Primary and secondary fusion intelligent switch configuration method, device, equipment and storage medium

The method improves fault identification and configuration in distribution networks by calculating comprehensive observability indices and economic constraints for primary and secondary fusion intelligent switches, addressing the limitations of existing methods that focus solely on fault section location.

CN119070274APending Publication Date: 2024-12-03YUNNAN POWER GRID CO LTD ELECTRIC POWER RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411100204.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing device optimization configuration methods for primary and secondary integrated intelligent switches in distribution networks focus primarily on fault section location, neglecting other critical fault information, leading to reduced accuracy in fault identification and configuration.

Method used

A method that calculates comprehensive fault observability indices for fault type, section, current distribution, transition resistance, and weak foundation area, combined with economic constraints, to optimize the configuration of primary and secondary fusion intelligent switches in active power distribution networks.

Benefits of technology

Enhances the accuracy of fault identification and configuration by integrating multiple observability indices and economic constraints, ensuring precise fault location and isolation in distribution networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070274A_ABST
    Figure CN119070274A_ABST
Patent Text Reader

Abstract

The invention discloses a primary and secondary fusion intelligent switch configuration method. Comprising the steps of determining a comprehensive fault observability index of the active power distribution network according to a fault type observability index, a fault section observability index, a fault current distribution characteristic observability index, a transition resistance observability index, a basic weak area observability index, a first weight, a second weight, a third weight, a fourth weight and a fifth weight; determining a target function according to the comprehensive fault observability index; and determining an economic constraint condition, and determining a configuration model according to the target function and the economic constraint condition. According to the method, the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index and the basic weak area observability index are combined to determine the configuration model of the primary and secondary fusion intelligent switch; configuration of primary and secondary fusion intelligent switches in an active power distribution network can be realized more accurately.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent switch configuration, and in particular to a primary-secondary fusion intelligent switch configuration method, device, equipment and storage medium. Background Art

[0002] As the requirements of distribution network for power supply stability and reliability continue to increase, the integration of primary and secondary distribution network equipment has become an inevitable development trend in the industry. The primary and secondary integrated intelligent switch has both measurement and protection functions, which can accurately locate the fault section after a distribution network fault occurs and quickly isolate the fault. By comprehensively utilizing the electrical measurement data of the primary and secondary integrated intelligent switch, and under the premise of configuring a limited number of primary and secondary integrated intelligent switches, the configuration method is optimized to maximize the effective identification of distribution network faults.

[0003] Existing device optimization configuration methods are mainly divided into optimization configuration methods for measuring devices and switch terminals. The goals of device optimization configuration methods are generally system observability, state estimation, fault observability, power supply reliability, power outage time, etc. Existing device optimization configuration methods for fault observability often only focus on the location of the fault section, while ignoring the importance of other fault information, reducing the accuracy of the configuration of the primary and secondary fusion intelligent switch. Summary of the invention

[0004] Based on this, it is necessary to propose a primary and secondary fusion intelligent switch configuration method, device, equipment and storage medium to address the above problems.

[0005] A primary and secondary fusion intelligent switch configuration method is applied to an active power distribution network, wherein a plurality of primary and secondary fusion intelligent switches are arranged on the active power distribution network, and two adjacent primary and secondary fusion intelligent switches constitute a section, and the method comprises:

[0006] Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0007] Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0008] Determine the comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0009] Determining an objective function according to the comprehensive fault observability index;

[0010] An economic constraint condition is determined, and a configuration model is determined according to the objective function and the economic constraint condition.

[0011] In one embodiment, the fault type observability indicator is determined by the following steps:

[0012] Obtaining a fault type determination factor for each section, wherein the fault type determination factor is used to indicate whether the fault type of the section is determined;

[0013] The number of sections with a fault probability in the active power distribution network is obtained, and the fault type observability index is determined according to the fault type judgment factor and the number of sections with a fault probability.

[0014] In one embodiment, the fault section observability index is determined by the following steps:

[0015] Obtaining a first total length of a section determined to be faulty in the active power distribution network and a second total length of a section having a probability of fault in the active power distribution network;

[0016] determining a fault location determination factor of each section according to the first total length and the second total length, wherein the fault location determination factor is used to indicate a probability of a fault occurring in each section;

[0017] The number of sections with a fault probability in the active power distribution network is obtained, and the fault section observability index is determined according to the fault location judgment factor and the number of sections with a fault probability.

[0018] In one embodiment, the observability index of the fault current distribution characteristic is determined by the following steps:

[0019] Acquire a node fault current factor, wherein the node fault current factor is used to indicate whether the current of a node in the active power distribution network can be determined, and the node is used to set the primary-secondary fusion intelligent switch;

[0020] The number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed is obtained, and the observability index of the fault current distribution characteristic is determined according to the node fault current factor and the number of the nodes.

[0021] In one embodiment, the transition resistance observability index is determined by the following steps:

[0022] Obtaining a transition resistance judgment factor of each section, wherein the transition resistance judgment factor is used to indicate whether the primary and secondary fusion intelligent switch on the section can detect the transition resistance;

[0023] The number of sections with a probability of failure in the active power distribution network is obtained, and the transition resistance observability index is determined according to the transition resistance judgment factor and the number of sections with a probability of failure.

[0024] In one embodiment, the weak foundation area visibility index is determined by the following steps:

[0025] Obtaining a node weight, the node weight being used to indicate a ratio of the node to be connected to the faulty section and to access different loads, the node being used to set the primary and secondary fusion intelligent switch;

[0026] Acquire a node installation factor, where the node installation factor is used to indicate whether the node is installed with the primary-secondary fusion intelligent switch;

[0027] The number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed is obtained, and the observability index of the weak foundation area is determined according to the node weight, the node installation factor and the node installation factor.

[0028] In one embodiment, the economic constraints are determined by the following steps:

[0029] Obtaining the cost and available economic cost of each of the primary and secondary fusion intelligent switches;

[0030] Acquire a node installation factor, where the node installation factor is used to indicate whether the node is installed with the primary-secondary fusion intelligent switch;

[0031] Obtaining the number of nodes in the active power distribution network where the primary and secondary fusion intelligent switch can be installed;

[0032] The economic constraint is determined based on the cost, available economic cost, the node installation factor and the number of nodes.

[0033] A primary and secondary fusion intelligent switch configuration device, comprising:

[0034] A first acquisition module is used to obtain the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0035] A second acquisition module is used to acquire a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0036] A first determination module, configured to determine a comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, a first weight, a second weight, a third weight, a fourth weight and a fifth weight;

[0037] A second determination module, used to determine an objective function according to the comprehensive fault observability index;

[0038] The third determination module is used to determine the economic constraint conditions and determine the configuration model according to the objective function and the economic constraint conditions.

[0039] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor performs the following steps:

[0040] Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0041] Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0042] Determine the comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0043] Determining an objective function according to the comprehensive fault observability index;

[0044] Determine economic constraints, and determine a configuration model based on the objective function and the economic constraints. A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the processor performs the following steps:

[0045] Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0046] Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0047] Determine the comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0048] Determining an objective function according to the comprehensive fault observability index;

[0049] An economic constraint condition is determined, and a configuration model is determined according to the objective function and the economic constraint condition.

[0050] The present invention provides a primary-secondary fusion intelligent switch configuration method, which is applied to an active power distribution network, wherein a plurality of primary-secondary fusion intelligent switches are arranged on the active power distribution network, and two adjacent primary-secondary fusion intelligent switches constitute a section, comprising: obtaining a fault type observability index, a fault section observability index, a fault current distribution characteristic observability index, a transition resistance observability index, and a foundation weak area observability index of the active power distribution network; obtaining a first weight of the fault type observability index of the active power distribution network, a second weight of the fault section observability index, and a third weight of the fault current distribution characteristic observability index. Weight, the fourth weight of the transition resistance observability index and the fifth weight of the weak foundation area observability index; determine the comprehensive fault observability index of the active distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight; determine the objective function according to the comprehensive fault observability index η; determine the economic constraints, and determine the configuration model according to the objective function and the economic constraints. The present application combines the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index and the weak foundation area observability index to determine the configuration model of the primary and secondary fusion intelligent switch. After solving the configuration model, the configuration of the primary and secondary fusion intelligent switch in the active distribution network can be more accurately realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0052] in:

[0053] Figure 1 It is an application environment diagram of a primary and secondary fusion intelligent switch configuration method in an embodiment;

[0054] Figure 2 It is a flow chart of a method for configuring a primary and secondary fusion intelligent switch in an embodiment;

[0055] Figure 3 It is a structural block diagram of a primary and secondary fusion intelligent switch configuration device in an embodiment;

[0056] Figure 4 A schematic diagram of a simple radial active power distribution network structure in one embodiment;

[0057] Figure 5 FIG. 4 is a structural block diagram of a computer device in one embodiment. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] As the requirements of distribution networks for power supply stability and reliability continue to increase, the integration of primary and secondary distribution network equipment has become an inevitable development trend in the industry. The primary and secondary integrated intelligent switch has both measurement and protection functions, which can accurately locate the fault section after a distribution network fault occurs and quickly isolate the fault. Comprehensively utilize the electrical measurement data of the primary and secondary integrated intelligent switch, and on the premise that the number of primary and secondary integrated intelligent switches is limited, the configuration method is optimized to maximize the effective identification of distribution network fault conditions. Existing device optimization configuration methods are mainly divided into optimization configuration methods for measuring devices and switch terminals. The goals of device optimization configuration methods are generally system observability, state estimation, fault observability, power supply reliability, power outage time, etc. Existing device optimization configuration methods for fault observability often only focus on the location of the fault section, while ignoring the importance of other fault information, reducing the accuracy of the configuration of the primary and secondary integrated intelligent switch. In order to solve the above technical problems, the present application provides a primary and secondary integrated intelligent switch configuration method; Figure 1 This is an application environment diagram of a method for configuring a primary and secondary fusion intelligent switch in an embodiment. Figure 1The primary and secondary fusion intelligent switch configuration method is applied to the primary and secondary fusion intelligent switch configuration system. The primary and secondary fusion intelligent switch configuration system includes a terminal 110 and a server 120. The terminal 110 and the server 120 are connected through a network. The terminal 110 can be a desktop terminal or a mobile terminal. The mobile terminal can be at least one of a mobile phone, a tablet computer, a laptop computer, etc. The server 120 can be implemented by an independent server or a server cluster composed of multiple servers. The terminal 110 is used to obtain the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active distribution network, the first weight of the observability index of the fault type, the second weight of the observability index of the fault section, the third weight of the observability index of the fault current distribution characteristic, the fourth weight of the observability index of the transition resistance and the fifth weight of the observability index of the weak foundation area; the server 120 is used to determine the comprehensive fault observability index of the active distribution network based on the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance, the observability index of the weak foundation area, the first weight, the second weight, the third weight, the fourth weight and the fifth weight; determine the objective function according to the comprehensive fault observability index; determine the economic constraints, and determine the configuration model according to the objective function and the economic constraints.

[0060] The primary and secondary fusion intelligent switch configuration method of the present application is applied to an active power distribution network, wherein a plurality of primary and secondary fusion intelligent switches are arranged on the active power distribution network, and two adjacent primary and secondary fusion intelligent switches constitute a section, such as Figure 2 As shown, the method includes:

[0061] S10: Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0062] S20: Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0063] S30: determining a comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0064] S40: determining an objective function according to the comprehensive fault observability index;

[0065] S50: Determine economic constraints, and determine a configuration model according to the objective function and the economic constraints.

[0066] The present invention provides a primary and secondary fusion intelligent switch configuration method, which is applied to an active power distribution network, wherein a plurality of primary and secondary fusion intelligent switches are arranged on the active power distribution network, and two adjacent primary and secondary fusion intelligent switches constitute a section, such as Figure 4 The figure shows a simple radial active distribution network structure diagram. Nodes 1-11 in the figure are configurable positions of primary and secondary fusion intelligent switches. The line section L1-L 11 The area where the fault may occur is the area surrounded by two primary and secondary fusion intelligent switches or the area where the terminal single-end primary and secondary fusion intelligent switch is configured as a fault possible section. The number of nodes where the primary and secondary fusion intelligent switch can be installed in the distribution network is N Z is 10, the number of possible fault regions N L is 10; the method comprises: obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active distribution network; obtaining the first weight of the observability index of the fault type, the second weight of the observability index of the fault section, the third weight of the observability index of the fault current distribution characteristic, the fourth weight of the observability index of the transition resistance and the fifth weight of the observability index of the weak foundation area of ​​the active distribution network; determining the comprehensive fault observability index of the active distribution network according to the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance, the observability index of the weak foundation area, the first weight, the second weight, the third weight, the fourth weight and the fifth weight; determining the objective function according to the comprehensive fault observability index η; determining the economic constraint conditions, and determining the configuration model according to the objective function and the economic constraint conditions. The present application combines the observability index of fault type, the observability index of fault section, the observability index of fault current distribution characteristics, the observability index of transition resistance and the observability index of weak foundation area to determine the configuration model of the primary and secondary fusion intelligent switch. After solving the configuration model, the configuration of the primary and secondary fusion intelligent switch in the active distribution network can be more accurately realized.

[0067] In step S10, the fault type observability index is determined by the following steps:

[0068] S101: Obtain a fault type determination factor for each section, where the fault type determination factor is used to indicate whether the fault type of the section is determined;

[0069] S101: Acquire the number of sections with fault probability in the active power distribution network, and determine the fault type observability index according to the fault type judgment factor and the number of sections with fault probability.

[0070] Specifically, when segment L i When a fault occurs, if the fault type can be effectively detected by the primary and secondary fusion intelligent switch at a certain node position, then section L i Corresponding fault type judgment factor μ t.i is 1, otherwise it is 0. According to the functional characteristics of the primary and secondary fusion intelligent switch and the pre-set judgment logic, the fault type judgment factor μ is set t judgment logic.

[0071] For example, if a fault occurs in a certain section, if there are primary and secondary fusion intelligent switches at both ends of the section, the fault type can be effectively identified, so:

[0072]

[0073] Then the expression of the observability index of the fault type is as follows:

[0074]

[0075] Where η t is the observability index of fault type, N L is the number of regions where failure may occur, μ t.i Fault type determination factor.

[0076] In step S10, the observability index of the fault section is determined by the following steps:

[0077] S201: Acquire a first total length of a section determined to be faulty in the active power distribution network and a second total length of a section with a probability of fault in the active power distribution network;

[0078] S202: determining a fault location determination factor of each section according to the first total length and the second total length, wherein the fault location determination factor is used to indicate a probability of a fault occurring in each section;

[0079] S203: Acquire the number of sections with a fault probability in the active power distribution network, and determine the fault section observability index according to the fault location judgment factor and the number of sections with a fault probability.

[0080] Specifically, the fault location determination factor is obtained by the following formula:

[0081]

[0082] In the formula, μ f.i is the fault location judgment factor; When a section fault occurs, it is a set of line areas that will be identified as the fault-occurring section. is the first total length of the section determined to be faulty, is the second total length of the section where the failure probability exists.

[0083] Then the expression of the observability index of the fault section is as follows:

[0084]

[0085] Where η f is the observability index of the fault section, N L is the number of sections with a probability of failure, μ f.i is the fault location determination factor.

[0086] In step S10, the observability index of the fault current distribution characteristic is determined by the following steps:

[0087] S301: Acquire a node fault current factor, where the node fault current factor is used to indicate whether the current of a node in the active power distribution network can be determined, and the node is used to set the primary-secondary fusion intelligent switch;

[0088] S302: Obtain the number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed, and determine the observability index of the fault current distribution characteristic according to the node fault current factor and the number of nodes.

[0089] Specifically, when a primary and secondary fusion intelligent switch is installed at a node, the node is defined as a node with observable direct fault current distribution characteristics, referred to as a directly observable node, and the node fault current factor μ I.i =1; when some nodes can indirectly observe the fault current distribution characteristics using the directly observable node current measurement quantity according to Kirchhoff's law, then the node is an observable node with indirect fault current distribution characteristics, and the node fault current factor μ I.i is 1. In other cases, the node fault current factor μ I.i is 0.

[0090] Then the expression of the observability index of the fault current distribution characteristic is as follows:

[0091]

[0092] Where ηI is the observability index of fault current distribution characteristics, N Z is the number of nodes in the active power distribution network where the primary and secondary fusion intelligent switch can be installed, μ I.i is the node fault current factor.

[0093] In step S10, the transition resistance observability index is determined by the following steps:

[0094] S401: Acquire a transition resistance judgment factor of each section, where the transition resistance judgment factor is used to indicate whether the primary and secondary fusion intelligent switch on the section can detect the transition resistance;

[0095] S402: Acquire the number of sections with a probability of failure in the active power distribution network, and determine the transition resistance observability index according to the transition resistance judgment factor and the number of sections with a probability of failure.

[0096] Specifically, when a fault occurs in a certain area, if the intelligent switch at a certain node position can effectively detect the transition resistance, the transition resistance judgment factor μ r.i is 1, otherwise it is 0. According to the functional characteristics of the primary and secondary fusion switch and the pre-set judgment logic, the transition resistance judgment factor μ is set r.i judgment logic.

[0097] Then the expression of the transition resistance observability index is as follows:

[0098]

[0099] Where η r is the observability index of transition resistance, μ r.i is the transition resistance judgment factor, N L is the number of segments with a probability of failure.

[0100] In step S10, the observability index of the weak foundation area is determined by the following steps:

[0101] S501: Obtaining a node weight, where the node weight is used to indicate the proportion of the node being connected to the faulty section and connected to different loads, and the node is used to set the primary and secondary fusion intelligent switch;

[0102] S502: Acquire a node installation factor, where the node installation factor is used to indicate whether the node is installed with the primary-secondary fusion intelligent switch;

[0103] S503: Obtain the number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed, and determine the observability index of the weak foundation area according to the node weight, the node installation factor and the node installation factor.

[0104] Specifically, the initial weight of all nodes is 0. According to the configuration of the infrastructure and the number of historical segment failures, the segments where failures may occur are divided into segments where no failures have occurred, segments where failures have occurred, and segments that are prone to failures. If a node is connected to a segment where no failures have occurred, the weight of the node is increased by 0; if a node is connected to a segment where failures have occurred, the weight of the node is increased by 1; if a node is connected to a segment that is prone to failures, the weight of the node is increased by 2. Regarding the loads connected to the nodes, according to the importance of the loads and the requirements of each type of load for power supply reliability, the loads are divided from high to low into Class I loads, Class II loads, and Class III loads. If a node is connected to Class I loads, the weight of the node is increased by 3; if it is connected to Class II loads, the weight is increased by 2; if it is connected to Class III loads, the weight is increased by 1.

[0105] Then the expression of the observability index of the weak foundation area is as follows:

[0106]

[0107] Where η p is the observability index of weak basic areas, μ i is the node installation factor. If the node is equipped with an intelligent switch, the node installation factor μ i is 1, otherwise the node installation factor μ i is 0. Z It is the number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed.

[0108] In step S20 and step S30, the expression of the comprehensive fault observability index of the active power distribution network is as follows:

[0109] η=k t η t +k f η f +k I η I +k r η r +k p η p (8)

[0110] k t +k f +k I +k r +k p =1 (9)

[0111] Where η is the comprehensive fault observability index of the active distribution network, η t is the observability index of fault type, η f is the observability index of the fault section, η Iis the observability index of fault current distribution characteristics, η r is the observability index of transition resistance, η p is the observability index of weak infrastructure areas, k t is the first weight, k f is the second weight, k I is the third weight, k r is the fourth weight, k p is the fifth weight, k t , k f , k I , k r , k p Set by relevant personnel based on importance.

[0112] In step S40, the maximum value of the comprehensive fault observability index of the active power distribution network in the above formula is solved to determine the comprehensive fault observability index determination objective function, which is specifically as follows:

[0113] maxη=k t η t +k f η f +k I η I +k r η r +k p η p (10).

[0114] In step S50, the economic constraints are determined by the following steps:

[0115] S501: Obtaining the cost and available economic cost of each primary and secondary fusion intelligent switch;

[0116] S502: Acquire a node installation factor, where the node installation factor is used to indicate whether the node is installed with the primary-secondary fusion intelligent switch;

[0117] S503: Obtain the number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed;

[0118] S504: Determine the economic constraint condition according to the cost, the available economic cost, the node installation factor and the number of the nodes.

[0119] Specifically, the economic constraint condition expression is as follows:

[0120]

[0121] In the formula, w Z is the cost of a single smart switch, W is the available economic cost, Indicates the number of smart switches installed in the configuration.

[0122] Combining the objective function and economic constraints, the configuration model is as follows:

[0123] maxη=k t η t +k f η f +k I η I +k r η r +k p η p (12)

[0124]

[0125] Solving the above configuration model based on genetic algorithm;

[0126] First, set up the configuration model to solve the initial data:

[0127] a) Set distribution network parameters;

[0128] Set the distribution network parameters required for iterative calculation, including the distribution network node line relationship matrix, line length in each area, number of faults, connected load level and other related parameters;

[0129] b) Set the data required for the iterative calculation of the genetic algorithm,

[0130] Set the number of nodes N in the active distribution network in the distribution network where the primary and secondary fusion intelligent switch can be installed Z , the number of sections with failure probability N L , initial population size is 100, maximum number of iterations, crossover probability, mutation probability, termination condition;

[0131] Secondly, calculate the optimal configuration scheme of primary and secondary integrated intelligent switches in the active distribution network:

[0132] a) Iterative calculation based on genetic algorithm;

[0133] According to the principle of genetic algorithm, iterative calculation is performed. The specific intelligent switch optimization configuration process is as follows: Figure 2 As shown;

[0134] b) Output the optimal configuration scheme of primary and secondary integrated intelligent switches for active distribution network.

[0135] The present application also provides a primary and secondary fusion intelligent switch configuration device, such as Figure 3 As shown, including:

[0136] A first acquisition module 100 is used to acquire the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0137] A second acquisition module 200 is used to acquire a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance and a fifth weight of the observability index of the weak foundation area;

[0138] A first determination module 300, for determining a comprehensive fault observability index of the active distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0139] A second determination module 400, configured to determine an objective function according to the comprehensive fault observability index;

[0140] The third determination module 500 is used to determine economic constraints and determine a configuration model according to the objective function and the economic constraints.

[0141] Figure 5 FIG. 1 shows an internal structure diagram of a computer device in an embodiment. The computer device may be a terminal or a server. Figure 5 As shown, the computer device includes a processor, a memory and a network interface connected via a system bus. The memory includes a non-volatile storage medium and an internal memory. The non-volatile storage medium of the computer device stores an operating system and may also store a computer program. When the computer program is executed by the processor, the processor can implement the primary and secondary fusion intelligent switch configuration method. The internal memory may also store a computer program. When the computer program is executed by the processor, the processor can execute the age recognition method. Those skilled in the art can understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0142] In one embodiment, a computer device is provided, comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor performs the following steps:

[0143] Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0144] Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0145] Determine the comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0146] Determining an objective function according to the comprehensive fault observability index;

[0147] An economic constraint condition is determined, and a configuration model is determined according to the objective function and the economic constraint condition.

[0148] In one embodiment, a computer-readable storage medium is provided, storing a computer program, wherein when the computer program is executed by a processor, the processor performs the following steps:

[0149] Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network;

[0150] Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area;

[0151] Determine the comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight;

[0152] Determining an objective function according to the comprehensive fault observability index;

[0153] An economic constraint condition is determined, and a configuration model is determined according to the objective function and the economic constraint condition.

[0154] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0155] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0156] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for configuring a primary and secondary fusion intelligent switch, applied to an active power distribution network, wherein a plurality of primary and secondary fusion intelligent switches are arranged on the active power distribution network, and two adjacent primary and secondary fusion intelligent switches constitute a section, characterized in that: The method comprises: Obtaining the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network; Obtaining a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area; Determine the comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, the first weight, the second weight, the third weight, the fourth weight and the fifth weight; Determining an objective function according to the comprehensive fault observability index; An economic constraint condition is determined, and a configuration model is determined according to the objective function and the economic constraint condition.

2. The primary and secondary fusion intelligent switch configuration method according to claim 1 is characterized in that: The fault type observability index is determined by the following steps: Obtaining a fault type determination factor for each section, wherein the fault type determination factor is used to indicate whether the fault type of the section is determined; The number of sections with a fault probability in the active power distribution network is obtained, and the fault type observability index is determined according to the fault type judgment factor and the number of sections with a fault probability.

3. The primary and secondary fusion intelligent switch configuration method according to claim 1, characterized in that: The observability index of the fault section is determined by the following steps: Obtaining a first total length of a section determined to be faulty in the active power distribution network and a second total length of a section having a probability of fault in the active power distribution network; determining a fault location determination factor of each section according to the first total length and the second total length, wherein the fault location determination factor is used to indicate a probability of a fault occurring in each section; The number of sections with a fault probability in the active power distribution network is obtained, and the fault section observability index is determined according to the fault location judgment factor and the number of sections with a fault probability.

4. The primary and secondary fusion intelligent switch configuration method according to claim 1, characterized in that: The observability index of the fault current distribution characteristic is determined by the following steps: Acquire a node fault current factor, wherein the node fault current factor is used to indicate whether the current of a node in the active power distribution network can be determined, and the node is used to set the primary-secondary fusion intelligent switch; The number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed is obtained, and the observability index of the fault current distribution characteristic is determined according to the node fault current factor and the number of the nodes.

5. The primary and secondary fusion intelligent switch configuration method according to claim 1, characterized in that: The transition resistance observability index is determined by the following steps: Obtaining a transition resistance judgment factor of each section, wherein the transition resistance judgment factor is used to indicate whether the primary and secondary fusion intelligent switch on the section can detect the transition resistance; The number of sections with a probability of failure in the active power distribution network is obtained, and the transition resistance observability index is determined according to the transition resistance judgment factor and the number of sections with a probability of failure.

6. The primary and secondary fusion intelligent switch configuration method according to claim 1, characterized in that: The observability index of the weak foundation area is determined by the following steps: Obtaining a node weight, the node weight being used to indicate a ratio of the node to be connected to the faulty section and to access different loads, the node being used to set the primary and secondary fusion intelligent switch; Acquire a node installation factor, where the node installation factor is used to indicate whether the node is installed with the primary-secondary fusion intelligent switch; The number of nodes in the active power distribution network where the primary-secondary fusion intelligent switch can be installed is obtained, and the observability index of the weak foundation area is determined according to the node weight, the node installation factor and the node installation factor.

7. The primary and secondary fusion intelligent switch configuration method according to claim 1, characterized in that: The economic constraints are determined by the following steps: Obtaining the cost and available economic cost of each of the primary and secondary fusion intelligent switches; Acquire a node installation factor, where the node installation factor is used to indicate whether the node is installed with the primary-secondary fusion intelligent switch; Obtaining the number of nodes in the active power distribution network where the primary and secondary fusion intelligent switch can be installed; The economic constraint is determined based on the cost, available economic cost, the node installation factor and the number of nodes.

8. A primary and secondary fusion intelligent switch configuration device, characterized in that: include: A first acquisition module is used to obtain the observability index of the fault type, the observability index of the fault section, the observability index of the fault current distribution characteristic, the observability index of the transition resistance and the observability index of the weak foundation area of ​​the active power distribution network; A second acquisition module is used to acquire a first weight of the observability index of the fault type of the active power distribution network, a second weight of the observability index of the fault section, a third weight of the observability index of the fault current distribution characteristic, a fourth weight of the observability index of the transition resistance, and a fifth weight of the observability index of the weak foundation area; A first determination module, configured to determine a comprehensive fault observability index of the active power distribution network according to the fault type observability index, the fault section observability index, the fault current distribution characteristic observability index, the transition resistance observability index, the weak foundation area observability index, a first weight, a second weight, a third weight, a fourth weight and a fifth weight; A second determination module, used to determine an objective function according to the comprehensive fault observability index; The third determination module is used to determine the economic constraint conditions and determine the configuration model according to the objective function and the economic constraint conditions.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, the processor executes the steps of the method according to any one of claims 1 to 7.

10. A computer-readable storage medium storing a computer program, wherein when the computer program is executed by a processor, the processor is caused to perform the steps of the method according to any one of claims 1 to 7.