Water plasma engine
Through the design of the water plasma engine, the water vapor in the water tank reacts with the electrode to push the piston to do work, and the heat energy is used multiple times through the heat exchange component, the existing engine pollution and non-renewable resources are solved, and the power output is efficient, energy-saving and environmentally friendly .
Patent Information
- Application Number
- CN202411104306.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing engines produce pollution and non-renewable resources when burning gasoline, diesel or natural gas, and electric vehicles cannot utilize energy many times, lacking energy-saving and environmentally friendly power output methods.
Design a water plasma engine, which uses water vapor in the water tank to react with high-voltage electrodes and negative electrodes in the ionization chamber, generates ionized gas to push the piston to do work, and uses heat energy multiple times through the heat exchange assembly, and combines the power output mechanism to realize power and thermal energy. efficient output.
It achieves efficient heat utilization, achieves the purpose of energy conservation and emission reduction, and provides power output without affecting the use of kinetic energy. It is more energy-saving and environmentally friendly than electric motors.
Smart Images

Figure CN119062402A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engines, in particular to a water plasma engine. Background Art
[0002] An engine is a power machine that converts the chemical energy generated by the combustion of fuel inside the machine into mechanical energy of piston movement and outputs power to the outside. Engines in the prior art usually use gasoline, diesel, and natural gas as engine fuels. However, when gasoline, diesel, etc. are burned, a large amount of gas that pollutes the environment will be generated, which will harm people's lives and health. In addition, as gasoline, diesel, natural gas, etc. are non-renewable resources, they are gradually decreasing with people's transitional exploitation. In addition, electric vehicles in the prior art are directly driven by electric motors and cannot use energy multiple times. For this reason, the present invention designs a water plasma thermal energy engine that can use water and electricity at the same time. Since the cost of water is low, the development of this new energy engine can achieve the purpose of energy saving and environmental protection. Compared with direct motor drive, in addition to being able to output kinetic energy to the outside, it can also output heat energy to the outside, and the output of kinetic energy is not affected. In addition, this application is improved by the inventor in the original patent number ZL201710469934.3, with more efficient thermal energy utilization and better energy saving and emission reduction effects. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a water plasma engine.
[0004] The present application embodiment provides a water plasma engine, comprising:
[0005] A shell, wherein three mutually independent ionization chambers are arranged inside, each of the ionization chambers is provided with a piston capable of reciprocating movement, the piston transmission is connected with a power output mechanism, the shell is provided with an air inlet channel and a liquid inlet channel connected with the three ionization chambers, the air inlet channel is provided with a first control valve for controlling the opening or closing of the air inlet channel, the air inlet end of each ionization chamber is provided with a control component for controlling water and steam to enter the ionization chamber, and the liquid inlet channel is provided with a second control valve for controlling the opening or closing of the liquid inlet channel; wherein the water in the liquid inlet channel and the steam in the air inlet channel enter the corresponding ionization chamber under the control of the same corresponding control component, and each of the ionization chambers is provided with a positive electrode and a negative electrode;
[0006] A storage and power supply system connected to the positive electrode and the negative electrode for providing high voltage to the positive electrode and the negative electrode so as to expand the steam entering the ionization chamber into ionized gas to push the piston to do work;
[0007] A water tank for storing water required for generating steam;
[0008] A heat exchange assembly, comprising a heat exchange box, an exhaust pipe and an intake pipe, wherein a first heat exchange chamber and a second heat exchange chamber are respectively provided in the heat exchange box, the first heat exchange chamber and the second heat exchange chamber are connected via a first high-pressure air pipe, the first high-pressure air pipe is provided with a water inlet delay switch for controlling the connection or disconnection of the first heat exchange chamber and the second heat exchange chamber, one end of the exhaust pipe is connected to the second heat exchange chamber, the other end of the exhaust pipe extends into the water tank and is located above the highest water level in the water tank, one end of the intake pipe is connected to the first heat exchange chamber, the other end of the intake pipe is connected to the intake channel, the first heat exchange chamber and the second heat exchange chamber are connected to the water tank.
[0009] In one embodiment, the control component includes an air intake valve and an elastic member, wherein the elastic member and the air intake valve are both arranged at the air intake end in the ionization chamber, the elastic member is located above the air intake valve, and two ends of the elastic member are respectively in contact with the inner wall of the air intake passage and the air intake valve;
[0010] When the air pressure in the ionization chamber is equal to the air pressure in the air inlet passage, the elastic member applies an elastic force to the air inlet valve, so that the air inlet valve blocks the air inlet end of the ionization chamber.
[0011] In one embodiment, the power output mechanism includes a crankshaft and three connecting rods. The crankshaft is rotatably disposed in the housing and is located below the ionization chamber. One ends of the three connecting rods are connected to the crankshaft, and the other ends of the three connecting rods are respectively connected to the pistons in the corresponding three ionization chambers.
[0012] In one embodiment, an auxiliary starting assembly is further included, the auxiliary starting assembly including a power member, a driving gear and a driven gear, the power member is located outside the housing, and the output end of the power member is connected to the driving gear, the driven gear is sleeved on one end of the crankshaft, and the driven gear is used to mesh with the driving gear;
[0013] When the water plasma engine is just started, the power member drives the driving gear to extend toward the driven gear to mesh with the driven gear, and drives the driving gear to rotate, so as to drive the crankshaft to rotate.
[0014] In one embodiment, it further includes a generator electrically connected to the storage and power supply system, wherein the generator is connected to the crankshaft so that the generator generates electricity when driven by the crankshaft to charge the storage and power supply system.
[0015] In one embodiment, the second heat exchange chamber is connected to the water tank via a connecting pipe, and a water level switch is provided in the first heat exchange chamber;
[0016] When the water level switch senses a signal, the second control valve is closed and the water inlet delay switch is opened, so that the water vapor in the second heat exchange chamber is discharged to inject the water in the water tank into the second heat exchange chamber.
[0017] In one embodiment, the exhaust pipe has thermal conductivity so as to conduct heat in the exhaust pipe to the water tank.
[0018] In one embodiment, it also includes a fluid infusion drive device, a one-way valve and an infusion tube, the fluid infusion drive device is connected to one end of the infusion tube, the other end of the infusion tube is connected to the liquid inlet channel of the shell, the liquid inlet channel is connected to the first heat exchange chamber, and the one-way valve is arranged on the infusion tube to control the water to flow into the first heat exchange chamber under the action of the fluid infusion drive device.
[0019] In one embodiment, a circulation pump is further included, and the circulation pump is used to accelerate the water circulation inside the shell.
[0020] Compared with the prior art, the above technical solution provided by the embodiment of the present application has the following beneficial effects:
[0021] The water in the water tank is injected into the first heat exchange chamber and the second heat exchange chamber, and the gas with heat after the ionization chamber does work is passed into the first heat exchange chamber and the second heat exchange chamber, so that the heat is absorbed by the water to generate steam, and then the steam in the first heat exchange chamber is passed to the intake channel through the intake pipe, and the corresponding control component is controlled to enter the corresponding ionization chamber, and then the storage and power supply system discharges to the positive electrode and the negative electrode in the ionization chamber to generate high voltage, so that the steam is ionized to form ionized gas and expand to push the piston to do work to output power. At the same time, huge heat will be released in the process of ionizing the steam. Part of the heat is conducted to the water of the water circulation device through the inner wall of the ionization chamber, and the other part of the heat will enter the first heat exchange chamber and the second heat exchange chamber with the discharge of the gas for absorption, so that the water in the first heat exchange chamber generates steam again and enters the ionization chamber again to generate ionization, and the water temperature of the second heat exchange chamber increases. This cycle is continued, so that the heat energy after work is used multiple times, with high efficiency of heat energy utilization, and the purpose of energy saving and emission reduction is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 is a top view of a water plasma engine of the present application;
[0023] Figure 2 It is a schematic cross-sectional structure diagram of a water plasma engine of the present application;
[0024] Figure 3 It is a schematic cross-sectional structure diagram of a third ionization chamber in a water plasma engine of the present application;
[0025] Figure 4 It is a schematic cross-sectional structure diagram of a second ionization chamber in a water plasma engine of the present application;
[0026] Figure 5 It is a structural schematic diagram of a heat exchange component in a water plasma engine of the present application;
[0027] Figure 6-Figure 10 This is a schematic diagram of various states of a water plasma engine in operation according to the present application.
[0028] Numbers in the figure:
[0029] 10. Shell; 20. Ionization chamber; 21. First ionization chamber; 22. Second ionization chamber; 23. Third ionization chamber; 30. Piston; 40. Power output mechanism; 41. Crankshaft; 42. Connecting rod; 50. Air intake passage; 51. Second control valve; 52. Water level switch; 53. Air intake pipe; 54. Liquid intake passage; 60. First control valve; 70. Control assembly; 71. Elastic member; 72. Air intake valve; 80. Water tank; 90. Heat exchange assembly; 91. Heat exchange tank; 91a. First heat exchange chamber; 91b. Second heat exchange chamber; 92. Exhaust pipe; 93 , water inlet delay switch; 94, first high-pressure air pipe; 95, second exhaust channel; 96, exhaust channel outlet; 100, driven gear; 200, circulating pump; 201, circulating water channel; 300, first exhaust channel; 401, fluid replenishment drive device; 402, infusion tube; 403, one-way valve; 500, positive electrode; 600, negative electrode; 701, controller; 702, power control system; 703, first power supply system; 704, battery; 705, second power supply system; 706, generator; 707, starter motor; 708, encoder. DETAILED DESCRIPTION
[0030] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific embodiments of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "back", "up", "down", "left", "right", "longitudinal", "horizontal", "vertical", "horizontal", "top", "bottom", "inside", "outside", "head", "tail", etc. are based on the directions or positional relationships shown in the accompanying drawings, are constructed and operated in a specific direction, and are only for the convenience of describing the present technical solution, rather than indicating that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.
[0031] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0032] Please refer to Figure 1 and Figure 2 An embodiment of the present application provides a water plasma engine, including a housing 10 , a power storage and electricity system, a water tank 80 , and a heat exchange component 90 .
[0033] Specifically, three mutually independent ionization chambers 20 are arranged inside the housing 10, each ionization chamber 20 is provided with a piston 30 capable of reciprocating movement, the piston 30 is transmission-connected with a power output mechanism 40, the housing 10 is provided with an air intake channel 50 communicating with the three ionization chambers 20, the air intake channel 50 is provided with a first control valve 60 for controlling the opening or closing of the air intake channel 50, the air intake end of each ionization chamber 20 is provided with a control component 70 for controlling the steam to enter the ionization chamber 20, and the liquid inlet channel 54 is provided with a second control valve 51 for controlling the opening or closing of the liquid inlet channel. Among them, the liquid in the liquid inlet channel 54 and the steam in the air inlet channel 50 enter the corresponding ionization chamber 20 under the control of the same corresponding control component 70, and each ionization chamber 20 is provided with a positive electrode 500 and a negative electrode 600. The storage and power supply system is connected to the positive electrode 500 and the negative electrode 600, and is used to provide high voltage to the positive electrode 500 and the negative electrode 600, so as to expand the steam entering the ionization chamber 20 into ionized gas and push the piston 30 to do work; the water tank 80 is used to store the water required to generate steam; the heat exchange component 90 includes a heat exchange box 91, an exhaust pipe 92 and an intake pipe 53, and the heat exchange box 91 is respectively provided with a first heat exchange chamber 91a and a second heat exchange chamber 91b, and the first heat exchange chamber 91a and the second heat exchange chamber 91b are connected through a first high-pressure gas pipe 94, and the first high-pressure gas pipe 94 is provided with a water inlet delay switch 93 for controlling the first heat exchange chamber 91a and the second heat exchange chamber 91b to be turned on or off, and the exhaust pipe One end of 92 is connected to the second heat exchange chamber 91b, the other end of the exhaust pipe 92 extends into the water tank 80 and is located above the highest water level in the water tank 80, one end of the air inlet pipe 53 is connected to the first heat exchange chamber 91a, the other end of the liquid inlet channel 54 is connected to the circulating water channel 201, the circulating water channel 201 is connected to the water in the infusion pipe 402, and is connected to the water in the first heat exchange chamber 91a, and the water vapor generated enters the upper part of the first heat exchange chamber 91a due to the buoyancy, the first heat exchange chamber 91a and the second heat exchange chamber 91b are connected, and are controlled by the water delay switch 93, the encoder 708 can be connected to the crankshaft to collect the state of the crankshaft when it is rotating, so as to accurately supply power to the ionization chamber.
[0034] Exemplarily, the storage and power supply system includes a battery 704, a first power supply system 703 and a second power supply system 705. The first power supply system 703 and the second power supply system 705 are both connected to the battery 704. The second power supply system 705 is used to provide high voltage to the positive electrode 500 and the negative electrode 600, and a power source that can continuously generate gas discharge phenomenon. The first power supply system 703 is used to provide power to other electrical components of the water plasma engine.
[0035] Exemplarily, the first heat exchange chamber 91a and the second heat exchange chamber 91b are connected through the first high-pressure gas pipe 94, so that the gas in the first heat exchange chamber 91a is discharged to the second heat exchange chamber 91b, and is controlled by the water inlet delay switch 93. At the same time, the liquid in the second heat exchange chamber 91b is injected into the first heat exchange chamber 91a from below to form an equal amount of spatial replacement to reduce the energy of forced injection of liquid; when the water in the first heat exchange chamber 91a is reduced and reaches the connection stroke of the water level switch 52, the water level switch 52 is opened. At this time, the signal of the water level switch 52 is transmitted to the controller 701, and the controller 701 controls the first power supply system 703 to supply power to the water inlet delay switch 93, so that the channels of the first heat exchange chamber 91a and the second heat exchange chamber 91b are connected, thereby allowing the steam in the first heat exchange chamber 91a to enter the second heat exchange chamber 91b, and at the same time, the first power supply system 703 supplies power to the liquid replenishment drive device 401 Power is supplied, driving water to push the one-way valve 403 to open, so that water enters the circulating water channel 201. When the water in the first heat exchange chamber 91a is filled, the water level switch 52 is closed and a signal is transmitted to the controller 701. The controller 701 issues an instruction to turn off the power supply of the liquid replenishment drive device 401, and at the same time, the water inlet delay switch 93 is turned to close the channels of the first heat exchange chamber 91a and the second heat exchange chamber 91b, and connect the channels of the second heat exchange chamber 91b and the water tank 80. The steam in the second heat exchange chamber 91b enters the water tank 80 due to buoyancy, and the water in the water tank 80 enters the second heat exchange chamber 91b. After the water is replenished in the second heat exchange chamber 91b, the water inlet delay switch 93 is turned to close the channels of the second heat exchange chamber 91b and the water tank 80. At this time, the channels of the second heat exchange chamber 91b and the water tank 80 are not connected to the first heat exchange chamber 91a.
[0036] Exemplarily, the exhaust pipe 92 passes through the second heat exchange chamber 91b, and the outlet of the exhaust pipe 92 extends into the water tank 80 and is located above the highest water level in the water tank 80. A water inlet is provided above the water tank 80 so that the gas in the exhaust pipe 92 can be discharged through the water inlet of the water tank 80. The inlet of the air intake pipe 53 is connected to the top of the first heat exchange chamber 91a, and the other end of the air intake pipe 53 is connected to the air intake channel 50. The top of the first heat exchange chamber 91a and the second heat exchange chamber 91b are connected through a first high-pressure air pipe 94 and are controlled by a water inlet delay switch 93.
[0037] Exemplarily, the shell 10 used in the water plasma thermal engine can be made of metal material to ensure that the shell 10 has sufficient strength to avoid cracks during operation, which may cause failure to work normally.
[0038] Exemplarily, after the steam enters the ionization chamber 20, the second power supply system 705 will provide high voltage to the positive electrode 500 and the negative electrode 600. When the voltage rises to a certain value, the gas between the positive electrode 500 and the negative electrode 600 will be broken down, and then discharge will occur. After the discharge occurs, the voltage will drop. At this time, if the power supply device can maintain the minimum voltage value for maintaining the discharge, the discharge will continue, and the second power supply system 705 can maintain the discharge, so that the gas can generate high temperature, so that the steam in the ionization chamber 20 is ionized to form ionized gas expansion to push the piston 30 to do work, thereby outputting the generated kinetic energy to the outside through the power output mechanism 40 for use. In addition, it should be noted that the power output mechanism 40 is a device for connecting to the outside to output the generated kinetic energy for use. The power output mechanism 40 can be a specific structure in the following embodiments, or a specific structure in the prior art, and is not limited to this.
[0039] Exemplarily, a control component 70 is provided at the air inlet end of each ionization chamber 20 so that the steam entering each ionization chamber 20 can be individually controlled. For example, after the positive electrode 500 and the negative electrode 600 in an ionization chamber 20 are provided with high voltage by the storage and power supply system, the positive electrode 500 and the negative electrode 600 generate a discharge phenomenon, and the discharge is maintained continuously and a high temperature is generated, so that the steam in the ionization chamber 20 is ionized to form an ionized gas. At this time, the pressure in the ionization chamber 20 is significantly increased until the pressure in the ionization chamber 20 is nearly equal to the pressure in the air inlet passage 50, and then the control component 70 is closed so that the steam cannot enter the ionization chamber 20, thereby making the ionization chamber 20 The piston 30 in the ionization chamber 20 moves up and down to compress the ionized gas and do work; when the piston 30 in the ionization chamber 20 moves downward, the volume in the ionization chamber gradually increases, and at this time the pressure in the ionization chamber gradually decreases. When the pressure in the ionization chamber is close to the pressure in the air inlet channel 50, due to the action of the elastic member 71, the control component is closed so that the steam in the air inlet channel 50 cannot enter the ionization chamber. When the volume of the ionization chamber reaches the maximum and is exhausted, the gas in the air inlet channel 50 cannot enter the ionization chamber. In addition, it should be noted that the air inlet end of each ionization chamber 20 is provided with a control component 70. The specific control method can be specifically referred to the above embodiment, and no specific description is given for this.
[0040] In addition, when steam is introduced into the air inlet passage 50, the first control valve 60 is opened to control the amount of gas injected into the ionization chamber by controlling the opening and closing degree of the first control valve 60, thereby controlling the magnitude of the output power. At the same time, the intensity of the current supplied by the second power supply system 705 can also be used to control the output power. The greater the current, the greater the output power, and vice versa.
[0041] Exemplarily, the pipeline on the second control valve 51 is connected to the water in the circulating water channel 201, and the outlet is above the air intake valve 72. When the air intake valve 72 is opened, the liquid reaches the air intake valve 72 through the liquid inlet channel 54. When the piston pushes the air intake valve 72 to open the valve, the liquid enters the ionization chamber together with the gas in the air intake channel 50. The amount of water entering the ionization chamber is adjusted by adjusting the opening and closing degree of the second control valve 51. The amount of water entering the ionization chamber is set according to the temperature of the ionization chamber. The higher the temperature, the more water enters the ionization chamber, and vice versa. It can be completely closed to prevent the ionization chamber from being damaged by excessive temperature. The temperature of the ionization chamber may be connected to the controller 701 through a temperature sensor. The controller 701 issues instructions to control the opening and closing degrees of the first control valve and the second control valve through data analysis of the temperature sensor and power control.
[0042] When the piston 30 reaches the maximum volume, the ionization chamber and the first exhaust channel 300 are in a connected state, and the gas in the ionization chamber flows toward the exhaust channel outlet 96, goes up to the second exhaust channel 95, and then goes down to the exhaust channel outlet 96, connects to the exhaust pipe 92, is discharged into the water tank 80, and then is discharged outward from the water inlet at the top of the water tank 80. The water in the water tank 80 passes through the second heat exchange chamber 91b and is on the same route as the exhaust pipe 92. The exhaust pipe 92 is in the water throughout the whole process, which can better complete the heat exchange and transfer the heat of the discharged water vapor to the water as much as possible.
[0043] Exemplarily, the water in the water tank 80 enters the circulating water channel 201 through the infusion tube 402. After the water in the circulating water channel 201 generates water vapor, it flows upward due to buoyancy and communicates with the first heat exchange chamber 91a. After the steam reaches the upper part, it enters the ionization chamber 20 through the air inlet pipe 53. The heat energy is continuously transferred from the ionization chamber 20 to the water in the first heat exchange chamber 91a. After the water vapor is formed, it enters the ionization chamber 20 again and is used in an infinite cycle, which greatly saves energy.
[0044] At this point, it should be noted that the conversion of heat energy and kinetic energy consumes water, not heat energy. The heat energy is 100% converted into water vapor and discharged from the equipment. The conversion rate of heat energy and kinetic energy is related to the precision of the equipment, pressure and other factors. This is similar to the air conditioner in the prior art. The input power of electrical energy cannot be equal to the output cooling or heating power. The input power of electrical energy must be less than the output cooling or heating power.
[0045] Exemplarily, after the water in the water tank 80 is injected into the first heat exchange chamber 91a and the second heat exchange chamber 91b, since the gas exhausted from the ionization chamber 20 carries heat, when the ionization chamber 20 is exhausted, the water in the first heat exchange chamber and the second heat exchange chamber absorbs heat to form steam, and the steam then enters the air intake channel 50 through the air intake pipe 53, and then enters the ionization chamber 20 to be ionized to form ionized gas, which is beneficial to improving energy utilization.
[0046] The water plasma engine based on the above technical features injects the water in the water tank 80 into the first heat exchange chamber and the second heat exchange chamber, and passes the gas with heat after the ionization chamber 20 does work into the first heat exchange chamber and the second heat exchange chamber, so that the heat is absorbed by the water to generate steam, and then uses the intake pipe to pass the steam in the first heat exchange chamber 91a and the second heat exchange chamber 91b to the intake channel 50, and controls the corresponding control component 70 to enter the corresponding ionization chamber 20, and then the storage and power supply system discharges to the positive electrode 500 and the negative electrode 600 in the ionization chamber 20 to generate high voltage, so that the steam is ionized. The ionized gas is formed and expands to push the piston 30 to do work externally for power output. At the same time, a huge amount of heat is released in the process of steam ionization. Part of the heat is conducted to the water in the water circulation device through the inner wall of the ionization chamber, and the other part of the heat will enter the first heat exchange chamber and the second heat exchange chamber for absorption along with the discharge of the gas, so that the water in the first heat exchange chamber and the second heat exchange chamber will generate steam again and enter the ionization chamber 20 again to generate ionization, and the second heat exchange chamber 91b will circulate in this way, thereby realizing multiple utilization of the heat energy after work, having a high efficiency of heat energy utilization, and achieving the purpose of energy saving and emission reduction.
[0047] In one embodiment, the control assembly 70 includes an air intake valve 72 and an elastic member 71. The elastic member 71 and the air intake valve 72 are both disposed at the air intake end in the ionization chamber 20. The elastic member 71 is located above the air intake valve 72, and the two ends of the elastic member 71 are respectively in contact with the inner wall of the air intake passage 50 and the air intake valve 72. When the air pressure in the ionization chamber 20 is equal to the air pressure in the air intake passage 50, the elastic member 71 applies an elastic force to the air intake valve 72, so that the air intake valve 72 blocks the air intake end of the ionization chamber 20.
[0048] Exemplarily, the elastic member 71 may be a spring, and the two ends of the spring are respectively in contact with the inner wall of the intake passage 50 and the intake valve 72, so that when the piston 30 moves in the direction of the ionization chamber 20 beyond the intake valve 72, the top of the piston 30 is in contact with the intake valve 72, and as the piston 30 continues to move, the intake valve 72 is pushed open, allowing the steam in the intake passage 50 to enter the ionization chamber 20, and the spring is in a compressed state at this time; after the piston 30 moves in the direction away from the intake valve 72, the piston 30 is separated from the push on the intake valve 72, and as the gas entering the ionization chamber 20 increases, the air pressure in the ionization chamber 20 and the air pressure in the intake passage 50 are close to being equal, and the spring in a compressed state pushes the intake valve 72 downward, so that the intake valve 72 blocks the intake end of the ionization chamber 20, so that the steam in the intake passage 50 cannot enter the ionization chamber 20, thereby using the piston 30 to do work on the ionized gas. The above elastic member 71 adopts a spring for example only, but is not limited thereto.
[0049] The gas in the ionization chamber 20 is discharged from the first exhaust channel 300, so that the pressure in the ionization chamber 20 is lower than the pressure in the intake channel 50. At this time, the control component 70 moves downward due to the pressure difference, so that the intake end of the ionization chamber 20 is opened, and then the steam enters the ionization chamber 20, and continues to be ionized under the high pressure of the positive electrode 500 and the negative electrode 600 to form ionized gas. In this way, the pressure difference between the intake channel 50 and the ionization chamber 20 is cleverly used to control the control component 70 and realize the automatic entry of gas.
[0050] In one embodiment, the power output mechanism 40 includes a crankshaft 41 and three connecting rods 42. The crankshaft 41 is rotatably disposed in the housing 10 and is located below the ionization chamber 20. One end of the three connecting rods 42 is connected to the crankshaft 41, and the other ends of the three connecting rods 42 are respectively connected to the pistons 30 in the corresponding three ionization chambers 20. In this way, the rotation of the crankshaft 41 can be used to drive the pistons 30 in the three ionization chambers 20 to move, thereby compressing the gas in the ionization chamber 20.
[0051] In one embodiment, an auxiliary starting assembly is also included, and the auxiliary starting assembly includes a power member, a driving gear and a driven gear 100. The power member is located outside the housing 10, and the output end of the power member is connected to the driving gear, and the driven gear 100 is sleeved on one end of the crankshaft 41, and the driven gear 100 is used to mesh with the driving gear. When the water plasma engine is just started, the power member drives the driving gear to extend to the driven gear 100 to mesh with the driven gear 100, and drives the driving gear to rotate, so as to drive the crankshaft 41 to rotate.
[0052] It should be noted that the power component may be a drive motor or other power components in the prior art, and this is not limited.
[0053] Exemplarily, since the piston 30 in the ionization chamber 20 is in a stopped state when the plasma motor starts, it is necessary to drive the piston 30 to move before the gas in the ionization chamber 20 can be compressed and work can be performed. For this purpose, an auxiliary starting component is required to drive the start. In this embodiment, the power member is used to drive the driving gear to extend to the driven gear 100, and the driving gear is meshed with the driven gear 100. Then, the power member is started to drive the driving gear to rotate, so as to drive the driven gear 100 to rotate, and then drive the crankshaft 41 to rotate. Since the piston 30 is connected to the crankshaft 41 by the connecting rod 42, the piston 30 is driven to expand and perform work in the ionization chamber 20. When the rotation speed of the crankshaft 41 is greater than the rotation speed of the power member, the power member drives the driving gear away from the driven gear 100 and falls off, thereby achieving the purpose of assisting the start of the water plasma engine.
[0054] In one embodiment, a generator electrically connected to the storage and power supply system is further included, and the generator is connected to the crankshaft 41 so that the generator generates electricity under the drive of the crankshaft 41 to charge the storage battery 704 .
[0055] Exemplarily, the electric energy generated by the engine being driven to generate electricity can charge the storage and power supply system so that the generated electric energy is stored in the storage and power supply system, so as to provide the required power for the positive electrode 500, the negative electrode 600 and the power parts.
[0056] The storage and power supply system is also provided with an external mains power interface, and when the power of the storage battery 704 is insufficient, the external mains power can be connected for charging.
[0057] It should be noted that when the plasma engine is operating normally to output power, the generator is not connected. At this time, the kinetic energy generated by the plasma engine is only used to drive the external device, and the generator is not driven to generate electricity. When the external device needs to slow down, the generator is connected to the crankshaft 41, so that the crankshaft 41 drives the generator to generate electricity, and then the generated electricity is stored in the power storage system. In addition, when the water plasma engine is turned off, it takes a period of time to stop completely. During this process, since there is high-temperature water in the first heat exchange chamber and the second heat exchange chamber, and the steam pressure is high, after the positive electrode 500 or the negative electrode 600 in the ionization chamber 20 turns off the power supply, the piston 30 can still drive the crankshaft 41 to rotate for a period of time. At this time, the engine is driven to generate electricity to avoid energy waste. If the engine is to be stopped for a short period of time only, the second power supply system 705 can be turned off, and the first control valve 60 and the second control valve 51 can be closed at the same time, and the engine will stop rotating. At this time, the pressure and temperature in the heat exchange chamber are still very high. When it is restarted, the power is very strong. Compared with the existing direct-acting electric motor drive technology, under the condition of the same power consumption, the power is stronger and the purpose of energy saving is achieved. If this engine is used in a car, in the winter in the north, the discharged water vapor is still much higher than the normal temperature and can be used for heating. Compared with direct-acting electric motor drive, it saves the electricity used for heating and consumes more water, thereby achieving the purpose of energy saving and emission reduction.
[0058] Reference Figure 3 In one embodiment, the second heat exchange chamber 91b is connected to the water tank 80 through a connecting pipe, and a water level switch is provided in the first heat exchange chamber 91a. When the water level switch senses a signal, the second control valve is closed, and the water inlet delay switch 93 is opened, so that the water vapor in the second heat exchange chamber 91b is discharged, so that the water in the water tank 80 is injected into the second heat exchange chamber 91b.
[0059] For example, when the water level in the first heat exchange chamber 91a drops to the lower limit,
[0060] The first heat exchange chamber 91a is opened to connect the first heat exchange chamber with the second heat exchange chamber, and the steam from the first heat exchange chamber enters the second heat exchange chamber through the first high-pressure gas pipe. At this time, the pressure in the first heat exchange chamber drops, so that the water in the water tank 80 is injected into the first heat exchange chamber 91a. When the water level in the first heat exchange chamber 91a rises to the upper limit, the water level switch senses a signal, controls the second control valve to close, and controls the water inlet delay switch 93 to open, disconnecting the first heat exchange chamber 91a and the second heat exchange chamber 91b through the first high pressure gas pipe. The compressed air pipe is connected, and the water vapor in the second heat exchange chamber 91b is discharged to the water tank 80. As the pressure in the second heat exchange chamber drops, the water in the water tank 80 flows into the second heat exchange chamber 91b until the steam in the second heat exchange chamber is completely discharged. The water inlet delay switch 93 is controlled to be completely closed. At this time, the first heat exchange chamber 91a, the second heat exchange chamber 91b and the water tank 80 cannot control the water inlet delay switch 93, thereby realizing automatic water replenishment of the first heat exchange chamber 91a and the second heat exchange chamber 91b.
[0061] In one embodiment, the exhaust pipe 92 has thermal conductivity to transfer the temperature in the exhaust pipe 92 to the water tank 80 .
[0062] In one embodiment, it also includes a fluid replenishment drive device 401, a one-way valve 403 and an infusion tube 402. The fluid replenishment drive device 401 is connected to one end of the infusion tube 402, and the other end of the infusion tube 402 is connected to the liquid inlet channel of the shell 10. The liquid inlet channel is connected to the first heat exchange chamber 91a. The one-way valve 403 is arranged on the infusion tube 402 to control water to enter the first heat exchange chamber 91a through the water circulation channel 201 under the action of the fluid replenishment drive device 401.
[0063] In one embodiment, a circulation pump 200 is further included, and the circulation pump 200 is used to accelerate the water circulation inside the housing 10. In this way, the circulation pump 200 is used to provide the power required to drive the water flow, so that the water circulates in the device to avoid damage to components due to excessive local temperature, resulting in malfunction. At the same time, the water forms water vapor and forms high pressure after being heated, and the high-pressure water vapor can provide power for the ionization chamber.
[0064] Application Examples
[0065] refer to Figures 6 to 10A water plasma engine according to an exemplary embodiment of the present application is provided. It should be noted that the above application scenarios are only shown to facilitate understanding of the spirit and principles of the present application, and the embodiments of the present application are not limited in this respect. On the contrary, the embodiments of the present application can be applied to any applicable scenario. In addition, for ease of description, the three ionization chambers are distinguished as a first ionization chamber, a second ionization chamber, and a third ionization chamber hereinafter. The above-mentioned "first", "second", and "third" do not constitute a limitation on the order in which the three ionization chambers are set, but are only used to distinguish the names.
[0066] When the water plasma engine in this embodiment starts to start, the power member drives the driving gear to drive the driven gear 100 to rotate, so that the crankshaft 41 is driven to rotate, and then drives the piston 30 connected to the crankshaft 41 to move up and down, so that the pistons 30 in the first ionization chamber 21 and the second ionization chamber 22 move downward, and the piston 30 in the third ionization chamber 23 moves upward to compress the gas. At this time, the intake valve 72 at the intake end of the second ionization chamber 22 begins to close, and the positive electrode 500 and the negative electrode 600 are connected by the storage and power supply system to generate high pressure, so that the steam in the second ionization chamber 22 produces a discharge phenomenon, and the discharge continues, thereby generating high temperature to ionize the steam to form ionized gas, so that the pressure of the second ionization chamber 22 is significantly increased, until the pressure in the second ionization chamber 22 is close to the pressure in the intake channel 50, the elastic member 71 pushes the intake valve 72 to move downward, and the intake end of the second ionization chamber 22 is closed, so that the steam cannot enter the second ionization chamber 22, as shown in FIG. Figure 6 shown.
[0067] Then, when the piston 30 in the first ionization chamber 21 moves downward to reach the maximum volume, the first ionization chamber 21 is connected to the first exhaust channel 300, and the gas in the first ionization chamber 21 is discharged. Figure 7 .
[0068] Then, when the piston 30 in the first ionization chamber 21 moves upward to compress the gas, and the piston of the third ionization chamber 23 moves to the minimum volume, the piston 30 of the third ionization chamber 23 pushes the intake valve 72 to allow the steam in the intake channel 50 to enter the third ionization chamber 23. When the piston 30 of the third ionization chamber 23 moves downward, the elastic member 71 pushes the intake valve 72 to close the intake end of the third ionization chamber 23. At the same time, the positive electrode 500 and the negative electrode 600 are connected by the storage and power supply system to generate high voltage, and the power supply of the positive electrode 500 and the negative electrode 600 in the second ionization chamber 22 is disconnected. At this time, the steam in the third ionization chamber 23 generates a discharge phenomenon, and the discharge continues, thereby generating a high temperature to ionize the steam to form an ionized gas, such as Figure 8 .
[0069] Then, when the piston 30 in the second ionization chamber 22 moves to the maximum volume, the second ionization chamber 22 is connected to the first exhaust channel 300, and the gas in the second ionization chamber 22 is discharged. Fig. 9 .
[0070] Then, when the piston 30 in the first ionization chamber 21 moves upward to reach the minimum volume, the piston 30 in the first ionization chamber 21 pushes the intake valve 72 to open, so that the steam in the intake channel 50 enters the first ionization chamber 21. When the piston 30 in the first ionization chamber 21 moves downward, the elastic member 71 pushes the intake valve 72 to close the intake end of the first ionization chamber 21. At the same time, the positive electrode 500 and the negative electrode 600 are connected by the storage and power supply system to generate high voltage, thereby generating high temperature to ionize the steam to form ionized gas, such as Fig.10 .
[0071] Such a cycle realizes the control process of the above-mentioned water plasma engine.
[0072] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A water plasma engine, characterized in that: include: A shell, wherein three mutually independent ionization chambers are arranged inside, each of the ionization chambers is provided with a piston capable of reciprocating movement, the piston transmission is connected with a power output mechanism, the shell is provided with an air inlet channel and a liquid inlet channel connected with the three ionization chambers, the air inlet channel is provided with a first control valve for controlling the opening or closing of the air inlet channel, the air inlet end of each ionization chamber is provided with a control component for controlling water and steam to enter the ionization chamber, and the liquid inlet channel is provided with a second control valve for controlling the opening or closing of the liquid inlet channel; wherein the water in the liquid inlet channel and the steam in the air inlet channel enter the corresponding ionization chamber under the control of the same corresponding control component, and each of the ionization chambers is provided with a positive electrode and a negative electrode; A storage and power supply system connected to the positive electrode and the negative electrode for providing high voltage to the positive electrode and the negative electrode so as to expand the steam entering the ionization chamber into ionized gas to push the piston to do work; A water tank for storing water required for generating steam; A heat exchange assembly, comprising a heat exchange box, an exhaust pipe and an intake pipe, wherein a first heat exchange chamber and a second heat exchange chamber are respectively provided in the heat exchange box, the first heat exchange chamber and the second heat exchange chamber are connected via a first high-pressure air pipe, the first high-pressure air pipe is provided with a water inlet delay switch for controlling the connection or disconnection of the first heat exchange chamber and the second heat exchange chamber, one end of the exhaust pipe is connected to the second heat exchange chamber, the other end of the exhaust pipe extends into the water tank and is located above the highest water level in the water tank, one end of the intake pipe is connected to the first heat exchange chamber, the other end of the intake pipe is connected to the intake channel, the first heat exchange chamber and the second heat exchange chamber are connected to the water tank.
2. The water plasma engine according to claim 1, characterized in that: The control component includes an air intake valve and an elastic member, wherein the elastic member and the air intake valve are both arranged at the air intake end in the ionization chamber, the elastic member is located above the air intake valve, and two ends of the elastic member are respectively in contact with the inner wall of the air intake passage and the air intake valve; When the air pressure in the ionization chamber is equal to the air pressure in the air inlet passage, the elastic member applies an elastic force to the air inlet valve, so that the air inlet valve blocks the air inlet end of the ionization chamber.
3. The water plasma engine according to claim 1, characterized in that: The power output mechanism includes a crankshaft and three connecting rods. The crankshaft is rotatably disposed in the housing and is located below the ionization chamber. One ends of the three connecting rods are connected to the crankshaft, and the other ends of the three connecting rods are respectively connected to the pistons in the corresponding three ionization chambers.
4. The water plasma engine according to claim 3, characterized in that: It also includes an auxiliary starting assembly, which includes a power piece, a driving gear and a driven gear, wherein the power piece is located outside the housing, and the output end of the power piece is connected to the driving gear, the driven gear is sleeved on one end of the crankshaft, and the driven gear is used to mesh with the driving gear; When the water plasma engine is just started, the power member drives the driving gear to extend toward the driven gear to mesh with the driven gear, and drives the driving gear to rotate, so as to drive the crankshaft to rotate.
5. The water plasma engine according to claim 4, characterized in that: It also includes a generator electrically connected to the storage and power supply system, and the generator is connected to the crankshaft so that the generator generates electricity under the drive of the crankshaft to charge the storage and power supply system.
6. The water plasma engine according to claim 1, characterized in that: The second heat exchange chamber is connected to the water tank via a connecting pipe, and a water level switch is provided in the first heat exchange chamber; When the water level switch senses a signal, the second control valve is closed and the water inlet delay switch is opened, so that the water vapor in the second heat exchange chamber is discharged to inject the water in the water tank into the second heat exchange chamber.
7. The water plasma engine according to claim 1, characterized in that: The exhaust pipe has thermal conductivity so as to conduct the heat in the exhaust pipe to the water tank.
8. The water plasma engine according to claim 1, characterized in that: It also includes a fluid infusion drive device, a one-way valve and an infusion tube, wherein the fluid infusion drive device is connected to one end of the infusion tube, the other end of the infusion tube is connected to the liquid inlet channel of the shell, the liquid inlet channel is connected to the first heat exchange chamber, and the one-way valve is arranged on the infusion tube to control water to flow into the first heat exchange chamber under the action of the fluid infusion drive device.
9. The water plasma engine according to claim 1, characterized in that: A circulation pump is also included, and the circulation pump is used to accelerate the water circulation inside the shell.
Citation Information
Patent Citations
Water plasma thermal energy engine
CN107091117A
