Gasification waste heat recycling method
By mixing and recycling the gasifier furnace water of high-pressure and low-pressure flash evaporation pipelines, combined with the dual-energy dual-effect refrigeration unit process, the problem of uneven heat distribution in gasification waste heat recovery is solved, and stable production in the heating season is achieved and Efficient energy utilization.
Patent Information
- Application Number
- CN202411399720.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-12-03
AI Technical Summary
In gasification waste heat recovery technology, uneven heat distribution leads to production fluctuations, production cuts or production suspensions, especially during the heating season, when the heat source for cooling is insufficient.
Design a gasification waste heat recovery method, by mixing the gasification furnace water of the high-pressure flash pipeline and the low-pressure flash pipeline and then feeding it into the furnace water cooler, and then cooling it through the intermediate water and entering the hot water heater in two channels. and heat pump steam unit, circulating and through the dual-energy dual-effect refrigeration unit process during the heating season, use steam heat sources to supplement or replace heat sources for refrigeration to ensure the cold water cooling demand.
It effectively solves the production fluctuations and production reduction problems caused by uneven heat distribution, improves energy utilization, ensures the demand for heating and cold water cooling, and achieves comprehensive recycling and economic utilization of gasification waste heat.
Smart Images

Figure CN119063545A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of waste heat recovery, in particular to a method for recovering and utilizing gasification waste heat. Background Art
[0002] Gasification waste heat recovery technology has been widely used in coal chemical industry, steel smelting and other industries. With the improvement of environmental protection requirements and the rise of energy prices, the market demand for gasification waste heat recovery technology is growing.
[0003] Although gasification waste heat recovery technology has great potential, it still faces some challenges in its promotion process, such as high initial investment costs, insufficient technical maturity, and seasonal process matching. In particular, the full recovery and systematic application of heat from gasifier water, flash steam and other media still face problems such as low efficiency, incompleteness, uneconomical, low benefits, and imbalance.
[0004] During the heating season, waste heat from gasification is often used to provide heating, resulting in insufficient or lack of heat for cooling, seriously affecting the chilled water capacity required by the production system, causing production fluctuations, reductions or even shutdowns. Summary of the invention
[0005] The technical task of the present invention is to provide a method for recovering and utilizing gasification waste heat to solve the problems of production fluctuation, production reduction or production stoppage caused by uneven heat distribution.
[0006] The technical task of the present invention is achieved in the following manner: a method for recovering and utilizing waste heat from gasification, wherein the gasifier water from the high-pressure flash evaporation pipeline and the gasifier water from the low-pressure flash evaporation pipeline are mixed and sent to a boiler water cooler, and after being cooled by intermediate water in the boiler water cooler, the water is returned to a sedimentation tank from the outlet of the boiler water cooler through a sedimentation pipeline;
[0007] Among them, the intermediate water at the outlet of the boiler water cooler has two routes. One route enters the hot water heater. After the hot water heater heats the heating water from the heating station, it enters the intermediate water pump from the outlet of the hot water heater. After the intermediate water pump increases the pressure, it enters the boiler water cooler and circulates. The other route enters the heat pump steam unit. After the outlet of the heat pump steam unit passes through the refrigeration component, it enters the intermediate water pump. After the intermediate water pump increases the pressure, it enters the boiler water cooler and circulates.
[0008] A heating water outlet pipe and a heating water inlet pipe are arranged at the lower end of the hot water heater.
[0009] Preferably, the refrigeration assembly comprises a primary refrigeration unit, a secondary refrigeration unit and a circulating water cooler, the outlet end of the heat pump steam unit enters the primary refrigeration unit through the intermediate water outlet valve of the heat pump steam unit and the intermediate water inlet valve of the primary refrigeration unit, the outlet end of the primary refrigeration unit enters the secondary refrigeration unit through the intermediate water outlet valve of the primary refrigeration unit and the intermediate water inlet valve of the secondary refrigeration unit, the outlet end of the secondary refrigeration unit enters the circulating water cooler through the intermediate water outlet valve of the secondary refrigeration unit, the outlet end of the circulating water cooler enters the intermediate water pump, after the intermediate water pump increases the pressure, enters the boiler water cooler through the intermediate water pump outlet flow regulating valve and the intermediate water inlet valve of the boiler water cooler, and circulates;
[0010] Among them, a standby water pump is arranged on the pipeline connecting the boiler water cooler and the hot water heater, and the standby water pump is arranged in parallel with the intermediate water pump.
[0011] Preferably, the high-pressure flash evaporation pipeline is provided with a high-pressure flash evaporation boiler water outlet valve, the low-pressure flash evaporation pipeline is provided with a low-pressure flash tank boiler water outlet valve, and the sedimentation pipeline is provided with a boiler water cooler boiler water outlet valve 1 and a boiler water cooler boiler water outlet valve 2;
[0012] A boiler water cooler boiler water drain valve is arranged at the lower end of the boiler water cooler.
[0013] Preferably, the gasification furnace water of the high-pressure flash evaporation pipeline and the gasification furnace water of the low-pressure flash evaporation pipeline are mixed and divided into two paths, one path enters the boiler water cooler through the boiler water inlet pipe and the boiler water inlet valve 1 of the boiler water cooler installed on the boiler water inlet pipe, and the other path enters the boiler water cooler through the boiler water inlet valve 2 of the boiler water cooler, and a reverse cut pipeline is arranged between the boiler water inlet pipe and the sedimentation pipeline, and a boiler water outlet valve 3 of the boiler water cooler is arranged on the reverse cut pipeline.
[0014] More preferably, a first-stage refrigeration unit intermediate water inlet valve 2 is provided on the pipeline connecting the first-stage refrigeration unit and the second-stage refrigeration unit, so as to maintain normal operation of the first-stage refrigeration unit and the second-stage refrigeration unit when the heat pump steam unit fails.
[0015] Preferably, a primary refrigeration unit intermediate water connecting valve is provided on the pipeline connecting the heat pump steam unit and the secondary refrigeration unit, so that when the primary refrigeration unit fails, the heat pump steam unit and the secondary refrigeration unit are maintained to operate normally.
[0016] Preferably, a secondary refrigeration unit intermediate water connecting valve is provided on the pipeline connecting the heat pump steam unit with the primary refrigeration unit and the circulating water cooler, so that when the secondary refrigeration unit fails, the heat pump steam unit, the primary refrigeration unit and the circulating water cooler are maintained to operate normally.
[0017] More preferably, the lower end of the heat pump steam unit is provided with a circulating water outlet pipe 1, a circulating water inlet pipe 1, a boiler water inlet pipe and a steam outlet pipe in sequence, the boiler water inlet pipe is provided with a heat pump steam unit boiler water inlet valve, and the steam outlet pipe is provided with a heat pump steam unit steam outlet valve;
[0018] Wherein, an intermediate water inlet valve of the heat pump steam unit is arranged on the pipeline connecting the heat pump steam unit and the boiler water cooler.
[0019] More preferably, a double-effect steam inlet pipe 1 and a steam condensate outlet pipe 1 are respectively arranged on both sides of the first-stage refrigeration unit, and a double-effect steam inlet valve of the first-stage refrigeration unit is arranged on the double-effect steam inlet pipe 1;
[0020] The lower end of the first-stage refrigeration unit is sequentially provided with a circulating water outlet pipe 2, a circulating water inlet pipe 2, a low-temperature cold water inlet pipe 1 and a low-temperature cold water outlet pipe 1.
[0021] More preferably, a double-effect steam inlet pipe 2 and a steam condensate outlet pipe 2 are respectively provided on both sides of the secondary refrigeration unit, and a double-effect steam inlet valve of the secondary refrigeration unit is provided on the double-effect steam inlet pipe 2;
[0022] The lower end of the secondary refrigeration unit is provided with a circulating water outlet pipe 3, a circulating water inlet pipe 3, a low-temperature cold water inlet pipe 2 and a low-temperature cold water outlet pipe 2 in sequence;
[0023] The lower end of the circulating water cooler is provided with a circulating water outlet pipe four and a circulating water inlet pipe four, and the circulating water inlet pipe four is provided with a circulating water cooler temperature regulating valve.
[0024] The gasification waste heat recovery and utilization method of the present invention has the following advantages:
[0025] (1) The present invention designs a dual-energy dual-effect refrigeration unit process, adopts steam heat source to supplement or replace the heat of the refrigeration heat source, ensures that the cold water cooling capacity required by the production system can still be met during the heating season, solves the production fluctuation, production reduction or shutdown caused by uneven heat distribution, and improves energy utilization;
[0026] (ii) The present invention recovers heat energy accounting for about 2.5% of the mass of coal fed into the gasifier, and through primary and secondary heat exchange, about 1% of the heat is used to produce low-pressure steam as a byproduct and returned to the production heat pipe network; about 1.5% of the heat is used to produce low-temperature cold water required for the production process, thereby improving the process conditions of the cooling and heat exchange equipment;
[0027] (III) The present invention can simultaneously meet the requirements of user heating and production system cold water cooling during the heating season, that is, during the heating season, the gasification waste heat is used to provide user heating heat, and the heat source of the refrigeration unit is switched from the gasification waste heat to the dual-energy steam mode, and the cold water cooling of the production system is continuously and stably produced;
[0028] (iv) The present invention is designed to combine multiple operating modes. The core equipment in the system can be connected in series or in parallel, such as a heat pump steam unit + a primary refrigeration unit + a secondary refrigeration unit, or a heat pump steam unit + a primary refrigeration unit + a circulating water cooler, or a primary refrigeration unit + a secondary refrigeration unit + a circulating water cooler. Different operating schemes are provided according to the amount of waste heat recovery to meet the needs of the production system;
[0029] (V) The present invention is provided with a circulating water cooler as a safety device to ensure that the outlet temperature of the gasifier water cooler meets the standard; under normal conditions, the circulating water cooler is not put into use, and is put into use when one or more of the heat pump steam unit / primary refrigeration unit / secondary refrigeration unit fails to ensure the stability of the water temperature index of the production system;
[0030] (VI) The present invention is provided with an intermediate water pump and a standby water pump, one for operation and the other for standby. When the operating water pump fails, the other water pump automatically starts according to the flow change to ensure the circulation supply of the intermediate water;
[0031] In summary, the present invention can fully recycle and utilize the gasification waste heat in both the heating season and the non-heating season, thereby maximizing the economic benefits.
[0032] Therefore, the invention has the characteristics of reasonable design, simple structure, easy processing, small size, convenient use, multi-purpose, etc., and thus has good promotion and use value. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention is further described below in conjunction with the accompanying drawings.
[0034] Attached Figure 1 Schematic diagram of the gasification waste heat recovery method.
[0035] In the figure: 1. boiler water cooler, 2. heat pump steam unit, 3. primary refrigeration unit, 4. secondary refrigeration unit, 5. circulating water cooler, 6. hot water heater, 7. intermediate water pump (organic heat carrier), 8. high pressure flash tank boiler water outlet valve, 9. low pressure flash tank boiler water outlet valve, 10. boiler water cooler boiler water outlet valve, 11. boiler water cooler boiler water inlet valve 1, 12. boiler water cooler boiler water outlet valve 1, 13. boiler water cooler boiler water inlet valve 2, 14. boiler water cooler boiler water outlet valve 2, 15. boiler water cooler boiler water drain valve , 16, boiler water cooler intermediate water outlet valve, 17, boiler water cooler intermediate water inlet valve, 18, intermediate water pump outlet flow regulating valve, 19, heat pump steam unit intermediate water inlet valve, 20, heat pump steam unit intermediate water outlet valve, 21, first-stage refrigeration unit intermediate water inlet valve 1, 22, first-stage refrigeration unit intermediate water outlet valve, 23, first-stage refrigeration unit intermediate water inlet valve 2, 24, first-stage refrigeration unit intermediate water connecting valve, 25, second-stage refrigeration unit intermediate water inlet valve 1, 26, second-stage refrigeration unit intermediate water outlet valve, 27, second-stage system Refrigeration unit intermediate water connecting valve, 28, circulating water cooler temperature regulating valve, 29, heat pump steam unit boiler water inlet valve, 30, heat pump steam unit steam outlet valve, 31, first-stage refrigeration unit double-effect steam inlet valve, 32, second-stage refrigeration unit double-effect steam inlet valve, 33, high-pressure flash pipeline, 34, low-pressure flash pipeline, 35, heating outlet pipe, 36, heating inlet pipe, 37, sedimentation pipeline, 38, circulating water outlet pipe 1, 39, circulating water inlet pipe 1, 40, boiler water inlet pipe, 41, steam outlet pipe, 42, double-effect steam Steam inlet pipe one, 43, steam condensate outlet pipe one, 44, circulating water outlet pipe two, 45, circulating water inlet pipe two, 46, low-temperature cold water inlet pipe one, 47, low-temperature cold water outlet pipe one, 48, double-effect steam inlet pipe two, 49, steam condensate outlet pipe two, 50, circulating water outlet pipe three, 51, circulating water inlet pipe three, 52, low-temperature cold water inlet pipe two, 53, low-temperature cold water outlet pipe two, 54, circulating water outlet pipe four, 55, circulating water inlet pipe four, 56, spare water pump, 57, boiler water inlet pipe, 58, reverse cut pipeline. DETAILED DESCRIPTION
[0036] The gasification waste heat recovery and utilization method of the present invention is described in detail below with reference to the accompanying drawings and specific embodiments of the specification.
[0037] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0038] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] Example:
[0040] As attached Figure 1 As shown, this embodiment provides a method for recovering waste heat from gasification, which is to mix the gasifier water in the high-pressure flash evaporation pipeline 33 and the gasifier water in the low-pressure flash evaporation pipeline 34, and then send them to the boiler water cooler 1, and after being cooled by the intermediate water of the boiler water cooler 1, they are returned to the sedimentation tank from the outlet of the boiler water cooler 1 through the sedimentation pipeline 37;
[0041] Among them, the intermediate water at the outlet end of the boiler water cooler 1 is divided into two paths. One path enters the hot water heater 2. After the hot water heater 2 heats the heating water from the heating station, it enters the intermediate water pump 7 from the outlet end of the hot water heater 2. After being pressurized by the intermediate water pump 7, it enters the boiler water cooler 1 and circulates; the other path enters the heat pump steam unit 2. After passing through the refrigeration component at the outlet end of the heat pump steam unit 2, it enters the intermediate water pump 7. After being pressurized by the intermediate water pump 7, it enters the boiler water cooler 1 and circulates; the lower end of the hot water heater 2 is provided with a heating water outlet pipe 25 and a heating water inlet pipe 36.
[0042] One end of the high-pressure flash pipeline 33 in this embodiment is connected to the high-pressure flash tank, and a high-pressure flash boiler water outlet valve 8 is installed on the high-pressure flash pipeline 33; one end of the low-pressure flash pipeline 34 is connected to the low-pressure flash tank, and a low-pressure flash tank boiler water outlet valve 9 is installed on the low-pressure flash pipeline 34; a boiler water cooler boiler water outlet valve 10 and a boiler water cooler boiler water outlet valve 12 are installed on the sedimentation pipeline 37; a boiler water cooler boiler water drain valve 15 is installed at the lower end of the boiler water cooler 1.
[0043] The refrigeration assembly in this embodiment includes a primary refrigeration unit 3, a secondary refrigeration unit 4 and a circulating water cooler 5. The outlet end of the heat pump steam unit 2 enters the primary refrigeration unit 3 through the intermediate water outlet valve 20 of the heat pump steam unit and the intermediate water inlet valve 21 of the primary refrigeration unit. The outlet end of the primary refrigeration unit 3 enters the secondary refrigeration unit 4 through the intermediate water outlet valve 22 of the primary refrigeration unit and the intermediate water inlet valve 25 of the secondary refrigeration unit. The outlet end of the secondary refrigeration unit 4 enters the circulating water cooler 5 through the intermediate water outlet valve 26 of the secondary refrigeration unit. The outlet end of the circulating water cooler 5 enters the intermediate water pump 7. After the intermediate water pump 7 increases the pressure, it enters the boiler water cooler 1 through the intermediate water pump outlet flow regulating valve 18 and the boiler water cooler intermediate water inlet valve 17, and circulates.
[0044] Among them, a standby water pump 56 is installed on the pipeline connecting the boiler water cooler 1 and the hot water heater 6, and the standby water pump 56 is arranged in parallel with the intermediate water pump 7.
[0045] The gasification furnace water of the high-pressure flash evaporation pipeline 33 and the gasification furnace water of the low-pressure flash evaporation pipeline 34 in this embodiment are mixed and divided into two paths. One path enters the boiler water cooler 1 through the boiler water inlet pipe 57 and the boiler water inlet valve 11 of the boiler water cooler installed on the boiler water inlet pipe 57, and the other path enters the boiler water cooler 1 through the boiler water inlet valve 2 13 of the boiler water cooler. A reverse cut pipeline 58 is installed between the boiler water inlet pipe 57 and the sedimentation pipeline 37, and a boiler water outlet valve 3 14 of the boiler water cooler is installed on the reverse cut pipeline 58.
[0046] In this embodiment, a first-stage refrigeration unit intermediate water inlet valve 23 is installed on the pipeline connecting the first-stage refrigeration unit 3 and the second-stage refrigeration unit 4. When the heat pump steam unit 2 fails, the first-stage refrigeration unit 3 and the second-stage refrigeration unit 4 are maintained to operate normally.
[0047] In this embodiment, a primary refrigeration unit intermediate water connecting valve 24 is installed on the pipeline connecting the heat pump steam unit 2 and the secondary refrigeration unit 4. When the primary refrigeration unit 3 fails, the heat pump steam unit 2 and the secondary refrigeration unit 4 are maintained to operate normally.
[0048] In this embodiment, a secondary refrigeration unit intermediate water connecting valve 27 is installed on the pipeline connecting the heat pump steam unit 2 with the primary refrigeration unit 3 and the circulating water cooler 5. When the secondary refrigeration unit 4 fails, the heat pump steam unit 2, the primary refrigeration unit 3 and the circulating water cooler 5 are maintained to operate normally.
[0049] In this embodiment, the lower end of the heat pump steam unit 2 is sequentially installed with a circulating water outlet pipe 38, a circulating water inlet pipe 39, a boiler water inlet pipe 40 and a steam outlet pipe 41. The boiler water inlet pipe 40 is installed with a heat pump steam unit boiler water inlet valve 29, and the steam outlet pipe 41 is installed with a heat pump steam unit steam outlet valve 30;
[0050] Among them, the heat pump steam unit intermediate water inlet valve 19 is installed on the pipeline connecting the heat pump steam unit 2 and the boiler water cooler 1.
[0051] In this embodiment, a double-effect steam inlet pipe 42 and a steam condensate outlet pipe 43 are installed on both sides of the primary refrigeration unit 3, and a double-effect steam inlet valve 31 of the primary refrigeration unit is installed on the double-effect steam inlet pipe 42;
[0052] The lower end of the primary refrigeration unit 3 is sequentially provided with a circulating water outlet pipe 2 44 , a circulating water inlet pipe 2 45 , a low-temperature cold water inlet pipe 1 46 and a low-temperature cold water outlet pipe 1 47 .
[0053] In this embodiment, the two-stage refrigeration unit 4 is provided with a double-effect steam inlet pipe 48 and a steam condensate outlet pipe 49 on both sides thereof, and a double-effect steam inlet valve 32 of the two-stage refrigeration unit is provided on the double-effect steam inlet pipe 48;
[0054] The lower end of the secondary refrigeration unit 4 is sequentially provided with a circulating water outlet pipe 3 50 , a circulating water inlet pipe 3 51 , a low-temperature cold water inlet pipe 2 52 and a low-temperature cold water outlet pipe 2 53 .
[0055] The circulating water cooler 5 in this embodiment is provided with a circulating water outlet pipe 454 and a circulating water inlet pipe 455 at the lower end, and a circulating water cooler temperature regulating valve 28 is installed on the circulating water inlet pipe 455. The circulating water cooler 5 is a safety device, which ensures that the intermediate water temperature is normally used when one of the heat pump steam unit 2, the primary refrigeration unit 3 or the secondary refrigeration unit 4 fails. The circulating water cooler 5 is provided with a circulating water cooler temperature regulating valve 28, which adjusts the circulating water flow rate according to the outlet temperature of the circulating water cooler 5.
[0056] The processes of the heat pump steam unit 2, the primary refrigeration unit 3 and the secondary refrigeration unit 4 can be connected in series or in parallel. In normal operation, they can be connected in series. When one of them fails, the interlocking valve switch can be adjusted to cut off the faulty equipment to ensure normal operation.
[0057] In this embodiment, each cycle is as follows:
[0058] ① The specific black water circulation process is: high-pressure flash tank boiler water outlet valve 8 + low-pressure flash tank boiler water outlet valve 9 → boiler water cooler boiler water inlet valve 11 → boiler water cooler 1 → boiler water cooler boiler water outlet valve 12 → boiler water cooler boiler water outlet valve 10.
[0059] ② The specific black water back-cutting process is: high-pressure flash tank boiler water outlet valve 8 + low-pressure flash tank boiler water outlet valve 9 → boiler water cooler boiler water inlet valve 2 13 → boiler water cooler 1 → boiler water cooler boiler water outlet valve 2 14 → boiler water cooler boiler water outlet valve 10.
[0060] ③ The intermediate water process (heating season operating conditions) is specifically as follows: intermediate water pump 7 → intermediate water pump outlet flow regulating valve 18 → boiler water cooler intermediate water inlet valve 17 → boiler water cooler 1 → boiler water cooler intermediate water outlet valve 16 → hot water heater 6 → intermediate water pump 7.
[0061] ④ The intermediate water process (non-heating season operating conditions) is specifically as follows: intermediate water pump 7→intermediate water pump outlet flow regulating valve 18→boiler water cooler intermediate water inlet valve 17→boiler water cooler 1→boiler water cooler intermediate water outlet valve 16→heat pump steam unit intermediate water inlet valve 19→heat pump steam unit 2→heat pump steam unit intermediate water outlet valve 20→first-stage refrigeration unit intermediate water inlet valve 21→first-stage refrigeration unit 3→first-stage refrigeration unit intermediate water outlet valve 22→second-stage refrigeration unit intermediate water inlet valve 25→secondary refrigeration unit 4→secondary refrigeration unit intermediate water outlet valve 26→circulating water cooler 5→intermediate water pump 7.
[0062] ⑤ The intermediate water process (non-heating season operating conditions, when the heat pump steam unit 2 fails) is specifically as follows: intermediate water pump 7→intermediate water pump outlet flow regulating valve 18→boiler water cooler intermediate water inlet valve 17→boiler water cooler 1→boiler water cooler intermediate water outlet valve 16→first-stage refrigeration unit intermediate water inlet valve two 23→first-stage refrigeration unit intermediate water inlet valve one 21→first-stage refrigeration unit 3→first-stage refrigeration unit intermediate water outlet valve 22→second-stage refrigeration unit intermediate water inlet valve one 25→secondary refrigeration unit 4→secondary refrigeration unit intermediate water outlet valve 26→circulating water cooler 5→intermediate water pump 7.
[0063] ⑥ The intermediate water process (non-heating season operating conditions, when the first-stage refrigeration unit 3 fails) is specifically as follows: intermediate water pump 7→intermediate water pump outlet flow regulating valve 18→boiler water cooler intermediate water inlet valve 17→boiler water cooler 1→boiler water cooler intermediate water outlet valve 16→heat pump steam unit intermediate water inlet valve 19→heat pump steam unit 2→heat pump steam unit intermediate water outlet valve 20→first-stage refrigeration unit intermediate water connecting valve 24→secondary refrigeration unit intermediate water inlet valve 25→secondary refrigeration unit 4→secondary refrigeration unit intermediate water outlet valve 26→circulating water cooler 5→intermediate water pump 7.
[0064] ⑦ The intermediate water process (non-heating season operating conditions, when the secondary refrigeration unit 4 fails) is specifically as follows: intermediate water pump 7→intermediate water pump outlet flow regulating valve 18→boiler water cooler intermediate water inlet valve 17→boiler water cooler 1→boiler water cooler intermediate water outlet valve 16→heat pump steam unit intermediate water inlet valve 19→heat pump steam unit 2→heat pump steam unit intermediate water outlet valve 20→first-stage refrigeration unit intermediate water inlet valve 21→first-stage refrigeration unit 3→first-stage refrigeration unit intermediate water outlet valve 22→secondary refrigeration unit intermediate water connecting valve 27→circulating water cooler 5→intermediate water pump 7.
[0065] Intermediate water flow (non-heating season operating conditions), intermediate water flow (non-heating season operating conditions, when the heat pump steam unit 2 fails), intermediate water flow (non-heating season operating conditions, when the first-stage refrigeration unit 3 fails), intermediate water flow (non-heating season operating conditions, when the second-stage refrigeration unit 4 fails) - four operating conditions in the non-heating season, equipment is connected in parallel.
[0066] This embodiment can fully recycle and utilize the gasification waste heat in both the heating season and the non-heating season, thereby maximizing the economic benefits.
[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for recovering and utilizing waste heat from gasification, characterized in that: The method comprises the following steps: mixing the gasifier water of the high-pressure flash evaporation pipeline and the gasifier water of the low-pressure flash evaporation pipeline, sending the mixed mixture into a boiler water cooler, cooling the mixed mixture with the intermediate water of the boiler water cooler, and then returning the mixed mixture from the outlet of the boiler water cooler to the sedimentation tank through a sedimentation pipeline; Among them, the intermediate water at the outlet of the boiler water cooler has two routes. One route enters the hot water heater. After the hot water heater heats the heating water from the heating station, it enters the intermediate water pump from the outlet of the hot water heater. After the intermediate water pump increases the pressure, it enters the boiler water cooler and circulates. The other route enters the heat pump steam unit. After the outlet of the heat pump steam unit passes through the refrigeration component, it enters the intermediate water pump. After the intermediate water pump increases the pressure, it enters the boiler water cooler and circulates. A heating water outlet pipe and a heating water inlet pipe are arranged at the lower end of the hot water heater.
2. The method for recovering and utilizing waste heat from gasification according to claim 1, characterized in that: The refrigeration assembly comprises a primary refrigeration unit, a secondary refrigeration unit and a circulating water cooler. The outlet end of the heat pump steam unit enters the primary refrigeration unit through the intermediate water outlet valve of the heat pump steam unit and the intermediate water inlet valve of the primary refrigeration unit. The outlet end of the primary refrigeration unit enters the secondary refrigeration unit through the intermediate water outlet valve of the primary refrigeration unit and the intermediate water inlet valve of the secondary refrigeration unit. The outlet end of the secondary refrigeration unit enters the circulating water cooler through the intermediate water outlet valve of the secondary refrigeration unit. The outlet end of the circulating water cooler enters the intermediate water pump. After the intermediate water pump increases the pressure, the outlet end enters the boiler water cooler through the intermediate water pump outlet flow regulating valve and the intermediate water inlet valve of the boiler water cooler, and circulates. Among them, a standby water pump is arranged on the pipeline connecting the boiler water cooler and the hot water heater, and the standby water pump is arranged in parallel with the intermediate water pump.
3. The method for recovering and utilizing waste heat from gasification according to claim 1, characterized in that: The high-pressure flash pipeline is provided with a high-pressure flash boiler water outlet valve, the low-pressure flash pipeline is provided with a low-pressure flash tank boiler water outlet valve, and the sedimentation pipeline is provided with a boiler water cooler boiler water outlet valve 1 and a boiler water cooler boiler water outlet valve 2; A boiler water cooler boiler water drain valve is arranged at the lower end of the boiler water cooler.
4. The method for recovering and utilizing waste heat from gasification according to claim 1, characterized in that: The gasification boiler water of the high-pressure flash evaporation pipeline and the gasification boiler water of the low-pressure flash evaporation pipeline are mixed and divided into two paths. One path enters the boiler water cooler through the boiler water inlet pipe and the boiler water inlet valve 1 of the boiler water cooler installed on the boiler water inlet pipe, and the other path enters the boiler water cooler through the boiler water inlet valve 2 of the boiler water cooler. A reverse cut pipeline is arranged between the boiler water inlet pipe and the sedimentation pipeline, and a boiler water outlet valve 3 of the boiler water cooler is arranged on the reverse cut pipeline.
5. The method for recovering and utilizing waste heat from gasification according to claim 2, characterized in that: A first-stage refrigeration unit intermediate water inlet valve 2 is arranged on the pipeline connecting the first-stage refrigeration unit and the second-stage refrigeration unit, so as to maintain the normal operation of the first-stage refrigeration unit and the second-stage refrigeration unit when the heat pump steam unit fails.
6. The method for recovering and utilizing waste heat from gasification according to claim 2, characterized in that: A primary refrigeration unit intermediate water connecting valve is arranged on the pipeline connecting the heat pump steam unit and the secondary refrigeration unit, so as to maintain the normal operation of the heat pump steam unit and the secondary refrigeration unit when the primary refrigeration unit fails.
7. The method for recovering and utilizing waste heat from gasification according to claim 2, characterized in that: A secondary refrigeration unit intermediate water connecting valve is arranged on the pipeline connecting the heat pump steam unit with the primary refrigeration unit and the circulating water cooler. When the secondary refrigeration unit fails, the heat pump steam unit, the primary refrigeration unit and the circulating water cooler are maintained to operate normally.
8. The method for recovering and utilizing waste heat from gasification according to claim 2, characterized in that: The lower end of the heat pump steam unit is provided with a circulating water outlet pipe 1, a circulating water inlet pipe 1, a boiler water inlet pipe and a steam outlet pipe in sequence, the boiler water inlet pipe is provided with a heat pump steam unit boiler water inlet valve, and the steam outlet pipe is provided with a heat pump steam unit steam outlet valve; Wherein, an intermediate water inlet valve of the heat pump steam unit is arranged on the pipeline connecting the heat pump steam unit and the boiler water cooler.
9. The method for recovering and utilizing waste heat from gasification according to claim 2, characterized in that: A double-effect steam inlet pipe 1 and a steam condensate outlet pipe 1 are respectively arranged on both sides of the first-stage refrigeration unit, and a double-effect steam inlet valve of the first-stage refrigeration unit is arranged on the double-effect steam inlet pipe 1; The lower end of the first-stage refrigeration unit is sequentially provided with a circulating water outlet pipe 2, a circulating water inlet pipe 2, a low-temperature cold water inlet pipe 1 and a low-temperature cold water outlet pipe 1.
10. The method for recovering and utilizing waste heat from gasification according to claim 2, characterized in that: A double-effect steam inlet pipe 2 and a steam condensate outlet pipe 2 are respectively arranged on both sides of the secondary refrigeration unit, and a double-effect steam inlet valve of the secondary refrigeration unit is arranged on the double-effect steam inlet pipe 2; The lower end of the secondary refrigeration unit is provided with a circulating water outlet pipe 3, a circulating water inlet pipe 3, a low-temperature cold water inlet pipe 2 and a low-temperature cold water outlet pipe 2 in sequence; The lower end of the circulating water cooler is provided with a circulating water outlet pipe four and a circulating water inlet pipe four, and the circulating water inlet pipe four is provided with a circulating water cooler temperature regulating valve.