Anti-pulling connecting structure and method for PHC pipe pile and cast-in-place bearing platform and supporting structure

By using anchor plates and steel bar components in the pull-resistant connection structure between PHC pipe piles and cast-in-place support, the problem of high thickness requirements for pull-resistant connection in the prior art is solved, and the effect of simplifying construction and improving pull-resistant ability is achieved.

CN119061927APending Publication Date: 2024-12-03CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411497602.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the existing pull-in connection structure between PHC pipe piles and cast-in-place support, the minimum thickness of the cast-in-place support is high, which is difficult to meet the calculation requirements of the anchoring length of pull-in-place reinforcement bars in concrete, which affects the reliability and construction efficiency of the connection. .

Method used

The combined structure of anchor plate and steel bar assembly is adopted. The anchor plate is connected to the end plate of PHC pipe pile. The steel bar assembly is installed inside the cast-in-place support platform and is set outside the pile body of the PHC pipe pile. The main ribs are cut off and reinforced. The steel bars reinforce the connecting structure to form a multi-layer crisscrossing grid structure to increase the pull-resistant ability.

Benefits of technology

The need for pre-welding or pre-embedded anti-pull steel bars is reduced, the construction process is simplified, and the inlay depth and resistance of PHC pipe piles in cast-in-place bearings is increased, and the reliability and construction efficiency of connections are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061927A_ABST
    Figure CN119061927A_ABST
Patent Text Reader

Abstract

The invention belongs to a supporting and connecting structure, and provides an anti-pulling connecting structure and method for a PHC pipe pile and a cast-in-place bearing platform and a supporting structure in order to solve the technical problem that an existing anti-pulling connecting structure for the PHC pipe pile and the cast-in-place bearing platform has the high requirement for the minimum thickness of the cast-in-place bearing platform, and the anti-pulling connecting structure for the PHC pipe pile and the cast-in-place bearing platform comprises an anchoring plate and a steel bar assembly, and the upper end of the PHC pipe pile extends into the cast-in-place bearing platform; the anchoring plate is connected to an end plate of the PHC pipe pile, the size of the anchoring plate is larger than that of the end plate, the steel bar assembly is installed in the cast-in-place bearing platform and arranged outside a pile body of the PHC pipe pile in a sleeving mode, and a gap is reserved between the steel bar assembly and the pile body of the PHC pipe pile.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a support connection structure, and specifically to a pull-out resistant connection structure and method, and a support structure of a PHC pipe pile and a cast-in-place cap. Background Art

[0002] In order to ensure construction safety, improve project quality, increase construction efficiency, and benefit green environmental protection, mechanized construction is comprehensively promoted in the construction of power transmission and transformation projects. In plains and hilly areas where overhead transmission lines pass, the road access conditions for mechanical equipment are relatively good, and the homogeneous clay foundation can adopt PHC (Prestressed High-strength Concrete) pipe pile foundation design. On the one hand, the degree of on-site mechanization construction is high, and the construction is efficient and fast. On the other hand, no waste mud is generated, and there is no need to transport the remaining soil, which has good environmental benefits. Unlike the foundations of buildings (structures) in the construction and transportation industries, which usually bear downward pressure loads, the foundation of the transmission line often bears large upward and horizontal loads while bearing downward pressure loads. Pull-out resistance and horizontal resistance are generally the main control conditions of the design. Therefore, the reliable upward connection of the PHC pipe pile and the cap has always been a problem that designers pay great attention to.

[0003] At present, the pull-out connection between PHC piles and cast-in-place caps is achieved by welding a certain number of anchoring steel bars on the end plates of the PHC piles, or placing a steel cage in the core of the PHC piles, and connecting to the cast-in-place caps by setting up pull-out steel bars. Therefore, the minimum thickness of the cast-in-place cap must meet the calculation requirements and structural requirements of the anchorage length of the pull-out steel bars in the concrete. Summary of the invention

[0004] The present application aims to solve the technical problem that the current pull-out resistant connection structure between PHC pipe piles and cast-in-place caps has high requirements on the minimum thickness of the cast-in-place caps, and provides a pull-out resistant connection structure and method and a support structure between PHC pipe piles and cast-in-place caps.

[0005] In order to achieve the above objectives, this application adopts the following technical solutions: In a first aspect, the present application proposes a pull-out resistant connection structure of a PHC pipe pile and a cast-in-place cap, comprising an anchor plate and a steel bar assembly; The end of the PHC pile with the end plate is defined as the upper end; The upper end of the PHC pile extends to the inside of the cast-in-place cap; The anchor plate is connected to the end plate of the PHC pile, and the size of the anchor plate is larger than the end plate; The steel bar assembly is installed inside the cast-in-place cap, and the steel bar assembly is sleeved outside the pile body of the PHC pipe pile, with a gap between the steel bar assembly and the pile body of the PHC pipe pile.

[0006] Further, the steel bar assembly includes reinforcing steel bars and truncated main bars; The truncated main reinforcement is in a mesh structure and is installed inside the cast-in-place cap. The truncated main reinforcement is in a truncated state at the PHC pile. The reinforcing steel bar is connected to the end of the truncated main steel bar in a truncated state.

[0007] Furthermore, the truncated main reinforcement is a multi-layer steel bar structure, and each layer of the multi-layer steel bar structure is a criss-cross grid structure; The reinforcing steel bar is circular.

[0008] Furthermore, the anchor plate is connected to the end plate via connecting bolts.

[0009] Furthermore, the depth from the upper end of the PHC pile to the inside of the cast-in-place cap is 300±100 mm.

[0010] Furthermore, the anchoring plate is circular or square.

[0011] Furthermore, the anchor plate is circular, and the diameter of the anchor plate is 100-200 mm larger than the diameter of the PHC pile; Alternatively, the anchor plate is square, and the side length of the anchor plate is 100-200 mm larger than the diameter of the PHC pile.

[0012] In the second aspect, the present application proposes a method for anti-pullout connection between a PHC pile and a cast-in-place cap, comprising: Make the upper end of the PHC pile extend to the inside of the cast-in-place cap; An anchor plate is connected to the end plate of the PHC pile, and the size of the anchor plate is larger than the end plate; A steel bar assembly is arranged outside the body of the PHC pipe pile, the steel bar assembly is installed inside the cast-in-place cap, the steel bar assembly is sleeved outside the body of the PHC pipe pile, and a gap is left between the steel bar assembly and the body of the PHC pipe pile.

[0013] In a third aspect, the present application proposes a supporting structure, including columns, cast-in-place caps and PHC pipe piles; the connection between the cast-in-place caps and the PHC pipe piles adopts the above-mentioned pull-out resistant connection structure between the PHC pipe piles and the cast-in-place caps.

[0014] Furthermore, column reinforcement is provided in the column; The column reinforcement is connected to the reinforcement assembly.

[0015] Compared with the prior art, this application has the following beneficial effects: The present application proposes a pull-out resistant connection structure between a PHC pipe pile and a cast-in-place cap. By setting an anchor plate and locking it with the end plate of the PHC pipe pile, it is equivalent to adding an anchor head to the PHC pipe pile, eliminating the need for pre-welding or pre-embedded pull-out steel bars. In addition, the use of anchor plates allows for direct installation on site after being processed in the factory, which makes construction simple, convenient and fast, saves time and effort, and increases the embedding depth of the PHC pipe pile in the cast-in-place cap. Furthermore, the present application cuts off and reinforces the steel bar assembly at the bottom of the cast-in-place cap that is interlaced with the PHC pipe pile, increasing the connection structure and the ability of the PHC pipe pile to resist horizontal forces.

[0016] The present application also proposes a method for the pull-out resistant connection of a PHC pipe pile and a cast-in-place cap, and a supporting structure, which possess all the advantages of the above-mentioned pull-out resistant connection structure of a PHC pipe pile and a cast-in-place cap. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 A structural schematic diagram of a steel bar assembly in this application; Figure 2 This is a schematic diagram of the implementation of the pull-out resistant connection structure between the PHC pile and the cast-in-place cap in this application; Figure 3 is a schematic diagram of an end plate; Figure 4 A schematic diagram of an end plate hole on an end plate; Figure 5 A schematic diagram of an anchor plate; Figure 6 This is a schematic diagram of a support structure of the present application.

[0019] Among them: 1-PHC pipe pile, 2-cast-in-place cap, 3-anchor plate, 4-end plate, 5-connecting bolt, 6-cut main reinforcement, 7-reinforcement steel bar, 8-column, 9-column steel bar, 10-end plate hole, 11-anchor plate through hole. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0023] In the description of the embodiments of the present application, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invented product is usually placed when used. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0024] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0025] In the description of the embodiments of the present application, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0026] In the construction of power transmission and transformation projects, mechanized construction has been fully promoted in order to ensure construction safety, improve project quality, increase construction efficiency, and promote the implementation of green environmental protection concepts. Especially when overhead transmission lines cross plains, hills and other areas, due to the relatively good conditions for mechanical equipment to enter the site, the use of PHC pipe pile foundation design has become an ideal choice. The advantages of PHC pipe pile foundation design are: (1) Efficient and fast construction: PHC pipe piles have the characteristics of factory production and on-site installation, which can greatly improve construction efficiency and shorten construction period. (2) Significant environmental benefits: Compared with traditional pile foundation construction methods, PHC pipe pile construction does not require the generation of waste mud or the transportation of excess soil, thereby effectively reducing environmental pollution. (3) Strong adaptability: PHC pipe piles are suitable for various geological conditions, especially in homogeneous clay foundations, and their bearing capacity and stability are excellent.

[0027] Unlike the foundations of buildings (structures) in the construction and transportation industries, the foundation of power transmission lines needs to withstand large upward and horizontal loads while bearing downward pressure loads. This is because the tower base of power transmission lines will be subject to complex mechanical effects under the influence of natural factors such as wind loads and icing. Therefore, when designing the foundation of power transmission lines, pullout resistance and horizontal force resistance are often the main control conditions.

[0028] In order to ensure a reliable connection between the PHC pile and the cap, designers need to pay special attention to the design of the pull-out connection. At present, there are two main pull-out connection methods commonly used: (1) Welding anchor steel bars on the end plate of the PHC pile: This method uses a certain number of anchor steel bars welded on the end plate of the pile to provide pull-out resistance by using the bond between the steel bars and the cap concrete. To ensure the reliability of the connection, the number, diameter and length of the anchor steel bars need to be calculated according to the specific design requirements. (2) Placing a steel cage in the core of the PHC pile: This method places a steel cage composed of multiple steel bars in the core of the pile, and then pours concrete to form the cap. The bond and friction between the steel cage and the cap concrete together provide pull-out resistance. Similarly, the specifications and layout of the steel cage also need to be calculated according to the design requirements.

[0029] Since the pull-out steel bar needs to reach a certain anchorage length in the cap concrete, the minimum thickness of the cast-in-place cap must meet the calculation requirements and structural requirements of the anchorage length of the pull-out steel bar in the concrete. Usually, this thickness is about 35 times the diameter of the steel bar, and the thickness of the cap is generally not less than 0.8 meters. Such a design can ensure that the cap has sufficient strength and rigidity to withstand the complex loads from the transmission line foundation.

[0030] Based on the above situation and requirements, the present application proposes a pull-out resistant connection structure and method and a support structure for a PHC pipe pile and a cast-in-place cap, aiming to eliminate the traditional pull-out resistant steel bars and enhance the connection reliability between the PHC pipe pile and the cast-in-place cap. The present application is described in detail below in conjunction with the embodiments and drawings.

[0031] As a first embodiment of the pull-out resistant connection structure of a PHC pile and a cast-in-place cap in the present application, it may include an anchor plate 3 and a steel bar assembly. For the convenience of subsequent description, the end of the PHC pile 1 provided with the end plate 4 is defined as the upper end. It should be noted that the upper end described in the present application is a relative direction.

[0032] The upper end of the PHC pile 1 extends into the interior of the cast-in-place cap 2. Extending the PHC pile 1 into the interior of the cast-in-place cap 2 can enhance the connection strength between the PHC pile 1 and the cast-in-place cap 2, thereby ensuring the stability and bearing capacity of the entire foundation structure.

[0033] The anchor plate 3 is connected to the end plate 4 of the PHC pile 1, and the size of the anchor plate 3 is larger than the end plate 4. It should be noted that the anchor plate 3 is a metal plate used to strengthen the connection, and the end plate 4 is a metal plate on the top of the PHC pile 1, which is used to connect with the cast-in-place cap 2 or other structures. The size of the anchor plate 3 is larger than the end plate 4, which can ensure that the anchor plate 3 can effectively transfer the load of the cast-in-place cap 2 to the PHC pile 1, while providing a larger contact area and a stronger connection force.

[0034] The steel bar assembly is installed inside the cast-in-place cap 2, and the steel bar assembly is sleeved outside the pile body of the PHC pipe pile 1, with a gap between the steel bar assembly and the pile body of the PHC pipe pile 1. Such a design can enhance the strength and rigidity of the cast-in-place cap 2. A gap is left between the steel bar assembly and the pile body of the PHC pipe pile 1, which can avoid stress concentration and damage caused by thermal expansion and contraction during the concrete pouring and curing process. At the same time, this gap can also be used as a flow channel during concrete pouring to ensure that the concrete can fully fill the space between the cast-in-place cap 2 and the PHC pipe pile 1. More importantly, such a structure forms a two-way main reinforcement truncation and reinforcement treatment method that interlaces the bottom of the cast-in-place cap 2 and the PHC pipe pile 1, which can effectively increase the horizontal resistance capacity.

[0035] The present application is aimed at the pull-out resistant connection between PHC pipe piles and cast-in-place caps for power transmission lines, and proposes a connection method without pre-welding or pre-embedded pull-out resistant steel bars, in which an anchor plate 3 with a larger diameter than the end plate 4 is directly added to the upper part of the end plate 4 of the PHC pipe pile 1, and the pull-out resistant and reliable connection requirements between the PHC pipe pile 1 and the cast-in-place cap 2 are met by mechanically anchoring the anchor plate 3 in concrete.

[0036] like Figure 1As shown, it is a structural schematic diagram of a steel bar assembly in the present application. The steel bar assembly includes reinforcing steel bars 7 and truncated main bars 6. The truncated main bars 6 are in a mesh structure and are installed inside the cast-in-place foundation 2. The truncated main bars 6 are located at the PHC pile 1 in a truncated state. The reinforcing steel bars 7 are connected to the ends of the truncated main bars 6 in a truncated state, so that the truncated main bars 6 can be reinforced. It should be noted that in some embodiments of the present application, the specific connection method of the mesh structure of the truncated main bars 6 can be adjusted according to processing needs, and the shape of the reinforcing steel bars 7 is adapted to the outer contour of the pile body of the PHC pile 1. In this embodiment, the truncated main bars 6 are a multi-layer steel bar structure, each layer of the multi-layer steel bar structure is a criss-cross grid structure, and the reinforcing steel bars 7 are circular.

[0037] like Figure 2 As shown, it is a schematic diagram of the implementation of the pull-out connection structure of the PHC pile and the cast-in-place cap in this application, and the upper end of the column 8 is located at the designed ground ( Figure 2 The X in the middle indicates the designed ground), the lower end is connected to the cast-in-place cap 2, the upper end of the PHC pile 1 extends to the inside of the cast-in-place cap 2, the anchor plate 3 is connected to the end plate 4 of the PHC pile 1, and the size of the anchor plate 3 is larger than the end plate 4, the anchor plate 3 and the end plate 4 are connected by connecting bolts 5, and the upper end of the PHC pile 1 extends to the depth of the inside of the cast-in-place cap 2 ( Figure 2 h) is 300±100mm, the bidirectional main reinforcement truncation and reinforcement treatment method of the bottom of the cast-in-place cap 2 and the PHC pile 1 is staggered, and a circular reinforcing steel bar 7 is arranged around the pile body of the PHC pile 1. The truncated main reinforcement 6 at the bottom of the cast-in-place cap 2 is truncated when it touches the PHC pile 1, and is welded and connected with the reinforcing steel bar 7. The present application directly adds an anchor plate 3 with a larger diameter than the end plate 4 on the upper part of the end plate 4 of the PHC pile 1, and meets the pull-out reliable connection requirements of the PHC pile 1 and the cast-in-place cap 2 through mechanical anchoring of the anchor plate 3 in concrete.

[0038] like Figure 3 As shown, it is a schematic diagram of the end plate 4, such as Figure 4 As shown, it is a schematic diagram of the end plate hole 10 on the end plate 4, as shown Figure 5The figure shows a schematic diagram of the anchor plate 3. As an example of the present application, the anchor plate 3 is circular, and the diameter of the anchor plate 3 is 100-200mm larger than the diameter of the PHC pile 1. The thickness of the anchor plate 3 is 20mm-40mm, and the material is Q355 and above. In other embodiments of the present application, the anchor plate 3 can also be square. If it is square, the side length is 100-200mm larger than the diameter of the PHC pile 1, and the thickness is also 20mm-40mm. The material can also be Q355 and above. The anchor plate 3 is processed with evenly arranged anchor plate through holes 11 that are consistent with the number of prestressed steel bars of the PHC pile 1. The diameter of the anchor plate through holes 11 is 32mm, and the distribution circle diameter of the anchor plate through holes 11 is the same as the distribution circle diameter of the prestressed steel bars of the PHC pile 1. A hole structure formed by connecting a large hole and a small hole in the end plate hole 10, when the connecting bolt 5 is connected, passes through Figure 4 The large hole of the middle end plate hole 10 and the anchor plate through hole 11, the specification of the connecting bolt 5 is M27 or M30 (M30 is used only when the diameter of the prestressed steel rod of the PHC pile 1 is Φ14), the length is the sum of the thickness of the anchor plate 3 and the thickness of the end plate 4, and the thread length is at least 30mm.

[0039] Based on the above connection structure, the present application also proposes a pull-out resistant connection method between a PHC pile and a cast-in-place cap, which may include: The upper end of the PHC pile 1 is extended to the inside of the cast-in-place cap 2; An anchor plate 3 is connected to the end plate 4 of the PHC pile 1, and the size of the anchor plate 3 is larger than the end plate 4; A steel bar assembly is arranged outside the body of the PHC pile 1 , the steel bar assembly is installed inside the cast-in-place cap 2 , and the steel bar assembly is sleeved outside the body of the PHC pile 1 , with a gap between the steel bar assembly and the body of the PHC pile 1 .

[0040] In addition, the present application also proposes a supporting structure, including columns 8, cast-in-place caps 2 and PHC pipe piles 1, wherein the connection between the cast-in-place caps 2 and the PHC pipe piles 1 adopts the above-mentioned pull-out resistant connection structure between the PHC pipe piles and the cast-in-place caps.

[0041] like Figure 6 FIG. 1 is a schematic diagram of a support structure of the present application, wherein the anti-pulling connection structure between the PHC pile and the cast-in-place cap can adopt the aforementioned embodiment. A column steel bar 9 is arranged in the column 8, and the column steel bar 9 is connected to the steel bar assembly.

[0042] In order to verify the pull-out resistant connection structure between the PHC pipe pile and the cast-in-place cap in this application, in actual application, for the pull-out resistant connection method between the PHC pipe pile and the cast-in-place cap using the upper end plate 4 to install the anchor plate 3, several 2×2 arranged PHC pipe pile 1 group pile foundation pull-out bearing characteristics field tests were carried out, the bearing capacity test results were good, and the pilot promotion and application was carried out in the supporting project, and the construction units generally responded well.

[0043] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A pull-out resistant connection structure between a PHC pile and a cast-in-place cap, characterized in that: It includes an anchor plate (3) and a steel bar assembly; The end of the PHC pile (1) provided with the end plate (4) is defined as the upper end; The upper end of the PHC pipe pile (1) extends to the inside of the cast-in-place cap (2); The anchor plate (3) is connected to the end plate (4) of the PHC pile (1), and the size of the anchor plate (3) is larger than that of the end plate (4); The steel bar assembly is installed inside the cast-in-place cap (2), and the steel bar assembly is sleeved outside the pile body of the PHC pipe pile (1), with a gap left between the steel bar assembly and the pile body of the PHC pipe pile (1).

2. According to claim 1, the pull-out resistant connection structure of a PHC pile and a cast-in-place cap is characterized in that: The steel bar assembly comprises reinforcing steel bars (7) and truncated main bars (6); The truncated main reinforcement (6) is in a mesh structure and is installed inside the cast-in-place cap (2). The truncated main reinforcement (6) is located at the PHC pile (1) and is in a truncated state; The reinforcing steel bar (7) is connected to the end of the truncated main steel bar (6) which is in a truncated state.

3. According to claim 2, the pull-out resistant connection structure of a PHC pile and a cast-in-place cap is characterized in that: The truncated main reinforcement (6) is a multi-layer steel bar structure, and each layer of the multi-layer steel bar structure is a crisscross grid structure; The reinforcing steel bar (7) is circular.

4. The pull-out resistant connection structure of a PHC pile and a cast-in-place cap according to claim 3, characterized in that: The anchor plate (3) and the end plate (4) are connected via connecting bolts (5).

5. According to claim 4, the pull-out resistant connection structure of a PHC pile and a cast-in-place cap is characterized in that: The depth from the upper end of the PHC pipe pile (1) to the inside of the cast-in-place cap (2) is 300±100 mm.

6. The pull-out resistant connection structure of a PHC pile and a cast-in-place cap according to claim 5, characterized in that: The anchoring plate (3) is circular or square.

7. The pull-out resistant connection structure of a PHC pile and a cast-in-place cap according to claim 6, characterized in that: The anchor plate (3) is circular, and the diameter of the anchor plate (3) is 100-200 mm larger than the diameter of the PHC pile (1); Alternatively, the anchor plate (3) is square, and the side length of the anchor plate (3) is 100-200 mm larger than the diameter of the PHC pile (1).

8. A method for anti-pullout connection between a PHC pile and a cast-in-place cap, characterized in that: include: The upper end of the PHC pile (1) is extended to the inside of the cast-in-place cap (2); An anchor plate (3) is connected to the end plate (4) of the PHC pile (1), and the size of the anchor plate (3) is larger than that of the end plate (4); A steel bar assembly is arranged outside the pile body of the PHC pipe pile (1), the steel bar assembly is installed inside the cast-in-place cap (2), the steel bar assembly is sleeved outside the pile body of the PHC pipe pile (1), and a gap is left between the steel bar assembly and the pile body of the PHC pipe pile (1).

9. A supporting structure, comprising a column (8), a cast-in-place cap (2) and a PHC pile (1); characterized in that: The connection between the cast-in-place cap (2) and the PHC pile (1) adopts the pull-out resistant connection structure between the PHC pile and the cast-in-place cap as claimed in any one of claims 1 to 7.

10. A support structure according to claim 9, characterized in that: The column (8) is provided with a column (8) steel bar; The column (8) steel bars are connected to the steel bar assembly.