Project signing management system and method

Through the information acquisition, agreement status tracking and project signing management modules of the project signing management system, the problems of difficulty in information communication and progress mastery in traditional project signing management are solved, and efficient, accurate management and real-time monitoring of project signing are achieved.

CN119067091AActive Publication Date: 2024-12-03YANCHENG TEACHERS UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411134406.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-03
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The traditional project signing management methods have difficulty in information communication and coordination, information delays, misunderstandings or loss, resulting in low efficiency and accuracy, lack of real-time tracking and monitoring methods, making it difficult to accurately grasp the progress and status of project signing, affecting management decisions.

Method used

It provides a project signing management system, which can track the signing process in real time by obtaining project basic information retrieval and adaptive adjustment agreement signing templates, and conduct multi-level audits after completion to ensure the comprehensiveness and accuracy of information records.

Benefits of technology

It improves the efficiency and accuracy of project signing management, realizes real-time tracking and monitoring, provides management personnel with convenient decision-making, and ensures the management effect of project agreement signing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067091A_ABST
    Figure CN119067091A_ABST
Patent Text Reader

Abstract

The invention provides a project signing management system and method, and the system comprises an information obtaining module which is used for obtaining the basic information of a project, calling a project protocol signing template based on the basic information of the project, and carrying out the adaptive adjustment of the project protocol signing template based on a project demand; the protocol state tracking module is used for tracking the project protocol signing process in real time according to the protocol signing process path based on the self-adaptive adjustment result and visually displaying the real-time tracking result; and the project signing management module is used for determining, based on the visual display result, multi-level auditing after completion of project protocol signing, and managing the project protocol signing result after the multi-level auditing is passed. The information recording comprehensiveness and the project agreement signing efficiency and accuracy are improved, meanwhile, the project agreement signing condition is effectively tracked and monitored, convenience is provided for management personnel to make decisions, and the project agreement signing management effect is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a project signing management system and method. Background Art

[0002] At present, in today's business and project operation environment, the project signing process often involves many links and complex processes. With the diversification and globalization of business, the traditional project signing management method faces many challenges;

[0003] Traditional project signing management leads to certain difficulties in information communication and coordination, which can easily lead to information delays, misunderstandings or losses, affecting the efficiency and accuracy of project signing. Moreover, most of them are managed manually. The project agreement itself may contain a large number of complex clauses and details that need to be carefully reviewed and managed. Manual management is prone to omissions and errors. At the same time, the lack of effective real-time tracking and monitoring means makes it difficult for management to accurately grasp the progress and status of project signing, and unable to make decisions and adjustments in a timely manner.

[0004] Therefore, in order to overcome the above-mentioned defects, the present invention provides a project signing management system and method. Summary of the invention

[0005] The present invention provides a project signing management system and method, which is used to retrieve the corresponding project agreement signing template according to the basic information of the project, and adaptively adjust the project agreement signing template according to the project requirements, thereby ensuring the adaptability of the final project agreement signing template to the project to be managed, and facilitating the corresponding project signing management operations. Secondly, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time final result is visualized, which is convenient for management personnel to have a real-time and effective understanding of the project agreement signing status and situation, so as to facilitate timely corresponding adjustments to the signing process when an abnormality occurs. Finally, after the project agreement is signed, the project agreement signing result is audited at multiple levels, and effective management operations are implemented on the project agreement signing result after the audit is passed, which improves the comprehensiveness of information recording and the efficiency and accuracy of project agreement signing. At the same time, effective tracking and monitoring of the project agreement signing situation is implemented, which provides convenience for management personnel to make decisions and ensures the management effect of project agreement signing.

[0006] The present invention provides a project signing management system, comprising:

[0007] The information acquisition module is used to obtain basic project information, retrieve the project agreement signing template based on the basic project information, and adaptively adjust the project agreement signing template based on project requirements;

[0008] The agreement status tracking module is used to track the project agreement signing process in real time based on the adaptive adjustment results and the agreement signing process path, and to visualize the real-time tracking results;

[0009] The project signing management module is used to determine the multi-level review after the project agreement is signed based on the visual display results, and manage the project agreement signing results after the multi-level review is passed.

[0010] Preferably, a project signing management system, an information acquisition module, includes:

[0011] A data determination unit is used to obtain the project plan of the project to be managed and to perform dimension splitting on the text content in the project plan based on the project composition indicators;

[0012] A text parsing unit, used to extract semantic features from the text content of each dimension after the dimension splitting, determine the key data segments of the text content of each dimension based on the extracted semantic features, and obtain the corresponding summary text based on the associated data segments;

[0013] The project basic information determination unit is used to determine the logical association relationship between text contents of different dimensions based on the project composition indicators, and to perform text fusion on the summary texts under different dimensions based on the logical association relationship to obtain the project basic information of the project to be managed.

[0014] Preferably, a project signing management system, an information acquisition module, includes:

[0015] An information acquisition unit, used to acquire the obtained basic information of the project, and perform a first feature conversion on the basic information of the project to obtain a corresponding information feature vector;

[0016] Attribute extraction unit, used to:

[0017] Determine the target industry of the project to be managed based on the basic information of the project, and roughly screen the project agreement signing templates from the template library based on the target industry to obtain the available project agreement signing templates;

[0018] Extracting the attribute information of the available project agreement signing template, and performing a second feature conversion on the attribute information to obtain a corresponding configuration feature vector;

[0019] The template determination unit is used to determine the similarity between the basic information of the project and each available project agreement signing template based on the information feature vector and the configuration feature vector, and determine the final valid project agreement signing template based on the value of the similarity.

[0020] Preferably, a project signing management system, an information acquisition module, includes:

[0021] A template parsing unit, used to decompose the project agreement signing template based on business characteristics to obtain the functional module composition of the project agreement signing template;

[0022] Requirements parsing unit, used to:

[0023] Analyze the project requirements to obtain the content to be managed and the corresponding constraints of the project to be managed, and map the content to be managed and the corresponding constraints of the project to be managed with the functional module composition;

[0024] Based on the mapping results, adjustment parameters for the project agreement signing template and supplementary text for the project agreement signing template are obtained;

[0025] The template adjustment unit is used to adjust the project agreement signing template based on the adjustment parameters. At the same time, it generates the supplementary terms of the agreement based on the supplementary text, and adds the supplementary terms of the agreement to the adjusted project agreement signing template to complete the adaptive adjustment of the project agreement signing template.

[0026] Preferably, a project signing management system, a template adjustment unit, comprises:

[0027] The result acquisition subunit is used to acquire the adaptively adjusted project agreement signing template, and transmit the project agreement signing template to the user terminal online synchronously based on the online interaction mechanism;

[0028] The permission opening subunit is used to open the uplink communication permission to the user terminal based on the online synchronization transmission result, and receive feedback information submitted by the user terminal based on the opening result;

[0029] The template verification sub-unit is used to determine the verification result of the user terminal on the adaptively adjusted project agreement signing template based on the feedback information, and to encapsulate the adaptively adjusted project agreement signing template after the verification is passed, and to deploy the encapsulated result according to the agreement signing process based on the signing standard.

[0030] Preferably, a project signing management system, an agreement status tracking module, includes:

[0031] Tracking configuration unit, used to:

[0032] Analyze the agreement signing process path, determine the agreement signing links included in the agreement signing process path, and determine the collaborative interaction mechanism between the agreement signing links based on the operation requirements of the agreement signing process;

[0033] Based on the collaborative interaction mechanism, the agreement signing process is divided into nodes, and the starting point of the agreement signing process is determined based on the node division results. At the same time, based on the node division results and according to the agreement signing process path, real-time dynamic display thumbnails between the agreement signing links are constructed;

[0034] Real-time tracking unit for:

[0035] Based on the sensor, the trigger status of the starting point is monitored in real time, and after the starting point is triggered, the status tracking mechanism is started synchronously;

[0036] Based on the status tracking mechanism, the real-time operating parameters of the agreement signing process in each node are monitored, and the differences between the monitored real-time operating parameters and the standard execution steps of the agreement signing process are compared;

[0037] Determine the real-time signing status of each agreement signing link based on the difference comparison status, and generate a real-time status display icon for each agreement signing link based on the real-time signing status;

[0038] Dynamically annotate the real-time status display icon in the real-time dynamic display thumbnails between each agreement signing link;

[0039] The visualization display unit is used to generate a visualization display diagram of the dynamic tracking results of the project agreement signing process based on the dynamic annotation results, and synchronously update the real-time dynamics of the project agreement signing in the visualization display diagram of the dynamic tracking results based on the data communication interface.

[0040] Preferably, a project signing management system, a project signing management module, includes:

[0041] A result acquisition unit is used to determine, based on the visual display results, when the project agreement is signed, extract the final project agreement and trigger the review process of the project agreement;

[0042] Multi-level audit unit for:

[0043] Determine the audit department based on the audit process, and determine the hierarchical execution order between the audit departments based on the audit requirements;

[0044] The project agreement is reviewed in text based on the upper and lower execution order. At the same time, an audit subsidiary record table is constructed, and the electronic audit signatures of each audit department are recorded in the audit subsidiary record table based on the audit results of each audit department;

[0045] Correction unit for:

[0046] Construct a multi-change point jump-out mechanism and associate it with the audit attachment record table;

[0047] Based on the correlation results, the electronic audit signatures of each audit department are sequentially monitored according to the multi-change point jump mechanism, and when there is a failure in the audit, the multi-level audit process of the project agreement is jumped out;

[0048] The abnormal content is locked based on the pop-up result, and the locking result is sent to the user terminal for correction;

[0049] Based on the sent results, the updated text of the abnormal content from the user terminal is received in real time, and the multi-level review process is memorized and restarted based on the received results until the multi-level review is completed.

[0050] Preferably, a project signing management system, a project signing management module, includes:

[0051] Marking unit for:

[0052] After passing the multi-level review, the constraints of the project agreement signing results are extracted, and the binding time limit of the project agreement signing results is determined based on the constraints;

[0053] Generate a time limit label based on the constraint time limit, and mark the project agreement signing result as effective based on the time limit label;

[0054] Snap-in for:

[0055] Extract the business category of the project agreement signing result based on the effective marking result, and determine the storage area corresponding to the project agreement signing result based on the business category;

[0056] The project agreement signing results shall be stored and managed in the corresponding storage area.

[0057] The present invention provides a project signing management method, comprising:

[0058] Step 1: Obtain basic project information, retrieve the project agreement signing template based on the basic project information, and adaptively adjust the project agreement signing template based on project requirements;

[0059] Step 2: Based on the adaptive adjustment results, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time tracking results are visualized;

[0060] Step 3: Based on the visualization results, determine that a multi-level review will be conducted after the project agreement is signed, and manage the project agreement signing results after the multi-level review is passed.

[0061] Preferably, in a project signing management method, in step 1, obtaining basic project information includes:

[0062] Obtain the project plan of the project to be managed, and perform dimension splitting on the text content in the project plan based on the project composition indicators;

[0063] Extracting semantic features from the text content of each dimension after the dimension splitting, determining key data segments of the text content of each dimension based on the extracted semantic features, and obtaining corresponding summary text based on the associated data segments;

[0064] Based on the project composition indicators, the logical association relationship between the text contents of different dimensions is determined, and based on the logical association relationship, the summary texts under different dimensions are fused to obtain the basic project information of the project to be managed.

[0065] Compared with the prior art, the present invention has the following beneficial effects:

[0066] By retrieving the corresponding project agreement signing template according to the basic information of the project, and adaptively adjusting the project agreement signing template according to the project requirements, the adaptability of the final project agreement signing template to the project to be managed is ensured, and the corresponding project signing management operations are also facilitated. Secondly, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time final results are visualized, which is convenient for managers to have a real-time and effective understanding of the status and situation of the project agreement signing, so as to facilitate timely adjustments to the signing process when abnormalities occur. Finally, after the project agreement is signed, the project agreement signing results are subject to multi-level review, and effective management operations are implemented on the project agreement signing results after the review is passed, which improves the comprehensiveness of information records and the efficiency and accuracy of project agreement signing. At the same time, effective tracking and monitoring of project agreement signing is achieved, which provides convenience for managers to make decisions and ensures the management effect of project agreement signing.

[0067] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0068] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0069] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0070] Figure 1 This is a structural diagram of a project signing management system in an embodiment of the present invention;

[0071] Figure 2 A structural diagram of an information acquisition module in a project signing management system in an embodiment of the present invention;

[0072] Figure 3 The present invention is a flowchart of a project signing management method in an embodiment of the present invention. DETAILED DESCRIPTION

[0073] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0074] Embodiment 1:

[0075] This embodiment provides a project signing management system, such as Figure 1 As shown, including:

[0076] The information acquisition module is used to obtain basic project information, retrieve the project agreement signing template based on the basic project information, and adaptively adjust the project agreement signing template based on project requirements;

[0077] The agreement status tracking module is used to track the project agreement signing process in real time based on the adaptive adjustment results and the agreement signing process path, and to visualize the real-time tracking results;

[0078] The project signing management module is used to determine the multi-level review after the project agreement is signed based on the visual display results, and manage the project agreement signing results after the multi-level review is passed.

[0079] In this embodiment, the basic project information refers to the project type of the project to be managed, the content to be managed, the management purpose to be achieved, and other information of the project to be managed.

[0080] In this embodiment, the project agreement signing template refers to a template selected from existing agreement signing templates that is most similar to the basic information of the current project as a basic template.

[0081] In this embodiment, the project requirements refer to the business content that needs to be managed in the project to be managed.

[0082] In this embodiment, adaptive adjustment refers to adjusting the content in the project agreement signing template that does not meet the project requirements according to the project requirements, and performing supplementary operations when the corresponding content is missing.

[0083] In this embodiment, the agreement signing process path is known in advance and is used to represent the signing order and rules that need to be followed when signing the project agreement.

[0084] In this embodiment, multi-level review refers to verifying the legality and compliance of the project agreement signing results step by step through different departments.

[0085] In this embodiment, managing the project agreement signing result after passing the multi-level review refers to marking and storing the project agreement signing result as effective.

[0086] The working principle and beneficial effects of the above technical solution are: by retrieving the corresponding project agreement signing template according to the basic information of the project, and adaptively adjusting the project agreement signing template according to the project requirements, it is ensured that the final project agreement signing template is compatible with the project to be managed, and it is also convenient for the corresponding project signing management operations. Secondly, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time final result is visualized, which is convenient for management personnel to have a real-time and effective understanding of the status and situation of the project agreement signing, so as to facilitate timely adjustment of the signing process when abnormalities occur. Finally, after the project agreement is signed, the project agreement signing results are subject to multi-level review, so as to achieve effective management operations on the project agreement signing results after the review is passed, thereby improving the comprehensiveness of information records and the efficiency and accuracy of project agreement signing. At the same time, it is possible to effectively track and monitor the signing of project agreements, which provides convenience for management personnel to make decisions and ensures the management effect of project agreement signing.

[0087] Embodiment 2:

[0088] Based on Example 1, this example provides a project signing management system, such as Figure 2 As shown, the information acquisition module includes:

[0089] A data determination unit is used to obtain the project plan of the project to be managed and to perform dimension splitting on the text content in the project plan based on the project composition indicators;

[0090] A text parsing unit, used to extract semantic features from the text content of each dimension after the dimension splitting, determine the key data segments of the text content of each dimension based on the extracted semantic features, and obtain the corresponding summary text based on the associated data segments;

[0091] The project basic information determination unit is used to determine the logical association relationship between text contents of different dimensions based on the project composition indicators, and to perform text fusion on the summary texts under different dimensions based on the logical association relationship to obtain the project basic information of the project to be managed.

[0092] In this embodiment, the project plan is a text used to record specific project information of the project to be managed.

[0093] In this embodiment, the project composition indicators are known in advance, such as the project background, project implementation plan, and project cost estimation.

[0094] In this embodiment, dimension splitting refers to splitting the text content in the project plan accordingly according to the project composition indicators, that is, the splitting results correspond to the project composition indicators one by one.

[0095] In this embodiment, the key data segment refers to data information in the text content of each dimension that can represent the main content.

[0096] In this embodiment, the summary text refers to the main idea of ​​the text content in each dimension.

[0097] The working principle and beneficial effects of the above technical solution are: by splitting the project plan of the project to be managed into dimensions, and extracting semantic features of the text content under each dimension after the split, it is possible to accurately and effectively determine the summary text information under each dimension; secondly, by determining the logical association relationship between the text contents of different dimensions according to the project composition indicators, it is possible to perform text fusion of the summary texts under different dimensions according to the logical association relationship, thereby achieving accurate and effective determination of the basic project information of the project to be managed, and providing convenience and basis for retrieving the project agreement signing template.

[0098] Embodiment 3:

[0099] Based on Example 1, this example provides a project signing management system, an information acquisition module, including:

[0100] An information acquisition unit, used to acquire the obtained basic information of the project, and perform a first feature conversion on the basic information of the project to obtain a corresponding information feature vector;

[0101] Attribute extraction unit, used to:

[0102] Determine the target industry of the project to be managed based on the basic information of the project, and roughly screen the project agreement signing templates from the template library based on the target industry to obtain the available project agreement signing templates;

[0103] Extracting the attribute information of the available project agreement signing template, and performing a second feature conversion on the attribute information to obtain a corresponding configuration feature vector;

[0104] The template determination unit is used to determine the similarity between the basic information of the project and each available project agreement signing template based on the information feature vector and the configuration feature vector, and determine the final valid project agreement signing template based on the value of the similarity.

[0105] In this embodiment, the first feature conversion refers to converting the format of the basic project information, that is, converting the basic project information into a corresponding information feature vector, in order to facilitate the retrieval of the corresponding project agreement signing template from the template library.

[0106] In this embodiment, the available project agreement signing template refers to an agreement signing template applicable to the current project to be managed, and is not unique.

[0107] In this embodiment, the attribute information refers to the types of available project agreement signing templates and corresponding structures, etc.

[0108] In this embodiment, the second feature conversion refers to converting the format of the attribute information of the available project agreement signing templates, that is, converting it into a configuration feature vector, in order to select the best agreement signing template from the available project agreement signing templates.

[0109] In this embodiment, determining the final valid project agreement signing template based on the similarity value refers to selecting the available project agreement signing template corresponding to the maximum similarity value as the final project agreement signing template.

[0110] The working principle and beneficial effects of the above technical solution are: by converting the format of the basic information of the project, the information feature vector is locked; secondly, the available project agreement signing template is selected from the template library, and the attribute information of the available project agreement signing template is formatted and converted to obtain the configuration feature vector; finally, the similarity between the information feature vector and the configuration feature vector is determined, and finally the final valid project agreement signing template is determined according to the similarity, providing an accurate and reliable template for project signing management.

[0111] Embodiment 4:

[0112] Based on Example 1, this example provides a project signing management system, an information acquisition module, including:

[0113] A template parsing unit, used to decompose the project agreement signing template based on business characteristics to obtain the functional module composition of the project agreement signing template;

[0114] Requirements parsing unit, used to:

[0115] Analyze the project requirements to obtain the content to be managed and the corresponding constraints of the project to be managed, and map the content to be managed and the corresponding constraints of the project to be managed with the functional module composition;

[0116] Based on the mapping results, adjustment parameters for the project agreement signing template and supplementary text for the project agreement signing template are obtained;

[0117] The template adjustment unit is used to adjust the project agreement signing template based on the adjustment parameters. At the same time, it generates the supplementary terms of the agreement based on the supplementary text, and adds the supplementary terms of the agreement to the adjusted project agreement signing template to complete the adaptive adjustment of the project agreement signing template.

[0118] In this embodiment, the business characteristics refer to the business scope corresponding to the project to be managed and the management objectives to be achieved.

[0119] In this embodiment, the functional module composition refers to the different components included in the project agreement signing template.

[0120] In this embodiment, the constraint condition refers to the requirements and rules that need to be followed when managing the content to be managed in the project to be managed.

[0121] In this embodiment, the adjustment parameter refers to the specific content of adjusting the corresponding functional module according to the content to be managed and the corresponding constraint conditions, so as to ensure that the functional module can effectively perform the management task of the content to be managed and the corresponding constraint conditions.

[0122] In this embodiment, the supplementary text refers to the data content that needs to be improved on the project agreement signing template when the project agreement signing template does not have a functional module with the content to be managed and the corresponding constraint conditions.

[0123] The working principle and beneficial effects of the above technical solution are: by structurally splitting the project agreement signing template, and mapping the to-be-managed content of the to-be-managed project and the corresponding constraints with the split functional modules, the project agreement signing template is adaptively adjusted according to the mapping results, thereby ensuring the accuracy and reliability of the final project agreement signing template, ensuring the adaptability of the final project agreement signing template to the project to be managed, and facilitating the corresponding project signing management operations.

[0124] Embodiment 5:

[0125] Based on Example 4, this embodiment provides a project signing management system, a template adjustment unit, including:

[0126] The result acquisition subunit is used to acquire the adaptively adjusted project agreement signing template, and transmit the project agreement signing template to the user terminal online synchronously based on the online interaction mechanism;

[0127] The permission opening subunit is used to open the uplink communication permission to the user terminal based on the online synchronization transmission result, and receive feedback information submitted by the user terminal based on the opening result;

[0128] The template verification sub-unit is used to determine the verification result of the user terminal on the adaptively adjusted project agreement signing template based on the feedback information, and to encapsulate the adaptively adjusted project agreement signing template after the verification is passed, and to deploy the encapsulated result according to the agreement signing process based on the signing standard.

[0129] In this embodiment, opening the uplink communication authority refers to opening the communication authority between different user terminals and the master control terminal, so as to facilitate the master control center to receive feedback information from different user terminals.

[0130] The working principle and beneficial effects of the above technical solution are: the obtained project agreement signing template is transmitted to the user terminal for verification through an online interactive mechanism, and the feedback information of the user terminal on the project agreement signing template is received in real time, so that the project agreement signing template is packaged after the verification, and the packaged project agreement signing template is deployed in the signing process, so as to facilitate the corresponding project signing management operations according to the project agreement signing template.

[0131] Embodiment 6:

[0132] Based on Example 1, this embodiment provides a project signing management system, an agreement status tracking module, including:

[0133] Tracking configuration unit, used to:

[0134] Analyze the agreement signing process path, determine the agreement signing links included in the agreement signing process path, and determine the collaborative interaction mechanism between the agreement signing links based on the operation requirements of the agreement signing process;

[0135] Based on the collaborative interaction mechanism, the agreement signing process is divided into nodes, and the starting point of the agreement signing process is determined based on the node division results. At the same time, based on the node division results and according to the agreement signing process path, real-time dynamic display thumbnails between the agreement signing links are constructed;

[0136] Real-time tracking unit for:

[0137] Based on the sensor, the trigger status of the starting point is monitored in real time, and after the starting point is triggered, the status tracking mechanism is started synchronously;

[0138] Based on the status tracking mechanism, the real-time operating parameters of the agreement signing process in each node are monitored, and the differences between the monitored real-time operating parameters and the standard execution steps of the agreement signing process are compared;

[0139] Determine the real-time signing status of each agreement signing link based on the difference comparison status, and generate a real-time status display icon for each agreement signing link based on the real-time signing status;

[0140] Dynamically annotate the real-time status display icon in the real-time dynamic display thumbnails between each agreement signing link;

[0141] The visualization display unit is used to generate a visualization display diagram of the dynamic tracking results of the project agreement signing process based on the dynamic annotation results, and synchronously update the real-time dynamics of the project agreement signing in the visualization display diagram of the dynamic tracking results based on the data communication interface.

[0142] In this embodiment, the agreement signing link refers to multiple processing links included in the agreement signing process path, including the review mechanisms of different departments.

[0143] In this embodiment, the operation requirements refer to the collaborative management conditions and requirements required between the various agreement signing links when conducting project signing management. The agreement signing processes corresponding to different types of projects are different.

[0144] In this embodiment, the collaborative interaction mechanism refers to the specific interaction relationship, interaction sequence and method corresponding to the interaction between the various agreement signing links.

[0145] In this embodiment, node division refers to dividing the execution order of the agreement signing links, so as to facilitate the control of each agreement signing link from the starting point to perform agreement signing management operations on the project according to the node division results.

[0146] In this embodiment, the real-time dynamic display thumbnail refers to constructing a real-time process display diagram between each agreement signing link when conducting project signing management based on the agreement signing process path. Through this diagram, the situation and progress of each agreement signing link in project signing management can be understood.

[0147] In this embodiment, the status tracking mechanism is a strategy for tracking each agreement signing link, so as to facilitate real-time and effective understanding of the status of project signing.

[0148] In this embodiment, the standard execution steps refer to all processing steps included in each agreement signing link, and the purpose is to effectively determine the progress of project signing in each link.

[0149] In this embodiment, the real-time status display icon refers to the icon generated according to the real-time signing status of each agreement signing link, and the status of project agreement signing management is displayed in the form of an icon, so that the user can intuitively view the processing status.

[0150] The working principle and beneficial effects of the above technical solution are: by parsing the agreement signing process path, the agreement signing link can be effectively determined, and the collaborative interaction mechanism between each agreement signing link can be determined according to the operation requirements of the agreement signing process, so as to facilitate project signing management according to the collaborative interaction mechanism; secondly, the agreement signing link is divided into nodes to determine the starting point, and a real-time dynamic display thumbnail is generated between each agreement signing link according to the node division result, which provides a visualization tool for tracking the agreement status; finally, after the starting point is triggered, the status tracking mechanism is synchronously started to monitor the real-time operating parameters of the agreement signing link, so as to accurately and effectively determine the real-time signing status of each agreement signing link, and generate a real-time status display icon for the real-time signing status and dynamically mark and display it in the real-time dynamic display thumbnail, so as to facilitate management personnel to have a real-time and effective understanding of the project agreement signing status and situation, so as to facilitate timely adjustment of the signing process when abnormalities occur.

[0151] Embodiment 7:

[0152] Based on Example 1, this example provides a project signing management system, and the project signing management module includes:

[0153] A result acquisition unit is used to determine, based on the visual display results, when the project agreement is signed, extract the final project agreement and trigger the review process of the project agreement;

[0154] Multi-level audit unit for:

[0155] Determine the audit department based on the audit process, and determine the hierarchical execution order between the audit departments based on the audit requirements;

[0156] The project agreement is reviewed in text based on the upper and lower execution order. At the same time, an audit subsidiary record table is constructed, and the electronic audit signatures of each audit department are recorded in the audit subsidiary record table based on the audit results of each audit department;

[0157] Correction unit for:

[0158] Construct a multi-change point jump-out mechanism and associate it with the audit attachment record table;

[0159] Based on the correlation results, the electronic audit signatures of each audit department are sequentially monitored according to the multi-change point jump mechanism, and when there is a failure in the audit, the multi-level audit process of the project agreement is jumped out;

[0160] The abnormal content is locked based on the pop-up result, and the locking result is sent to the user terminal for correction;

[0161] Based on the sent results, the updated text of the abnormal content from the user terminal is received in real time, and the multi-level review process is memorized and restarted based on the received results until the multi-level review is completed.

[0162] In this embodiment, the audit process is known in advance and represents the specific strategies and methods used to audit the standardization and effectiveness of the project agreement.

[0163] In this embodiment, the review requirements are set in advance, including sensitive word restrictions and the review order between the review departments.

[0164] In this embodiment, the upper and lower execution order refers to the execution order between the audit departments.

[0165] In this embodiment, the audit attachment record table is a table used to record the electronic audit signature of each audit department after the audit is completed, wherein the electronic audit signature refers to a marking symbol used to represent the identity of the audit department after the audit is completed.

[0166] In this embodiment, the multi-change point jump-out mechanism is used to monitor the audit results of the project agreement, that is, when it is monitored that the audit has not passed, the current audit link can be jumped out at any time, that is, the audit process is terminated without being restricted by the link.

[0167] In this embodiment, the abnormal content refers to the specific agreement content that has not passed the review department.

[0168] In this embodiment, memorizing and restarting refers to re-performing the audit operation from the audit exit position.

[0169] The working principle and beneficial effects of the above technical solution are: by triggering the review process after the project agreement is signed, a strict and effective review of the project agreement is achieved according to the review process, and a multi-point jump-out mechanism is configured for the review process, so that when the review fails, the multi-level review process can be jumped out in time. At the same time, the abnormal content is locked to facilitate the user terminal to revise the abnormal content, thereby ensuring the rigor and reliability of the final project agreement. Finally, the revised project agreement is reviewed again after the revision is completed until the multi-level review is completed, thereby ensuring the rigor and reliability of the project agreement.

[0170] Embodiment 8:

[0171] Based on Example 1, this example provides a project signing management system, and the project signing management module includes:

[0172] Marking unit for:

[0173] After passing the multi-level review, the constraints of the project agreement signing results are extracted, and the binding time limit of the project agreement signing results is determined based on the constraints;

[0174] Generate a time limit label based on the constraint time limit, and mark the project agreement signing result as effective based on the time limit label;

[0175] Snap-in for:

[0176] Extract the business category of the project agreement signing result based on the effective marking result, and determine the storage area corresponding to the project agreement signing result based on the business category;

[0177] The project agreement signing results shall be stored and managed in the corresponding storage area.

[0178] In this embodiment, the constraint condition refers to the limiting effect that the result of signing the project agreement can have, that is, the specific content and standard of the limitation.

[0179] In this embodiment, the binding time limit refers to the length of time during which the results of the project agreement are effective.

[0180] In this embodiment, the time limit label is generated based on the constraint time limit and is used to mark the time limit length of the project agreement signing result.

[0181] The working principle and beneficial effects of the above technical solution are: by parsing the results of the project agreement signing, the binding time limit and business category of the project agreement signing results can be effectively determined, so that the project agreement signing results can be stored and managed accordingly according to the business category and time limit labels, thereby improving the effect of project signing management.

[0182] Embodiment 9:

[0183] This embodiment provides a project signing management method, such as Figure 3 As shown, including:

[0184] Step 1: Obtain basic project information, retrieve the project agreement signing template based on the basic project information, and adaptively adjust the project agreement signing template based on project requirements;

[0185] Step 2: Based on the adaptive adjustment results, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time tracking results are visualized;

[0186] Step 3: Based on the visualization results, determine that a multi-level review will be conducted after the project agreement is signed, and manage the project agreement signing results after the multi-level review is passed.

[0187] The working principle and beneficial effects of the above technical solution are: by retrieving the corresponding project agreement signing template according to the basic information of the project, and adaptively adjusting the project agreement signing template according to the project requirements, it is ensured that the final project agreement signing template is compatible with the project to be managed, and it is also convenient for the corresponding project signing management operations. Secondly, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time final result is visualized, which is convenient for management personnel to have a real-time and effective understanding of the status and situation of the project agreement signing, so as to facilitate timely adjustment of the signing process when abnormalities occur. Finally, after the project agreement is signed, the project agreement signing results are subject to multi-level review, so as to achieve effective management operations on the project agreement signing results after the review is passed, thereby improving the comprehensiveness of information records and the efficiency and accuracy of project agreement signing. At the same time, it is possible to effectively track and monitor the signing of project agreements, which provides convenience for management personnel to make decisions and ensures the management effect of project agreement signing.

[0188] Embodiment 10:

[0189] Based on Example 9, this example provides a project signing management method. In step 1, basic project information is obtained, including:

[0190] Obtain the project plan of the project to be managed, and perform dimension splitting on the text content in the project plan based on the project composition indicators;

[0191] Extracting semantic features from the text content of each dimension after the dimension splitting, determining key data segments of the text content of each dimension based on the extracted semantic features, and obtaining corresponding summary text based on the associated data segments;

[0192] Based on the project composition indicators, the logical association relationship between the text contents of different dimensions is determined, and based on the logical association relationship, the summary texts under different dimensions are fused to obtain the basic project information of the project to be managed.

[0193] The working principle and beneficial effects of the above technical solution are: by splitting the project plan of the project to be managed into dimensions, and extracting semantic features of the text content under each dimension after the split, it is possible to accurately and effectively determine the summary text information under each dimension; secondly, by determining the logical association relationship between the text contents of different dimensions according to the project composition indicators, it is possible to perform text fusion of the summary texts under different dimensions according to the logical association relationship, thereby achieving accurate and effective determination of the basic project information of the project to be managed, and providing convenience and basis for retrieving the project agreement signing template.

[0194] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A project signing management system, It is characterized in that include: The information acquisition module is used to obtain basic project information, retrieve the project agreement signing template based on the basic project information, and adaptively adjust the project agreement signing template based on project requirements; The agreement status tracking module is used to track the project agreement signing process in real time based on the adaptive adjustment results and the agreement signing process path, and to visualize the real-time tracking results; The project signing management module is used to determine the multi-level review after the project agreement is signed based on the visual display results, and manage the project agreement signing results after the multi-level review is passed.

2. A project signing management system according to claim 1, It is characterized in that Information acquisition module, including: A data determination unit is used to obtain the project plan of the project to be managed and to perform dimension splitting on the text content in the project plan based on the project composition indicators; A text parsing unit, used to extract semantic features from the text content of each dimension after the dimension splitting, determine the key data segments of the text content of each dimension based on the extracted semantic features, and obtain the corresponding summary text based on the associated data segments; The project basic information determination unit is used to determine the logical association relationship between text contents of different dimensions based on the project composition indicators, and to perform text fusion on the summary texts under different dimensions based on the logical association relationship to obtain the project basic information of the project to be managed.

3. A project signing management system according to claim 1, It is characterized in that Information acquisition module, including: An information acquisition unit, used to acquire the obtained basic information of the project, and perform a first feature conversion on the basic information of the project to obtain a corresponding information feature vector; Attribute extraction unit, used to: Determine the target industry of the project to be managed based on the basic information of the project, and roughly screen the project agreement signing templates from the template library based on the target industry to obtain the available project agreement signing templates; Extracting attribute information of the available project agreement signing template, and performing a second feature conversion on the attribute information to obtain a corresponding configuration feature vector; The template determination unit is used to determine the similarity between the basic information of the project and each available project agreement signing template based on the information feature vector and the configuration feature vector, and determine the final valid project agreement signing template based on the value of the similarity.

4. A project signing management system according to claim 1, It is characterized in that Information acquisition module, including: A template parsing unit, used to decompose the project agreement signing template based on business characteristics to obtain the functional module composition of the project agreement signing template; Requirements parsing unit, used to: Analyze the project requirements to obtain the content to be managed and the corresponding constraints of the project to be managed, and map the content to be managed and the corresponding constraints of the project to be managed with the functional module composition; Based on the mapping results, adjustment parameters for the project agreement signing template and supplementary text for the project agreement signing template are obtained; The template adjustment unit is used to adjust the project agreement signing template based on the adjustment parameters. At the same time, it generates the supplementary terms of the agreement based on the supplementary text, and adds the supplementary terms of the agreement to the adjusted project agreement signing template to complete the adaptive adjustment of the project agreement signing template.

5. A project signing management system according to claim 4, It is characterized in that Template adjustment unit, including: The result acquisition subunit is used to acquire the adaptively adjusted project agreement signing template, and transmit the project agreement signing template to the user terminal online synchronously based on the online interaction mechanism; The permission opening subunit is used to open the uplink communication permission to the user terminal based on the online synchronization transmission result, and receive feedback information submitted by the user terminal based on the opening result; The template verification sub-unit is used to determine the verification result of the user terminal on the adaptively adjusted project agreement signing template based on the feedback information, and to encapsulate the adaptively adjusted project agreement signing template after the verification is passed, and to deploy the encapsulated result according to the agreement signing process based on the signing standard.

6. A project signing management system according to claim 1, It is characterized in that Protocol status tracking module, including: Tracking configuration unit for: Analyze the agreement signing process path, determine the agreement signing links included in the agreement signing process path, and determine the collaborative interaction mechanism between the agreement signing links based on the operation requirements of the agreement signing process; Based on the collaborative interaction mechanism, the agreement signing process is divided into nodes, and the starting point of the agreement signing process is determined based on the node division results. At the same time, based on the node division results and according to the agreement signing process path, real-time dynamic display thumbnails between the agreement signing links are constructed; Real-time tracking unit for: Based on the sensor, the trigger status of the starting point is monitored in real time, and after the starting point is triggered, the status tracking mechanism is started synchronously; Based on the status tracking mechanism, the real-time operating parameters of the agreement signing process in each node are monitored, and the differences between the monitored real-time operating parameters and the standard execution steps of the agreement signing process are compared; Determine the real-time signing status of each agreement signing link based on the difference comparison status, and generate a real-time status display icon for each agreement signing link based on the real-time signing status; Dynamically annotate the real-time status display icon in the real-time dynamic display thumbnails between each agreement signing link; The visualization display unit is used to generate a visualization display diagram of the dynamic tracking results of the project agreement signing process based on the dynamic marking results, and synchronously update the real-time dynamics of the project agreement signing in the visualization display diagram of the dynamic tracking results based on the data communication interface.

7. A project signing management system according to claim 1, It is characterized in that Project signing management module, including: A result acquisition unit is used to determine, based on the visual display results, when the project agreement is signed, extract the final project agreement and trigger the review process of the project agreement; Multi-level audit unit for: Determine the audit department based on the audit process, and determine the hierarchical execution order between the audit departments based on the audit requirements; The project agreement is reviewed in text based on the upper and lower execution order. At the same time, an audit subsidiary record table is constructed, and the electronic audit signatures of each audit department are recorded in the audit subsidiary record table based on the audit results of each audit department; Correction unit for: Construct a multi-change point jump-out mechanism and associate it with the audit attachment record table; Based on the correlation results, the electronic audit signatures of each audit department are sequentially monitored according to the multi-change point jump mechanism, and when there is a failure in the audit, the multi-level audit process of the project agreement is jumped out; The abnormal content is locked based on the pop-up result, and the locking result is sent to the user terminal for correction; Based on the sent results, the updated text of the abnormal content from the user terminal is received in real time, and the multi-level review process is memorized and restarted based on the received results until the multi-level review is completed.

8. A project signing management system according to claim 1, It is characterized in that Project signing management module, including: Marking unit for: After passing the multi-level review, the constraints of the project agreement signing results are extracted, and the binding time limit of the project agreement signing results is determined based on the constraints; Generate a time limit label based on the constraint time limit, and mark the project agreement signing result as effective based on the time limit label; Snap-in for: Extract the business category of the project agreement signing result based on the effective marking result, and determine the storage area corresponding to the project agreement signing result based on the business category; The project agreement signing results shall be stored and managed in the corresponding storage area.

9. A project signing management method, It is characterized in that include: Step 1: Obtain basic project information, retrieve the project agreement signing template based on the basic project information, and adaptively adjust the project agreement signing template based on project requirements; Step 2: Based on the adaptive adjustment results, the project agreement signing process is tracked in real time according to the agreement signing process path, and the real-time tracking results are visualized; Step 3: Based on the visualization results, determine that a multi-level review will be conducted after the project agreement is signed, and manage the project agreement signing results after the multi-level review is passed.

10. A project signing management method according to claim 9, It is characterized in that In step 1, obtain basic project information, including: Obtain the project plan of the project to be managed, and perform dimension splitting on the text content in the project plan based on the project composition indicators; Extracting semantic features from the text content of each dimension after the dimension splitting, determining key data segments of the text content of each dimension based on the extracted semantic features, and obtaining corresponding summary text based on the associated data segments; Based on the project composition indicators, the logical association relationship between the text contents of different dimensions is determined, and based on the logical association relationship, the summary texts under different dimensions are fused to obtain the basic project information of the project to be managed.

Citation Information

Patent Citations

  • Electronic contract signing system and electronic contract signing method

    CN109784946A

  • Full-process automatic management system for industrial constructional engineering

    CN111274774A

  • Project process management system and method based on software componentization

    CN114418527A

  • Context-specific item-to-agreement matching