Physical simulation research system for mud permeation spatio-temporal characteristics of cast-in-situ bored pile
Through the physical simulation research system of the spatial and temporal characteristics of mud permeation of bored piles, the problem that the existing technology cannot simulate the spatial and temporal characteristics of mud permeation of bored piles is solved, and the detailed analysis of mud permeation behavior and optimization of slurry ratio are realized, and the improvement of slurry ratio is achieved. The stability assessment of pile foundation was carried out.
Patent Information
- Application Number
- CN202411246173.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art cannot effectively simulate the penetration of drilling pile mud at different times and depths, and cannot truly study the spatial and temporal evolution characteristics of the penetration characteristics, resulting in errors in actual engineering.
A physical simulation research system for the spatial and temporal characteristics of mud permeation of drilled piles was designed, including drilling stand, multi-stage fill bucket and mud circulation system. The mud circulation was realized through multi-stage fill bucket simulation of soil samples and mud circulation systems at different depths. It can easily change the ratio of mud material, simulate the permeation process in deep sand layers, and accurately extract the soil samples through a sampling knife to prevent disturbances from the original soil.
This system can simulate the construction environment of cast-injected piles in actual projects, analyze the permeability of different proportioned muds in different spaces around the drilling hole over time, evaluate the stability of the drilling pile hole wall, and optimize the slurry rationing process, and have a simple design , easy to operate.
Smart Images

Figure CN119064239A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering, in particular to a physical simulation research system for time-space characteristics of bored pile mud penetration. Background Art
[0002] In the process of civil engineering construction, piles are widely used in construction projects as a deep foundation form to transfer the load of the superstructure to deeper soil or rock. However, the bearing capacity of the pile is affected by many factors such as the soil layer, the characteristics of the pile body itself, the geometric dimensions of the pile, the construction method of the pile, and the surrounding environmental conditions. In actual engineering, piles usually pass through the surface soil layer to reach the deeper bearing layer, such as rock layer or harder soil layer, to obtain sufficient bearing capacity. In addition, the material strength of the pile body, the diameter and length of the pile, the arrangement of the pile (such as the pile spacing and the number of piles), and the interaction between the ends and sides of the pile body and the soil or rock layer will all affect the bearing capacity of the pile. According to different splitting standards, piles can be divided into many types. For example, according to different stress conditions, they are divided into friction piles, end-bearing piles, end-bearing friction piles, and friction end-bearing piles; according to different construction methods, they are divided into mechanically bored piles, cast-in-place piles, manually excavated piles, immersed pipe cast-in-place piles, precast piles, and prestressed concrete piles. Generally, according to the pile-making process, piles can be divided into bored cast-in-place piles and pipe piles. Bored cast-in-place piles require excavation of the stratum, but excavation will not only change the stress distribution of the original soil layer, but also cause the groundwater in the soil layer to overflow, resulting in a decrease in the effective stress of the soil layer, leading to serious problems such as hole collapse and shrinkage, which will bring great safety hazards to the pile foundation project. Therefore, studying the temporal and spatial penetration degree and wall protection of mud in the process of pile foundation drilling has important theoretical significance and engineering practical value for the evaluation of pile foundation stability.
[0003] So far, the research on this issue is mainly based on methods such as physical simulation tests, numerical simulation analysis, and field tests. Compared with other test methods, the physical simulation test of pile foundation has the advantages of being more intuitive, reliable, more specific, more realistic, and more controllable. Therefore, when studying similar problems, physical model tests are more favored by researchers. In physical simulation tests, most researchers simulate the actual stratum conditions and use the mud's own gravity and vertical external pressure to study the degree of mud penetration. However, such tests cannot simulate the lateral penetration in practical projects and the research and analysis of water level changes. For example, patent CN107489426B provides a slurry shield indoor simulation excavation device and a simulation method thereof, the purpose of which is to simulate different complex geological conditions of the excavation construction of the slurry shield and expand the scope of application of the device; to achieve dynamic adjustment of the mud water pressure on the excavation surface, solve the problem of mud circulation pipeline blockage, and improve the continuity of the test. Although this patent can realize the excavation of the slurry shield, the operation is too complicated and it is impossible to study and analyze the penetration of the mud at different times and depths. Another example is patent CN111173049A, which aims to solve the problems of pile sinking methods (static pressure method and hammer method) of PHC pipe piles, large pile sinking resistance and easy damage to the pile body and noise pollution, and limited application range of high-strength PHC pipe piles (generally applicable to diameters of 300mm to 600mm, generally applicable to soft soil layers with small pile sinking resistance). The present invention belongs to the field of geotechnical engineering pile foundation model test technology, and specifically discloses an experimental device for simulating the side grouting of pipe piles while drilling, which can obtain the grouting body under different grouting process parameters, obtain the pressure applied to the model pile and the displacement relationship curve of the strain gauge, and calculate the bearing capacity and side friction resistance of the pipe pile while drilling, so as to judge the grouting effect. However, it cannot judge the penetration range of mud in the inner wall of the borehole, and the grouting effect is judged by the test relationship, which may be different from the practical engineering. For example, in "Experimental Study on the Permeability Characteristics of Mud in Formations", Min Fanlu et al. made a mud pressure penetration device in order to explore the permeability law of mud in formations. The main body of the device is a transparent organic glass cylinder. A 5cm filter layer with uniform particles is first installed in the soil column with a circular diameter of 8.3cm, and then a 22cm thick stratum is filled. Water is slowly introduced into the stratum from the lower drainage pipe to saturate the stratum. The permeability coefficient of the stratum is tested using a constant head to detect the filling state of the stratum. Then, 21cm of mud is filled in the upper part. After the device is sealed, air pressure is applied through an air compressor. A drainage pipe is opened at the bottom of the device to collect water or mud that seeps out during the test and measure the filtration loss of mud during the test. The test adopts a graded pressurization method. The first stage applies an air pressure of 50kPa to measure the permeability of mud in the stratum every 20s, and observe the clear and turbid state of the seepage water body; after the permeability is stable over time (the difference between two adjacent readings is the same or similar), the next level of air pressure is applied, and 50kPa of air pressure is applied at each level, with a maximum of 300kPa.However, the soil layer studied by this device is a vertical permeability mode and exerts pressure on the inside. At the same time, the temporal and spatial evolution characteristics of the permeability characteristics are not studied, which is inconsistent with the permeability of bored pile mud in actual engineering.
[0004] Therefore, there is an urgent need for a physical simulation research system for the temporal and spatial characteristics of bored pile mud penetration to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a physical simulation research system for the time-space characteristics of bored pile mud penetration, so as to solve the problems existing in the above-mentioned prior art.
[0006] To achieve the above object, the present invention provides the following solution: The present invention provides a physical simulation research system for the time and space characteristics of bored pile mud penetration, comprising:
[0007] A drilling platform, wherein a drilling rig is arranged on the drilling platform, and a drill bit is installed at the output end of the drilling rig;
[0008] A multi-section soil filling bucket is arranged on the drilling stand and is located directly below the drill bit. The multi-section soil filling bucket is used to fill soil samples of different depths. The bottom of the side wall of the multi-section soil filling bucket is connected to a pore water pressure pipe;
[0009] A mud circulation system, comprising a mud pool, a mud pump and a mud storage pool, wherein the mud pool is connected to the multi-stage filling barrel and the drill bit through a mud trough, the mud pump is connected to the drilling rig through a mud inflow pipe, and the mud storage pool is connected to the mud pool, the mud pump and the mud inflow pipe through a mud return pipe;
[0010] The soil sampling knife is installed on the drilling rig to extract soil samples from the multi-stage filling bucket.
[0011] Preferably, the soil cutting knife comprises a soil cutting knife shell, a soil cutting knife joint is slidably connected to the soil cutting knife shell, the soil cutting knife joint is detachably connected to the drilling rig, a blade is arranged at the bottom end of the soil cutting knife joint, a soil cutting knife direction changing gear is arranged at the bottom end of the soil cutting knife joint, the blade is turned from a vertical direction to a horizontal outward direction through the soil cutting knife direction changing gear, and the blade is extended into the soil sample to take soil.
[0012] Preferably, the mud pump includes a mud pump container, an agitator is installed at the bottom end of the mud pump container, the agitator is connected to a power supply, a mud pump cover is provided at the top of the mud pump container, a mud pump pressure rod is installed on the mud pump cover, one end of the mud inlet pipe passes through the mud pump cover and extends into the mud pump container, and one end of the mud return pipe is connected to the mud pump container through the mud pump cover.
[0013] Preferably, the multi-stage soil filling bucket includes a plurality of soil filling buckets, which are stacked in a vertical direction, a flange is provided between each adjacent soil filling bucket, the adjacent flanges are connected by screws, and a pore water pipe interface is provided at the bottom of the side wall of the soil filling bucket located at the lowest layer, and the pore water pipe interface is connected to the pore water pressure pipe.
[0014] Preferably, the mud trough includes a mud trough body, and two mud trough fixed baffles are fixedly connected to the bottom end of the mud trough body. The mud trough body is respectively connected to the filling barrel and the mud pool located at the top layer through the two mud trough fixed baffles. A mud trough drill hole is opened on the mud trough body, and the drill bit is adapted to the mud trough drill hole.
[0015] Preferably, a mud platform is fixedly connected to the bottom end of the mud pool, and the mud platform is a lifting platform.
[0016] Preferably, a tensioner is provided on the drilling rig platform, the drilling rig is arranged on the tensioner, and a hand plate is provided on the top of the drilling rig platform, and the hand plate is used to control the vertical movement of the tensioner.
[0017] Preferably, a protective barrel is provided on the soil filling barrel located at the uppermost layer, and the protective barrel is coaxially arranged with the drill bit.
[0018] Preferably, the mud return pipe between the mud trough, the mud pool and the mud storage pool is arranged obliquely.
[0019] Preferably, valves are installed on the mud inflow pipe and the mud return pipe.
[0020] Compared with the prior art, the present invention has the following advantages and technical effects:
[0021] The present invention provides a physical simulation research system for the spatiotemporal characteristics of mud penetration in bored cast-in-place piles. The system tests soil samples at different depths by means of a multi-section filling bucket. The mud circulation system realizes the recycling of mud. Meanwhile, the mud material ratio can be conveniently changed to realize the simulation of the penetration process of mud in thick sand layers. The sampling knife is used to accurately extract soil samples, thereby preventing the disturbance of the original soil to the greatest extent. The system fully considers the changes in the mud penetration range and the pore water level in the actual construction process. The present invention overcomes the shortcomings of the prior art, fully considers the changes in the mud penetration range and the pore water level in the actual construction process, has the advantages of simple design principle, clear purpose and easy operation, etc., can simulate the construction environment of bored piles in actual projects, analyze the penetration behavior of muds with different ratios in different spaces around the borehole over time, evaluate the stability of the bored pile hole wall, and optimize the slurry ratio process. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor:
[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0024] Figure 2 It is a side sectional view of the present invention;
[0025] Figure 3 This is a schematic diagram of the structure of the sampling knife of the present invention;
[0026] Among them, 1. Drilling stand; 2. Drilling rig; 3. Drill bit; 4. Mud tank; 41. Mud tank body; 42. Mud tank fixed baffle; 43. Mud tank drill hole; 5. Mud pool; 6. Mud platform; 7. Pore water pressure pipe; 8. Multi-section filling bucket; 81. Pore water pipe interface; 82. Filling bucket; 83. Flange; 84. Screw; 9. Mud pump; 91. Power supply; 92. Mud pump container; 93. Mud pump cover; 94. Mud pump pressure rod; 95. Agitator; 10. Mud return pipe; 11. Mud inflow pipe; 12. Mud storage tank; 13. Bucket protection; 14. Soil knife; 141. Soil knife shell; 142. Soil knife direction changing gear; 143. Blade; 144. Soil knife joint; 15. Elastic fixer; 16. Hand plate. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0029] Reference Figure 1-Figure 3 The present invention provides a physical simulation research system for the time-space characteristics of bored pile mud penetration, comprising:
[0030] A drilling platform 1, on which a drilling rig 2 is arranged, and a drill bit 3 is installed at the output end of the drilling rig 2;
[0031] A multi-section filling bucket 8 is arranged on the drilling stand 1 and is located directly below the drill bit 3. The multi-section filling bucket 8 is used to fill soil samples of different depths. A pore water pressure pipe 7 is connected to the bottom of the side wall of the multi-section filling bucket 8;
[0032] The mud circulation system includes a mud pool 5, a mud pump 9 and a mud storage pool 12. The mud pool 5 is connected to the multi-stage filling bucket 8 and the drill bit 3 through the mud tank 4. The mud pump 9 is connected to the drilling rig 2 through the mud inflow pipe 11. The mud storage pool 12 is connected to the mud pool 5, the mud pump 9 and the mud inflow pipe 11 through the mud return pipe 10.
[0033] The soil sampling knife 14 is installed on the drilling rig 2 to extract soil samples from the multi-stage filling bucket 8.
[0034] A further optimized solution is provided, in which the soil cutting knife 14 comprises a soil cutting knife shell 141, on which a soil cutting knife joint 144 is slidably connected, and the soil cutting knife joint 144 is detachably connected to the drilling rig 2, and a blade 143 is arranged at the bottom end of the soil cutting knife joint 144, and a soil cutting knife direction changing gear 142 is arranged at the bottom end of the soil cutting knife joint 144, and the blade 143 is turned from a vertical direction to a horizontal outward direction through the soil cutting knife direction changing gear 142, and the blade 143 is extended into the soil sample to take soil.
[0035] In one embodiment of the present invention, grooves are provided on both sides of the bottom end of the soil taking knife housing 141, which are adapted to the barrel wall of the multi-section filling barrel 8. When in use, the drill bit 3 is unscrewed and replaced with the soil taking knife 14, and the soil taking knife housing 141 is fixed on the filling barrel 82. The blade 143 is bent to a horizontal position through the soil taking knife direction changing gear 142 and inserted into the soil body. After the test depth, the drilling rig 2 is started to rotate and cut the soil. After the soil cutting is completed, the hand plate 16 is controlled to rise and the soil taking knife 14 is restored to its original state, and then the top flange 83 is loosened and taken away together with the filling barrel 82 to complete the extraction of soil samples.
[0036] Specifically, the soil cutting knife joint 144 is slidably connected to the soil cutting knife shell 141, and the soil cutting knife joint 144 and the blade 143 are fixedly connected. During the downward movement, the blade 143 extends into the soil sample and rotates synchronously to be horizontal. When in use, the soil cutting knife shell 141 is first fixed on the filling bucket 82, and then the soil cutting knife joint 144 is connected to the drilling rig 2. As the drilling rig 2 descends, the blade 143 passes through the soil cutting knife direction changing gear 142 inside the soil cutting knife shell 141, and the soil cutting blade 143 changes from vertically downward to horizontally outward.
[0037] The specific soil-excavating knife direction-changing gear 142 is composed of three gears, which are located at the three positions where the blade 143 changes direction at the bottom of the soil-excavating knife housing 141. One is a vertical transmission gear and two are horizontal transmission gears. The blade 143 is first fixed in position by the vertical transmission gear, and then the bottom horizontal transmission gear changes the blade 143 from a vertical direction to a horizontal outward direction, and finally the upper gear fixes it in a horizontal direction. Finally, the blade 143 is inserted into the soil to perform horizontal rotation and soil cutting.
[0038] There is a buckle scale on the soil cutting blade 143 that can match the soil cutting blade direction change gear 142. As long as the drilling rig does not move downward, a stable state is formed.
[0039] A further optimized solution is that the mud pump 9 includes a mud pump container 92, an agitator 95 is installed at the bottom end of the mud pump container 92, the agitator 95 is connected to the power supply 91, a mud pump cover 93 is provided at the top of the mud pump container 92, a mud pump pressure rod 94 is installed on the mud pump cover 93, one end of the mud inflow pipe 11 passes through the mud pump cover 93 and extends into the mud pump container 92, and one end of the mud return pipe 10 is connected to the mud pump container 92 through the mud pump cover 93.
[0040] In one embodiment of the present invention, the mud material is poured into a mud pump container 92 and stirred by an agitator 95 . After being stirred evenly, the mud pump cover 93 is closed. The mud pump pressure rod 94 is provided to pressurize the mud pump container 92 .
[0041] A further optimized solution is that the multi-stage filling bucket 8 includes a plurality of filling buckets 82, and the plurality of filling buckets 82 are stacked in a vertical direction. A flange 83 is provided between two adjacent filling buckets 82, and the two adjacent flanges 83 are connected by screws 84. A pore water pipe interface 81 is provided at the bottom of the side wall of the filling bucket 82 located at the lowest layer, and the pore water pipe interface 81 is connected to the pore water pressure pipe 7.
[0042] In one embodiment of the present invention, soil and rocks from the construction site are loaded into the bottom filling bucket 82 and compacted, and then the second filling bucket 82 is fixed to the bottom filling bucket 82 by means of the flange 83 of the filling bucket 82 itself through screws 84 and a sealing ring, and the surface of the bottom filling is scraped and then filled with soil and rocks from the construction site and compacted to ensure the continuity of the layered filling, and the above steps are repeated until the last layer.
[0043] A further optimized solution is that the mud trough 4 includes a mud trough body 41, and two mud trough fixed baffles 42 are fixedly connected to the bottom of the mud trough body 41. The mud trough body 41 is respectively connected to the filling barrel 82 and the mud pool 5 located at the uppermost layer through the two mud trough fixed baffles 42. A mud trough drill hole 43 is opened on the mud trough body 41, and the drill bit 3 is adapted to the mud trough drill hole 43.
[0044] In one embodiment of the present invention, the mud trough drill hole 43 is adapted to the drill bit 3, and the mud trough body 41 is connected to the filling barrel 82 and the mud pool 5 located at the top layer through two mud trough fixed baffles 42, thereby guiding the mud from the filling barrel 82 through the mud trough body 41 to the mud pool 5.
[0045] According to a further optimization scheme, a mud platform 6 is fixedly connected to the bottom of the mud pool 5, and the mud platform 6 is a lifting platform.
[0046] In one embodiment of the present invention, the mud pool 5 is fixedly connected to the mud platform 6 by bolts. The mud platform 6 is preferably a liftable lifting platform, so that the height of the mud pool 5 can be adjusted to form a height difference with the top of the filling bucket 82.
[0047] According to a further optimization scheme, a tensioner 15 is provided on the drilling platform 1 , the drilling rig 2 is arranged on the tensioner 15 , and a hand plate 16 is provided on the top of the drilling platform 1 , and the hand plate 16 is used to control the vertical movement of the tensioner 15 .
[0048] In one embodiment of the present invention, the elastic fixer 15 is driven to move vertically by rotating the hand plate 16. This is a prior art and will not be described in detail here.
[0049] To further optimize the solution, a protective barrel 13 is provided on the topmost filling barrel 82 , and the protective barrel 13 is coaxially arranged with the drill bit 3 .
[0050] To further optimize the solution, the protective barrel 13 is adapted to the drill bit 3 .
[0051] To further optimize the solution, the mud return pipe 10 between the mud trough 4, the mud pool 5 and the mud storage pool 12 is arranged at an angle.
[0052] In one embodiment of the present invention, the mud trough 4 has a slope of 3% to ensure that the mud can smoothly flow back to the mud pool 5 through the mud trough 4, and the mud return pipe 10 between the mud pool 5 and the mud storage tank 12 has a slope of 2% to ensure that the mud flows into the mud storage tank 12.
[0053] To further optimize the solution, valves are installed on the mud inflow pipe 11 and the mud return pipe 10.
[0054] In one embodiment of the present invention, valves are provided to facilitate the control of the opening and closing of the mud inflow pipe 11 and the mud return pipe 10.
[0055] The present invention provides a physical simulation research system for the time-space characteristics of bored pile mud penetration. When in use, firstly, a group of mud materials (including fluorescent powder, which appears blue under ultraviolet light) are poured into a mud pump container 92 and stirred. After being stirred evenly, a mud pump cover 93 is put on. Then, the mud circulation system is turned on, and the hand plate 16 is used to control the drilling rig 2 to move slowly downward. After the drill bit 3 passes through the protective barrel 13, the mud pump pressure rod 94 is used to inject mud into the drill bit 3. At this time, the drilling rig 2 carries the mud to the bottom. When the drilling is done, the mud will flow into the mud pool 5 with the drilling cuttings through the mud trough 4 when it overflows the hole. After the drilling cuttings are precipitated in the mud pool 5, the mud will flow back to the mud storage pool 12 through the mud return pipe 10. By closing the valve of the mud inlet pipe 11 and opening the valve of the mud return pipe 10, and pressurizing with the mud pump pressure rod 94 at the same time, the mud in the mud storage pool 12 will flow back into the drill bit 3. During this process, the water level changes in the pore water pressure pipe 7 are always paid attention to, and the cycle operation is carried out until the end of the test. After the test, the borehole is cleaned, and then the drill bit 3 is lifted to the appropriate position using the hand plate 16, and then the mud tank 4 and the protective bucket 13 are removed. The drill bit 3 is unscrewed at the bottom of the drilling rig 2 and replaced with the soil cutter 14, and the soil cutter housing 141 is fixed on the filling bucket 82. The hand plate 16 is operated slowly downward, and the blade 143 is turned to the horizontal insertion test depth inside the soil body through the soil cutter direction change gear 142, and then the drilling rig 2 is started to rotate and cut the soil. After the soil cutting is completed, the hand plate 16 is controlled to rise and the soil cutter 14 is restored to the initial state, and then the uppermost flange 83 is loosened and removed together with the filling bucket 82, and then the soil is taken out with the ring knife, and the mud penetration range in different time and space is observed under ultraviolet light. Finally, the device is cleaned and the next set of test operations are carried out. After the entire test is completed, it is summarized and sorted out to complete the test.
[0056] According to the test requirements, an appropriate soil layer thickness is selected for filling. After the filling is completed, a multi-section filling bucket is placed directly below the drill bit 3 to observe whether the center of the drill bit 3 coincides with the center of the filling bucket 82 .
[0057] During the test phase, in order to quantify the infiltration behavior of mud at different times and depths, and to improve the impact of sampling on the test soil, the method of this device can be used to simulate the infiltration process under actual geological conditions.
[0058] Step 1: Prepare the test materials
[0059] Prepare mud permeability test equipment, make new mud samples, ensure the samples are comparable according to the proportion of mud materials in each group (2 good groups, 2 medium groups, and 2 poor groups), and record their initial conditions (such as particle size distribution, water content, consistency, mud skin thickness, etc.). Finally, select soil samples from the construction site as the medium for permeability testing according to the research purpose.
[0060] Step 2: Design the experimental plan
[0061] Different penetration times and depths are set according to the test, as well as other factors that may affect the penetration behavior (such as temperature, pressure, mud concentration, etc.). In order to obtain reliable data, each condition is repeated at least twice or more.
[0062] Step 3: Execute the experiment
[0063] According to the new mud design scheme, each group of mud materials is poured into the mud pump container 92, and the soil samples are sequentially loaded into the filling bucket 82 to a suitable height, and then the power supply 91 is turned on, and the mud is stirred by the stirrer 95. After stirring evenly, the mud pump cover 93 is covered and the mud circulation system is turned on, and then the mud is added to the borehole by the mud pump pressure rod 94. During the test, the data of different penetration times (1h, 4h, 8h, 16h and 24h), flow rate, pressure change, etc. are recorded in real time, and at the same time, the soil cutter 14 is used to cut the soil at different depths (10cm, 25cm, 40cm, 70cm, 100cm) at the corresponding time to measure the permeability characteristics of the mud.
[0064] Step 4: Data Analysis
[0065] Use permeability models such as Darcy's law to calculate permeability coefficients under different conditions. Evaluate how mud permeability behavior changes over time.
[0066] Step 5: Result verification
[0067] The accuracy of test design and data analysis is crucial to obtain reliable conclusions. The test results are compared with existing soil mechanics theories or empirical formulas to verify the accuracy of the test method. Through the above steps, the penetration behavior of mud at different times and depths can be quantitatively described, providing a scientific basis for engineering applications.
[0068] The same method was used to conduct the second set of mud penetration tests, and then the third set of mud penetration tests, until six sets of mud tests with different proportions were completed. The differences in penetration range, mud complex and permeability coefficient were compared and analyzed to optimize the mud proportions of different soil layers.
[0069] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0070] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A physical simulation research system for the temporal and spatial characteristics of bored pile mud penetration, characterized in that: include: A drilling platform (1), wherein a drilling rig (2) is arranged on the drilling platform (1), and a drill bit (3) is installed at the output end of the drilling rig (2); A multi-section soil filling bucket (8) is arranged on the drilling rig (1) and is located directly below the drill bit (3); the multi-section soil filling bucket (8) is used to fill soil samples of different depths; and a pore water pressure pipe (7) is connected to the bottom of the side wall of the multi-section soil filling bucket (8); A mud circulation system, comprising a mud pool (5), a mud pump (9) and a mud storage pool (12), wherein the mud pool (5) is connected to the multi-stage filling bucket (8) and the drill bit (3) through a mud trough (4), the mud pump (9) is connected to the drilling rig (2) through a mud inflow pipe (11), and the mud storage pool (12) is connected to the mud pool (5), the mud pump (9) and the mud inflow pipe (11) through a mud return pipe (10); The soil sampling knife (14) is installed on the drilling rig (2) to extract soil samples from the multi-stage soil filling barrel (8).
2. A physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1, characterized in that: The soil taking knife (14) comprises a soil taking knife shell (141), a soil taking knife joint (144) is slidably connected to the soil taking knife shell (141), the soil taking knife joint (144) is detachably connected to the drilling rig (2), a blade (143) is arranged at the bottom end of the soil taking knife joint (144), a soil taking knife direction changing gear (142) is arranged at the bottom end of the soil taking knife joint (144), the blade (143) is turned from a vertical direction to a horizontal outward direction through the soil taking knife direction changing gear (142), and the blade (143) extends into the soil sample to take soil.
3. A physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1, characterized in that: The mud pump (9) comprises a mud pump container (92), an agitator (95) is installed at the bottom end of the mud pump container (92), and the agitator (95) is connected to a power source (91). A mud pump cover (93) is arranged at the top of the mud pump container (92), and a mud pump pressure rod (94) is installed on the mud pump cover (93). One end of the mud inflow pipe (11) passes through the mud pump cover (93) and extends into the mud pump container (92), and one end of the mud return pipe (10) is connected to the mud pump container (92) through the mud pump cover (93).
4. A physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1, characterized in that: The multi-stage soil filling bucket (8) comprises a plurality of soil filling buckets (82), the plurality of soil filling buckets (82) are stacked in a vertical direction, a flange (83) is provided between two adjacent soil filling buckets (82), the two adjacent flanges (83) are connected by screws (84), and a pore water pipe interface (81) is provided at the bottom of the side wall of the soil filling bucket (82) at the bottom layer, and the pore water pipe interface (81) is connected to the pore water pressure pipe (7).
5. A physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 4, characterized in that: The mud trough (4) comprises a mud trough body (41), the bottom end of which is fixedly connected to two mud trough fixed baffles (42), the mud trough body (41) is respectively connected to the filling bucket (82) and the mud pool (5) located at the top through the two mud trough fixed baffles (42), and a mud trough drill hole (43) is provided on the mud trough body (41), and the drill bit (3) is adapted to fit the mud trough drill hole (43).
6. The physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1 is characterized by: The bottom end of the mud pool (5) is fixedly connected to a mud platform (6), and the mud platform (6) is a lifting platform.
7. The physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1 is characterized by: The drilling platform (1) is provided with a tensioner (15), the drilling rig (2) is arranged on the tensioner (15), and a hand plate (16) is arranged at the top of the drilling platform (1), and the hand plate (16) is used to control the vertical movement of the tensioner (15).
8. The physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 4 is characterized by: The soil filling bucket (82) located at the uppermost layer is provided with a protective bucket (13), and the protective bucket (13) is coaxially arranged with the drill bit (3).
9. The physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1 is characterized by: The mud return pipe (10) between the mud trough (4), the mud pool (5) and the mud storage pool (12) is arranged at an angle.
10. The physical simulation research system for the time-space characteristics of bored pile mud penetration according to claim 1 is characterized by: Valves are installed on the mud inflow pipe (11) and the mud return pipe (10).
Citation Information
Patent Citations
An indoor simulation device and simulation method for slurry shield tunneling
CN107489426B
Cited By
Drilling and sampling device for road construction