Adjustable efficient concentrated compressed air supply system and method

The first air compressor is driven by the gas turbine, the waste heat boiler generates steam, the back press drives the second air compressor, and the combined driving of the motor generator and the back press is used to solve the problem of unstable compressed air demand in the prior art. Power fluctuation issues achieve efficient and flexible compressed air system.

CN119084151APending Publication Date: 2024-12-06ZHEJIANG GAS&THERMOELECTRICITY DESIGN INST CO LTD

Patent Information

Application Number
CN202411298544.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

When the compressed air demand for existing centralized compressed air systems is unstable, the power fluctuations of a single drive source lead to insufficient or excessive power and lack flexibility.

Method used

The first air compressor is driven by a gas turbine, and steam is generated through the waste heat boiler. The steam is distributed evenly in the cylinders. The backpressor drives the second air compressor. The motor generator and the backpressor are driven jointly, and the clutch and the motor generator are automatically adjusted. The power difference enables the system to be flexible and adjustable.

Benefits of technology

Improve system efficiency, reduce intermediate losses in energy conversion, achieve flexible response to compressed air demand, and enhance system adjustability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084151A_ABST
    Figure CN119084151A_ABST
Patent Text Reader

Abstract

The invention discloses an adjustable efficient concentrated compressed air supply system and method, and relates to the technical field of natural gas energy. A heat accumulator; a steam header; a back pressure machine; a second air compressor; a first air compressor; provided is a motor generator. According to the adjustable and efficient concentrated compressed air supply system and method, through the scheme that the gas turbine directly drives the first air compressor and the steam-electricity double-drive air compressor, compared with a conventional technical means of an electric air compressor, the energy conversion frequency and loss are reduced as much as possible, the system efficiency is effectively improved, and the energy consumption is reduced. The adjustment of the power of the second air compressor and the change of the steam admission amount of the back pressure turbine can bring about four working conditions, and the power difference of the two working conditions is automatically adjusted and matched through the clutch and the motor generator, so that the whole system is flexible and adjustable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of natural gas energy technology, and in particular to an adjustable and efficient centralized compressed air supply system and method. Background Art

[0002] The centralized compressed air integrated supply system uses steam or electricity in thermal power plants or natural gas distributed energy stations to drive compressed air units. By sharing compressed air resources, it optimizes the allocation of existing resources, realizes Pareto improvement of resources, and helps gas-using enterprises reduce pollution and carbon emissions, increase efficiency and accelerate green transformation and development. Compared with small decentralized air compressor stations, the centralized compressed air integrated supply system has the characteristics of lower unit gas production cost, smaller air compressor station area, and less energy consumption. For large industrial parks and industrial groups, the construction of centralized compressed air supply projects instead of decentralized air compressor station construction is an inevitable industry development trend. However, the system efficiency of centralized compressed air integrated supply and the adjustability of steam and gas co-supply need to be further improved.

[0003] In conjunction with publication number CN113217899A, publication date 2021-08-06, a comprehensive energy station and operation scheduling method for actively regulating the load of a steam network is disclosed, including a steam pipe, a steam air compressor, a compressed air storage tank, a hot water storage tank and a control system; the steam pipe is connected to the inlet of the steam air compressor through a first pipe, and a first electric valve is provided on the first pipe; the inlet of the compressed air storage tank is connected to the outlet of the steam air compressor through a steam pipe, for receiving compressed air from the steam air compressor; the outlet of the compressed air storage tank is connected to a compressed air user through a second pipe, and a second electric valve is provided on the second pipe.

[0004] However, the existing technologies including the above-mentioned technologies mainly use a single steam-driven air compressor or an electric-driven air compressor. When the demand for compressed air is unstable, the fluctuating power demand of the air compressor may cause the single driving source to have insufficient or excessive power, which is not flexible enough. Summary of the invention

[0005] The object of the present invention is to provide an adjustable and efficient centralized compressed air supply system and method to solve the above-mentioned problems.

[0006] In order to achieve the above-mentioned object, the present invention provides the following technical solutions: an adjustable and efficient centralized compressed air supply system and method, comprising a gas turbine connected to a waste heat boiler to generate steam;

[0007] Regenerators, which are used to store excess steam;

[0008] The steam sub-cylinder is used to receive and evenly distribute the steam output by the waste heat boiler, and the steam sub-cylinder is connected to a heating end;

[0009] back press, which is driven by steam;

[0010] A second air compressor, which is driven by the back pressure machine and connected to the air supply end;

[0011] A first air compressor, which is driven by the gas turbine and connected to an air supply end;

[0012] The electric generator is connected to the back compressor through a clutch, and the excess electricity generated is supplied to the power supply end or the power grid is used to supplement the electricity when the back compressor is insufficient to jointly drive the second air compressor;

[0013] Wherein, the steam exhaust port of the back pressure machine is connected with the steam cylinder.

[0014] As a preferred embodiment, it also includes:

[0015] A first pipeline connected between the waste heat boiler and the steam cylinder;

[0016] A second pipeline connected between the waste heat boiler and the heat accumulator;

[0017] Connected between the heat accumulator and the back pressure machine and the third pipeline;

[0018] A fourth pipeline connected between the waste heat boiler and the back pressure machine;

[0019] Wherein, the first pipeline, the second pipeline and the third pipeline are respectively provided with a first valve, a second valve and a third valve.

[0020] Preferably, it also includes a heating monitoring and control unit which is arranged at the heating end and is used to detect heating fluctuations, and which is connected to the first valve, the second valve and the third valve through signals.

[0021] Preferably, the clutch is a clutch gearbox that performs adaptive adjustment according to the power difference between the electric generator and the back pressure machine.

[0022] Preferably, the back pressure machine is a back pressure steam turbine.

[0023] Preferably, the second air compressor is a steam-electric dual-drive air compressor.

[0024] Preferably, it also includes an air supply monitoring and control unit which is arranged at the air supply end and is used to detect the pressure of the compressed air network, and is connected to the second air compressor via a signal.

[0025] Preferably, the waste heat boiler is a double-pressure waste heat boiler.

[0026] Preferably, a steam pressure detection unit is provided on the waste heat boiler.

[0027] An adjustable and efficient centralized compressed air supply method, used in the above-mentioned adjustable and efficient centralized compressed air supply system, comprises the following steps:

[0028] Step 1: The natural gas in the gas turbine is mixed with the compressed air and burned to generate high-temperature and high-pressure gas that expands and performs work to drive the first air compressor. The compressed air generated in the first air compressor is directly supplied to the air supply end;

[0029] Step 2: The waste heat boiler converts the high-temperature and high-pressure gas in the gas turbine into high-pressure and low-pressure steam, and directly transports the low-pressure steam to the steam cylinder;

[0030] Step 3: The high-pressure steam in the waste heat boiler is divided into two paths. The first path enters the back pressure machine and is used in stages to drive the second air compressor to do work. The clutch detects and feeds back the speed of the back pressure machine and the electric generator and automatically engages and disengages. When the steam driving force of the second air compressor is sufficient, the clutch drives the electric generator to generate electricity and inputs the excess electricity into the power supply end. When the steam driving force of the second air compressor is insufficient, the electric generator and the back pressure machine jointly drive the second air compressor. The second path enters the heat accumulator to store excess heat.

[0031] Step 4: The back pressure machine utilizes the steam in the waste heat boiler in a cascade manner, so that the steam is converted into low-pressure steam and input into the steam cylinder;

[0032] Step 5: The steam cylinders are divided to deliver low-pressure steam to the heating end;

[0033] Step 6: The second air compressor compresses the air and delivers it to the air supply end.

[0034] In the above technical scheme, the present invention provides an adjustable and efficient centralized compressed air supply system and method, which has the following beneficial effects: first, the gas turbine directly drives the first air compressor. Compared with the electric air compressor (the gas turbine generates electricity and then drives the air compressor through the electric motor), there is only one energy conversion, which is highly efficient; second, compared with the conventional technical means that all steam first drives the generator to generate electricity, is connected to the grid to the factory electricity, and then drives the air compressor through the motor, the steam-electric dual-drive air compressor scheme gives priority to steam-driven air compressors. Only when the steam drive power is greater than the power required by the air compressor, there is a state where excess steam is used for power generation. Only a small amount of excess steam has two energy conversions, and most of it is directly driven by steam drive to drive the air compressor, thereby eliminating the intermediate loss of this part of the energy conversion; third, the adjustment of the power of the second air compressor and the change of the steam intake of the back pressure machine will bring about four working conditions. Relying on the clutch and the electric generator to automatically adjust and match the power difference between the two under the four working conditions, the entire system is flexible and adjustable. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0036] Figure 1 A schematic flow chart of an adjustable and efficient centralized compressed air supply system and method provided in an embodiment of the present invention.

[0037] Description of reference numerals:

[0038] 1. Gas turbine; 2. Waste heat boiler; 3. Cylinder; 4. Regenerator; 5. Back pressure machine; 7. Second air compressor; 8. Clutch; 9. Generator; 10. First valve; 11. Second valve; 12. Third valve; 14. First air compressor;

[0039] a, first pipeline; b, second pipeline; c, third pipeline. DETAILED DESCRIPTION

[0040] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0041] like Figure 1 As shown, an adjustable and efficient centralized compressed air supply system comprises a gas turbine 1, which is connected to a waste heat boiler 2 to generate steam;

[0042] A heat accumulator 4 for storing excess steam;

[0043] The steam sub-cylinder 3 is used to receive and evenly distribute the steam output by the waste heat boiler 2, and the steam sub-cylinder 3 is connected to a heating end;

[0044] a back pressure machine 5, which is driven by steam;

[0045] A second air compressor 7, which is driven by the back pressure machine 5 and connected to the air supply end;

[0046] A first air compressor 14, which is driven by the gas turbine 1 and connected to an air supply end;

[0047] The electric generator 9 is connected to the back compressor 5 through the clutch 8, and the excess electricity generated is supplied to the power supply end or the power grid is used to supplement the electric energy when the back compressor is insufficient to jointly drive the second air compressor 7;

[0048] The steam outlet of the back pressure machine 5 is connected to the steam cylinder 3 .

[0049] Specifically, a pipeline is connected between the waste heat boiler 2 and the back pressure machine 5, so that the high-pressure steam first enters the steam inlet of the back pressure machine 5 through the pipeline, and the excess steam enters the heat accumulator 4 to be stored, and the high-pressure steam is converted into low-pressure steam after the step utilization of the back pressure machine 5, and then enters the steam cylinder 3 through the steam exhaust port of the back pressure machine 5.

[0050] like Figure 1 As shown, an adjustable and efficient centralized compressed air supply method is applied to the above-mentioned adjustable and efficient centralized compressed air supply system, comprising the following steps:

[0051] Step 1: The natural gas in the gas turbine 1 is mixed with the compressed air and burned to generate high-temperature and high-pressure gas that expands and performs work to drive the first air compressor 14. The compressed air generated in the first air compressor 14 is directly supplied to the air supply end;

[0052] Step 2: The waste heat boiler 2 uses the high-temperature flue gas in the gas turbine 1 to heat the desalted water and convert it into high-pressure and low-pressure steam, and directly transports the low-pressure steam to the steam cylinder 3;

[0053] Step 3: The high-pressure steam in the waste heat boiler 2 is divided into two paths. The first path enters the back pressure machine 5 and is used in stages to drive the second air compressor 7 to do work. The clutch 8 detects and feeds back the rotation speed of the back pressure machine 5 and the electric generator 9 and automatically engages and disengages. When the steam driving force of the second air compressor 7 is sufficient, the clutch 8 drives the electric generator 9 to generate electricity and inputs the excess electricity into the power supply end. When the steam driving force of the second air compressor 7 is insufficient, the electric generator 9 and the back pressure machine 5 jointly drive the second air compressor 7. The second path enters the heat accumulator 4 to store excess heat.

[0054] Step 4: The back pressure machine 5 utilizes the steam in the waste heat boiler 2 in a stepwise manner, so that the steam is converted into low-pressure steam and input into the steam cylinder 3;

[0055] Step 5, the steam cylinder 3 delivers the low-pressure steam to the heating end;

[0056] Step 6: The second air compressor 7 compresses the air and delivers it to the air supply end.

[0057] Specifically, the gas turbine 1 always maintains a high load condition operation, the flue gas generated in the gas turbine 1 enters the waste heat boiler 2 to heat the desalted water and generate steam, and there are four operating conditions at this time: First, when the heating supply is low and the gas supply is peak, the high-pressure steam in the waste heat boiler 2 first enters the back pressure machine 5 through the pipeline, and the excess steam enters the heat accumulator 4 and is stored. At this time, the steam drive power of the high-pressure steam to the back pressure machine 5 is not enough to drive the second air compressor 7 to meet the gas supply demand, and the electric generator 9 and the back pressure machine 5 need to be jointly driven to drive the second air compressor 7; Second, when the heating supply is low and the gas supply is low, the high-pressure steam is stored in the heat accumulator 4, and the clutch 8 is adjusted according to the power difference between the back pressure machine 5 and the electric generator 9, and automatically engages or disengages. When the steam drive power of the back pressure machine 5 is insufficient, the electric generator 9 is an electric motor, and jointly drives the second air compressor 7 with the back pressure machine 5. When the steam drive power is excessive, the electric generator 9 is a generator. The back pressure machine 5 drives the electric generator 9 to generate electricity, and transmits the excess electricity to the power supply end; third, heating peak + gas supply valley, the heat accumulator 4 releases high-pressure steam into the back pressure machine 5, and the high-pressure steam in the waste heat boiler 2 is combined to drive the back pressure machine 5. The power of the back pressure machine 5 is greater than the power required by the second air compressor 7, and the excess power is used to drive the electric generator 9 to generate electricity; fourth, heating peak + gas supply peak, the heat accumulator 4 releases high-pressure steam into the back pressure machine 5, and the high-pressure steam in the waste heat boiler 2 is combined to drive the back pressure machine 5. The clutch 8 is adjusted according to the power difference between the back pressure machine 5 and the electric generator 9, and automatically engages or disengages. When the steam drive power of the back pressure machine 5 is insufficient, the electric generator 9 is an electric motor, and the second air compressor 7 is driven together with the back pressure machine 5. When the steam drive power is excessive, the electric generator 9 is a generator, and the back pressure machine 5 drives the electric generator 9 to generate electricity, and transmits the excess electricity to the power supply end.

[0058] In the above technology, the gas turbine 1 directly drives the first air compressor 14. Compared with the electric air compressor (the gas turbine generates electricity and then drives the air compressor through the electric motor), there is only one energy conversion, which is highly efficient. Compared with the conventional technical means that all steam first drives the generator to generate electricity, is connected to the grid to the factory electricity, and then drives the air compressor through the motor, the steam-electric dual-drive air compressor solution gives priority to steam-driven air compressors. Only when the steam drive power is greater than the power required by the air compressor, there is a state where excess steam is used for power generation. Only a small amount of excess steam has two energy conversions, and most of it is directly driven by steam drive to drive the air compressor, thereby eliminating the intermediate loss of this part of the energy conversion. The adjustment of the power of the second air compressor 7 and the change of the steam intake of the back compressor will bring about four working conditions. Relying on the clutch 8 and the electric generator 9 to automatically adjust and match the power difference between the two under the four working conditions, the entire system is flexible and adjustable.

[0059] As an embodiment further provided by the present invention, it also includes:

[0060] A first pipeline a connected between the waste heat boiler 2 and the steam cylinder 3;

[0061] A second pipeline b connected between the waste heat boiler 2 and the heat accumulator 4;

[0062] Connected between the heat accumulator 4 and the back pressure machine 5 and the third pipeline c;

[0063] A fourth pipeline d connected between the waste heat boiler 2 and the back pressure machine 5;

[0064] The first pipeline a, the second pipeline b and the third pipeline c are respectively provided with a first valve 10, a second valve 11 and a third valve 12.

[0065] Specifically, when the heating supply is at a low point (heat consumption is at a low point), the first valve 10 is lowered according to demand, the third valve 12 is closed, and the second valve 11 is opened. At this time, the high-pressure steam generated in the waste heat boiler 2 drives the back pressure machine 5 preferentially through the fourth pipeline d, and the excess steam generated enters the heat accumulator 4 through the second pipeline b and is stored.

[0066] During the peak of heating supply (peak of heat consumption), the second valve 11 is closed or lowered, so that the first valve 10 and the third valve 12 are opened. At this time, the low-pressure steam generated in the waste heat boiler 2 enters the sub-cylinder 3 through the first pipeline a. When the steam driving force of the back pressure machine 5 is insufficient, the heat accumulator 4 supplies steam to the back pressure machine 5 through the third pipeline c. The back pressure machine 5 utilizes the steam in stages to convert the high-pressure steam into low-pressure steam to supply steam to the sub-cylinder 3.

[0067] As another embodiment further provided by the present invention, it also includes a heating monitoring and control unit arranged at the heating end and used to detect heating fluctuations, which is connected to the first valve 10, the second valve 11 and the third valve 12 through signals.

[0068] Specifically, a control program is provided in the heating end monitoring and control unit, including a metering unit for detecting external heating demand, which can be a pressure detector arranged in the heating network, or a flow meter for detecting the flow at the output end of the cylinder 3, or a metering unit known to technicians in this field.

[0069] Furthermore, when the temperature detector detects that the pressure of the heating network is low (lower than the design pressure value), or the flow meter detects that the flow rate at the output end of the cylinder 3 is lower than the average value, that is, the current heating peak period, the second valve 11 is controlled or shut down and lowered, so that the first valve 10 and the third valve 12 are open; and when the pressure of the heating network is high (higher than the design pressure value), or the flow rate at the output end is higher than the average value, it is the heating trough period, the first valve 10 is lowered, the third valve 12 is closed, and the second valve 11 is opened.

[0070] As another embodiment further provided by the present invention, the clutch 8 is a clutch gear box that performs adaptive adjustment according to the power difference between the electric generator 9 and the back pressure machine 5 .

[0071] Specifically, the clutch 8 controls the speed difference between the electric generator 9 and the back compressor 5, so that the clutch 8 is engaged or disengaged. When the steam drive power of the back compressor 5 is greater than the power required by the second air compressor 7, the second air compressor 7 drives the electric generator 9 to generate electricity through the clutch 8 to supplement the power supply end. When the steam drive power of the back compressor 5 is lower than the power required by the second air compressor 7, the back compressor 5 will only drive the second air compressor 7. At the same time, the motor 9 outputs power through the engaged clutch 8, and drives the second air compressor 7 together with the back compressor 5. The clutch 8 in operation is equivalent to a transmission shaft, and there is almost no power loss.

[0072] As another embodiment further provided by the present invention, the back pressure machine 5 is a back pressure steam turbine.

[0073] Specifically, the back-pressure steam turbine can utilize the higher pressure level steam discharged from the waste heat boiler 2 to convert mechanical energy or electrical energy, and reduce it to lower pressure steam, thereby realizing the cascade utilization of high-pressure steam, and then supplying the sub-cylinder 3 requiring a lower pressure level to meet the heating demand.

[0074] As another embodiment further provided by the present invention, the second air compressor 7 is a steam-electric dual-drive air compressor.

[0075] Specifically, the second air compressor 7 adopts a steam-electric dual-drive air compressor, and realizes multiple operating modes of electric, steam-driven, and steam-electric dual-drive through the cooperation of the back compressor 5, the clutch 8 and the electric generator 9. Steam is preferentially used to drive the second air compressor 7. Only when the steam-driven power is greater than the power required by the second air compressor 7, there is excess steam for power generation. Compared with all the steam first driving the generator to generate electricity, connected to the grid for factory electricity, and then driving the air compressor through the motor, both of which undergo two energy conversions, the steam-electric dual-drive air compressor solution only has a small amount of excess steam that has two energy conversions, and most of it is directly driven by steam drive to drive the second air compressor 7, thereby eliminating the intermediate loss of this part of energy conversion.

[0076] As another embodiment further provided by the present invention, it also includes an air supply monitoring and control unit arranged at the air supply end and used to detect the pressure of the compressed air pipeline network, which is connected to the second air compressor 7 through a signal.

[0077] Specifically, the pressure of the compressed air network is detected by the air supply monitoring and control unit. If the pressure is higher than the preset value, it is a gas consumption peak, and the power or speed of the second air compressor 7 should be increased. If the pressure is higher than the preset value, it is a gas consumption trough, and the power or speed of the second air compressor 7 should be reduced, thereby determining the power difference between the back compressor 5 and the back compressor 5.

[0078] As another embodiment further provided by the present invention, the waste heat boiler 2 is a double-pressure waste heat boiler.

[0079] Specifically, the waste heat boiler 2 has the ability to provide high-pressure and low-pressure steam at the same time. On this basis, a steam pressure detection unit is provided on the waste heat boiler 2 to detect whether the current pressure is consistent with the preset pressure. Under normal operating conditions, low-pressure steam passes through the sub-cylinder 3, and high-pressure steam first enters the steam turbine 5 for power generation, and then is converted into low-pressure steam and enters the sub-cylinder 3, which is a gas turbine combined cycle system, which can greatly improve the power generation efficiency of the entire system (the combined cycle system can convert more electrical energy, which is a high-quality energy, and the power generation efficiency is 20% higher than that of the traditional coal-fired thermal power generation system, and can reach up to 64%). After calculation, the high-pressure steam pressure is between 7.0-9.8MPa, and the system investment and operation economy are the highest.

[0080] Furthermore, the accumulator 4 is a high-pressure accumulator. The cost of a steam accumulator is generally proportional to its volume. Affected by manufacturing and transportation conditions, the volume of a single accumulator should not be greater than 150m3. 3 The higher the steam pressure entering the heat accumulator, the higher the heat storage capacity per unit volume of saturated water, that is, the heat accumulator of the same volume can store more heat. When the heating supply is low, part of the high-pressure steam is stored in the heat accumulator 4; when the heating supply is high, the high-pressure steam is released through the heat accumulator 4, and combined with the high-pressure steam generated by the waste heat boiler 2, it enters the steam turbine 5 for cascade utilization and power generation, and then generates low-pressure steam for external heating.

[0081] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. An adjustable and efficient centralized compressed air supply system, characterized in that: include: A gas turbine (1) connected to a waste heat boiler (2) for generating steam; A heat accumulator (4) for storing excess steam; A steam sub-cylinder (3) is used to receive and evenly distribute the steam output by the waste heat boiler (2), and the steam sub-cylinder (3) is connected to a heating end; a back compressor (5), which is driven by steam; A second air compressor (7), which is driven by the back pressure machine (5) and is connected to an air supply end; A first air compressor (14), which is driven by the gas turbine (1) and is connected to an air supply end; An electric generator (9) is connected to the back compressor (5) through a clutch (8), and the excess electricity generated is supplied to the power supply end or the power grid is used to supplement the electricity when the back compressor is insufficient to jointly drive the second air compressor (7); The steam outlet of the back pressure machine (5) is connected to the steam cylinder (3).

2. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: Also includes: A first pipeline (a) connected between the waste heat boiler (2) and the steam cylinder (3); A second pipeline (b) connected between the waste heat boiler (2) and the heat accumulator (4); Connected between the heat accumulator (4) and the back pressure machine (5) and the third pipeline (c); a fourth pipeline (d) connected between the waste heat boiler (2) and the back pressure machine (5); Wherein, the first pipeline (a), the second pipeline (b), and the third pipeline (c) are respectively provided with a first valve (10), a second valve (11), and a third valve (12).

3. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: It also includes a heating monitoring and control unit which is arranged at the heating end and is used to detect heating fluctuations, and is connected to the first valve (10), the second valve (11) and the third valve (12) via signals.

4. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: The clutch (8) is a clutch gearbox that performs adaptive adjustment according to the power difference between the electric generator (9) and the back pressure machine (5).

5. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: The back pressure machine (5) is a back pressure steam turbine.

6. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: The second air compressor (7) is a steam-electric dual-drive air compressor.

7. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: It also includes an air supply monitoring and control unit which is arranged at the air supply end and is used to detect the pressure of the compressed air network, and is connected to the second air compressor (7) via a signal.

8. The adjustable and efficient centralized compressed air supply system according to claim 1, characterized in that: The waste heat boiler (2) is a double-pressure waste heat boiler.

9. The adjustable and efficient centralized compressed air supply system according to claim 8, characterized in that: The waste heat boiler (2) is provided with a steam pressure detection unit.

10. An adjustable and efficient centralized compressed air supply method, characterized in that: The adjustable and efficient centralized compressed air supply system for any one of items 1 to 9 comprises the following steps: Step 1: Natural gas in the gas turbine (1) is mixed with compressed air and burned to generate high-temperature and high-pressure gas that expands and performs work to drive the first air compressor (2); the compressed air generated in the first air compressor (2) is directly supplied to the air supply end; Step 2: The waste heat boiler (2) converts the high-temperature and high-pressure gas in the gas turbine (1) into high-pressure and low-pressure steam, and directly transports the low-pressure steam to the steam cylinder (3); Step 3: The high-pressure steam in the waste heat boiler (2) is further divided into two paths. The first path enters the back pressure machine (5) and is used in stages to drive the second air compressor (7) to perform work. The clutch (8) detects and feeds back the rotation speed of the back pressure machine (5) and the electric generator (9) and automatically engages and disengages, so that when the steam driving force of the second air compressor (7) is sufficient, the clutch (8) drives the electric generator (9) to generate electricity and inputs the excess electricity to the power supply end. When the steam driving force of the second air compressor (7) is insufficient, the electric generator (9) and the back pressure machine (5) jointly drive the second air compressor (7); the second path enters the heat accumulator (4) to store excess heat. Step 4: The back pressure machine (5) performs cascade utilization on the steam in the waste heat boiler (2), so that the steam is converted into low-pressure steam and input into the steam cylinder (3); Step 5: The steam cylinder (3) delivers the low-pressure steam to the heating end; Step 6: The second air compressor (7) compresses the air and delivers it to the air supply end.

Citation Information

Patent Citations

  • Comprehensive energy station for actively regulating and controlling load of steam pipe network and operation scheduling method

    CN113217899A

Cited By

  • Power generation system integrating gas-steam combined cycle and compressed air energy storage

    CN120083576A