Self-detection method before grid-connected operation of energy storage converter

By using the grid stable state for self-testing in the energy storage converter, the problem of detecting its abnormal state before being connected to the grid is solved, high-reliability self-test is achieved, system losses are avoided, and system losses are guaranteed. The normal startup of the device.

CN119064690APending Publication Date: 2024-12-03BEIJING SHENGYUN ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411114009.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

It is difficult for the energy storage converter to reliably detect its abnormal state before it is connected to the grid, which may lead to a wider loss in the system.

Method used

Without adding additional hardware costs, use the stable voltage and frequency of the power grid as a reference to configure the measurement points for self-testing, calculate the effective values ​​of the phase, frequency and voltage, and conduct the self-testing process in combination with the power grid status to ensure that the detection is performed before starting Exception state.

Benefits of technology

It realizes high reliability self-check before the energy storage converter is connected to the grid, avoids system losses caused by abnormal states, and does not affect the normal operation of the power grid and energy storage system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064690A_ABST
    Figure CN119064690A_ABST
Patent Text Reader

Abstract

A high-power energy storage converter (gt; at present, as a main converter product of a centralized energy storage system, the converter has high requirements for stability and reliability, but in actual system application, some devices in the energy storage converter fail or cannot work normally due to some reasons, and if the energy storage converter has abnormity, the abnormity can be detected in time before grid-connected operation, so that the energy storage converter cannot work normally. The method is used for detecting functions of a main power circuit before grid-connected operation of the energy storage converter, detecting the state of an alternating current side switch, detecting a main control loop of the converter, and performing grid-connected operation of the converter after normal detection. The method is automatically executed before grid-connected operation of the converter every time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention patent relates to the field of energy storage grid-connected converters, and in particular to the application field of high-reliability, high-power energy storage converter operation self-detection. Background Art

[0002] The country is vigorously promoting the development and utilization of renewable energy and building a new power system. Energy storage systems play an important role in improving the reliability of renewable energy. They can balance the volatility and intermittency of renewable energy, store excess renewable energy, and release it when needed. This capability can improve the reliability and stability of renewable energy, help increase the proportion of renewable energy in the power system, and promote the development of sustainable energy.

[0003] Energy storage inverters serve as a "bridge" between the storage medium and the power grid in the energy storage system. As the demand for large-scale energy storage power stations continues to increase, the unit power of energy storage inverters is gradually increasing. At present, the unit power of energy storage inverters in centralized energy storage power stations is all MW-level. Due to the large unit power, higher requirements are placed on the stability and reliability of energy storage inverters. The inverter should reliably detect abnormal conditions before starting and connecting to the grid. This method can reliably detect its own abnormal state before each operation of the energy storage inverter, avoiding the energy storage inverter itself from being directly connected to the grid after an abnormality occurs, causing a larger range of system losses. Summary of the invention

[0004] In order to reliably and accurately detect the abnormal state of the energy storage inverter before it is connected to the grid, the present invention selects the power grid as a reference (the voltage amplitude and frequency of the power grid are relatively stable under normal power supply conditions) without increasing additional hardware costs. Without energy interaction with the power grid, the device's own circuit is self-checked, and the reference and basis for the inspection are the power grid status (frequency or amplitude). The inspection has high reliability and will not affect the power grid and energy storage system. The inspection process can be combined with the startup process of the device without affecting the normal operation of the device. The process can be executed during each startup process of the device, and can effectively detect the abnormal state of the energy storage inverter before it is connected to the grid.

[0005] Technical Solution

[0006] A self-detection method for energy storage converter before grid-connected operation, characterized in that Figure 1 The main circuit is equipped with two sets of AC voltage sampling circuits at both sides of the AC switch, namely, measurement point 1 and measurement point 2. The inverter controller performs independent phase-lock calculations on the voltages at measurement point 1 and measurement point 2, and calculates the phase, frequency, and effective value.

[0007] See attached Figure 2This method changes its working state according to the established steps and processes, referring to the amplitude and phase of the grid voltage, and performs self-checks at each state point. If an abnormality is detected, the inverter stops running. If the detection is normal, it directly enters the grid-connected operation state. The inverter operates according to the following steps before grid-connected operation:

[0008] Step 1: Refer to the grid phase and frequency, and output the power device PWM drive signal with a lower modulation ratio. The modulation ratio satisfies the following formula, where Vref<50V, and VDC is the DC voltage sampling value. The DSP control module is configured with a modulation ratio calculation module and a PWM output control module;

[0009]

[0010] Step 2: After executing the first step, sample and calculate the voltage at measurement point 1, and perform phase locking to obtain the effective value, phase and frequency of the voltage at measurement point 1. If the effective value is less than the threshold value set based on Vref, it is determined that the main inverter circuit is abnormal and the PCS grid-connected operation is prohibited. Otherwise, the third step is executed. The voltage effective value calculation module and the PLL phase-locked loop module are configured in the DSP control module;

[0011] Step 3: Using the grid voltage as a reference value, recalculate the modulation ratio of the PWM drive signal of the output power device. The modulation ratio is calculated as follows, where Vgrid is the effective value of the grid voltage;

[0012]

[0013] Step 4: Taking the phase and frequency of the grid voltage as reference, calculate the integral of the three-phase voltage difference between measuring point 1 and measuring point 2 point by point, and calculate the voltage waveform overlap between measuring point 1 and measuring point 2. The calculation method is as follows: D is defined as the overlap of the same-phase voltage between measuring point 1 and measuring point 2, N is the number of sampling points in a single cycle of the grid voltage, VxInv is the instantaneous sampling value of the x-phase voltage at measuring point 1 (x=a / b / c), Vxgrid is the instantaneous sampling value of the x-phase voltage at measuring point 2 (x=a / b / c), Vxgrid is the effective value of the x-phase voltage at measuring point 2 (x=a / b / c), and the voltage overlap calculation module is configured in the DSP control module;

[0014]

[0015] Step 5: If the D value calculated in the third step is within the threshold range, the inverter output circuit is judged to be normal and the AC switch can be closed. If the D value is outside the threshold range, the inverter circuit or sampling circuit is judged to be abnormal and the inverter grid-connected operation is prohibited;

[0016] Step 6: After closing the AC switch, stop the PWM output and execute step 4 to determine whether the D value is within the threshold range. If it is within the threshold range, the detection process ends and the inverter is started to connect to the grid. If the D value is outside the threshold, it is determined that the AC switch is working abnormally.

[0017] Beneficial Effects

[0018] The present invention selects the power grid as a reference (the voltage amplitude and frequency of the power grid are relatively stable under normal power supply conditions) without increasing additional hardware costs. Without energy interaction with the power grid, the device's own circuit is self-checked, and the reference and basis for the inspection are the power grid status (frequency or amplitude). The inspection has high reliability and will not affect the power grid and the energy storage system. The inspection process can be combined with the startup process of the device, without affecting the normal operation of the device or the startup speed of the device. The process can be executed during each startup of the device, and can effectively detect the abnormal state of the energy storage inverter before it is connected to the grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is the hardware and software block diagram of the energy storage converter that implements this method.

[0020] Figure 2 This is the action flow of energy storage conversion to realize this method. DETAILED DESCRIPTION

[0021] As attached Figure 1 As shown in the figure, the main circuit of the energy storage converter is equipped with two sets of AC voltage sampling circuits at measurement point 1 and measurement point 2 on both sides of the AC switch. The inverter DSP control module performs independent sampling operations on the voltages at measurement point 1 and measurement point 2, and calculates the phase, frequency, and voltage effective values. Before each device is started, the energy storage converter is controlled according to the following process and algorithm.

[0022] Step 1: Refer to the grid phase and frequency, and output the power device PWM drive signal with a lower modulation ratio. The modulation ratio satisfies the following formula, where Vref<50V, and VDC is the DC voltage sampling value.

[0023]

[0024] Step 2: After executing the first step, the voltage at measurement point 1 is sampled and calculated, and phase-locked to obtain the effective value, phase and frequency of the voltage at measurement point 1. If the effective value is less than the threshold set based on Vref, it is determined that the main inverter circuit is working abnormally and the PCS is prohibited from connecting to the grid. Otherwise, the third step is executed.

[0025] Step 3: Using the grid voltage as a reference value, recalculate the modulation ratio of the PWM drive signal of the output power device. The modulation ratio is calculated as follows, where Vgrid is the effective value of the grid voltage.

[0026]

[0027] Step 4: Taking the phase and frequency of the grid voltage as reference, calculate the integral of the three-phase voltage difference between measuring point 1 and measuring point 2 point by point, and calculate the voltage waveform overlap between measuring point 1 and measuring point 2. The calculation method is as follows: D is defined as the overlap of the same-phase voltage between measuring point 1 and measuring point 2, N is the number of sampling points in a single cycle of the grid voltage, VxInv is the instantaneous sampling value of the x-phase voltage at measuring point 1 (x=a / b / c), Vxgrid is the instantaneous sampling value of the x-phase voltage at measuring point 2 (x=a / b / c), and Vxgrid is the effective value of the x-phase voltage at measuring point 2 (x=a / b / c).

[0028]

[0029] Step 5: If the D value calculated in the third step is within the threshold range, the inverter output circuit is judged to be normal and the AC switch can be closed. If the D value is outside the threshold range, the inverter circuit or sampling circuit is judged to be abnormal and the inverter is prohibited from connecting to the grid.

[0030] Step 6: After closing the AC switch, stop the PWM output and execute step 4 to determine whether the D value is within the threshold range. If it is within the threshold range, the detection process ends and the inverter is started to connect to the grid. If the D value is outside the threshold, it is determined that the AC switch is working abnormally.

[0031] At this point, the energy storage converter has completed the self-inspection work before grid-connected operation, and the energy storage converter can directly enter the grid-connected operation state. This method has high reliability in detecting abnormalities of the converter itself and will not affect the energy storage system and the power grid.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A self-detection method for an energy storage converter before grid-connected operation, characterized in that: Taking the grid voltage as a reference, the main power circuit is controlled in steps based on the phase and amplitude of the grid voltage. The output results of the step-by-step control are compared with the grid. If the comparison threshold requirement is met, the next step is executed. After the entire detection process is completed, the equipment can enter the normal grid-connected operation state. This method can simply and effectively detect the abnormality of the inverter main power circuit.

2. A self-detection method for energy storage converter before grid-connected operation according to claim 1, characterized in that Referring to FIG. 1 , the main circuit is configured with two groups of AC voltage sampling circuits at measuring point 1 and measuring point 2 on both sides of the AC switch.

3. A self-detection method for energy storage converter before grid-connected operation according to claim 1, characterized in that The inverter DSP controller is equipped with a PLL phase-locked module, a PWM output control module, a grid voltage calculation module, and a voltage coincidence calculation module. It performs independent phase-locked calculations on the voltages at measurement point 1 and measurement point 2, and calculates the phase, frequency, and effective value.

4. A self-detection method for energy storage converter before grid-connected operation according to claim 1, characterized in that The inverter should be operated according to the following steps before grid-connected operation; Step 1: Refer to the grid phase and frequency, and output the power device PWM drive signal with a lower modulation ratio. The modulation ratio satisfies the following formula, where Vref<50V, and VDC is the DC voltage sampling value; Step 2: After executing the first step, the voltage of measurement point 1 is sampled and calculated, and phase-locked to obtain the effective value, phase and frequency of the voltage of measurement point 1. If the effective value is less than the threshold value set based on Vref, it is determined that the main inverter circuit is working abnormally, and the PCS is prohibited from connecting to the grid. Otherwise, the third step is executed; Step 3: Using the grid voltage as a reference value, recalculate the modulation ratio of the PWM drive signal of the output power device. The modulation ratio is calculated as follows, where Vgrid is the effective value of the grid voltage; Step 4: Taking the phase and frequency of the grid voltage as reference, calculate the integral of the three-phase voltage difference between measuring point 1 and measuring point 2 point by point, and calculate the voltage waveform overlap between measuring point 1 and measuring point 2. The calculation method is as follows: D is defined as the overlap of the same-phase voltage between measuring point 1 and measuring point 2, N is the number of sampling points in a single cycle of the grid voltage, VxInv is the instantaneous sampling value of the x-phase voltage at measuring point 1 (x=a / b / c), Vxgrid is the instantaneous sampling value of the x-phase voltage at measuring point 2 (x=a / b / c), and Vxgrid is the effective value of the x-phase voltage at measuring point 2 (x=a / b / c); Step 5: If the D value calculated in the third step is within the threshold range, the inverter output circuit is judged to be normal and the AC switch can be closed. If the D value is outside the threshold range, the inverter circuit or sampling circuit is judged to be abnormal and the inverter grid-connected operation is prohibited; Step 6: After closing the AC switch, stop the PWM output and execute step 4 to determine whether the D value is within the threshold range. If it is within the threshold range, the detection process ends and the inverter is started to connect to the grid. If the D value is outside the threshold, it is determined that the AC switch is working abnormally.