One-out-of-three selection method for active power signals of water-turbine generator set and related equipment

By using a three-choice active power signal selection method in the hydrowheel generator set, the optimal active power is confirmed based on the channel quality and deviation of multiple sets of data, and the insufficient stability and reliability of active power signals in the prior art are solved. The problem has improved the stable operation and control accuracy of the system.

CN119070397AActive Publication Date: 2024-12-03THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD

Patent Information

Application Number
CN202411172237.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-12-03
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

In the acquisition and processing of active power signals, existing hydrowheel generator sets have problems such as insufficient main and backup redundancy and frequent switching caused by fluctuations in PT or CT loops, which affect the stability and reliability of the signal.

Method used

A three-choice and one-one selection method for selecting active power signals in the hydro turbine generator sets is adopted. By obtaining three sets of active power acquisition data, the optimal active power is confirmed based on the channel quality, including calculating the deviation between any two sets of data when the three sets of data are normal. From the mean deviation, judge and select the optimal active power; when at least two sets of data are normal, calculate the deviation and average deviation between the two sets, and select the optimal active power; when one set of data is normal, confirm based on channel quality Optimal active power.

Benefits of technology

It effectively improves the reliability of the judgment and processing of active power signals, reduces the problems of unit start-up and shutdown due to fluctuations, loss or failures, and improves the stability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070397A_ABST
    Figure CN119070397A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a one-out-of-three selection method for active power signals of a water-turbine generator set and related equipment, and relates to the technical field of automation of the water-turbine generator set, and the method comprises the steps: obtaining three groups of active power collection data Y1, Y2 and Y3; and determining the optimal active power based on the channel quality condition of the active power acquisition data. According to the technical scheme, the unique optimal active power can be selected and output to serve as the final active power of the water-turbine generator set to participate in unit control, the reliability of active power signal judgment and processing is effectively improved, and the problem that the water-turbine generator set is damaged due to inaccurate judgment and processing after the active power signal fluctuates, is lost or breaks down is solved. And the problems of unit startup and shutdown and out-of-control AGC regulation are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of automation of hydro-turbine generator sets, and in particular to a method for selecting one of three active power signals of a hydro-turbine generator set and related equipment. Background Art

[0002] At present, under the national strategic background of "carbon peak and carbon neutrality", hydropower, as one of the clean energy sources, is still in the stage of vigorous development. Active power is one of the important parameters of hydro-turbine generator sets. Whether its measured value is stable or not directly affects the start-up and shutdown control, power generation efficiency and frequency balance of the hydro-turbine generator set. Therefore, the stability and reliability of the active power signal is crucial to the hydro-turbine generator set.

[0003] At present, most hydropower stations are equipped with multiple sets of power sensors to collect the active power signals of the units, and use "two-choose-one" and "three-choose-two" methods to monitor, judge and process the active power signals. Among them, the "two-choose-one" method mainly realizes the main and standby redundancy through two active signals. The disadvantage is that when the two active signals are disconnected or fail at the same time, the active signal of the unit loses monitoring and control. The "three-choose-two" method mainly selects two groups of active signals and takes the average value as the actual active value. The disadvantage is that this method will be affected by the fluctuation of the PT or CT circuit, resulting in frequent switching of the two selected active signals. Therefore, there is an urgent need for an acquisition system and a selection and processing method to improve the stability and reliability of the active power signal of the hydro-turbine generator set, and further ensure the stable operation of the unit. Summary of the invention

[0004] The embodiments of the present application provide a method for selecting one of three active power signals of a hydro-turbine generator set and related equipment to solve the technical problems existing in the prior art.

[0005] Other features and advantages of the present application will become apparent from the following detailed description, or may be learned in part by the practice of the present application.

[0006] According to a first aspect of an embodiment of the present application, a method for selecting one of three active power signals of a hydro-generator set is provided, comprising:

[0007] Obtain three groups of active power acquisition data, namely Y1, Y2 and Y3;

[0008] Based on the channel quality of active power acquisition data, the optimal active power is determined, including:

[0009] When the channel qualities of the three groups of active power acquisition data are all normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data;

[0010] When the channel quality of at least two groups of active power acquisition data is normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data;

[0011] When the channel quality of at least one group of active power acquisition data is normal, the optimal active power is determined based on the channel quality of the active power acquisition data.

[0012] In some embodiments of the present application, based on the aforementioned scheme, when the channel qualities of the three groups of active power acquisition data are all normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data, including:

[0013] When the channel qualities of the three groups of active power acquisition data are all normal, the active power deviation between any two groups is calculated to obtain a first active power deviation, a second active power deviation and a third active power deviation;

[0014] Performing judgment based on the first active power deviation, the second active power deviation, the third active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results;

[0015] The optimal active power is obtained by comparing the deviations from the average values.

[0016] In some embodiments of the present application, based on the aforementioned solution, the judgment is made based on the first active power deviation, the second active power deviation, the third active power deviation and the active power deviation threshold, and the average value deviation under different judgment results is calculated based on different judgment results, including:

[0017] When the first active power deviation, the second active power deviation and the third active power deviation are all less than the active power deviation threshold, calculating the first type average value deviation of the active power collection data Y1, the first type average value deviation of the active power collection data Y2 and the first type average value deviation of the active power collection data Y3;

[0018] When the third active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or the third active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, calculate the second type of average value deviation of the active power acquisition data Y2 and the second type of average value deviation of the active power acquisition data Y3;

[0019] When the first active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or the first active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, calculating the second type of average value deviation of the active power collection data Y1 and the third type of average value deviation of the active power collection data Y2;

[0020] When the second active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, or the second active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, the third type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y3 are calculated.

[0021] In some embodiments of the present application, based on the above-mentioned solution, the comparison based on the mean value deviation to obtain the optimal active power includes:

[0022] When the first active power deviation, the second active power deviation and the third active power deviation are all smaller than the active power deviation threshold, a comparison is performed based on the first type of average value deviation of the active power acquisition data Y1, the first type of average value deviation of the active power acquisition data Y2 and the first type of average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

[0023] When the third active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the third active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, a comparison is performed based on the second type of average value deviation of the active power acquisition data Y2 and the second type of average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0024] When the first active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the first active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, a comparison is performed based on the second type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y2, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0025] When the second active power deviation is smaller than the active power deviation threshold and the first active power deviation is larger than the active power deviation threshold, or the second active power deviation is smaller than the active power deviation threshold and the third active power deviation is larger than the active power deviation threshold, a comparison is made based on the third category average value deviation of the active power acquisition data Y1 and the third category average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

[0026] In some embodiments of the present application, based on the above-mentioned solution, when the channel quality of at least two groups of active power acquisition data is normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data, including:

[0027] When the channel qualities of at least two groups of active power acquisition data are all normal, the active power deviation between any two groups is calculated to obtain a fourth active power deviation, a fifth active power deviation and a sixth active power deviation;

[0028] Performing judgment based on the fourth active power deviation, the fifth active power deviation, the sixth active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results;

[0029] The optimal active power is obtained by comparing the deviations from the average values.

[0030] In some embodiments of the present application, based on the aforementioned solution, the judgment is made based on the fourth active power deviation, the fifth active power deviation, the sixth active power deviation and the active power deviation threshold, and the average value deviation under different judgment results is calculated based on different judgment results, including:

[0031] When the sixth active power deviation is less than the active power deviation threshold, calculating the second type average value deviation of the active power collection data Y2 and the second type average value deviation of the active power collection data Y3;

[0032] When the fifth active power deviation is less than the active power deviation threshold, calculating the third type average value deviation of the active power collection data Y1 and the third type average value deviation of the active power collection data Y3;

[0033] When the fourth active power deviation is less than the active power deviation threshold, the second type average value deviation of the active power collection data Y1 and the third type average value deviation of the active power collection data Y2 are calculated.

[0034] In some embodiments of the present application, based on the above-mentioned solution, the comparison based on the mean value deviation to obtain the optimal active power includes:

[0035] When the sixth active power deviation is less than the active power deviation threshold, a comparison is performed based on the second type average value deviation of the active power acquisition data Y2 and the second type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0036] When the fifth active power deviation is less than the active power deviation threshold, a comparison is performed based on the third type average value deviation of the active power acquisition data Y1 and the third type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0037] When the fourth active power deviation is smaller than the active power deviation threshold, a comparison is made based on the second type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y2, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

[0038] According to a second aspect of an embodiment of the present application, a device for selecting one of three active power signals of a hydro-generator set is provided, comprising:

[0039] An acquisition unit is used to acquire three groups of active power acquisition data, namely, Y1, Y2 and Y3;

[0040] A confirmation unit, used to confirm the optimal active power based on the channel quality of the active power collection data;

[0041] Wherein, the confirmation unit comprises:

[0042] A first confirmation subunit is used to confirm the optimal active power according to the active power deviation between any two groups of active power collection data and the average value deviation of each group of active power collection data when the channel qualities of the three groups of active power collection data are all normal;

[0043] A second confirmation subunit is used to confirm the optimal active power according to the active power deviation between any two groups of active power collection data and the average value deviation of each group of active power collection data when the channel quality of at least two groups of active power collection data is normal;

[0044] The third confirmation subunit is used to confirm the optimal active power based on the channel quality of the active power collection data when the channel quality of at least one group of active power collection data is normal.

[0045] According to a third aspect of an embodiment of the present application, a computer-readable storage medium is provided, wherein the storage medium stores computer instructions, and when the computer instructions are executed on a computer, the computer executes the method according to the first aspect.

[0046] According to a fourth aspect of the embodiments of the present application, there is provided an electronic device, including: a memory and a processor;

[0047] The memory is used to store computer instructions;

[0048] The processor is used to call the computer instructions stored in the memory so that the electronic device executes the method as described in the first aspect.

[0049] The technical solution of the present application can select and output the only optimal active power as the final active power of the hydro-turbine generator set to participate in the control of the unit, effectively improving the reliability of active power signal judgment and processing, and solving the problems of hydro-turbine generator set start-up and shutdown and AGC adjustment out of control due to inaccurate judgment and processing of active power signal fluctuations, loss or failure.

[0050] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments consistent with the present application, and together with the specification, are used to explain the principles of the present application. Obviously, the drawings described below are only some embodiments of the present application, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0052] Figure 1 A schematic flow chart of a method for selecting one of three active power signals of a hydro-generator set according to an embodiment of the present application is shown;

[0053] Figure 2 A schematic diagram of the process of step S200 according to an embodiment of the present application is shown;

[0054] Figure 3 A block diagram of a device for selecting one out of three active power signals of a hydro-generator set according to an embodiment of the present application is shown;

[0055] Figure 4 A block diagram of an electronic device according to an embodiment of the present application is shown;

[0056] Figure 5A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown. DETAILED DESCRIPTION

[0057] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that this application will be more comprehensive and complete and fully convey the concept of the example embodiments to those skilled in the art.

[0058] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present application. However, those skilled in the art will appreciate that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the application.

[0059] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.

[0060] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.

[0061] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the objects used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those shown or described.

[0062] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] Some embodiments of the present application will be described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments may be combined with each other.

[0064] See also Figure 1 , shows a flow chart of a method for selecting one of three active power signals of a hydro-turbine generator set according to an embodiment of the present application.

[0065] like Figure 1 As shown, a method for selecting one of three active power signals of a hydro-generator set is presented, comprising steps S100 to S200.

[0066] Step S100, obtaining three groups of active power acquisition data, namely Y1, Y2 and Y3.

[0067] It can be understood that, in this embodiment, three groups of active power acquisition data are obtained by random selection.

[0068] Continue to refer Figure 1 , step S200, confirming the optimal active power based on the channel quality of the active power acquisition data.

[0069] For details, see Figure 2 , step S200 includes:

[0070] Step S210, when the channel qualities of the three groups of active power acquisition data are all normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data;

[0071] Step S220, determining the optimum active power by comparing the active power deviation between the rate collection data and the average value deviation of each group of active power collection data;

[0072] Step S230: when the channel quality of at least one set of active power acquisition data is normal, the optimal active power is determined based on the channel quality of the active power acquisition data.

[0073] It should be noted that, when at least one set of active power acquisition data has normal channel quality, the active power acquisition data with normal channel quality among the three sets of active power acquisition data is used as the optimal active power.

[0074] In some feasible embodiments, based on the above scheme, when the channel qualities of the three groups of active power acquisition data are all normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data, including:

[0075] When the channel qualities of the three groups of active power acquisition data are all normal, the active power deviation between any two groups is calculated to obtain a first active power deviation, a second active power deviation and a third active power deviation;

[0076] Performing judgment based on the first active power deviation, the second active power deviation, the third active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results;

[0077] The optimal active power is obtained by comparing the deviations from the average values.

[0078] Exemplarily, the calculation process of the first active power deviation, the second active power deviation and the third active power deviation is as follows:

[0079] (1) The first active power deviation Diff1 is calculated based on the active power collection data Y1 and the active power collection data Y2, specifically:

[0080] Diff1 = |Y1-Y2|.

[0081] (2) The second active power deviation Diff2 is calculated based on the active power collection data Y1 and the active power collection data Y3, specifically:

[0082] Diff2 = |Y1-Y3|.

[0083] (3) A third active power deviation Diff3 is calculated based on the active power collection data Y2 and the active power collection data Y3, specifically:

[0084] Diff3 = |Y2-Y3|.

[0085] In some feasible embodiments, based on the above scheme, the judgment is made based on the first active power deviation, the second active power deviation, the third active power deviation and the active power deviation threshold, and the average value deviation under different judgment results is calculated based on different judgment results, including:

[0086] When the first active power deviation, the second active power deviation and the third active power deviation are all less than the active power deviation threshold, calculating the first type average value deviation of the active power collection data Y1, the first type average value deviation of the active power collection data Y2 and the first type average value deviation of the active power collection data Y3;

[0087] When the third active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the third active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, calculate the second type of average deviation of the active power acquisition data Y2 and the second type of average deviation of the active power acquisition data Y3;

[0088] When the first active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the first active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, calculate the second type of average deviation of the active power acquisition data Y1 and the third type of average deviation of the active power acquisition data Y2;

[0089] When the second active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, or when the second active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, calculate the third type of average deviation of the active power acquisition data Y1 and the third type of average deviation of the active power acquisition data Y3.

[0090] Exemplarily, when Diff1 < W and Diff2 < W and Diff2 < W, where W represents the active power deviation threshold, the calculation process of the average deviation is as follows:

[0091] Obtain the first type of average deviation AVED1 of the active power acquisition data Y1 according to the active power acquisition data Y1 and the average value of the three groups of active power acquisition data Y1, Y2, and Y3, specifically:

[0092] AVED1 = |Y1 - (Y1 + Y2 + Y3) / 3|.

[0093] Obtain the first type of average deviation AVED2 of the active power acquisition data Y2 according to the active power acquisition data Y2 and the average value of the three groups of active power acquisition data Y1, Y2, and Y3, specifically:

[0094] AVED2 = |Y2 - (Y1 + Y2 + Y3) / 3|.

[0095] Obtain the first type of average deviation AVED3 of the active power acquisition data Y3 according to the active power acquisition data Y3 and the average value of the three groups of active power acquisition data Y1, Y2, and Y3, specifically:

[0096] AVED3 = |Y3 - (Y1 + Y2 + Y3) / 3|.

[0097] When Diff3 < W and Diff1 > W, or Diff3 < W and Diff2 > W, the calculation process of the average deviation is as follows:

[0098] According to the active power acquisition data Y2 and the average value of the active power acquisition data Y2 and Y3, the second type of average deviation AVED2' of the active power acquisition data Y2 is obtained, specifically:

[0099] AVED2' = |Y2 - (Y2 + Y3) / 2|.

[0100] According to the active power acquisition data Y3 and the average value of the active power acquisition data Y2 and Y3, the second type of average deviation AVED3' of the active power acquisition data Y3 is obtained, specifically:

[0101] AVED3' = |Y3 - (Y2 + Y3) / 2|.

[0102] When Diff1 < W and Diff2 > W, or Diff1 < W and Diff3 > W, the calculation process of the average deviation is as follows:

[0103] According to the active power acquisition data Y1 and the average value of the active power acquisition data Y1 and Y2, the third type of average deviation AVED1' of the active power acquisition data Y1 is obtained, specifically:

[0104] AVED1' = |Y1 - (Y1 + Y2) / 2|.

[0105] According to the active power acquisition data Y2 and the average value of the active power acquisition data Y1 and Y2, the third type of average deviation AVED2'' of the active power acquisition data Y2 is obtained, specifically:

[0106] AVED2'' = |Y2 - (Y1 + Y2) / 2|.

[0107] When Diff2 < W and Diff1 > W, or Diff2 < W and Diff3 > W, the calculation process of the average deviation is as follows:

[0108] According to the active power acquisition data Y1 and the average value of the active power acquisition data Y1 and Y3, the third type of average deviation AVED1'' of the active power acquisition data Y1 is obtained, specifically:

[0109] AVED1'' = |Y1 - (Y1 + Y3) / 2|.

[0110] According to the active power acquisition data Y3 and the average value of the active power acquisition data Y1 and Y3, the third type of average deviation AVED3'' of the active power acquisition data Y3 is obtained, specifically:

[0111] AVED3″=|Y3-(Y1+Y3) / 2|.

[0112] In some feasible embodiments, based on the above scheme, the comparison based on the mean value deviation to obtain the optimal active power includes:

[0113] When the first active power deviation, the second active power deviation and the third active power deviation are all smaller than the active power deviation threshold, a comparison is performed based on the first type of average value deviation of the active power acquisition data Y1, the first type of average value deviation of the active power acquisition data Y2 and the first type of average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

[0114] When the third active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the third active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, a comparison is performed based on the second type of average value deviation of the active power acquisition data Y2 and the second type of average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0115] When the first active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the first active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, a comparison is performed based on the second type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y2, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0116] When the second active power deviation is smaller than the active power deviation threshold and the first active power deviation is larger than the active power deviation threshold, or the second active power deviation is smaller than the active power deviation threshold and the third active power deviation is larger than the active power deviation threshold, a comparison is made based on the third category average value deviation of the active power acquisition data Y1 and the third category average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

[0117] Exemplarily, AVED1, AVED2 and AVED3 are compared in size. If AVED1 is the smallest among the three, the active power collection data Y1 is confirmed as the optimal active power. If AVED2 is the smallest among the three, the active power collection data Y2 is confirmed as the optimal active power. If AVED3 is the smallest among the three, the active power collection data Y3 is confirmed as the optimal active power.

[0118] Similarly, AVED2′ and AVED3′ are compared in size. If the value of AVED2′ is the smallest, the active power collection data Y2 is confirmed as the optimal active power. If the value of AVED3′ is the smallest, the active power collection data Y3 is confirmed as the optimal active power.

[0119] Compare AVED1′ and AVED2″. If AVED1′ has the smallest value, the active power acquisition data Y1 is confirmed as the optimal active power. If AVED2″ has the smallest value, the active power acquisition data Y2 is confirmed as the optimal active power.

[0120] Compare AVED1″ and AVED3″. If AVED1″ value is the smallest, the active power collection data Y1 is confirmed as the optimal active power. If AVED3″ value is the smallest, the active power collection data Y3 is confirmed as the optimal active power.

[0121] In some feasible embodiments, based on the above scheme, when the channel quality of at least two groups of active power acquisition data is normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data, including:

[0122] When the channel qualities of at least two groups of active power acquisition data are all normal, the active power deviation between any two groups is calculated to obtain a fourth active power deviation, a fifth active power deviation and a sixth active power deviation;

[0123] Performing judgment based on the fourth active power deviation, the fifth active power deviation, the sixth active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results;

[0124] The optimal active power is obtained by comparing the deviations from the average values.

[0125] Exemplarily, the calculation process of the fourth active power deviation, the fifth active power deviation and the sixth active power deviation is as follows:

[0126] (1) A fourth active power deviation Diff4 is calculated based on the active power collection data Y1 and the active power collection data Y2, specifically:

[0127] Diff4 = |Y1 - Y2|.

[0128] (2) Calculate the fifth active power deviation Diff5 based on the active power acquisition data Y1 and the active power acquisition data Y3. Specifically:

[0129] Diff5 = |Y1 - Y3|.

[0130] (3) Calculate the sixth active power deviation Diff6 based on the active power acquisition data Y2 and the active power acquisition data Y3. Specifically:

[0131] Diff6 = |Y2 - Y3|.

[0132] It should be noted that the fourth active power deviation is essentially the same as the first active power deviation, so their calculation methods are the same. In this application, since the first active power deviation and the fourth active power deviation exist in different steps, for the sake of easy distinction, they are respectively named the first active power deviation and the fourth active power deviation. The same reason applies to the fifth active power deviation and the second active power deviation, as well as the sixth active power deviation and the third active power deviation.

[0133] In some feasible embodiments, based on the foregoing solution, judge based on the fourth active power deviation, the fifth active power deviation, the sixth active power deviation, and the active power deviation threshold, and calculate the average deviation under different judgment results based on different judgment results, including:

[0134] When the sixth active power deviation is less than the active power deviation threshold, calculate the second type of average deviation of the active power acquisition data Y2 and the second type of average deviation of the active power acquisition data Y3;

[0135] When the fifth active power deviation is less than the active power deviation threshold, calculate the third type of average deviation of the active power acquisition data Y1 and the third type of average deviation of the active power acquisition data Y3;

[0136] When the fourth active power deviation is less than the active power deviation threshold, calculate the second type of average deviation of the active power acquisition data Y1 and the third type of average deviation of the active power acquisition data Y2.

[0137] Exemplarily, when Diff6 < W, where W represents the active power deviation threshold, the calculation process of the average deviation is as follows:

[0138] Obtain the second type of average deviation AVED2' of the active power acquisition data Y2 according to the active power acquisition data Y2 and the average value of the active power acquisition data Y2 and Y3. Specifically:

[0139] AVED2' = |Y2 - (Y2 + Y3) / 2|.

[0140] The second type of average value deviation AVED3' of the active power acquisition data Y3 is obtained based on the active power acquisition data Y3 and the average value of the active power acquisition data Y2 and Y3, specifically:

[0141] AVED3' = |Y3 - (Y2 + Y3) / 2|.

[0142] When Diff5 < W, the calculation process of the average value deviation is as follows:

[0143] The third type of average value deviation AVED1'' of the active power acquisition data Y1 is obtained based on the active power acquisition data Y1 and the average value of the active power acquisition data Y1 and Y3, specifically:

[0144] AVED1'' = |Y1 - (Y1 + Y3) / 2|.

[0145] The third type of average value deviation AVED3'' of the active power acquisition data Y3 is obtained based on the active power acquisition data Y3 and the average value of the active power acquisition data Y1 and Y3, specifically:

[0146] AVED3'' = |Y3 - (Y1 + Y3) / 2|.

[0147] When Diff4 < W, the calculation process of the average value deviation is as follows:

[0148] The second type of average value deviation AVED1' of the active power acquisition data Y1 is obtained based on the active power acquisition data Y1 and the average value of the active power acquisition data Y1 and Y2, specifically:

[0149] AVED1' = |Y1 - (Y1 + Y2) / 2|.

[0150] The third type of average value deviation AVED2'' of the active power acquisition data Y2 is obtained based on the active power acquisition data Y2 and the average value of the active power acquisition data Y1 and Y2, specifically:

[0151] AVED2'' = |Y2 - (Y1 + Y2) / 2|.

[0152] In some feasible embodiments, based on the foregoing solution, comparing based on the average value deviation to obtain the optimal active power includes:

[0153] When the sixth active power deviation is less than the active power deviation threshold, a comparison is performed based on the second type average value deviation of the active power acquisition data Y2 and the second type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0154] When the fifth active power deviation is less than the active power deviation threshold, a comparison is performed based on the third type average value deviation of the active power acquisition data Y1 and the third type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power;

[0155] When the fourth active power deviation is smaller than the active power deviation threshold, a comparison is made based on the second type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y2, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

[0156] Exemplarily, AVED2′ and AVED3′ are compared in size. If the value of AVED2′ is the smallest, the active power collection data Y2 is confirmed as the optimal active power. If the value of AVED3′ is the smallest, the active power collection data Y3 is confirmed as the optimal active power.

[0157] Compare AVED1′ and AVED2″. If AVED1′ has the smallest value, the active power acquisition data Y1 is confirmed as the optimal active power. If AVED2″ has the smallest value, the active power acquisition data Y2 is confirmed as the optimal active power.

[0158] Compare AVED1″ and AVED3″. If AVED1″ value is the smallest, the active power collection data Y1 is confirmed as the optimal active power. If AVED3″ value is the smallest, the active power collection data Y3 is confirmed as the optimal active power.

[0159] In summary, the technical solution of the present application effectively improves the reliability of active power signal acquisition, judgment and processing, effectively reduces the risk of unit active power signal fluctuation, loss or failure due to single sensor failure and PT, CT circuit fluctuation, and solves the problems of inaccurate judgment and processing after active power signal fluctuation, loss or failure of the hydro-turbine generator set, resulting in unit start-up and shutdown and AGC regulation out of control.

[0160] Below, a specific implementation process of this method is provided:

[0161] Step S1: Obtain three groups of active power acquisition data Y1, Y2, and Y3.

[0162] Step S2: Determine whether the quality of all three groups of data channels is normal. If the quality of all three groups of data channels is normal, proceed to step S21; otherwise, execute step S3.

[0163] Step S21: When the quality of all three groups of data channels is normal, select one out of the three groups of collected active powers, and finally output the only optimal active power. Specifically:

[0164] 1. Execute step T1 to calculate the active power deviation between any two groups: Diff1 = |Y1 - Y2|, Diff2 = |Y1 - Y3|, Diff3 = |Y2 - Y3|.

[0165] 2. Execute step T2 to determine whether the active power deviation between any two groups is within the threshold W, that is, whether Diff1 < W and Diff2 < W and Diff2 < W. If so, execute step T21; otherwise, execute step T3.

[0166] 3. Execute step T21 to calculate the average deviation: AVED1 = |Y1 - (Y1 + Y2 + Y3) / 3|, AVED2 = |Y2 - (Y1 + Y2 + Y3) / 3|, AVED3 = |Y3 - (Y1 + Y2 + Y3) / 3|.

[0167] 4. Execute step T22 to determine whether the average deviation AVED2 > AVED3. If so, execute step T23; otherwise, execute step T24.

[0168] 5. Execute step T23 to determine whether the average deviation AVED1 > AVED3. If so, output the optimal active power as Y3, and the process ends; otherwise, output the optimal active power as Y1, and the process ends.

[0169] 6. Execute step T24 to determine whether the average deviation AVED2 < AVED1. If so, output the optimal active power as Y2, and the process ends; otherwise, output the optimal active power as Y1, and the process ends.

[0170] 7. Execute step T3 to determine whether the deviation Diff3 < W and Diff1 > W or Diff2 > W. If so, execute step T31; otherwise, execute step T4.

[0171] 8. Execute step T31 to calculate the average deviation: AVED2′ = |Y2 - (Y2 + Y3) / 2|, AVED3′ = |Y3 - (Y2 + Y3) / 2|.

[0172] 9. Execute step T32 to determine whether the average value deviation AVED2′ > AVED3′. If so, output the optimal active power as Y3 and end the process; otherwise, output the optimal active power as Y2 and end the process.

[0173] 10. Execute step T4 to determine whether the deviation Diff1 < W and Diff2 > W or Diff3 > W. If so, execute step T41; otherwise, execute step T5.

[0174] 11. Execute step T41 to calculate the average value deviation: AVED1′ = |Y1 - (Y1 + Y2) / 2|, AVED2″ = |Y2 - (Y1 + Y2) / 2|.

[0175] 12. Execute step T42 to determine whether the average value deviation AVED1′ > AVED2″. If so, output the optimal active power as Y2 and end the process; otherwise, output the optimal active power as Y1 and end the process.

[0176] 13. Execute step T5 to determine whether the deviation Diff2 < W and Diff1 > W or Diff3 > W. If so, execute step T51; otherwise, end the process.

[0177] 14. Execute step T51 to calculate the average value deviation: AVED1″ = |Y1 - (Y1 + Y3) / 2|, AVED3″ = |Y3 - (Y1 + Y3) / 2|.

[0178] 15. Execute step T52 to determine whether the average value deviation AVED1″ > AVED3″. If so, output the optimal active power as Y3 and end the process; otherwise, output the optimal active power as Y1 and end the process.

[0179] Step S3: Determine whether at least two groups of data channel qualities are normal. If so, enter step S31; otherwise, execute step S4.

[0180] Step S31: In the case where at least two groups of data channel qualities are normal, select one out of the two sets of collected active powers through a three - way selection, and finally output the unique optimal active power. Specifically:

[0181] 16. Execute step G1 to calculate the active power deviation between any two groups: Diff4 = |Y1 - Y2|, Diff5 = |Y1 - Y3|, Diff6 = |Y2 - Y3|.

[0182] 17. Execute step G2 to determine whether the active power deviation Diff6 is within the threshold W, that is, whether Diff6 < W. If so, execute step G21; otherwise, execute step G3.

[0183] 18. Execute step G21 to calculate the average deviation: AVED2' = |Y2 - (Y2 + Y3) / 2|, AVED3' = |Y3 - (Y2 + Y3) / 2|.

[0184] 19. Execute step G22 to determine whether the average deviation AVED2' > AVED3'. If so, output the optimal active power as Y3 and end the process; otherwise, output the optimal active power as Y2 and end the process.

[0185] 20. Execute step G3 to determine whether the active power deviation Diff5 is within the threshold W, that is, whether Diff5 < W. If so, execute step G31; otherwise, execute step G4.

[0186] 21. Execute step G31 to calculate the average deviation: AVED1″ = |Y1 - (Y1 + Y3) / 2|, AVED3″ = |Y3 - (Y1 + Y3) / 2|.

[0187] 22. Execute step G32 to determine whether the average deviation AVED1″ > AVED3″. If so, output the optimal active power as Y3 and end the process; otherwise, output the optimal active power as Y1 and end the process.

[0188] 23. Execute step G4 to determine whether the active power deviation Diff4 is within the threshold W, that is, whether Diff4 < W. If so, execute step G41; otherwise, end the process.

[0189] 24. Execute step G41 to calculate the average deviation: AVED1' = |Y1 - (Y1 + Y2) / 2|, AVED2″ = |Y2 - (Y1 + Y2) / 2|.

[0190] 25. Execute step G42 to determine whether the average deviation AVED1' > AVED2″. If so, output the optimal active power as Y2 and end the process; otherwise, output the optimal active power as Y1 and end the process.

[0191] Step S4: Determine whether at least one group of data channel qualities is normal. If so, enter step S41; otherwise, end the process.

[0192] Step S41: In the case where at least one group of data channel qualities is normal, select one out of three of the collected active power signals, and finally output the only optimal active power. Specifically:

[0193] 26. Execute step B1 to determine whether the quality of the first group of active power data Y1 channel is normal. If so, output the optimal active power as Y1 and end the process; otherwise, execute step B2.

[0194] 27. Execute step B2 to determine whether the quality of the second group of active power data Y2 channel is normal. If so, output the optimal active power as Y2 and the process ends; otherwise, output the optimal active power as Y3 and the process ends.

[0195] The following describes an embodiment of the device of the present application, which can be used to implement a method for selecting one of three active power signals of a hydro-generator set in the above embodiment of the present application. For details not disclosed in the embodiment of the device of the present application, please refer to the embodiment of the above method of the present application.

[0196] Reference Figure 3 As shown, according to an embodiment of the present application, a device 300 for selecting one of three active power signals of a hydro-generator set includes:

[0197] The acquisition unit 301 is used to acquire three groups of active power acquisition data, namely Y1, Y2 and Y3;

[0198] A confirmation unit 302, configured to confirm the optimal active power based on the channel quality of the active power acquisition data;

[0199] Wherein, the confirmation unit comprises:

[0200] A first confirmation subunit is used to confirm the optimal active power according to the active power deviation between any two groups of active power collection data and the average value deviation of each group of active power collection data when the channel qualities of the three groups of active power collection data are all normal;

[0201] A second confirmation subunit is used to confirm the optimal active power according to the active power deviation between any two groups of active power collection data and the average value deviation of each group of active power collection data when the channel quality of at least two groups of active power collection data is normal;

[0202] The third confirmation subunit is used to confirm the optimal active power based on the channel quality of the active power collection data when the channel quality of at least one group of active power collection data is normal.

[0203] like Figure 4 As shown, an embodiment of the present application also provides an electronic device 400, including a memory 410, a processor 420, and a computer program 411 stored in the memory 410 and executable on the processor. When the processor 420 executes the computer program 411, the steps of the above-mentioned three-selection method for active power signal of a hydro-turbine generator set are implemented.

[0204] Since the electronic device introduced in this embodiment is a device used to implement a three-choice selection device for active power signals of a hydro-turbine generator set in the embodiment of the present application, based on the method introduced in the embodiment of the present application, the technical personnel in this field can understand the specific implementation mode of the electronic device of this embodiment and its various variations. Therefore, how the electronic device implements the method in the embodiment of the present application is not introduced in detail here. As long as the equipment used by the technical personnel in this field to implement the method in the embodiment of the present application is within the scope of protection of this application.

[0205] During the specific implementation process, when the computer program 411 is executed by a processor, any implementation method in the embodiments corresponding to the first aspect can be implemented.

[0206] Figure 5 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown.

[0207] It should be noted that Figure 5 The computer system 500 of the electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0208] like Figure 5 As shown, the computer system 500 includes a central processing unit (CPU) 501, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 502 or the program loaded from the storage part 508 to the random access memory (RAM) 503, such as executing the method described in the above embodiment. In the RAM 503, various programs and data required for system operation are also stored. The CPU 501, the ROM 502 and the RAM 503 are connected to each other through the bus 504. The input / output (I / O) interface 505 is also connected to the bus 504.

[0209] The following components are connected to the I / O interface 505: an input section 506 including a keyboard, a mouse, etc.; an output section 507 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker; a storage section 508 including a hard disk, etc.; and a communication section 509 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 509 performs communication processing via a network such as the Internet. A drive 510 is also connected to the I / O interface 505 as needed. A removable medium 511, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 510 as needed so that a computer program read therefrom is installed into the storage section 508 as needed.

[0210] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 509, and / or installed from a removable medium 511. When the computer program is executed by a central processing unit (CPU) 501, various functions defined in the system of the present application are executed.

[0211] It should be noted that the computer-readable medium shown in the embodiment of the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, - but not limited to - an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by an instruction execution system, device or device or used in combination with it. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, wherein a computer-readable program code is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.

[0212] The flowchart and block diagram in the accompanying drawings illustrate the possible architecture, functions and operations of the system, method and computer program product according to various embodiments of the present application. Wherein, each box in the flowchart or block diagram can represent a module, a program segment, or a part of the code, and the above-mentioned module, program segment, or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0213] The units involved in the embodiments described in this application may be implemented by software or hardware, and the units described may also be set in a processor. The names of these units do not, in some cases, constitute limitations on the units themselves.

[0214] As another aspect, the present application further provides a computer program product or a computer program, the computer program product or the computer program including computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device executes a method for selecting one of three active power signals of a hydro-generator set as described in the above embodiment.

[0215] As another aspect, the present application also provides a computer-readable medium, which may be included in the electronic device described in the above embodiment; or may exist independently without being assembled into the electronic device. The above computer-readable medium carries one or more programs, and when the above one or more programs are executed by an electronic device, the electronic device implements the method for selecting one of three active power signals of a hydro-turbine generator set described in the above embodiment.

[0216] It should be noted that, although several modules or units of the equipment for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present application, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into being embodied by multiple modules or units.

[0217] Through the description of the above implementation methods, it is easy for those skilled in the art to understand that the example implementation methods described here can be implemented by software or by combining software with necessary hardware. Therefore, the technical solution according to the implementation methods of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a touch terminal, or a network device, etc.) to execute the method according to the implementation methods of the present application.

[0218] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the embodiments disclosed herein. The present application is intended to cover any variations, uses or adaptations of the present application, which follow the general principles of the present application and include common knowledge or customary techniques in the art that are not disclosed in the present application. It should be understood that the present application is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A method for selecting one of three active power signals of a hydro-generator set. It is characterized in that include: Obtain three groups of active power acquisition data, namely Y1, Y2 and Y3; Based on the channel quality of active power acquisition data, the optimal active power is determined, including: When the channel qualities of the three groups of active power acquisition data are all normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data; When the channel quality of at least two groups of active power acquisition data is normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data; When the channel quality of at least one group of active power acquisition data is normal, the optimal active power is determined based on the channel quality of the active power acquisition data.

2. The method according to claim 1, It is characterized in that When the channel qualities of the three groups of active power acquisition data are all normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data, including: When the channel qualities of the three groups of active power acquisition data are all normal, the active power deviation between any two groups is calculated to obtain a first active power deviation, a second active power deviation and a third active power deviation; Performing judgment based on the first active power deviation, the second active power deviation, the third active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results; The optimal active power is obtained by comparing the deviations from the average values.

3. The method according to claim 2, It is characterized in that The step of making a judgment based on the first active power deviation, the second active power deviation, the third active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results, includes: When the first active power deviation, the second active power deviation and the third active power deviation are all less than the active power deviation threshold, calculating the first type average value deviation of the active power collection data Y1, the first type average value deviation of the active power collection data Y2 and the first type average value deviation of the active power collection data Y3; When the third active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the third active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, calculate the second type of average value deviation of the active power acquisition data Y2 and the second type of average value deviation of the active power acquisition data Y3; When the first active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the first active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, calculate the second type of average value deviation of the active power collection data Y1 and the third type of average value deviation of the active power collection data Y2; When the second active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, or the second active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, the third type of average value deviation of the active power collection data Y1 and the third type of average value deviation of the active power collection data Y3 are calculated.

4. The method according to claim 3, It is characterized in that The comparing based on the mean value deviation to obtain the optimal active power includes: When the first active power deviation, the second active power deviation and the third active power deviation are all smaller than the active power deviation threshold, a comparison is performed based on the first type average value deviation of the active power acquisition data Y1, the first type average value deviation of the active power acquisition data Y2 and the first type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power; When the third active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the third active power deviation is less than the active power deviation threshold and the first active power deviation is greater than the active power deviation threshold, a comparison is performed based on the second type of average value deviation of the active power acquisition data Y2 and the second type of average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power; When the first active power deviation is less than the active power deviation threshold and the second active power deviation is greater than the active power deviation threshold, or when the first active power deviation is less than the active power deviation threshold and the third active power deviation is greater than the active power deviation threshold, a comparison is performed based on the second type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y2, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power; When the second active power deviation is smaller than the active power deviation threshold and the first active power deviation is larger than the active power deviation threshold, or the second active power deviation is smaller than the active power deviation threshold and the third active power deviation is larger than the active power deviation threshold, a comparison is made based on the third category average value deviation of the active power acquisition data Y1 and the third category average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

5. The method according to claim 1, It is characterized in that When the channel quality of at least two groups of active power acquisition data is normal, the optimal active power is determined according to the active power deviation between any two groups of active power acquisition data and the average value deviation of each group of active power acquisition data, including: When the channel qualities of at least two groups of active power acquisition data are all normal, the active power deviation between any two groups is calculated to obtain a fourth active power deviation, a fifth active power deviation and a sixth active power deviation; Performing judgment based on the fourth active power deviation, the fifth active power deviation, the sixth active power deviation and the active power deviation threshold, and calculating the average value deviation under different judgment results respectively based on different judgment results; The optimal active power is obtained by comparing the deviations from the average values.

6. The method according to claim 5, It is characterized in that The judging based on the fourth active power deviation, the fifth active power deviation, the sixth active power deviation and the active power deviation threshold, and respectively calculating the average value deviation under different judgment results based on different judgment results, include: When the sixth active power deviation is less than the active power deviation threshold, calculating the second type average value deviation of the active power collection data Y2 and the second type average value deviation of the active power collection data Y3; When the fifth active power deviation is less than the active power deviation threshold, calculating the third type average value deviation of the active power collection data Y1 and the third type average value deviation of the active power collection data Y3; When the fourth active power deviation is less than the active power deviation threshold, the second type average value deviation of the active power collection data Y1 and the third type average value deviation of the active power collection data Y2 are calculated.

7. The method according to claim 6, It is characterized in that The comparing based on the mean value deviation to obtain the optimal active power includes: When the sixth active power deviation is less than the active power deviation threshold, a comparison is performed based on the second type average value deviation of the active power acquisition data Y2 and the second type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power; When the fifth active power deviation is less than the active power deviation threshold, a comparison is performed based on the third type average value deviation of the active power acquisition data Y1 and the third type average value deviation of the active power acquisition data Y3, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power; When the fourth active power deviation is smaller than the active power deviation threshold, a comparison is made based on the second type of average value deviation of the active power acquisition data Y1 and the third type of average value deviation of the active power acquisition data Y2, and the active power acquisition data corresponding to the smallest average value deviation is taken as the optimal active power.

8. A device for selecting one of three active power signals of a hydro-generator set, It is characterized in that include: An acquisition unit is used to acquire three groups of active power acquisition data, namely, Y1, Y2 and Y3; A confirmation unit, used to confirm the optimal active power based on the channel quality of the active power collection data; Wherein, the confirmation unit comprises: A first confirmation subunit is used to confirm the optimal active power according to the active power deviation between any two groups of active power collection data and the average value deviation of each group of active power collection data when the channel qualities of the three groups of active power collection data are all normal; A second confirmation subunit is used to confirm the optimal active power according to the active power deviation between any two groups of active power collection data and the average value deviation of each group of active power collection data when the channel quality of at least two groups of active power collection data is normal; The third confirmation subunit is used to confirm the optimal active power based on the channel quality of the active power collection data when the channel quality of at least one group of active power collection data is normal.

9. A computer-readable storage medium, It is characterized in that The storage medium stores computer instructions, which, when executed on a computer, enable the computer to execute the method according to any one of claims 1 to 7.

10. An electronic device, It is characterized in that include: Memory and processor; The memory is used to store computer instructions; The processor is used to call the computer instructions stored in the memory so that the electronic device executes the method as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Clustering method and device of transient power angle stable assessment historic data

    CN110323743A

  • Safe and reliable hydroelectric generating set power signal processing system and method

    CN116879624A

  • Fault judgment system for abnormal data acquisition of power transmitter

    CN118151002A

  • Computed tomography (CT) image reconstruction from polychromatic projection data

    US20220292736A1

  • Stored-energy calling method and apparatus for wind power, and device and medium

    WO2024066196A1

Cited By

  • One-out-of-three selection method for active power signals of hydro-turbine generator set, and related device

    WO2026045011A1