Intelligent power dispatching system based on power big data
Through the intelligent power scheduling system based on power big data, the status of power generation equipment and energy storage battery packs is analyzed, efficient power scheduling of wind power stations is achieved, the problem of traditional scheduling efficiency is solved, and the energy supply and energy storage scheduling is improved Accuracy and efficiency.
Patent Information
- Application Number
- CN202411144465.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-12-03
AI Technical Summary
Traditional power scheduling methods are difficult to effectively match supply and demand, resulting in waste of energy or unstable power grids, and have not been analyzed for power generation equipment, which has the problem of low power scheduling efficiency.
An intelligent power scheduling system based on power big data was designed, including information acquisition module, equipment monitoring module, power analysis module, status analysis module, level division module and power scheduling module. By acquiring and analyzing power generation equipment and energy storage battery packs , determine its operating status and working mode, and conduct accurate energy supply and energy storage scheduling.
Improve the power scheduling efficiency of wind power stations, improve the accuracy of equipment state analysis by setting preset parameters, and thus improve the classification and scheduling accuracy of energy storage levels and energy supply levels, and enhance the accuracy and efficiency of power scheduling. .
Smart Images

Figure CN119070395A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power dispatching, and in particular to an intelligent electric power dispatching system based on electric power big data. Background Art
[0002] As the global demand for renewable energy grows, wind power generation, as a clean and sustainable form of energy, has been widely used in remote areas. Traditional dispatching methods are difficult to effectively match supply and demand, which can easily lead to energy waste or grid instability. Therefore, it is particularly important to develop an intelligent dispatching system that can optimize power generation and transmission strategies.
[0003] Chinese patent publication number CN117410981A discloses a multi-regional electric energy intelligent dispatching method and system based on big data, which relates to the field of electric power dispatching technology, including obtaining regional power system historical data, predicting regional power consumption, obtaining regional initial power consumption forecast data, and obtaining regional power consumption forecast data based on regional initial power consumption forecast data, regional construction power consumption data and regional power consumption environmental impact index. The present invention completes the prediction of regional power consumption by supplementing and analyzing the regional power consumption historical data, calculating the impact of weather and temperature on regional power consumption, and the power supply required for regional planning and construction, thereby improving the accuracy of regional power consumption prediction, and judging the regional power supply status according to the regional power supply data, dispatching the electric energy of multiple regions according to the regional power supply situation and the dispatching route distance between regions, thereby improving the efficiency of multi-regional electric energy dispatching; it can be seen that when dispatching electricity, the scheme does not analyze the power generation equipment, and there is a problem of low power dispatching efficiency. Summary of the invention
[0004] To this end, the present invention provides an intelligent power dispatching system based on power big data to overcome the problem of low power dispatching efficiency in the prior art.
[0005] To achieve the above object, the present invention provides an intelligent power dispatching system based on power big data, the system comprising: Information acquisition module, used to obtain power demand, power generation equipment information and energy storage battery group information of the energy supply area; An equipment monitoring module is used to analyze the operating status of the power generation equipment based on the acquired temperature and vibration acceleration of the power generation equipment; A power analysis module is used to determine the working mode of the energy storage battery pack based on the analysis results of the acquired power demand and the operating status of the power generation equipment; A state analysis module is used to analyze the operating state of the energy storage battery pack according to the acquired temperature of the energy storage battery pack; A level classification module is used to classify the energy supply level and energy storage level of the wind power station according to the judgment result of the working mode of the energy storage battery group and the analysis result of the operating status of the energy storage battery group; The power dispatching module is used to judge the working status of the energy storage battery group according to the power percentage of the energy storage battery group, and to dispatch the energy storage power and energy supply power of the energy storage battery group according to the judgment result of the working status of the energy storage battery group and the division result of the energy supply level and energy storage level of the wind power station.
[0006] Furthermore, the equipment monitoring module is provided with a vibration analysis unit. When the temperature of the i-th power generation equipment is normal, the vibration analysis unit is used to compare the acquired vibration acceleration of the power generation equipment with the preset acceleration a0, and analyze the operating state of the power generation equipment according to the comparison result, wherein: When ai≤a0, the vibration analysis unit determines that the operating state of the i-th power generation equipment is normal; When ai>a0, the vibration analysis unit determines that the operation state of the i-th power generation equipment is abnormal.
[0007] Furthermore, the power analysis module determines the working mode of the energy storage battery pack according to the analysis results of the acquired power demand p0 and the operating status of the power generation equipment, wherein: When the power analysis module determines that the working mode of the energy storage battery pack is the energy storage mode; when When the power analysis module determines that the working mode of the energy storage battery pack is the energy supply mode; Wherein, dj is the power generation power of the jth power generation equipment in normal operation state, and J is the number of power generation equipment in normal operation state.
[0008] Furthermore, the state analysis module compares the acquired energy storage battery pack temperature with the preset battery pack temperature f0, and analyzes the abnormality of the energy storage battery pack operation state according to the comparison result, wherein: When fk≤f0, the state analysis module determines that the operating state of the kth energy storage battery group is normal; When fk>f0, the state analysis module determines that the operating state of the kth energy storage battery group is abnormal; Wherein, fk is the temperature of the kth energy storage battery group, 0<k≤K, and K is the number of energy storage battery groups.
[0009] Furthermore, the level classification module is provided with an energy supply level classification unit and an energy storage level classification unit. When the working mode of the energy storage battery group is the energy supply mode, the energy supply level classification unit is used to classify the energy supply level of the wind power station according to the analysis result of the operating state of the energy storage battery group, wherein: when When the energy supply level classification unit determines that the energy supply level of the wind power station is level one; when When the energy supply level classification unit determines that the energy supply level of the wind power station is level 2; Among them, u1 is the preset energy supply power, α is the preset energy supply adjustment coefficient, and kh is the number of energy storage battery groups with abnormal operating status; When the working mode of the energy storage battery group is the energy storage mode, the energy storage level classification unit is used to classify the energy storage level of the wind power station according to the analysis result of the operating state of the energy storage battery group, wherein: when When , the energy storage level classification unit determines that the energy storage level of the wind power station is level one; when When , the energy storage level classification unit determines that the energy storage level of the wind power station is level two; wherein u3 is the preset energy storage power, and β is the preset energy storage adjustment coefficient.
[0010] Furthermore, the power dispatching module is provided with a state judgment unit, a first dispatching unit and a second dispatching unit, wherein the state judgment unit is used to judge the working state of the energy storage battery group according to the judgment result of the working mode of the energy storage battery group and the power percentage of each energy storage battery group, wherein: When the working mode of the energy storage battery pack is the energy storage mode, if Sz≤s1, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a high energy storage state; if Sz>s1, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a low energy storage state; When the working mode of the energy storage battery pack is the energy supply mode, if Sz≤s2, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a low energy supply state; if Sz>s2, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a high energy supply state; Wherein, s1 is a first preset power percentage, s2 is a second preset power percentage, and s1<s2.
[0011] Furthermore, the first dispatching unit is used to dispatch the energy storage power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the classification result of the energy storage level of the wind power station, wherein: when the energy storage level of the wind power station is level one, if △p1×(1-η) / z1≤pc1, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn1, setting Cn1=△p1×(1-η) / z1; the first dispatching unit sets the energy storage power of the energy storage battery group in the low energy storage state to Cn1. The energy storage power of the energy storage battery group is set to Cn2, and Cn2=0; if △p1×(1-η) / z1>pc1, the first scheduling unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn3, and sets Cn3=pc1; the energy storage power of the energy storage battery group in the low energy storage state of the first scheduling unit is set to Cn4, and Cn4=(△p1×(1-η) / z1-pc1×z1) / z2, when Cn4≥pc2, the value of Cn4 is pc2; When the energy storage level of the wind power station is level two, if △p1×(1-η) / z1≤pc3, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn5, and sets Cn5=△p1×(1-η) / z1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn6, and sets Cn6=0; if △p1×(1-η) / z1>pc3, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn7, and sets Cn7=pc3; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn8, and sets Cn8=(△p1×(1-η) / z1-pc3×z1) / z2. When Cn8≥pc2, the value of Cn8 is pc2; Among them, η is the preset loss coefficient, z1 is the number of energy storage battery groups in the high energy storage state, z2 is the number of energy storage battery groups in the low energy storage state, pc1 is the first preset energy storage power, pc2 is the second preset energy storage power, pc3 is the third preset energy storage power, and pc3>pc1>pc2.
[0012] Furthermore, the second scheduling unit is used to schedule the energy supply power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the division result of the energy supply level of the wind power station, wherein: When the energy supply level of the wind power station is level one, if △p2×(1+h0)≤z3×pg1, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn1, and sets Gn1=△p2×(1+h0) / z3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn2, and sets Gn2=0; if △p2×(1+h0)>z3×pg1, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn3, and sets Gn3=pg1; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn4, and sets Gn4=[△p2×(1+h0)-z3×pg1] / z4; if Gn4≥pg2, Gn4 takes the value of pg2; When the energy supply level of the wind power station is level two, if △p2×(1+h0)≤z3×pg3, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn5, and sets Gn5=△p2×(1+h0) / z3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn6, and sets Gn6=0; if △p2×(1+h0)>z3×pg3, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn7, and sets Gn7=pg3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn8, and sets Gn8=[△p2×(1+h0)-z3×pg3] / z4. If Gn4≥pg2, Gn4 takes the value of pg2; Among them, h0 is the preset transmission loss coefficient, z1 is the number of energy storage battery groups in high energy supply state, z2 is the number of energy storage battery groups in low energy supply state, pg1 is the first preset energy supply power, pg2 is the second preset energy supply power, and pg3 is the third preset energy supply power.
[0013] Further, an optimization module is used to optimize the judgment process of the working state of the energy storage battery group according to the acquired number of charge and discharge cycles of each energy storage battery group and the energy density of the energy storage battery group; the optimization module is provided with a first optimization unit and a second optimization unit, the first optimization unit is used to compare the acquired number of charge and discharge cycles of each energy storage battery group with the preset number m0, and optimize the judgment process of the working state of the energy storage battery group according to the comparison result, wherein: When Mz≤m0, the first optimization unit determines that the number of charge and discharge cycles of the z-th energy storage battery pack in normal operating state is normal and does not perform optimization; When Mz>m0, the first optimization unit determines that the number of charge and discharge cycles of the z-th energy storage battery pack in normal operation is abnormal, and optimizes the judgment process of the working state of the z-th energy storage battery pack in normal operation, and sets the optimized first preset power percentage to s1', and sets s1'=s1×{1-exp[3×(Mz-m0) / (Mz+m0)-3]}; Wherein, Mz is the number of charge and discharge cycles of the zth energy storage battery pack in normal operating state.
[0014] Furthermore, the second optimization unit is used to compare the energy density r0 of the energy storage battery pack obtained with the preset density r1, and perform secondary optimization on the determination process of the working state of the energy storage battery pack according to the comparison result, wherein: When r0≤r1, the second optimization unit determines that the energy density of the energy storage battery pack is normal and does not perform optimization; When r0>r1, the second optimization unit determines that the energy density of the energy storage battery pack is abnormal, and performs secondary optimization on the determination process of the working state of the energy storage battery pack, and sets the preset number of times after optimization as m0', and sets: m0'=m0×{1+[(r0-r1) / (r0+r1)+1] (r0-r1) / r1+1 -1} / 3}.
[0015] Compared with the prior art, the beneficial effects of the present invention are that the equipment monitoring module improves the accuracy of the temperature abnormality analysis of the power generation equipment by setting a preset temperature, and improves the accuracy of the power generation equipment operation status analysis by setting a preset acceleration, thereby improving the accuracy of the energy storage battery group working mode judgment, the state analysis module improves the accuracy of the energy storage battery group operation status abnormality analysis by setting a preset battery group temperature, thereby improving the accuracy of the energy storage level and energy supply level division of the wind power station, the level division module improves the accuracy of the wind power station energy supply level division by setting a preset energy supply power and a preset adjustment coefficient, thereby improving the accuracy of the wind power station energy supply power scheduling, the preset energy storage power and the preset energy storage adjustment coefficient are set to improve the accuracy of the wind power station energy storage level division, thereby improving the accuracy of the wind power station energy storage power scheduling, the power dispatching module is set The preset power percentage is used to improve the accuracy of the working state judgment of the energy storage battery group, thereby improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station. The preset loss coefficient and the preset energy storage power are set to improve the accuracy of the energy storage power scheduling of the wind power station. The preset transmission loss coefficient and the preset energy supply power are set to improve the accuracy of the energy storage power scheduling of the wind power station, thereby improving the power scheduling efficiency of the wind power station. The optimization module sets a preset number of times to reduce the adverse effect of excessive charge and discharge cycles of the energy storage battery group on the working state judgment, thereby improving the accuracy of the working state judgment of the energy storage battery group. The preset density is set to reduce the effect of the high energy density of the energy storage battery group on the working state judgment, thereby improving the accuracy of the working state judgment of the energy storage battery group, thereby improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and ultimately improving the power scheduling efficiency of the wind power station. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the structure of the intelligent power dispatching system based on power big data in this embodiment.
[0017] Figure 2 Schematic diagram of the structure of the equipment monitoring module in this embodiment.
[0018] Figure 3 It is a structural diagram of the level division module of this embodiment.
[0019] Figure 4 It is a structural diagram of the power dispatching module of this embodiment.
[0020] Figure 5 This is a schematic diagram of the structure of the optimization module in this embodiment. DETAILED DESCRIPTION
[0021] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0022] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0023] It should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] See also Figure 1 As shown, it is a structural diagram of the intelligent power dispatching system based on power big data in this embodiment, and the system includes: An information acquisition module is used to acquire power demand, power generation equipment information and energy storage battery group information of the energy supply area; the power demand is the power demand of the energy supply area of the wind power station, and the power generation equipment information includes the temperature of the power generation equipment and the vibration acceleration of the power generation equipment; the energy storage battery group information includes the percentage of power of the energy storage battery group, the temperature of the energy storage battery group, the energy density of the energy storage battery group and the number of charge and discharge cycles of the energy storage battery group; in this embodiment, no specific limitation is made on the acquisition method of the power demand, power generation equipment information and energy storage battery group information of the energy supply area, and those skilled in the art can freely set it, as long as the power demand, power generation equipment information and energy storage battery group information of the energy supply area are met. Among them, the power demand of the energy supply area can be acquired through a smart meter, the temperature of the power generation equipment can be acquired through a temperature sensor, the vibration acceleration of the power generation equipment can be acquired through an acceleration sensor, and the energy storage battery group information can be acquired through a BMS; the power generation equipment in this embodiment is a wind turbine; An equipment monitoring module, used to analyze the operating status of the power generation equipment according to the acquired temperature and vibration acceleration of the power generation equipment, the equipment monitoring module is connected to the information acquisition module; A power analysis module, used to determine the working mode of the energy storage battery pack according to the analysis results of the acquired power demand and the operating status of the power generation equipment, and the power analysis module is connected to the equipment monitoring module; A state analysis module, used to analyze the operating state of the energy storage battery pack according to the acquired temperature of the energy storage battery pack, the state analysis module being connected to the information acquisition module; A level classification module, used to classify the energy supply level and energy storage level of the wind power station according to the judgment result of the working mode of the energy storage battery group and the analysis result of the operating state of the energy storage battery group, and the level classification module is connected with the power analysis module and the state analysis module; A power dispatching module is used to judge the working state of the energy storage battery group according to the power percentage of the energy storage battery group, and to dispatch the energy storage power and energy supply power of the energy storage battery group according to the judgment result and the division result of the energy supply level and energy storage level of the wind power station. The power dispatching module is connected to the level division module; The optimization module is used to optimize the judgment process of the working state of the energy storage battery group according to the acquired number of charge and discharge cycles of each energy storage battery group and the energy density of the energy storage battery group. The optimization module is connected to the power dispatching module.
[0025] See also Figure 2 As shown, it is a schematic diagram of the structure of the equipment monitoring module of this embodiment, and the equipment monitoring module includes: A temperature analysis unit, used to analyze the temperature abnormality of the power generation equipment according to the acquired temperature of the power generation equipment; The vibration analysis unit is used to analyze the operating state of the power generation equipment according to the analysis result of the temperature anomaly of the power generation equipment and the acquired vibration acceleration of the power generation equipment. The vibration analysis unit is connected to the temperature analysis unit.
[0026] See also Figure 3 As shown, it is a schematic diagram of the structure of the level division module of this embodiment, and the level division module includes: An energy supply level classification unit is used to classify the energy supply level of the wind power station according to the analysis result of the operating state of the energy storage battery group and the judgment result of the working mode of the energy storage battery group; The energy storage level division unit is used to divide the energy storage level of the wind power station according to the analysis result of the operating status of the energy storage battery group and the judgment result of the working mode of the energy storage battery group. The energy storage level division unit is connected to the energy supply level division unit.
[0027] See also Figure 4 As shown, it is a schematic diagram of the structure of the power dispatching module of this embodiment, and the power dispatching module includes: A state judgment unit, used to judge the working state of the energy storage battery pack according to the judgment result of the working mode of the energy storage battery pack and the power percentage of each energy storage battery pack; A first dispatching unit, used for dispatching the energy storage power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the classification result of the energy storage level of the wind power station, and the first dispatching unit is connected to the state judgment unit; The second scheduling unit is used to schedule the energy supply power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the classification result of the energy supply level of the wind power station. The second scheduling unit is connected to the state judgment unit.
[0028] See also Figure 5 As shown, it is a schematic diagram of the structure of the optimization module of this embodiment, and the optimization module includes: A first optimization unit is used to optimize the determination process of the working state of the energy storage battery pack according to the acquired number of charge and discharge cycles of each energy storage battery pack; The second optimization unit is used to perform secondary optimization on the determination process of the working state of the energy storage battery pack according to the acquired energy density of the energy storage battery pack, and the second optimization unit is connected to the first optimization unit.
[0029] Specifically, the intelligent power dispatching system based on power big data described in this embodiment is applied to the dispatching of power from wind power stations. The operating status of the power generation equipment is analyzed and the working mode of the energy storage battery pack is judged. The energy storage level and the energy supply level of the wind power station are divided based on the analysis results of the operating status of the energy storage battery pack. The power of the wind power station is dispatched according to the division results, thereby improving the power dispatching efficiency of the wind power station.
[0030] Specifically, the temperature analysis unit compares the acquired temperature of the power generation equipment with the preset temperature t0, and analyzes the abnormality of the temperature of the power generation equipment according to the comparison result, wherein: When ti≤t0, the temperature analysis unit determines that the temperature of the i-th power generation equipment is normal; When ti>t0, the temperature analysis unit determines that the temperature of the i-th power generation equipment is abnormal and the operation state of the i-th power generation equipment is abnormal; Wherein, ti is the temperature of the i-th power generation equipment, 0<i≤A, and A is the number of power generation equipment.
[0031] Specifically, the temperature analysis unit improves the accuracy of the temperature abnormality analysis of the power generation equipment by setting a preset temperature, thereby improving the accuracy of the analysis of the operating status of the power generation equipment, thereby improving the accuracy of the judgment of the working mode of the energy storage battery pack, and improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and ultimately improving the power scheduling efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset temperature, and technicians in this field can set it freely, as long as the setting requirements of the preset temperature are met, where the optimal value of t0 is 95°C.
[0032] Specifically, when the temperature of the i-th power generation equipment is normal, the vibration analysis unit compares the acquired vibration acceleration of the power generation equipment with the preset acceleration a0, and analyzes the operating state of the power generation equipment according to the comparison result, wherein: When ai≤a0, the vibration analysis unit determines that the operating state of the i-th power generation equipment is normal; When ai>a0, the vibration analysis unit determines that the operation state of the i-th power generation equipment is abnormal.
[0033] Specifically, the vibration analysis unit improves the accuracy of the analysis of the operating status of the power generation equipment by setting a preset acceleration, thereby improving the accuracy of the judgment of the working mode of the energy storage battery group, and further improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and ultimately improving the power scheduling efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset acceleration, and those skilled in the art can set it freely, as long as the setting requirements of the preset acceleration are met, where the optimal value of a0 is 4.5 m / s².
[0034] Specifically, the power analysis module determines the working mode of the energy storage battery pack according to the analysis results of the acquired power demand p0 and the operating status of the power generation equipment, wherein: when When the power analysis module determines that the working mode of the energy storage battery pack is the energy storage mode; when When the power analysis module determines that the working mode of the energy storage battery pack is the energy supply mode; Wherein, dj is the power generation power of the jth power generation equipment in normal operation state, J is the number of power generation equipment in normal operation state, and 0<j≤J.
[0035] Specifically, the state analysis module compares the acquired energy storage battery pack temperature with the preset battery pack temperature f0, and analyzes the abnormality of the energy storage battery pack operation state according to the comparison result, wherein: When fk≤f0, the state analysis module determines that the operating state of the kth energy storage battery group is normal; When fk>f0, the state analysis module determines that the operating state of the kth energy storage battery group is abnormal; Wherein, fk is the temperature of the kth energy storage battery group, 0<k≤K, and K is the number of energy storage battery groups.
[0036] Specifically, the state analysis module improves the accuracy of abnormality analysis of the operating state of the energy storage battery pack by setting a preset battery pack temperature, thereby improving the accuracy of the division of energy storage level and energy supply level of the wind power station, thereby improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and ultimately improving the power scheduling efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset battery pack temperature, and those skilled in the art can set it freely, as long as the setting requirements of the preset battery pack temperature are met. Among them, when the energy storage battery pack is a lithium-ion battery, the optimal value of f0 is 60°C.
[0037] Specifically, when the working mode of the energy storage battery group is the energy supply mode, the energy supply level classification unit classifies the energy supply level of the wind power station according to the analysis result of the operating state of the energy storage battery group, wherein: when When the energy supply level classification unit determines that the energy supply level of the wind power station is level one; when When the energy supply level classification unit determines that the energy supply level of the wind power station is level 2; Wherein, u1 is the preset energy supply power, α is the preset energy supply adjustment coefficient, 0.1<α<0.5, and kh is the number of energy storage battery groups with abnormal operating status.
[0038] Specifically, the energy supply level division unit improves the accuracy of the energy supply level division of the wind power station by setting the preset energy supply power and the preset adjustment coefficient, thereby improving the accuracy of the energy supply power scheduling of the wind power station, and ultimately improving the power dispatching efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset energy supply power and the preset adjustment coefficient, and technical personnel in this field can set them freely, as long as the setting requirements of the preset energy supply power and the preset adjustment coefficient are met. Among them, when the energy supply area is a remote area, the optimal value of u1 is 200kW, and the optimal value of α is 0.24.
[0039] Specifically, when the working mode of the energy storage battery group is the energy storage mode, the energy storage level classification unit classifies the energy storage level of the wind power station according to the analysis result of the operating state of the energy storage battery group, wherein: when When , the energy storage level classification unit determines that the energy storage level of the wind power station is level one; when When , the energy storage level classification unit determines that the energy storage level of the wind power station is level 2; Among them, u3 is the preset energy storage power, β is the preset energy storage adjustment coefficient, 0.3<β<0.6.
[0040] Specifically, the energy storage level classification unit improves the accuracy of energy storage level classification of wind power stations by setting preset energy storage power and preset energy storage regulation coefficient, thereby improving the accuracy of energy storage power scheduling of wind power stations, and ultimately improving the power scheduling efficiency of wind power stations; this embodiment does not specifically limit the setting of preset energy storage power and preset energy storage regulation coefficient, and technical personnel in this field can set them freely, as long as the setting requirements of preset energy storage power and preset energy storage regulation coefficient are met. Among them, when the energy supply area is a remote area, the optimal value of u1 is 150kW, and the optimal value of β is 0.3.
[0041] Specifically, the state judgment unit judges the working state of the energy storage battery pack according to the judgment result of the working mode of the energy storage battery pack and the power percentage of each energy storage battery pack, wherein: When the working mode of the energy storage battery pack is the energy storage mode, if Sz≤s1, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a high energy storage state; if Sz>s1, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a low energy storage state; When the working mode of the energy storage battery pack is the energy supply mode, if Sz≤s2, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a low energy supply state; if Sz>s2, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a high energy supply state; Wherein, s1 is a first preset power percentage, s2 is a second preset power percentage, and s1<s2.
[0042] Specifically, the state judgment unit improves the accuracy of judging the working state of the energy storage battery pack by setting a preset power percentage, thereby improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and ultimately improving the power scheduling efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset power percentage, and those skilled in the art can set it freely, as long as the setting requirements of the preset power percentage are met, among which the optimal value of s1 is 25%, and the optimal value of s2 is 70%.
[0043] Specifically, the first scheduling unit schedules the energy storage power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the classification result of the energy storage level of the wind power station, wherein: When the energy storage level of the wind power station is level one, if △p1×(1-η) / z1≤pc1, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn1, and sets Cn1=△p1×(1-η) / z1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn2, and sets Cn2=0; if △p1×(1-η) / z1>pc1, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn3, and sets Cn3=pc1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn4, and sets Cn4=(△p1×(1-η) / z1-pc1×z1) / z2, and when Cn4≥pc2, the value of Cn4 is pc2; When the energy storage level of the wind power station is level two, if △p1×(1-η) / z1≤pc3, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn5, and sets Cn5=△p1×(1-η) / z1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn6, and sets Cn6=0; if △p1×(1-η) / z1>pc3, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn7, and sets Cn7=pc3; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn8, and sets Cn8=(△p1×(1-η) / z1-pc3×z1) / z2. When Cn8≥pc2, the value of Cn8 is pc2; Wherein, η is the preset loss coefficient, z1 is the number of energy storage battery groups in high energy storage state, z2 is the number of energy storage battery groups in low energy storage state, pc1 is the first preset energy storage power, pc2 is the second preset energy storage power, pc3 is the third preset energy storage power, pc3>pc1>pc2, .
[0044] Specifically, the first dispatching unit improves the accuracy of the wind power station's energy storage power dispatching by setting a preset loss coefficient and a preset energy storage power, thereby improving the power dispatching efficiency of the wind power station; this embodiment does not specifically limit the setting of the preset loss coefficient and the preset energy storage power, and technical personnel in this field can set them freely, as long as the setting requirements of the preset loss coefficient and the preset energy storage power are met, wherein the optimal value of η is 0.2, the optimal value of pc3 is 15kW, the optimal value of pc2 is 5kW, and the optimal value of pc1 is 12kW; the energy storage power described in this embodiment is the charging power of each energy storage battery group.
[0045] Specifically, the second scheduling unit schedules the energy supply power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the division result of the energy supply level of the wind power station, wherein: When the energy supply level of the wind power station is level one, if △p2×(1+h0)≤z3×pg1, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn1, and sets Gn1=△p2×(1+h0) / z3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn2, and sets Gn2=0; if △p2×(1+h0)>z3×pg1, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn3, and sets Gn3=pg1; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn4, and sets Gn4=[△p2×(1+h0)-z3×pg1] / z4; if Gn4≥pg2, Gn4 takes the value of pg2; When the energy supply level of the wind power station is level two, if △p2×(1+h0)≤z3×pg3, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn5, and sets Gn5=△p2×(1+h0) / z3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn6, and sets Gn6=0; if △p2×(1+h0)>z3×pg3, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn7, and sets Gn7=pg3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn8, and sets Gn8=[△p2×(1+h0)-z3×pg3] / z4. If Gn4≥pg2, Gn4 takes the value of pg2; Wherein, h0 is the preset transmission loss coefficient, 0.07<h0<0.15, z1 is the number of energy storage battery packs in high energy supply state, z2 is the number of energy storage battery packs in low energy supply state, pg1 is the first preset energy supply power, pg2 is the second preset energy supply power, pg3 is the third preset energy supply power, pg3>pg1>pg2, .
[0046] Specifically, the second dispatching unit improves the accuracy of the wind power station's energy storage power dispatching by setting a preset transmission loss coefficient and a preset energy supply power, thereby improving the power dispatching efficiency of the wind power station; this embodiment does not specifically limit the setting of the preset transmission loss coefficient and the preset energy supply power, and technical personnel in this field can set them freely, as long as the setting requirements of the preset transmission loss coefficient and the preset energy supply power are met, among which the optimal value of h0 is 0.2, the optimal value of pg3 is 18kW, the optimal value of pg2 is 6kW, and the optimal value of pg1 is 15kW; the energy supply power described in this embodiment is the discharge power of each energy storage battery group.
[0047] Specifically, the first optimization unit compares the acquired number of charge and discharge cycles of each energy storage battery pack with the preset number m0, and optimizes the determination process of the working state of the energy storage battery pack according to the comparison result, wherein: When Mz≤m0, the first optimization unit determines that the number of charge and discharge cycles of the z-th energy storage battery pack in normal operating state is normal and does not perform optimization; When Mz>m0, the first optimization unit determines that the number of charge and discharge cycles of the z-th energy storage battery pack in normal operation is abnormal, and optimizes the judgment process of the working state of the z-th energy storage battery pack in normal operation, and sets the optimized first preset power percentage to s1', and sets s1'=s1×{1-exp[3×(Mz-m0) / (Mz+m0)-3]}; Wherein, Mz is the number of charge and discharge cycles of the zth energy storage battery pack in normal operating state.
[0048] Specifically, the first optimization unit reduces the adverse effects of excessive charge and discharge cycles of the energy storage battery pack on the working state judgment by setting a preset number of times, thereby improving the accuracy of the working state judgment of the energy storage battery pack, and further improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and ultimately improving the power dispatching efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset number of times, and those skilled in the art can set it freely, as long as the setting requirements of the preset number of times are met, where the optimal value of m0 is 1000 times.
[0049] Specifically, the second optimization unit compares the energy density r0 of the energy storage battery pack obtained with the preset density r1, and performs secondary optimization on the determination process of the working state of the energy storage battery pack according to the comparison result, wherein: When r0≤r1, the second optimization unit determines that the energy density of the energy storage battery pack is normal and does not perform optimization; When r0>r1, the second optimization unit determines that the energy density of the energy storage battery pack is abnormal, and performs secondary optimization on the determination process of the working state of the energy storage battery pack, and sets the preset number of times after optimization as m0', and sets: m0'=m0×{1+[(r0-r1) / (r0+r1)+1] (r0-r1) / r1+1 -1} / 3}.
[0050] Specifically, the second optimization unit reduces the influence of the high energy density of the energy storage battery group on the working state judgment by setting a preset density, thereby improving the accuracy of the working state judgment of the energy storage battery group, thereby improving the accuracy of the energy storage power and energy supply power scheduling of the wind power station, and finally improving the power scheduling efficiency of the wind power station; this embodiment does not make specific limitations on the setting of the preset density, and those skilled in the art can set it freely, as long as the setting requirements of the preset density are met, wherein, when the energy storage battery group is a lithium-ion battery, the optimal value of r1 is 260 Wh / kg; this embodiment does not make specific limitations on the secondary optimization process of the working state judgment process of the energy storage battery group, and those skilled in the art can also add influencing factors such as the self-discharge rate of the energy storage battery group to jointly perform secondary optimization on the working state judgment process of the energy storage battery group.
[0051] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. An intelligent power dispatching system based on power big data, characterized in that: include, Information acquisition module, used to obtain power demand, power generation equipment information and energy storage battery group information of the energy supply area; An equipment monitoring module is used to analyze the operating status of the power generation equipment based on the acquired temperature and vibration acceleration of the power generation equipment; A power analysis module is used to determine the working mode of the energy storage battery pack based on the analysis results of the acquired power demand and the operating status of the power generation equipment; A state analysis module is used to analyze the operating state of the energy storage battery pack according to the acquired temperature of the energy storage battery pack; A level classification module is used to classify the energy supply level and energy storage level of the wind power station according to the judgment result of the working mode of the energy storage battery group and the analysis result of the operating status of the energy storage battery group; The power dispatching module is used to judge the working status of the energy storage battery group according to the power percentage of the energy storage battery group, and to dispatch the energy storage power and energy supply power of the energy storage battery group according to the judgment result of the working status of the energy storage battery group and the division result of the energy supply level and energy storage level of the wind power station.
2. According to the intelligent power dispatching system based on power big data according to claim 1, it is characterized in that: The equipment monitoring module is provided with a vibration analysis unit. When the temperature of the i-th power generation equipment is normal, the vibration analysis unit is used to compare the acquired vibration acceleration of the power generation equipment with the preset acceleration a0, and analyze the operating state of the power generation equipment according to the comparison result, wherein: When ai≤a0, the vibration analysis unit determines that the operating state of the i-th power generation equipment is normal; When ai>a0, the vibration analysis unit determines that the operation state of the i-th power generation equipment is abnormal.
3. The intelligent power dispatching system based on power big data according to claim 2 is characterized in that: The power analysis module determines the working mode of the energy storage battery pack according to the analysis results of the acquired power demand p0 and the operating status of the power generation equipment, wherein: when When the power analysis module determines that the working mode of the energy storage battery pack is the energy storage mode; when When the power analysis module determines that the working mode of the energy storage battery pack is the energy supply mode; Wherein, dj is the power generation power of the jth power generation equipment in normal operation state, and J is the number of power generation equipment in normal operation state.
4. The intelligent power dispatching system based on power big data according to claim 3 is characterized in that: The state analysis module compares the acquired energy storage battery pack temperature with the preset battery pack temperature f0, and analyzes the abnormality of the energy storage battery pack operation state according to the comparison result, wherein: When fk≤f0, the state analysis module determines that the operating state of the kth energy storage battery group is normal; When fk>f0, the state analysis module determines that the operating state of the kth energy storage battery group is abnormal; Wherein, fk is the temperature of the kth energy storage battery group, 0<k≤K, and K is the number of energy storage battery groups.
5. According to claim 4, the intelligent power dispatching system based on power big data is characterized in that: The level classification module is provided with an energy supply level classification unit and an energy storage level classification unit. When the energy storage battery group working mode is the energy supply mode, the energy supply level classification unit is used to classify the energy supply level of the wind power station according to the analysis result of the operating state of the energy storage battery group, wherein: when When the energy supply level classification unit determines that the energy supply level of the wind power station is level one; when When the energy supply level classification unit determines that the energy supply level of the wind power station is level 2; Among them, u1 is the preset energy supply power, α is the preset energy supply adjustment coefficient, and kh is the number of energy storage battery groups with abnormal operating status; When the working mode of the energy storage battery group is the energy storage mode, the energy storage level classification unit is used to classify the energy storage level of the wind power station according to the analysis result of the operating state of the energy storage battery group, wherein: when When , the energy storage level classification unit determines that the energy storage level of the wind power station is level one; when When , the energy storage level classification unit determines that the energy storage level of the wind power station is level 2; Among them, u3 is the preset energy storage power, and β is the preset energy storage adjustment coefficient.
6. The intelligent power dispatching system based on power big data according to claim 5 is characterized in that: The power dispatching module is provided with a state judgment unit, a first dispatching unit and a second dispatching unit, wherein the state judgment unit is used to judge the working state of the energy storage battery group according to the judgment result of the working mode of the energy storage battery group and the power percentage of each energy storage battery group, wherein: When the working mode of the energy storage battery pack is the energy storage mode, if Sz≤s1, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a high energy storage state; if Sz>s1, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a low energy storage state; When the working mode of the energy storage battery pack is the energy supply mode, if Sz≤s2, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a low energy supply state; if Sz>s2, the state judgment unit determines that the working state of the z-th energy storage battery pack with normal operation is a high energy supply state; Wherein, s1 is a first preset power percentage, s2 is a second preset power percentage, and s1<s2.
7. The intelligent power dispatching system based on power big data according to claim 6 is characterized in that: The first dispatching unit is used to dispatch the energy storage power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the classification result of the energy storage level of the wind power station, wherein: When the energy storage level of the wind power station is level one, if △p1×(1-η) / z1≤pc1, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn1, and sets Cn1=△p1×(1-η) / z1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn2, and sets Cn2=0; if △p1×(1-η) / z1>pc1, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn3, and sets Cn3=pc1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn4, and sets Cn4=(△p1×(1-η) / z1-pc1×z1) / z2, and when Cn4≥pc2, the value of Cn4 is pc2; When the energy storage level of the wind power station is level two, if △p1×(1-η) / z1≤pc3, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn5, and sets Cn5=△p1×(1-η) / z1; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn6, and sets Cn6=0; if △p1×(1-η) / z1>pc3, the first dispatching unit sets the energy storage power of the energy storage battery group in the high energy storage state to Cn7, and sets Cn7=pc3; the energy storage power of the energy storage battery group in the low energy storage state of the first dispatching unit is set to Cn8, and sets Cn8=(△p1×(1-η) / z1-pc3×z1) / z2. When Cn8≥pc2, the value of Cn8 is pc2; Among them, η is the preset loss coefficient, z1 is the number of energy storage battery groups in the high energy storage state, z2 is the number of energy storage battery groups in the low energy storage state, pc1 is the first preset energy storage power, pc2 is the second preset energy storage power, pc3 is the third preset energy storage power, and pc3>pc1>pc2.
8. The intelligent power dispatching system based on power big data according to claim 6 is characterized in that: The second scheduling unit is used to schedule the energy supply power of the energy storage battery group according to the judgment result of the working state of the energy storage battery group and the classification result of the energy supply level of the wind power station, wherein: When the energy supply level of the wind power station is level one, if △p2×(1+h0)≤z3×pg1, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn1, and sets Gn1=△p2×(1+h0) / z3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn2, and sets Gn2=0; if △p2×(1+h0)>z3×pg1, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn3, and sets Gn3=pg1; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn4, and sets Gn4=[△p2×(1+h0)-z3×pg1] / z4; if Gn4≥pg2, Gn4 takes the value of pg2; When the energy supply level of the wind power station is level two, if △p2×(1+h0)≤z3×pg3, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn5, and sets Gn5=△p2×(1+h0) / z3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn6, and sets Gn6=0; if △p2×(1+h0)>z3×pg3, the second dispatching unit sets the energy supply power of the energy storage battery group in the high energy supply state to Gn7, and sets Gn7=pg3; the second dispatching unit sets the energy supply power of the energy storage battery group in the low energy supply state to Gn8, and sets Gn8=[△p2×(1+h0)-z3×pg3] / z4. If Gn4≥pg2, Gn4 takes the value of pg2; Among them, h0 is the preset transmission loss coefficient, z1 is the number of energy storage battery groups in high energy supply state, z2 is the number of energy storage battery groups in low energy supply state, pg1 is the first preset energy supply power, pg2 is the second preset energy supply power, and pg3 is the third preset energy supply power.
9. The intelligent power dispatching system based on power big data according to claim 1 is characterized in that: It also includes an optimization module, which is used to optimize the judgment process of the working state of the energy storage battery group according to the acquired number of charge and discharge cycles of each energy storage battery group and the energy density of the energy storage battery group; the optimization module is provided with a first optimization unit and a second optimization unit, the first optimization unit is used to compare the acquired number of charge and discharge cycles of each energy storage battery group with the preset number m0, and optimize the judgment process of the working state of the energy storage battery group according to the comparison result, wherein: When Mz≤m0, the first optimization unit determines that the number of charge and discharge cycles of the z-th energy storage battery pack in normal operating state is normal and does not perform optimization; When Mz>m0, the first optimization unit determines that the number of charge and discharge cycles of the z-th energy storage battery pack in normal operation is abnormal, and optimizes the judgment process of the working state of the z-th energy storage battery pack in normal operation, and sets the optimized first preset power percentage to s1', and sets s1'=s1×{1-exp[3×(Mz-m0) / (Mz+m0)-3]}; Wherein, Mz is the number of charge and discharge cycles of the zth energy storage battery pack in normal operating state.
10. The intelligent power dispatching system based on power big data according to claim 9 is characterized in that: The second optimization unit is used to compare the energy density r0 of the energy storage battery pack obtained with the preset density r1, and perform secondary optimization on the determination process of the working state of the energy storage battery pack according to the comparison result, wherein: When r0≤r1, the second optimization unit determines that the energy density of the energy storage battery pack is normal and does not perform optimization; When r0>r1, the second optimization unit determines that the energy density of the energy storage battery pack is abnormal, and performs secondary optimization on the determination process of the working state of the energy storage battery pack, and sets the preset number of times after optimization as m0', and sets: m0’=m0×{1+[(r0-r1) / (r0+r1)+1] (r0-r1) / r1+1 -1} / 3}。
Citation Information
Patent Citations
Multi-region electric energy intelligent scheduling method and system based on big data
CN117410981A
