliding plate (614), the bottom end of the connecting rod (613) is rotatably connected to the rotating frame (605), and the inner wall of the rotating frame (605) is rotatably connected to the hook body (606).
2. A foundation pit recharging bagged sand well hanger device and method according to claim 1, Features: Both upper surfaces of the connection plate (616) are fixedly connected to magnetic blocks (617), and both lower surfaces of the sliding plate (614) are fixedly connected to magnetic sheets (615).
3. A foundation pit recharging bagged sand well hanger device and method according to claim 1, Features: A plurality of friction pads (604) are fixedly connected to the arc surface of the pulley (603), and the plurality of friction pads (604) are all rubber pads.
4. A foundation pit recharging bagged sand well hanger device and method according to claim 1, Features: The upper surface of the hook body (606) is fixedly connected to a fixing frame (607), the surface of the fixing frame (607) is rotatably connected to a rotating frame (608), a screw rod (609) is threadedly passed through one side of the rotating frame (608), and a fixing hole (610) is opened on the surface of the hook body (606), and the inner wall of the fixing hole (610) is in contact with one end of the squeezing rod (609).
5. A foundation pit recharging bagged sand well hanger device and method according to claim 1, Features: An auxiliary device (7) is provided at a position on the upper surface of the installation frame (5) corresponding to the installation column (9), and the auxiliary device (7) comprises a docking rod (702), the bottom end of the docking rod (702) is fixedly connected to the upper surface of the installation frame (5), and the lower surface of the installation column (9) is fixedly connected to an auxiliary rod (701), and the arc surface of the auxiliary rod (701) is engaged with the inner wall of the docking rod (702), and the two side surfaces of the docking rod (702) are fixedly connected to a connecting plate (710), and the cross section of the connecting plate (710) is "L"-shaped, and a connecting hole (711) is provided on the short arm end surface of the connecting plate (710), and a moving rod (706) is slidably penetrated through the inner wall of the connecting hole (711), and the moving rod (706) An auxiliary block (707) is fixedly connected to one end of the movable rod (706) close to the docking rod (702), and the cross-section of the auxiliary block (707) is arc-shaped. The arc surface of the movable rod (706) is sleeved with a tension spring (708), and the two ends of the tension spring (708) are respectively fixedly connected to the connecting plate (710) and the auxiliary block (707). Auxiliary holes (705) are provided on both sides of the arc surface of the auxiliary rod (701), and the inner wall of the auxiliary hole (705) is plugged into the surface of the auxiliary block (707). A sliding groove (703) is provided on the upper surface of the auxiliary rod (701), and the inner wall of the sliding groove (703) is slidably connected with a slip ring (704), and the inner wall of the slip ring (704) is threadedly connected to the arc surface of the docking rod (702).
6. A foundation pit recharging bagged sand well hanger device and method according to claim 5, Features: Auxiliary plates (709) are fixedly connected to both sides of the arc surface of the movable rod (706), and the surface of the auxiliary plate (709) slides through the inner wall of the connecting hole (711).
7. A foundation pit recharging bagged sand well hanger device and method according to claim 5, Features: The auxiliary block (707) is a hard alloy block, and the cross-sectional dimensions of the auxiliary block (707) are compatible with the cross-sectional dimensions of the auxiliary hole (705).
8. A foundation pit recharging bagged sand well hanger device and method according to claim 1, Features: The surrounding surfaces of the installation frame (5) are provided with a limiting device (8), the limiting device (8) comprising a fixing frame (81), the inner wall arc surface of the fixing frame (81) being rotatably connected to a rotating plate (83), the cross section of the rotating plate (83) being in an "L" shape, the upper surface of the short arm end of the rotating plate (83) being fixedly connected to an inlay frame (84), the cross section of the inlay frame (84) being in a "U" shape, the cross sections of both sides of the inlay frame (84) being in an arc shape, the inner wall of the inlay frame (84) being fixedly connected to an extrusion block (85), the cross section of the extrusion block (85) being in a semicircular shape, the extrusion block (85) being a silica gel block, the inner wall bottom surface of the inlay frame (84) being fixedly connected to a fixing ring (86), the cross section of the fixing ring (86) being in an arc shape, the cross section size of the inner wall of the inlay frame (84) being compatible with the cross section size of the hook body (606).
9. A foundation pit recharging bagged sand well hanger device and method according to claim 8, Features: Both ends of the inner wall of the fixing frame (81) are sleeved with coil springs (82), and both ends of the coil spring (82) are fixedly connected to the rotating plate (83) and the fixing frame (81) respectively.
10. A method for constructing a foundation pit recharging bagged sand well, using a foundation pit recharging bagged sand well hanger device as claimed in any one of claims 1 to 9, It is characterized in that The following steps are involved: S1. Leveling the ground: Clean and level the original ground, remove all the silt, tree roots, grass, humus, etc. on the original ground within the roadbed range, and level the site for the bagged sand well construction; Spread the lower sand cushion: Use qualified sand to lay the sand cushion on the built road arch. The paving should be done evenly and flatly to form a two-way cross slope that meets the design requirements, and use a roller to statically press it to the required density; Machine positioning: During positioning, ensure that the center of the casing and the ground pile are at the same point, and the pile position deviation does not exceed 100mm; start the hydraulic system to control the verticality of the guide frame and control it within 1.5%; Driving the casing: Select the casing diameter according to the diameter of the sand well. The diameter of the steel pipe used is slightly larger than the diameter of the sand well, but not too large. Before driving, use paint to mark the scale line for controlling the elevation on the casing; Sinking sandbags: Use permeable geotextile elongated sandbags as vertical drainage channels and sink them to the designed depth through casing; Pull out the casing: slowly pull out the casing, leaving the sand bag, and the bagged sand well is formed; Machine tool shifting: after completing a process cycle, move the machine tool to the next construction location; Bury the sand bag head: bury the top of the sand bag in the sand cushion layer to ensure that the sand bag and the sand cushion layer are firmly connected; Laying the upper sand cushion: Setting the sand cushion on the top of the bagged sand well as a horizontal drainage channel to ensure the uniformity and density of the sand cushion; S2. Key points of construction method: on the compacted sand cushion layer, accurately lay out the position and spacing of the sand well plan layout in accordance with the design drawing, mark the pile position, and mark the sand well position with bamboo sticks. Move the sand well pile driver according to the laid out position to align the casing with the sand well position, adjust the verticality of the guide frame, and clean the pile tip. During construction, a dedicated person should be assigned to record the length, inclination, sand well diameter, sand filling rate and other construction data of each bagged sand well. The steel casing is driven into the soil by a vibrating hammer. When sinking the pile, the verticality of the steel casing should be controlled by a theodolite or plumb bob, and the driving depth should be controlled by the scale on the steel casing to ensure that the bottom elevation of the well meets the design requirements. The sand bag is sunk into the casing using the frame roller and manual transportation. When the sand bag is completely sunk into the casing, it is The steel casing can be pulled out, and the machine tool can be moved to the next pile position. The soil and other debris on the head of the sand bag can be manually removed. After the sand well construction is completed, the machine tool will enter the next cycle. The construction order is to inject from one side to the other side horizontally, and move to the second row after one row is completed. In order to ensure the amount of sand filled and improve the sand filling efficiency, a mechanical sand filling method must be adopted. The height of the sand filling machine should be slightly higher than half the length of the sand well, and two outlets should be left on the lower side of the sand filling bucket. A vibrator is attached to the bucket wall. When filling the sand, first connect the two ends of the sand bag to the outlet of the sand bucket and tie it tightly, then put the sand that meets the requirements into the sand bucket, lift the hopper, and start the vibrator to make the sand in the bucket flow into the sand bag. Lift the sand bucket until the entire sand bag is suspended in the air, vibrate to fill the sand bag with sand, then put down the hopper, untie the sand bag, manually fill the bag with sand and shake it, and then tie the bag mouth. S3. Construction precautions: When laying out bagged sand wells, arrange the bagged sand wells (S is the distance between the sand wells) according to the horizontal S and vertical 0.866S of the route, and pay attention to arranging them in an equilateral triangle; the design length of the bagged sand wells in the drawings is determined according to the existing geological data, some are average values, and some are larger values. There may be a certain deviation from the design length during specific construction. During construction, the length of the bagged sand wells should be adjusted in time according to the injection situation; the construction of bagged sand wells should be carried out after laying the first layer of sand cushion and before laying geogrids.