Mobile maintenance power supply cluster management system and scheduling method
Through an intelligent and automated mobile maintenance power cluster management system, combining power consumption requirements and power information, resource allocation is optimized, and the problem of low efficiency of traditional power scheduling methods is solved, efficient scheduling and resource optimization are achieved, and losses at critical moments are reduced Risk and improve power supply reliability.
Patent Information
- Application Number
- CN202411139112.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-03
AI Technical Summary
Traditional power scheduling methods lack efficiency and cannot respond quickly and accurately to specific needs of each target site, resulting in insufficient optimization of resource allocation and the inability to achieve optimal resource allocation, especially in critical moments such as natural disasters or emergency repairs, which may cause serious Casualty or product loss.
Through precise information collection, efficient allocation analysis and flexible allocation execution strategies, we adopt intelligentization and other factors in multiple dimensions such as power demand, power demand duration, power outage loss level coefficient, power outage loss level coefficient, and power outage loss level coefficient. , an automated mobile maintenance power cluster management system, reasonably allocate limited power resources, and minimize losses caused by insufficient power supply.
It has achieved efficient scheduling, flexible response to different needs, optimized resource utilization, reduced loss risks and improved power supply reliability, significantly improving emergency response capabilities and service quality.
Smart Images

Figure CN119067257A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power dispatching management, and in particular to a mobile maintenance power cluster management system and a dispatching method. Background Art
[0002] In modern society, with the rapid development of industrialization and urbanization, electricity has become an indispensable infrastructure in production and daily life. Especially in some special circumstances, such as natural disasters, large-scale events or emergency repairs, temporary and mobile power solutions become particularly important. As a flexible and convenient power supply method, mobile maintenance power supply can quickly provide the required power support for various occasions, thereby ensuring the continuity and safety of key operations.
[0003] However, traditional power dispatch methods are often inefficient and unable to quickly and accurately respond to the specific needs of each target site. In addition, existing dispatch systems usually do not fully consider the losses and risks that may be caused by power outages in different locations, resulting in suboptimal resource allocation and failure to achieve optimal resource configuration.
[0004] For example, in places such as hospitals and cold storages that have extremely high requirements for power supply, once a power outage occurs, it may cause serious casualties or product losses. Therefore, how to effectively manage and dispatch mobile maintenance power supplies to ensure that these sensitive areas can obtain stable power supply at critical moments has become an urgent problem to be solved.
[0005] In view of the above problems, the present invention proposes an innovative scheduling method and management system for a mobile maintenance power supply cluster. Summary of the invention
[0006] In view of the shortcomings of the prior art, the present invention provides a mobile maintenance power supply cluster management system and a scheduling method. Through precise information collection, efficient deployment analysis and flexible deployment execution strategy, it not only takes into account factors of multiple dimensions such as power demand power, power demand duration, power outage loss level coefficient, power outage loss level coefficient, etc., but also through this intelligent and automated management system, it can not only improve the utilization efficiency of mobile maintenance power supply, but also reasonably allocate limited power resources according to the priorities and characteristics of different target sites, minimize the losses caused by insufficient power supply, and significantly improve emergency response capabilities and service quality.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: A mobile maintenance power supply cluster management and scheduling method, comprising the following steps:
[0008] Step 1: Collect the power environment information of each target site and the power supply information of each mobile maintenance power supply; the power environment information includes: site location, power demand power, power demand duration, power outage loss level coefficient, power outage loss level coefficient; the power supply information includes: power supply location, power supply duration without energy supply, maximum output power of the power supply, and power supply failure rate;
[0009] Step 2: Combine the power environment information and power supply information with the preset allocation coefficient formula and priority coefficient formula to perform allocation analysis and calculation, and obtain the allocation coefficient between the mobile maintenance power supply and the target site and the priority coefficient of each target site;
[0010] The third step is to obtain the number of mobile maintenance power supplies and the number of target locations, and based on the number of mobile maintenance power supplies and the number of target locations, obtain the allocation coefficients between each mobile maintenance power supply and the target locations, and then determine the mobile maintenance power supply dispatched to the target location based on the allocation coefficients.
[0011] As a further solution of the present invention: the target site refers to the corresponding place where a mobile maintenance power supply is needed to carry out operations. The mobile maintenance power supply can be called to the corresponding place and can provide temporary power for power tools, electrical equipment and lighting lamps in the corresponding place.
[0012] As a further solution of the present invention: the power demand is expressed as the power supply power required by the target site;
[0013] The power demand duration is the duration for which power supply is required at the target site;
[0014] The power failure loss level coefficient refers to the level of product loss cost pre-assessed within a certain period of time at the target site when the power is off, and each level has a corresponding fixed loss coefficient preset. The loss coefficient corresponding to the target site is the power failure loss level coefficient of the corresponding target site;
[0015] The power outage loss level coefficient refers to the level of assessment based on the estimated casualties caused by the power outage in the target site during the power outage, and the level of assessment based on the estimated casualties. Each level has a corresponding fixed casualty coefficient preset. The casualty coefficient of the target site is the power outage loss level coefficient of the target site.
[0016] The power failure rate refers to the ratio between the number of failures and the total number of times the corresponding mobile maintenance power supply has been used since it was put into use.
[0017] As a further solution of the present invention: the preparation analysis and calculation method is as follows:
[0018] SH1. Calculate the difference between the maximum output power of the mobile maintenance power supply and the power demand of the target site, and mark it as C;
[0019] SH2, obtain a mobile maintenance power supply with a positive C value;
[0020] SH3. Compare the C value corresponding to the mobile maintenance power supply with a preset difference interval, and obtain the mobile maintenance power supply with a C value in the difference interval as the dispatching power supply for the corresponding target site;
[0021] SH4. The absolute value of the difference between the power supply duration of the mobile maintenance power supply and the power demand duration of the target site is marked as CJ;
[0022] SH5. Calculate the distance between the site location and the power supply location and mark it as JL;
[0023] SH6. Mark the power failure rate of the mobile maintenance power supply as GZ, and mark the power failure loss level coefficient and power failure loss level coefficient in the target site as DH and DW respectively;
[0024] SH7, through the deployment coefficient formula Calculate the coordination factor X between the mobile maintenance power supply and the target location;
[0025] Among them, α1, α2, α3, and α4 are all preset proportional coefficients, which are used to adjust the proportions of C, CL, JL, and GZ when calculating the allocation coefficient between the mobile maintenance power supply and the target location;
[0026] SH8. Calculate the priority coefficient Y of the target site through the priority coefficient formula Y=β1×DH+β2×DW, where β1 and β2 are both preset proportional coefficients, which are used to adjust the proportion of DH and DW when calculating the priority coefficient of the target site;
[0027] As a further solution of the present invention: the determination method in the third step is as follows:
[0028] Among all target locations, a target location with the largest priority coefficient is selected, and then a mobile maintenance power source with the largest deployment coefficient corresponding to the target location is obtained, and it is determined as the mobile maintenance power source of the target location;
[0029] Then, a target location with the second largest priority coefficient is selected, and then a mobile maintenance power source with the largest allocation coefficient corresponding to the target location is obtained, and it is determined as the mobile maintenance power source of the target location. When the mobile maintenance power source has been determined as the mobile maintenance power source of other target locations, the mobile maintenance power source with the largest allocation coefficient corresponding to the target location and determined as other target locations is obtained in descending order of the allocation coefficient, and it is determined as the mobile maintenance power source of the target location;
[0030] And so on, until all target locations or mobile maintenance power supplies are fully distributed;
[0031] A mobile maintenance power supply cluster management system, the system is used to implement a mobile maintenance power supply cluster scheduling method, the system includes:
[0032] An information collection module is used to collect the power environment information of each target site and the power supply information of each mobile maintenance power supply;
[0033] A dispatch analysis module is used to perform dispatch analysis based on the collected information and derive the dispatch coefficient between the mobile maintenance power supply and the target site and the priority coefficient of the target site;
[0034] The deployment execution module is used to determine the mobile maintenance power supply dispatched to the target location according to the deployment coefficient.
[0035] As a further solution of the present invention: also include:
[0036] The priority level assessment module is used to compare the priority coefficient of the target site with its corresponding preset priority threshold, and the power outage loss level coefficient with its corresponding preset loss level threshold, and mark the target site as a primary site, a lower-middle site, an upper-middle site, and a senior site according to the comparison results.
[0037] As a further solution of the present invention: the comparison method of the priority assessment module is as follows:
[0038] If the priority coefficient is less than or equal to the priority threshold, and the power failure loss level coefficient is less than or equal to the loss level threshold, the target site is marked as a primary site;
[0039] If the priority coefficient is greater than the priority threshold, and the power failure loss level coefficient is less than or equal to the loss level threshold, the target site is marked as a medium or lower level site;
[0040] If the priority coefficient is less than or equal to the priority threshold, and the power failure loss level coefficient is greater than the loss level threshold, the target site is marked as a medium-to-high-level site;
[0041] If the priority coefficient is greater than the priority threshold, and the power failure loss level coefficient is greater than the loss level threshold, the target site is marked as a high-level site.
[0042] As a further solution of the present invention: also include:
[0043] The combination optimization module is used to analyze the high-level sites and the middle and upper-level sites when there are multiple target sites. According to the priority coefficients corresponding to the high-level sites and the middle and upper-level sites, the power demand of the corresponding target sites is selected in turn, and multiple mobile maintenance power supplies are selected from all available mobile maintenance power supplies to form a mobile maintenance power supply group. Then, the group output power of each mobile maintenance power supply group is obtained, and it is subtracted from the power demand power of the target site to obtain the difference, and then the mobile maintenance power supply group with the smallest difference is selected and allocated to the corresponding target site.
[0044] Among them, the group output power of each combined mobile maintenance power supply group is greater than the required power of the corresponding target site, and when the mobile maintenance power supply groups are combined, the already allocated mobile maintenance power supplies no longer participate in the new combination.
[0045] The present invention provides a mobile maintenance power supply cluster management system and dispatching method. Compared with the prior art, it has the following beneficial effects:
[0046] Efficient dispatching: Through the information collection and dispatching analysis module, the dispatching coefficient between each mobile maintenance power source and the target location and the priority coefficient of the target site can be calculated quickly and accurately, thereby achieving efficient power dispatching.
[0047] Flexible response to different needs: The present invention can flexibly adjust the distribution of mobile maintenance power supply according to factors such as the power demand power, power demand duration, power outage loss level coefficient, power outage loss level coefficient, etc. of the target site to meet the needs of different scenarios.
[0048] Optimize resource utilization: Through the combination optimization module, multiple mobile maintenance power supplies can be combined to meet the power requirements of the target site, thereby improving resource utilization.
[0049] Reduce the risk of loss: The present invention takes into account the power outage loss level coefficient and the power outage death level coefficient during the scheduling process, which can give priority to ensuring the power supply needs of important places and reduce the risk of loss caused by power outages.
[0050] Improve power supply reliability: The present invention can reasonably allocate power resources according to factors such as the maximum output power, power supply duration, and failure rate of the mobile maintenance power supply, thereby improving the reliability of the power supply system.
[0051] Systematic management: Through the mobile maintenance power cluster management system, centralized management and monitoring of power resources can be achieved to improve management efficiency.
[0052] Strong adaptability: The present invention can flexibly adjust the scheduling strategy according to actual conditions to adapt to changes in power demand in different scenarios. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] Figure 1 is a system block diagram of the present invention;
[0054] Figure 2 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0056] As embodiment 1 of the present invention
[0057] See also Figure 1-Figure 2 The present invention provides a technical solution: a mobile maintenance power supply cluster scheduling method, comprising the following steps:
[0058] Step 1: Information Collection
[0059] Collect the power environment information of each target site and the power supply information of each mobile maintenance power supply;
[0060] The target site refers to the corresponding place where the mobile maintenance power supply needs to be called for operation. The mobile maintenance power supply is a power supply that can be called to the corresponding place and can provide temporary power for the power tools, electrical equipment and lighting in the corresponding place;
[0061] The power consumption environment information includes: site location, power demand power, power demand duration, power failure loss level coefficient, power failure loss level coefficient;
[0062] Among them, the power demand is expressed as the power supply power required by the target site;
[0063] The power demand duration is the duration for which power supply is required at the target site;
[0064] The power failure loss level coefficient refers to the level of product loss cost pre-assessed in a certain period of time at the target site when the power is off, and each level has a corresponding fixed loss coefficient preset. The loss coefficient corresponding to the target site is the power failure loss level coefficient of the target site, and the target area is such as a cold storage warehouse, etc.
[0065] The power outage loss level coefficient refers to the pre-judgment and estimation of whether there will be casualties caused by the power outage in the target site during the power outage, and the level is assessed based on the estimated casualties. Each level has a corresponding fixed casualty coefficient. The casualty coefficient of the target site is the power outage loss level coefficient of the target site. Target areas include hospitals, etc.
[0066] Power supply information includes: power supply location, power supply duration without energy supply, maximum output power of the power supply, and power supply failure rate;
[0067] The power failure rate refers to the ratio between the number of failures and the total number of times the corresponding mobile maintenance power supply has been used since it was put into use;
[0068] Step 2: Allocation Analysis
[0069] SH1. Calculate the difference between the maximum output power of the mobile maintenance power supply and the power demand of the target site, and mark it as C;
[0070] SH2, obtain a mobile maintenance power supply with a positive C value;
[0071] SH3. Compare the C value corresponding to the mobile maintenance power supply with a preset difference interval, and obtain the mobile maintenance power supply with a C value in the difference interval as the dispatching power supply for the corresponding target site;
[0072] SH4. The absolute value of the difference between the power supply duration of the mobile maintenance power supply and the power demand duration of the target site is marked as CJ;
[0073] SH5. Calculate the distance between the site location and the power supply location and mark it as JL;
[0074] SH6. Mark the power failure rate of the mobile maintenance power supply as GZ, and mark the power failure loss level coefficient and power failure loss level coefficient in the target site as DH and DW respectively;
[0075] SH7, through the formula: Calculate the coordination factor X between the mobile maintenance power supply and the target location;
[0076] Among them, α1, α2, α3, and α4 are all preset proportional coefficients, which are used to adjust the proportions of C, CL, JL, and GZ when calculating the allocation coefficient between the mobile maintenance power supply and the target location;
[0077] SH8. Calculate the priority coefficient Y of the target site by Y=β1×DH+β2×DW, where β1 and β2 are preset proportional coefficients, which are used to adjust the proportion of DH and DW when calculating the priority coefficient of the target site;
[0078] Step 3: Deployment and Execution
[0079] SS1. Obtain the number of mobile maintenance power supplies and the number of target locations;
[0080] SS2. Obtaining the allocation coefficients between each mobile maintenance power source and the target location based on the number of mobile maintenance power sources and the number of target locations;
[0081] SS3, determine the mobile maintenance power supply dispatched to the target location based on the deployment coefficient;
[0082] The specific method is as follows:
[0083] Among all target locations, a target location with the largest priority coefficient is selected, and then a mobile maintenance power source with the largest deployment coefficient corresponding to the target location is obtained, and it is determined as the mobile maintenance power source of the target location;
[0084] Then, a target location with the second largest priority coefficient is selected, and then a mobile maintenance power source with the largest allocation coefficient corresponding to the target location is obtained, and it is determined as the mobile maintenance power source of the target location. When the mobile maintenance power source has been determined as the mobile maintenance power source of other target locations, the mobile maintenance power source with the largest allocation coefficient corresponding to the target location and determined as other target locations is obtained in descending order of the allocation coefficient, and it is determined as the mobile maintenance power source of the target location;
[0085] And so on, until all target locations or mobile maintenance power supplies are fully distributed;
[0086] The present invention also provides a technical solution: a mobile maintenance power supply cluster management system, the system is used to implement a mobile maintenance power supply cluster management method, the system comprises:
[0087] Information collection module: used to collect the power environment information of each target site and the power supply information of each mobile maintenance power supply.
[0088] Deployment analysis module: used to perform deployment analysis based on the collected information, and obtain the deployment coefficient X between the mobile maintenance power supply and the target location and the priority coefficient Y of the target site.
[0089] Dispatch execution module: used to determine the mobile maintenance power supply dispatched to the target location based on the dispatch coefficient.
[0090] Embodiment 2
[0091] As the second embodiment of the present invention, when the present application is implemented, compared with the first embodiment, the difference between the technical solution of the present embodiment and the first embodiment is that the priority coefficient of the target site and its corresponding preset priority threshold, and the power failure loss level coefficient and its corresponding preset loss level threshold are compared:
[0092] If the priority coefficient is less than or equal to the priority threshold, and the power failure loss level coefficient is less than or equal to the loss level threshold, the target site is marked as a primary site;
[0093] If the priority coefficient is greater than the priority threshold, and the power failure loss level coefficient is less than or equal to the loss level threshold, the target site is marked as a medium or lower level site;
[0094] If the priority coefficient is less than or equal to the priority threshold, and the power failure loss level coefficient is greater than the loss level threshold, the target site is marked as a medium-to-high-level site;
[0095] If the priority coefficient is greater than the priority threshold, and the power failure loss level coefficient is greater than the loss level threshold, the target site is marked as a high-level site;
[0096] In this embodiment, when the mobile maintenance power supply is insufficient, when multiple target sites are analyzed to be advanced sites and mid-upper sites, a small amount of mobile maintenance power supply is preferentially allocated to the advanced sites and mid-upper sites, and the primary sites and mid-lower sites may not be allocated temporarily;
[0097] A mobile maintenance power supply cluster management system, further comprising:
[0098] The priority level assessment module is used to compare the priority coefficient of the target site with its corresponding preset priority threshold, and the power outage loss level coefficient with its corresponding preset loss level threshold, and mark the level of the target site accordingly, such as primary site, lower-middle site, upper-middle site, and senior site.
[0099] Embodiment 3
[0100] As the third embodiment of the present invention, when the present application is implemented, compared with the first and second embodiments, the technical solution of this embodiment is to combine the solutions of the first and second embodiments, and the difference between the technical solution of this embodiment and the first and second embodiments is only in this embodiment;
[0101] When multiple target sites are analyzed to identify high-level sites and upper-middle-level sites;
[0102] At the same time, according to the priority coefficients of the senior site and the middle and upper-level site from large to small, the power demand power of the corresponding target site is selected in turn, and multiple mobile maintenance power supplies are selected from all mobile maintenance power supplies to form multiple mobile maintenance power supply groups, and then the output power of the mobile maintenance power supply group is obtained and marked as the group output power;
[0103] Then, the power demand of the target site is subtracted from the group output power corresponding to the multiple mobile maintenance power groups, and multiple corresponding differences are obtained. Then, a mobile maintenance power group corresponding to the smallest difference is selected from the multiple differences, and the mobile maintenance power group is allocated to the corresponding target site.
[0104] By analogy, multiple mobile maintenance power supply groups are allocated to corresponding target sites, wherein when the mobile maintenance power supply groups are combined, the allocated mobile maintenance power supplies do not participate in the combination.
[0105] In this embodiment, a plurality of mobile maintenance power supplies are combined to meet the power demand of the target site, wherein the group output power of each combined mobile maintenance power supply group is greater than the power demand of the target site.
[0106] A mobile maintenance power supply cluster management system, further comprising:
[0107] The combined optimization module, when multiple target sites are analyzed to be advanced sites and mid-to-upper-level sites, this module will select the power demand of the corresponding target sites in descending order of priority coefficients corresponding to the advanced sites and mid-to-upper-level sites, and select multiple from all available mobile maintenance power supplies to form a mobile maintenance power supply group, and then obtain the group output power of each power supply group, subtract it from the power demand power of the target site, and then obtain the difference. The power supply group with the smallest difference is selected and allocated to the corresponding target site.
[0108] Embodiment 4
[0109] As the fourth embodiment of the present invention, when the present application is specifically implemented, compared with the first, second and third embodiments, the technical solution of this embodiment is to combine and implement the solutions of the above-mentioned first, second and third embodiments.
[0110] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and thresholds in the formula are set by technicians in this field according to actual conditions.
[0111] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0112] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A mobile maintenance power supply cluster scheduling method, characterized in that: The following steps are involved: Step 1: Collect the power environment information of each target site and the power supply information of each mobile maintenance power supply; the power environment information includes: site location, power demand power, power demand duration, power outage loss level coefficient, power outage loss level coefficient; the power supply information includes: power supply location, power supply duration without energy supply, maximum output power of the power supply, and power supply failure rate; Step 2: Combine the power environment information and power supply information with the preset allocation coefficient formula and priority coefficient formula to perform allocation analysis and calculation, and obtain the allocation coefficient between the mobile maintenance power supply and the target site and the priority coefficient of each target site; The third step is to obtain the number of mobile maintenance power supplies and the number of target locations, and based on the number of mobile maintenance power supplies and the number of target locations, obtain the allocation coefficients between each mobile maintenance power supply and the target locations, and then determine the mobile maintenance power supply dispatched to the target location based on the allocation coefficients.
2. A mobile maintenance power cluster scheduling method according to claim 1, characterized in that: The calculation method of deployment analysis is as follows: SH1. Calculate the difference between the maximum output power of the mobile maintenance power supply and the power demand of the target site, and mark it as C; SH2, obtain a mobile maintenance power supply with a positive C value; SH3. Compare the C value corresponding to the mobile maintenance power supply with a preset difference interval, and obtain the mobile maintenance power supply with a C value in the difference interval as the dispatching power supply for the corresponding target site; SH4. The absolute value of the difference between the power supply duration of the mobile maintenance power supply and the power demand duration of the target site is marked as CJ; SH5. Calculate the distance between the site location and the power supply location and mark it as JL; SH6. Mark the power failure rate of the mobile maintenance power supply as GZ, and mark the power failure loss level coefficient and power failure loss level coefficient in the target site as DH and DW respectively; SH7, through the deployment coefficient formula Calculate the coordination factor X between the mobile maintenance power supply and the target location; Among them, α1, α2, α3, and α4 are all preset proportional coefficients, which are used to adjust the proportions of C, CL, JL, and GZ when calculating the allocation coefficient between the mobile maintenance power supply and the target location; SH8. The priority coefficient Y of the target site is calculated through the priority coefficient formula Y=β1×DH+β2×DW. β1 and β2 are both preset proportional coefficients, which are used to adjust the proportion of DH and DW when calculating the priority coefficient of the target site.
3. A mobile maintenance power cluster scheduling method according to claim 1, characterized in that: The determination in the third step is as follows: Among all target locations, a target location with the largest priority coefficient is selected, and then a mobile maintenance power source with the largest deployment coefficient corresponding to the target location is obtained, and it is determined as the mobile maintenance power source of the target location; Then, a target location with the second largest priority coefficient is selected, and then a mobile maintenance power source with the largest allocation coefficient corresponding to the target location is obtained, and it is determined as the mobile maintenance power source of the target location. When the mobile maintenance power source has been determined as the mobile maintenance power source of other target locations, the mobile maintenance power source with the largest allocation coefficient corresponding to the target location and determined as other target locations is obtained in descending order of the allocation coefficient, and it is determined as the mobile maintenance power source of the target location; And so on, until all target locations or mobile maintenance power supplies are fully distributed.
4. A mobile maintenance power cluster scheduling method according to claim 1, characterized in that: The target site refers to the corresponding place where a mobile maintenance power supply is needed to carry out operations. The mobile maintenance power supply is a power supply that can be called to the corresponding place and can provide temporary power for power tools, electrical equipment and lighting lamps in the corresponding place.
5. A mobile maintenance power cluster scheduling method according to claim 1, characterized in that: The power demand is expressed as the power supply required by the target site; The power demand duration is the duration for which power supply is required at the target site; The power failure loss level coefficient refers to the level of product loss cost pre-assessed within a certain period of time at the target site when the power is off, and each level has a corresponding fixed loss coefficient preset. The loss coefficient corresponding to the target site is the power failure loss level coefficient of the corresponding target site; The power outage loss level coefficient refers to the level of assessment based on the estimated casualties caused by the power outage in the target site during the power outage, and the level of assessment based on the estimated casualties. Each level has a corresponding fixed casualty coefficient preset. The casualty coefficient of the target site is the power outage loss level coefficient of the target site. The power failure rate refers to the ratio between the number of failures and the total number of times the corresponding mobile maintenance power supply has been used since it was put into use.
6. A mobile maintenance power supply cluster management system, the system is used to implement a mobile maintenance power supply cluster scheduling method according to any one of claims 1 to 5, characterized in that: The system includes: An information collection module is used to collect the power environment information of each target site and the power supply information of each mobile maintenance power supply; A dispatch analysis module is used to perform dispatch analysis based on the collected information and derive the dispatch coefficient between the mobile maintenance power supply and the target site and the priority coefficient of the target site; The deployment execution module is used to determine the mobile maintenance power supply dispatched to the target location according to the deployment coefficient.
7. A mobile maintenance power supply cluster management system according to claim 6, characterized in that: Also includes: The priority level assessment module is used to compare the priority coefficient of the target site with its corresponding preset priority threshold, and the power outage loss level coefficient with its corresponding preset loss level threshold, and mark the target site as a primary site, a lower-middle site, an upper-middle site, and a senior site according to the comparison results.
8. The mobile maintenance power supply cluster management system according to claim 7, characterized in that: The comparison method of the priority assessment modules is as follows: If the priority coefficient is less than or equal to the priority threshold, and the power failure loss level coefficient is less than or equal to the loss level threshold, the target site is marked as a primary site; If the priority coefficient is greater than the priority threshold, and the power failure loss level coefficient is less than or equal to the loss level threshold, the target site is marked as a medium or lower level site; If the priority coefficient is less than or equal to the priority threshold, and the power failure loss level coefficient is greater than the loss level threshold, the target site is marked as a medium-to-high-level site; If the priority coefficient is greater than the priority threshold, and the power failure loss level coefficient is greater than the loss level threshold, the target site is marked as a high-level site.
9. The mobile maintenance power supply cluster management system according to claim 7, characterized in that: Also includes: The combination optimization module is used to analyze the high-level sites and the middle and upper-level sites when there are multiple target sites. According to the priority coefficients corresponding to the high-level sites and the middle and upper-level sites, the power demand of the corresponding target sites is selected in turn, and multiple mobile maintenance power supplies are selected from all available mobile maintenance power supplies to form a mobile maintenance power supply group. Then, the group output power of each mobile maintenance power supply group is obtained, and it is subtracted from the power demand power of the target site to obtain the difference, and then the mobile maintenance power supply group with the smallest difference is selected and allocated to the corresponding target site.
10. A mobile maintenance power supply cluster management system according to claim 9, characterized in that: in, The group output power of each combined mobile maintenance power supply group is greater than the required power of the corresponding target site, and when the mobile maintenance power supply groups are combined, the already allocated mobile maintenance power supplies no longer participate in the new combination.
Citation Information
Patent Citations
Emergency power resource optimization dispatching method based on different user demands
CN105678400A
Mobile emergency power supply scheduling method and device and computer device
CN110826847A
Emergency power supply optimal configuration method and device, electronic equipment and storage medium
CN113988662A
Mobile emergency power supply space scheduling system and method based on electric power internet of things
CN114266377A
Mobile energy storage system control decision method based on power network
CN114709850A