Vegetation-growing concrete slope protection structure suitable for high and steep slope and construction method of vegetation-growing concrete slope protection structure
By using the combined structure of prefabricated concrete bricks, protective nets and drainage ditches on high steep slopes, combined with specific construction methods, the problem of planting concrete slope protection structure on high steep slopes is solved, and the slope is realized Ecological greening and stability reduce construction difficulty and cost.
Patent Information
- Application Number
- CN202411326454.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-23
AI Technical Summary
The existing planted concrete slope protection structure of high steep slopes is not conducive to plant growth and development, and the construction technology is limited and the adaptability to the environment of high steep slopes is insufficient, resulting in low construction safety and efficiency in harsh environments, and it is difficult to maintain soil and water and long-term maintenance. accomplish.
The structure of prefabricated concrete bricks combined with protective nets and drainage ditches is adopted. The prefabricated concrete bricks are equipped with void structures and nutrients. They are reinforced by anchoring devices and support mesh, and steel rope mesh is laid to enhance stability, and through specific construction methods For example, layered horizontally and sprayed seeds, combined with moisture-retaining materials to promote plant growth.
Provides a good base to support plant growth, enhances the adhesion and stability of slopes, realizes ecological re-greening and curing of high steep slopes, reduces construction difficulty and cost, improves construction safety and efficiency, and is suitable for high-quality Ecological restoration of steep slopes.
Smart Images

Figure CN119061914A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high and steep slope greening and protection, and in particular to a vegetation concrete slope protection structure suitable for high and steep slopes and a construction method thereof. Background Art
[0002] In the field of slope protection, ecological restoration of steep slopes has always been a key and difficult issue in engineering practice. Traditional slope protection methods, such as concrete retaining walls, anti-slide piles, and shotcrete support, although they provide stability to a certain extent, often ignore the importance of ecological restoration and environmental protection. These traditional slope protection methods sometimes even damage the ecological environment of the slope. In recent years, with people's increasing attention to the ecological environment and sustainable development, traditional slope protection methods can no longer meet the needs of modern society.
[0003] Vegetation concrete slope protection technology is a slope protection method that combines bioengineering and geological disaster control engineering. It promotes plant germination and growth by adding plant seeds, organic matter and other nutrients to concrete, thereby achieving a perfect combination of slope protection and ecological restoration. It is an eco-friendly and sustainable slope protection technology. At present, the existing vegetated concrete slope protection technology has been used to a certain extent on slopes with gentle or medium slopes, but it is still less used on steep slopes. The main reason is the limitations of construction technology and the lack of adaptability to the steep slope environment. For example, how to ensure the adhesion and stability of concrete on steep slopes, how to promote plant germination and growth while ensuring structural strength, and how to ensure the safety and efficiency of construction in harsh construction environments are all problems that need to be solved. In addition, the vegetated concrete slope protection structure of steep slopes also needs to take into account factors such as soil and water conservation, environmental erosion and long-term maintenance.
[0004] Therefore, the existing vegetation concrete slope protection structure of high and steep slopes is not conducive to the growth and development of plants. Summary of the invention
[0005] The main purpose of the present invention is to provide a vegetation concrete slope protection structure suitable for high and steep slopes and a construction method thereof, aiming to solve the problem that the existing vegetation concrete slope protection structure for high and steep slopes is not conducive to plant growth and development.
[0006] To achieve the above object, the present invention proposes a vegetation concrete slope protection structure suitable for high and steep slopes, comprising:
[0007] The vegetation concrete layer includes precast vegetation concrete bricks, which are laid on the surface of the high and steep slope; the precast vegetation concrete bricks are provided with a gap structure for planting slope plants;
[0008] A protective net, comprising an anchoring device, a supporting net, a steel rope net and a suture rope, wherein the anchoring device comprises an anchor rod and an exposed ring sleeve of the anchor rod; the anchor rod is anchored in the high and steep slope to fix the supporting net; the supporting net comprises a transverse supporting rope and a longitudinal supporting rope, the transverse supporting rope and the longitudinal supporting rope are respectively passed through the exposed ring sleeve of the anchor rod and stretched into a mesh structure to support the steel rope net; the supporting net and the steel rope net are fixedly connected by the suture rope; the steel rope net is laid on the surface of the vegetation concrete layer to reinforce the vegetation concrete layer; and,
[0009] A drainage ditch is arranged at the bottom of the high and steep slope and is used for intercepting and draining water and supporting the vegetation concrete layer.
[0010] In one embodiment, the protective net includes a rope clip for fixing the supporting net to the exposed ring of the anchor rod.
[0011] In one embodiment, the vegetation concrete layer includes a precast brick unit formed by paving the vegetation concrete precast bricks, and a groove is provided between the precast brick unit and adjacent precast brick units, and the groove is used to install the anchor rod and the support net.
[0012] In one embodiment, a pre-buried pipe is provided in the precast vegetation concrete brick, and a steel wire rope is passed through the pre-buried pipe. The steel wire rope is used to pass through the precast vegetation concrete brick and be connected to the support net.
[0013] In one embodiment, at least one embedded pipe is disposed in each of the precast vegetation concrete bricks.
[0014] In one embodiment, the precast vegetation concrete brick is a cube or a cuboid, and the length of the precast vegetation concrete brick is 30 to 45 cm, the width is 30 to 45 cm, and the height is 10 to 15 cm.
[0015] In one embodiment, the precast green concrete bricks include cement particles, a viscosity enhancer, fibers, and nutrients.
[0016] In one embodiment, the cement particles have a diameter of 1 to 2 cm; and / or,
[0017] The cement particles are prepared from water and cement in a mass ratio of (0.25-0.27):1.
[0018] In one embodiment, the mass ratio of the cement particles, the viscosity enhancer, the fiber and the nutrient is (70% to 75%): (0.5% to 1%): (1.5% to 2%): (25% to 30%); and / or,
[0019] The tackifier includes any one of mortar glue, polyacrylamide, and hydroxyethyl cellulose ether; and / or,
[0020] The fiber includes any one of polypropylene fiber, wood fiber and glass fiber.
[0021] The present invention proposes a construction method for a vegetation concrete slope protection structure suitable for high and steep slopes, comprising the following steps:
[0022] (1) Construction preparation: Collect the survey data, design data, climate, surrounding spoil conditions and transportation conditions of the slope;
[0023] (2) Slope cleaning: according to the slope shape, remove the dangerous rocks, floating stones, floating roots of plants, weeds and garbage on the slope, and perform slope shaping;
[0024] (3) Preparation of prefabricated biomass concrete bricks: Pour cement and viscosity enhancer into a mixer and mix them, add water during the mixing process, granulate the mixed cement mixture, and after granulation, put cement particles, fibers and nutrients into a mold to form them;
[0025] (4) Anchor bolt installation: Drill holes according to design standards, insert anchor bolts after the holes are formed, and fix the anchor bolts;
[0026] (5) Digging and construction of bottom beam drainage ditch;
[0027] (6) Support net installation: Install the horizontal and vertical support ropes, tighten them and use rope clips to fix them to the exposed ring sleeves of the anchor rods;
[0028] (7) Laying of precast concrete bricks: Lay and install precast concrete bricks in a horizontal layered manner from bottom to top, and use steel wire ropes to connect and fix the precast concrete bricks to the support ropes;
[0029] (8) Laying the steel rope net: Lay the steel rope net on the vegetation concrete precast brick paving layer and fix the steel rope net on the supporting net with sewing rope;
[0030] (9) Plant sowing: Mix seeds, pre-cultivation soil, water retaining agent, adhesive and water, and then use a sprayer to spray. After sowing, cover the surface of the protective net with a layer of moisture retaining material.
[0031] (10) Maintenance management and growth monitoring.
[0032] The technical solution of the present invention provides a vegetation concrete slope protection structure suitable for high and steep slopes and a construction method thereof, wherein the vegetation concrete slope protection structure suitable for high and steep slopes includes a vegetation concrete layer, a protective net and a drainage ditch. Precast vegetation concrete bricks are used to replace the conventional vegetation concrete spraying process. The precast vegetation concrete bricks provide a good base for the growth and development of plant seeds, are also convenient for factory prefabrication and standardized production, reduce the construction difficulty, save corresponding time and labor costs, and solve the problem that vegetation concrete is easily hardened when directly sprayed on the slope surface, which is not conducive to plant growth and development. Therefore, the slope protection structure provided by the technical solution of the present invention can not only stabilize high and steep slopes and prevent soil erosion, but also improve the ecological environment of the slope through the growth of plants, achieving the dual effects of high and steep slope solidification and ecological restoration. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0034] Figure 1 It is a structural schematic diagram of a slope protection structure in an embodiment of a vegetation concrete slope protection structure applicable to a high and steep slope of the present invention;
[0035] Figure 2 It is a schematic diagram of the structure of the protection net in one embodiment of the vegetation concrete slope protection structure applicable to high and steep slopes of the present invention;
[0036] Figure 3 for Figure 1 A local enlarged view of point A in FIG.
[0037] Figure 4 for Figure 1 A local enlarged view of point C in FIG.
[0038] Figure 5 This is a schematic diagram of the installation of a support net in an embodiment of a vegetation concrete slope protection structure suitable for high and steep slopes of the present invention;
[0039] Figure 6 for Figure 1 The front view at B in FIG.
[0040] Figure 7 This is a schematic structural diagram of the embedded pipe in an embodiment of the vegetation concrete slope protection structure applicable to high and steep slopes of the present invention;
[0041] Figure 8It is a schematic diagram of the structure of the steel wire rope in one embodiment of the vegetation concrete slope protection structure applicable to high and steep slopes of the present invention;
[0042] Fig. 9 A physical picture of the prefabricated vegetated concrete bricks in one embodiment of the vegetated concrete slope protection structure suitable for high and steep slopes of the present invention;
[0043] Fig.10 The figure is a schematic diagram of the installation of a steel rope net in one embodiment of the vegetation concrete slope protection structure suitable for high and steep slopes of the present invention.
[0044] Description of Figure Numbers:
[0045] 100. Vegetated concrete slope protection structure suitable for high and steep slopes; 1. Vegetated concrete layer; 11. Vegetated concrete precast bricks; 12. Embedded pipes; 13. Steel wire rope; 2. Protective net; 21. Anchor device; 22. Support net; 23. Steel rope net; 24. Suture rope; 25. Rope clamp; 3. Drainage ditch.
[0046] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0049] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0050] Vegetated concrete slope protection technology is a slope protection method that combines bioengineering and geological disaster control engineering. It promotes plant germination and growth by adding plant seeds, organic matter and other nutrients to concrete, thereby achieving a perfect combination of slope protection and ecological restoration. It is an eco-friendly and sustainable slope protection technology.
[0051] At present, the existing vegetated concrete slope protection technology has been applied to gentle or medium slopes, but it is still rarely used on steep slopes. The particularity of steep slopes lies in their large slope, complex geological conditions, fragile ecological environment and high construction difficulty. These characteristics lead to more stringent requirements on the design and construction methods of vegetated concrete slope protection structures. Therefore, it is still necessary to develop a vegetated concrete slope protection structure and construction method suitable for steep slopes.
[0052] The invention provides a vegetation concrete slope protection structure suitable for high and steep slopes.
[0053] See also Figures 1 to 3 The vegetation concrete slope protection structure 100 suitable for high and steep slopes includes:
[0054] The vegetation concrete layer 1 comprises a vegetation concrete precast brick 11, wherein the vegetation concrete precast brick 11 is laid on the surface of the high and steep slope; the vegetation concrete precast brick 11 is provided with a gap structure for planting slope plants;
[0055] The protective net 2 comprises an anchoring device 21, a supporting net 22, a steel rope net 23 and a suture rope 24, wherein the anchoring device 21 comprises an anchor rod and an exposed ring sleeve of the anchor rod; the anchor rod is anchored in the high and steep slope to fix the supporting net 22; the supporting net 22 comprises a transverse supporting rope and a longitudinal supporting rope, the transverse supporting rope and the longitudinal supporting rope are respectively passed through the exposed ring sleeve of the anchor rod and stretched into a mesh structure to support the steel rope net 23; the supporting net 22 and the steel rope net 23 are fixedly connected by the suture rope 24; the steel rope net 23 is laid on the surface of the vegetation concrete layer 1 to reinforce the vegetation concrete layer 1; and,
[0056] The drainage ditch 3 is arranged at the bottom of the high and steep slope, and is used for intercepting and draining water and supporting the vegetation concrete layer 1 .
[0057] The technical solution of the present invention provides a vegetated concrete slope protection structure 100 suitable for high and steep slopes, which is provided with a vegetated concrete layer 1, a protection net 2 and a drainage ditch 3. The vegetation concrete layer 1 is paved with vegetation concrete precast bricks 11. Since the vegetation concrete precast bricks 11 are provided with a void structure inside or on the surface, after spraying seeds, the seeds can enter the gaps, voids, micropores in the main structure of the vegetation concrete precast bricks 11, the gaps between bricks, and adhere to the rough and uneven brick surfaces. In addition, the vegetation concrete precast bricks 11 also contain nutrient ingredients. Therefore, the vegetation concrete precast bricks 11 provide a good base for the growth and development of plant seeds, which is beneficial to promoting the germination and growth of plants; the protective net 2 provides support and protection, which can enhance the integrity of the vegetation concrete layer 1 and the slope, prevent the vegetation concrete layer 1 from falling off the slope, and avoid slope collapse, weathering and peeling. The drainage ditch 3 is set at the bottom of the slope. On the one hand, it serves as a protective bottom beam to support the vegetation concrete layer 1, and on the other hand, it collects and promptly removes the water flow on the slope surface, thereby playing a role in intercepting and draining water. The vegetated concrete slope protection structure 100 provided by the present invention has good adhesion, stability and structural strength. It can not only stabilize the high and steep slopes and prevent soil erosion, but also improve the ecological environment of the slopes through the growth of plants, achieving the dual effects of high and steep slope solidification and ecological restoration.
[0058] In addition, the use of prefabricated vegetation concrete bricks 11 instead of conventional vegetation concrete spraying processes facilitates factory prefabrication and standardized production, reduces construction difficulty, saves corresponding time and labor costs, and avoids the problem of vegetation concrete being easily hardened when directly sprayed on the slope surface. The size and shape of the prefabricated vegetation concrete bricks 11 in the technical solution of the present invention can be designed as needed to adapt to different high and steep slope conditions, reducing the skill requirements for construction personnel and reducing construction risks.
[0059] It should be noted that after the anchor rod is installed, the support net 22 needs to be pre-stressed for the first time when it is fixed to the anchor rod; a second pre-stressing is required when the steel rope net 23 and the support net 22 are sutured and connected with the suture rope 24. This pre-stressing process enables the system to apply a certain normal pre-tightening pressure to the slope surface to enhance stability and strength.
[0060] See also Figure 4 In the embodiment of the present invention, the drainage ditch 3 adopts a reinforced concrete structure and is set at the foot of the slope of the vegetation concrete layer. The buried depth is not less than 30cm. The top surface of the drainage ditch 3 is not less than 5cm higher than the ground in front of the ditch. The foundation soil at the bottom of the ditch should be compacted to meet the bearing capacity requirements. A trapezoidal cross-section is adopted, the ditch wall on the front side is upright, and the ditch wall on the back side is set according to the slope of the slope, so that the vegetation concrete prefabricated brick 11 can be directly located on the drainage ditch 3. The ditch width and ditch depth are determined according to the slope catchment area and flow rate, and are not less than 200mm. The concrete strength grade is 30, and the steel bar adopts Φ10 threaded steel.
[0061] See also Figure 5 In an embodiment of the present invention, the protective net 2 includes a rope clip 25 for fixing the support net 22 to the exposed ring sleeve of the anchor rod. The support net 22 is inserted into the exposed ring sleeve of the anchor rod and fixed by a plurality of rope clips 25. The technical solution of the present invention does not impose specific restrictions on the specifications and number of the rope clips 25, as long as the support net 22 can be fixed to the exposed ring sleeve of the anchor rod. In one embodiment of the present invention, a Φ16 DIN741 steel rope buckle is selected as the rope clip, and rope clips are respectively set at each anchor rod and the end of the support rope.
[0062] See also Figure 2 In an embodiment of the present invention, the vegetation concrete layer 1 comprises a precast brick unit formed by laying the vegetation concrete precast bricks 11, and a groove is provided between the precast brick unit and the adjacent precast brick unit, and the groove is used to install the anchor rod and the support net 22. Figure 3 Before the positioning drilling of the slope, the slope is reserved with anchor hole grooves, and the anchor rods are inserted into the slope through the anchor hole grooves for fixing. The size of the prefabricated brick unit is set according to the slope conditions, taking into account the slope strength and planting density. Considering that the position of installing the anchor rods and the support net 22 is not conducive to plant growth, grooves are set between adjacent prefabricated brick units for installing the anchor rods and the support net.
[0063] See also Figures 6 to 8In the embodiment of the present invention, the embedded pipe 12 is provided in the precast concrete brick 11, and the embedded pipe 12 is provided with a steel wire 13, and the steel wire 13 is used to pass through the precast concrete brick 11 and connect to the support net 22. The embedded pipe 12 and the steel wire 13 are provided in the precast concrete brick 11, and the steel wire 13 can fix the precast concrete brick 11 through the embedded pipe 12, thereby improving the overall stability of the slope protection structure and preventing sudden and overall collapse.
[0064] See also Figure 7 and Figure 8 In an embodiment of the present invention, at least one embedded pipe 12 is provided in each of the precast vegetation concrete bricks 11. It should be noted that the embedded pipe 12 can be provided horizontally, vertically, or both horizontally and vertically. The number of embedded pipes 12 can be one or more, all of which fall within the protection scope of the present invention. As the number of embedded pipes increases, the construction difficulty and cost increase accordingly. In one embodiment of the present invention, considering the strength, structural stability and cost comprehensively, one horizontal embedded pipe 12 is provided in each precast vegetation concrete brick 11.
[0065] In an embodiment of the present invention, the vegetation concrete precast brick 11 is a cube or a cuboid, and the length of the vegetation concrete precast brick 11 is 30 to 45 cm, the width is 30 to 45 cm, and the height is 10 to 15 cm. The design of the length, width and height dimensions is comprehensively considered to ensure the overall stability after the slope protection (no local bricks will protrude and fall), local stability (bricks will not be broken and cracked due to pressure), easy transportation, and easy construction (easy to bury the reserved holes inside). If the size is too thick and too large, the weight of the brick body is large, which will cause the local bricks, especially those at the bottom, to be crushed or damaged; if the size is too thin and too small, it is not convenient to lay on the slope surface, and it is not convenient for plants to take root and grow. During construction, for slopes with steeper slopes (more than 65 degrees), the vegetation concrete precast bricks 11 can be appropriately thickened and the single area can be reduced; for slopes with gentler slopes (less than 65 degrees), the brick body can be appropriately thinned and the area of a single plane can be increased. In one embodiment of the present invention, the vegetation concrete prefabricated brick 11 is selected to be prepared into a cuboid of 300 mm×300 mm×100 mm.
[0066] In an embodiment of the present invention, the vegetation concrete precast bricks include cement particles, thickeners, fibers and nutrients. Adding a certain amount of thickeners to cement mortar can improve the viscosity and water retention of cement slurry; adding fibers can enhance the strength and durability of vegetation concrete precast bricks; the nutrients are mainly inorganic materials, with organic matter that is beneficial to plant growth, rich in nutrients such as nitrogen, phosphorus, and potassium, and then quickly solidified to form a granular material with a particle size of 1-2 cm and a honeycomb pore structure inside, which can slowly release nutrients within 5 years. Since the material strength of the nutrients is relatively high, it is resistant to long-term immersion and scouring by water flow, and the material itself contains nutrients for plant growth, it can also store sufficient water and nutrients, and the structure is porous, so it is conducive to the penetration of plant roots to absorb nutrients and water. The performance parameters of the nutrients are shown in Table 1 below.
[0067] Table 1 Performance parameters of nutrients
[0068]
[0069] In an embodiment of the present invention, the diameter of the cement particles is 1 to 2 cm. The particle size will affect the porosity, and thus affect the space for plant growth and rooting; secondly, the particle size will affect the compressive strength, flexural strength and durability of the brick. During construction, the particle size of the cement particles will be appropriately reduced for slopes with steeper slopes (over 65 degrees), and the particle size of the cement particles will be appropriately increased for slopes with gentler slopes (less than 65 degrees). In one embodiment of the present invention, when preparing precast vegetation concrete bricks, the size of the cement particles is set to 1.5 cm.
[0070] In an embodiment of the present invention, the cement particles are prepared from water and cement in a mass ratio of (0.25-0.27):1. Setting the water-cement ratio within the above range is conducive to the obtained cement particles having higher strength, density and durability. The cement is selected from Ezhou Junfeng brand PO42.5 ordinary Portland cement, and its chemical composition and physical and mechanical properties are shown in Tables 2 and 3. The water is ordinary tap water.
[0071] Table 2 Chemical composition of P.O.42.5 cement
[0072] Inspection indicators <![CDATA[SiO2 / %]]> CaO / % Loss on ignition / % <![CDATA[Fe2O3 / %]]> <![CDATA[Al2O3 / %]]> MgO / % <![CDATA[SO3 / %]]> other / % Test results 20.51 57.72 1.05 3.92 5.9 1.4 2.54 6.92
[0073] Table 3 Physical and mechanical properties of P.O.42.5 cement
[0074]
[0075] In an embodiment of the present invention, the mass ratio of the cement particles, the viscosity enhancer, the fiber and the nutrient agent is (70% to 75%): (0.5% to 1%): (1.5% to 2%): (25% to 30%). By setting the mass ratio of the cement particles, the viscosity enhancer, the fiber and the nutrient agent within the above range, the obtained vegetation concrete prefabricated bricks can have good water retention performance, porosity and relatively low acid-base environment under the premise of meeting the strength requirements and durability requirements of the bricks for slope protection and greening on the slope surface, and can also provide nutrients for plants for a long time and provide a suitable growth environment for plants.
[0076] In an embodiment of the present invention, the tackifier includes any one of mortar glue, polyacrylamide, and hydroxyethyl cellulose ether. In an embodiment of the present invention, the tackifier is a strong mortar glue produced by Guangdong Desini Building Materials Co., Ltd.
[0077] In an embodiment of the present invention, the fiber includes any one of polypropylene fiber, wood fiber, and glass fiber. In one embodiment of the present invention, the fiber is a polypropylene fiber with a length of 20 mm and a diameter of 1.5 mm produced by Changsha Ningxiang, and the performance parameters are shown in Table 4 below.
[0078] Table 4 Performance parameters of polypropylene fiber
[0079] Inspection indicators L / mm d / m <![CDATA[ρ / g·cm -3 ]]> <![CDATA[f t / MPa]]> E / GPa T 10、16、20 0.15 0.91 750 8 P 40 0.6 0.91 650 7
[0080] The present invention proposes a construction method for a vegetation concrete slope protection structure suitable for high and steep slopes, comprising the following steps:
[0081] (1) Construction preparation: Collect the survey data, design data, climate, surrounding spoil conditions and transportation conditions of the slope;
[0082] (2) Slope cleaning: according to the slope shape, remove the dangerous rocks, floating stones, floating roots of plants, weeds and garbage on the slope, and perform slope shaping;
[0083] (3) Preparation of prefabricated biomass concrete bricks: Pour cement and viscosity enhancer into a mixer and mix them, add water during the mixing process, granulate the mixed cement mixture, and after granulation, put cement particles, fibers and nutrients into a mold to form them;
[0084] (4) Anchor bolt installation: Drill holes according to design standards, insert anchor bolts after the holes are formed, and fix the anchor bolts;
[0085] (5) Digging and construction of bottom beam drainage ditch;
[0086] (6) Support net installation: Install the horizontal and vertical support ropes, tighten them and use rope clips to fix them to the exposed ring sleeves of the anchor rods;
[0087] (7) Laying of precast concrete bricks: Lay and install precast concrete bricks in a horizontal layered manner from bottom to top, and use steel wire ropes to connect and fix the precast concrete bricks to the support ropes;
[0088] (8) Laying the steel rope net: Lay the steel rope net on the vegetation concrete precast brick paving layer and fix the steel rope net on the supporting net with sewing rope;
[0089] (9) Plant sowing: Mix seeds, pre-cultivation soil, water retaining agent, adhesive and water, and then use a sprayer to spray. After sowing, cover the surface of the protective net with a layer of moisture retaining material.
[0090] (10) Maintenance management and growth monitoring.
[0091] The construction method provided by the technical solution of the present invention does not spray the vegetation concrete on the entire steep slope surface, but uses the vegetation concrete prefabricated bricks 11 for paving, which is convenient for factory prefabrication and standardized production, reduces the construction difficulty, saves the corresponding time and labor costs, and avoids the problem of easy hardening of the vegetation concrete directly sprayed on the slope surface. In addition, since the size and shape of the vegetation concrete prefabricated bricks 11 in the technical solution of the present invention can be designed according to the needs of different steep slopes to adapt to different steep slope conditions, it has a wide range of applications, reduces the skill requirements for construction personnel, and also reduces construction risks.
[0092] It should be noted that when executing step (9), the sowing amount is first calculated based on the expected number of surviving plants per square meter, seed purity, germination rate, sowing loss rate, etc., and then the idea of combining grass and shrubs is adopted to reasonably deploy vegetation density. The sowing varieties include blue mountain tall fescue, alkali grass, bermudagrass, dwarf ophiopogon, and locust. After sowing, a layer of non-woven fabric or other moisture-retaining material is covered on the surface of the active protection net for sun protection and moisture retention, which is conducive to creating an environment for rapid seed germination.
[0093] It should be noted that when executing step (10), the amount of water used for the water spraying maintenance is adjusted according to the watering method. Usually, the amount of water used for a single brick to be thoroughly watered at one time is about 1.5L. If micro-sprinkler irrigation or drip irrigation with a smaller irrigation water loss coefficient is used, the amount can be appropriately reduced. Whether maintenance is needed is to keep the vegetation concrete precast bricks 11 moist during the survival period. The amount of watering during the growth period and the maintenance period is based on keeping the plants from wilting. The survival period is generally 15-20 days, and the growth period is limited to the initial flattening of the steep slopes by plants (about 60 days).
[0094] In an embodiment of the present invention, the growth monitoring step includes observing plant growth, regularly counting germination rate, seedling height, root length and dispersion, vegetation uniformity, and vegetation coverage, and replanting or replanting based on statistically evaluated survival rate and coverage rate.
[0095] In one embodiment of the present invention, the construction method of the vegetation concrete slope protection structure 100 suitable for high and steep slopes comprises the following specific steps:
[0096] (1) Construction preparation: Before construction, collect the survey data, design data, climate, surrounding waste soil conditions, and transportation conditions of the slope; make good construction organization design and improve various emergency plans;
[0097] (2) Slope cleaning: According to the slope shape, use manual and mechanical methods to remove dangerous rocks, floating stones, floating plant roots, weeds and garbage on the slope, and shape the slope to make it smooth and free of debris;
[0098] (3) Preparation of precast concrete bricks 11: Select a water-cement ratio of 0.27, a viscosity enhancer dosage of 1.5%, a polypropylene fiber dosage of 0.13%, a nutrient dosage of 40%, and cement particles of 1.5 cm as the basic parameters for the production of precast concrete bricks 11. The mold uses a wooden mold of 300mm×300mm×100mm. Put 5500g of cement and 100g of viscosity enhancer into a cement mixer and mix for 120s. Add 1500g of water during the mixing process, and granulate the mixed cement mixture. After granulation, put 200g of polypropylene fiber and 2500g of nutrient agent into the mold to form; after demolding the precast concrete bricks 11, use artificial sprinkling to carry out post-maintenance of the precast concrete bricks 11;
[0099] (4) Anchor installation: First, after measuring the anchor hole and positioning it, a down-the-hole drill is used to drill the hole. The diameter of the anchor hole is 10 cm, the depth is 2.5 m to 3 m, the inclination angle of the anchor to the horizontal plane is 20° to 30°, and the spacing is 2m*2m. A single glass fiber reinforced plastic hollow grouting anchor is used. Secondly, after the anchor hole is drilled and cleaned, the anchor is installed, and a green and environmentally friendly anchoring agent (polyurethane-water glass anchoring agent) is injected from the bottom of the hole until thick grout overflows from the hole mouth. After the grouting is completed, the anchor is not knocked or hit within 24 hours. After the grouting reaches the strength requirement, a pull-out test is carried out.
[0100] (5) Excavation of drainage ditch 3: Mechanical excavation is used to dig the foundation trench of the bottom beam drainage ditch. After the foundation trench is formed and accepted, the steel bars and formwork are installed, and then C30 concrete is poured to form it. The formwork is removed after 12 hours, and watering and curing are carried out on time;
[0101] (6) Installation of the support net 22: Install the transverse support ropes and the longitudinal support ropes, and after tensioning, use 3 to 5 rope clips 25 to fix them to the exposed ring sleeves of the anchor rods;
[0102] (7) Laying of precast concrete bricks 11: The precast concrete bricks 11 are laid and installed in a horizontal layered manner from bottom to top, and the precast concrete bricks 11 are connected and fixed to the support net 22 by passing the steel wire rope 13 through the embedded pipe 12; the embedded pipe 12 is arranged horizontally, and each precast concrete brick is provided with one embedded pipe 12 ( Fig. 9 );
[0103] (8) Laying the steel rope net 23: Lay the steel rope net 23 on the surface layer of the precast concrete brick 11, and fix the steel rope net 23 on the support net 22 with the sewing rope 24 ( Fig.10 );
[0104] (9) Plant sowing: Mix seeds, pre-cultivation covering soil, water retaining agent, adhesive and water, and use a sprayer to spray the seeds on the vegetation concrete layer 1; after sowing, cover the surface of the protective net 2 with a layer of moisture retaining material;
[0105] (10) Maintenance management and growth monitoring;
[0106] The anchor rod is a Φ25 glass fiber reinforced plastic hollow grouting anchor rod, the exposed ring of the anchor rod is a heavy-duty heart-shaped ring (H5 / 8) for the steel rope anchoring node, the specification of the support rope is Φ16, the specification of the rope clamp is DIN714, the specification of the suture rope is Φ8, and the specification of the steel rope net is DO / 08 / 300. The above materials are anti-corrosive by hot-dip galvanizing and plastic coating process, and the service life is not less than 50 years;
[0107] 6×6 vegetation concrete precast bricks are used as a precast brick unit, and a 1.8m×1.8m DO / 08 / 300 type steel rope net is laid on each precast brick unit.
[0108] The vegetation concrete slope protection structure in the above embodiment was subjected to compressive strength, flexural strength, porosity test, pH value test, freeze-thaw cycle test, and acid corrosion test. The test methods and test results are as follows:
[0109] Compressive strength: According to GB / T50081-2002 "Standard for Test Methods of Mechanical Properties of Ordinary Concrete", a hydraulic press (YAW-2~OCO type) was used for compression tests. The specifications of the prepared vegetation concrete compression test block were 150mm×150mm×150mm, placed in the center of the hydraulic press for compression testing, the maximum load was recorded, and its compressive strength was calculated. The test results were 3.63-4.31MPa, which meets the application requirements of vegetation concrete slope protection and greening on steep slopes (3MPa), indicating that the slope protection structure provided by the technical solution of the present invention can be used for the protection and restoration of steep slopes.
[0110] Flexural strength: According to GB / T50081-2002 "Standard for Test Methods of Mechanical Properties of Ordinary Concrete", a WDW-100H universal material testing machine was used to conduct flexural tests. The specifications of the prepared vegetation concrete flexural test block are 100mm×100mm×400mm. The two supporting points at the bottom of the test block are 50mm away from the edge of the test block. The upper concentrated load is evenly transmitted to the 3-point points on the upper surface of the test block through the steel plate and steel bars. During the pressurization process, the appearance of through cracks on the side surface of the test block is used as the failure standard. The maximum load F when the test block is destroyed is recorded, and its flexural strength is calculated. The test results are 1.57-1.85MPa, which meets the application requirements of vegetation concrete slope protection and greening on steep slopes (1.5MPa), indicating that the slope protection structure provided by the technical solution of the present invention can be used for the protection and restoration of steep slopes.
[0111] Porosity: (1) Use a steel ruler to measure the length, width and height of the vegetation concrete specimen respectively. The obtained volume is the apparent volume of the specimen, recorded as V1. (2) According to Archimedes' principle, the volume of water discharged when the specimen is completely immersed in water is the apparent volume of the specimen, which includes the solid volume of the skeleton and the volume of the closed pores, recorded as V2. At this time, the volume of the connected pores can be expressed as the difference between V1 and V2. (3) The dry weight M1 of the specimen and the mass M2 suspended in water are measured by a hydrostatic electronic balance. The continuous porosity P = 0.5V2 can be obtained by dividing the difference between M1 and M2 by the density of water. The measured porosity is 28.5%.
[0112] pH value test: (1) Take the test block that has been cured for 28 days out of the standard curing box, place the test block in a container, add tap water and soak for 24 hours, the mass ratio of the test block to tap water is 1:3; (2) Use a pH tester to measure the pH value of the test block that has been left for 24 hours, and stir the solution soaked in the test block evenly when measuring the pH; (3) Read the pH value after the reading stabilizes, with an accuracy of 0.1. The measured pH value is 9.7, which is less than 10, indicating that the slope protection structure provided by the technical solution of the present invention is conducive to plant growth.
[0113] Freeze-thaw cycle test: After curing the test blocks required for the freeze-thaw experiment for 24 days, soak them in (20±2)℃ water for 4 days. The water level should be (20-30)mm higher than the top surface of the test blocks. After the curing age reaches 28 days, take out the vegetation concrete test blocks in time, wipe off the moisture on the surface of the test blocks, measure their appearance dimensions, and number and weigh them respectively. Then, place them in the test block rack with a 20mm gap between the test blocks and the inner wall of the refrigerator, and keep a distance of 30mm between each test block. The timing starts when the temperature in the refrigerator reaches -20℃, and the freezing time is set to 6h. After the freezing, take out the test blocks and put them into the water tank for melting. The water temperature of the melting water tank is controlled at 20℃, and the melting time is 6h. After the melting time, carry out the next round of test. Before the test, wipe off the residual moisture on the surface of the vegetation concrete test blocks. Repeat the operation 25 times and 50 times until the freeze-thaw cycle test is completed. After the freeze-thaw cycle, the appearance of the test block was recorded, and the weight and compressive strength were measured in time, and the mass loss rate and compressive strength loss rate of the test block were calculated. The test results show that after 50 freeze-thaw cycle tests, the mass loss rate of the test block is 1.37%-2.73%, and the compressive strength loss rate is 2.22%-3.75%.
[0114] Acid corrosion test: Take the planted concrete test block out of the standard curing room 2 days before curing it to 28 days old, wipe the surface clean, and put it in an oven for 48 hours at an oven temperature of (80±5)℃. After drying, number the test blocks, weigh them and record their appearance, then put them into a large test block box with a mass fraction of 5% Na2SO4 solution for immersion. The immersion time is set to 12 hours. The distance between the test block and the side wall of the test block box should not be less than 20mm, and the distance between adjacent test blocks should be 20mm. After immersion, put the test block into an oven for drying. The drying temperature is 80℃ and the drying time is set to 6 hours. After the test block is dried, take it out for natural cooling. The cooling time is 2 hours. After completing the above steps, the planted concrete sulfate dry-wet cycle test is completed. Repeat the operation until the designed number of cycles is completed. After the test, weigh the test block and measure the compressive strength. The test results show that after 30 sulfate dry-wet cycle tests, the mass loss rate of the test block is 1.47%-2.76%, and the compressive strength loss rate is 0.68%-2.41%.
[0115] The above description is only an exemplary embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the technical concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A vegetation concrete slope protection structure suitable for high and steep slopes, characterized in that: include: The vegetation concrete layer includes precast vegetation concrete bricks, and the precast vegetation concrete bricks are laid on the surface of the high and steep slope; The vegetation concrete prefabricated bricks are provided with a void structure for planting slope plants; A protective net, comprising an anchoring device, a supporting net, a steel rope net and a suture rope, wherein the anchoring device comprises an anchor rod and an exposed ring sleeve of the anchor rod; the anchor rod is anchored in the high and steep slope to fix the supporting net; the supporting net comprises a transverse supporting rope and a longitudinal supporting rope, the transverse supporting rope and the longitudinal supporting rope are respectively passed through the exposed ring sleeve of the anchor rod and stretched into a mesh structure to support the steel rope net; the supporting net and the steel rope net are fixedly connected by the suture rope; the steel rope net is laid on the surface of the vegetation concrete layer to reinforce the vegetation concrete layer; as well as, A drainage ditch is arranged at the bottom of the high and steep slope and is used for intercepting and draining water and supporting the vegetation concrete layer.
2. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 1 is characterized in that: The protective net includes a rope clip for fixing the supporting net to the exposed ring sleeve of the anchor rod.
3. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 1 is characterized in that: The vegetation concrete layer includes a precast brick unit formed by paving the vegetation concrete precast bricks. A groove is provided between the precast brick unit and adjacent precast brick units. The groove is used to install the anchor rod and the support net.
4. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 1, characterized in that: The vegetation precast concrete brick is provided with an embedded pipe, and a steel wire rope is passed through the embedded pipe. The steel wire rope is used to pass through the vegetation precast concrete brick and be connected to the support net.
5. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 4 is characterized in that: At least one embedded pipe is arranged in each of the vegetation concrete prefabricated bricks.
6. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 1, characterized in that: The vegetation concrete prefabricated brick is a cube or a cuboid, and the length of the vegetation concrete prefabricated brick is 30 to 45 cm, the width is 30 to 45 cm, and the height is 10 to 15 cm.
7. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 1, characterized in that: The vegetation concrete prefabricated bricks include cement particles, viscosity enhancers, fibers and nutrients.
8. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 7 is characterized in that: The diameter of the cement particles is 1 to 2 cm; and / or, The cement particles are prepared from water and cement in a mass ratio of (0.25-0.27):
1.
9. The vegetation concrete slope protection structure suitable for high and steep slopes as claimed in claim 7, characterized in that: The mass ratio of the cement particles, the viscosity enhancer, the fiber and the nutrient is (70% to 75%): (0.5% to 1%): (1.5% to 2%): (25% to 30%); and / or, The tackifier includes any one of mortar glue, polyacrylamide, and hydroxyethyl cellulose ether; and / or, The fiber includes any one of polypropylene fiber, wood fiber and glass fiber.
10. A construction method for a vegetation concrete slope protection structure suitable for high and steep slopes as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: (1) Construction preparation: Collect the survey data, design data, climate, surrounding spoil conditions and transportation conditions of the slope; (2) Slope cleaning: according to the slope shape, remove the dangerous rocks, floating stones, floating roots of plants, weeds and garbage on the slope, and perform slope shaping; (3) Preparation of prefabricated biomass concrete bricks: Pour cement and viscosity enhancer into a mixer and mix them, add water during the mixing process, granulate the mixed cement mixture, and after granulation, put cement particles, fibers and nutrients into a mold to form them; (4) Anchor bolt installation: Drill holes according to design standards, insert anchor bolts after the holes are formed, and fix the anchor bolts; (5) Digging and construction of bottom beam drainage ditch; (6) Support net installation: Install the horizontal and vertical support ropes, tighten them and use rope clips to fix them to the exposed ring sleeves of the anchor rods; (7) Laying of precast concrete bricks: Lay and install precast concrete bricks in a horizontal layered manner from bottom to top, and use steel wire ropes to connect and fix the precast concrete bricks to the support ropes; (8) Laying the steel rope net: Lay the steel rope net on the vegetation concrete precast brick paving layer and fix the steel rope net on the supporting net with sewing rope; (9) Plant sowing: Mix seeds, pre-cultivation soil, water retaining agent, adhesive and water, and then use a sprayer to spray. After sowing, cover the surface of the protective net with a layer of moisture retaining material. (10) Maintenance management and growth monitoring.
Citation Information
Patent Citations
Steel wire rope netting and active protective netting and rockfall protection fences containing steel wire rope netting
CN102261078A
Quake-proof flexible active protecting net system for slope surface
CN102587395A
Novel roadbed side slope building protecting method and precast concrete blocks therefor
CN102644224A
Construction method of tourist attraction complex environment slope flexible protective net
CN113482020A
Supporting structure and method for rock slope and silty clay slope
CN118441725A
