Air preheater system and working method thereof
Through the two-part slewing and two-stage tube air preheater combination system, the adjustment baffle and real-time temperature detection are used to solve the problems of air preheater blockage and high smoke exhaust temperature, and the flexible adjustment of smoke exhaust temperature is achieved. and the improvement of boiler efficiency.
Patent Information
- Application Number
- CN202411308467.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-12-06
AI Technical Summary
The existing air preheaters are easily blocked after being put into use in the denitrification system, resulting in an increase in air leakage rate and an increase in smoke exhaust temperature, which affects the boiler efficiency and load capacity. In addition, conventional solutions increase steam use and smoke exhaust temperature, making it difficult to effectively adjust. .
The combination system of two-part slewing air preheater and two-stage tube air preheater is adopted. The air volume of primary and secondary air is controlled by adjusting the baffle, the smoke exhaust temperature is detected in real time, and the heat exchange of flue gas and air is adjusted. , ensure that the smoke exhaust temperature is within the preset range, prevent blockage and reduce smoke exhaust loss.
It realizes flexible adjustment of smoke exhaust temperature, reduces smoke exhaust loss, improves boiler efficiency, reduces air leakage rate and auxiliary machinery power consumption, avoids the use of steam air heaters, and extends the service life of the air preheater.
Smart Images

Figure CN119084981A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of air preheaters, and more particularly to an air preheater system and a working method thereof. Background Art
[0002] In order to reduce the exhaust gas temperature, improve the boiler efficiency and increase the combustion air temperature, thermal power plants are equipped with air preheaters. The main forms of air preheaters are tubular air preheaters and rotary air preheaters. These two types of air preheaters have their own advantages and disadvantages. The advantages of tubular air preheaters are low air leakage and not easy to be blocked by ash; the disadvantages are heavy weight and easy corrosion in the low temperature section. The advantages of rotary air preheaters are small metal consumption, strong heat transfer capacity, and easy soot blowing and water washing during operation; the disadvantages are high air leakage and serious blockage after the denitrification system is put into use.
[0003] Due to the above characteristics, tubular air preheaters are widely used below 200MW, and rotary air preheaters are widely used above 300MW. In recent years, due to environmental protection requirements, after the ammonia denitrification system was put into use, the ammonia escape of the SCR (English full name: Selective Catalytic Reduction, Chinese full name: Selective Catalytic Reduction) denitrification system reacted with sulfur trioxide in the flue gas to form ammonium bisulfate, resulting in prominent air preheater blockage problems, resulting in increased air leakage rate of the air preheater and increased exhaust gas temperature, affecting the unit's economy, and in severe cases limiting the unit's load capacity. In order to prevent the air preheater from being blocked, it is necessary to use a heater for a long time, which increases the use of steam and causes the exhaust gas temperature to rise.
[0004] Among the heat losses that affect boiler efficiency, the largest proportion is exhaust loss. The main influencing factors of exhaust loss are flue gas volume and exhaust temperature. The flue gas volume is positively correlated with the boiler load and cannot be adjusted. The exhaust temperature is affected by the blockage of the air preheater, the dust collector, the desulfurization operation requirements, etc. The exhaust temperature of the conventional air preheater cannot be adjusted. A higher fixed temperature is used in the design, but at the same time, primary and secondary air heaters are required to preheat the cold air entering the air preheater when the exhaust temperature is insufficient under low load conditions and winter conditions, so as to increase the exhaust temperature and prevent the air preheater from being blocked. However, this setting will make the exhaust temperature too high.
[0005] Therefore, how to solve the problem of air preheater blockage and high exhaust gas temperature is an urgent problem to be solved by technical personnel in this field. Summary of the invention
[0006] In view of this, an object of the present invention is to provide an air preheater system, which can adjust the exhaust gas temperature during normal operation of the system to obtain the lowest exhaust gas temperature possible and achieve a higher boiler efficiency.
[0007] Another object of the present invention is to provide a working method comprising the above-mentioned air preheater system, which can adjust the exhaust gas temperature to obtain the lowest possible exhaust gas temperature.
[0008] In order to achieve the above object, the present invention provides the following technical solutions:
[0009] An air preheater system, comprising:
[0010] Two-compartment rotary air preheater for heat exchange between flue gas and secondary air;
[0011] A first-stage tubular air preheater and a second-stage tubular air preheater are used for heat exchange between flue gas and primary air. The first-stage tubular air preheater is arranged in the smoke exhaust channel of the two-compartment rotary air preheater, and the second-stage tubular air preheater is arranged in the smoke inlet channel of the two-compartment rotary air preheater. The input end of the first-stage tubular air preheater is connected with the air inlet channel of the primary air, and the output end of the first-stage tubular air preheater is connected with the second-stage tubular air preheater through the air outlet channel. The air inlet channel is connected with the air outlet channel through a bypass air duct, and the bypass air duct is provided with a first regulating baffle for adjusting the air volume of the primary air entering the first-stage tubular air preheater.
[0012] Preferably, it also includes a controller for controlling the operating status of the two-compartment rotary air preheater, the first-stage tubular air preheater, the second-stage tubular air preheater and the first regulating damper, and the two-compartment rotary air preheater, the first-stage tubular air preheater, the second-stage tubular air preheater and the first regulating damper are all connected to the controller signal.
[0013] Preferably, it also includes a temperature measuring device for real-time detection of the exhaust temperature, which is arranged in the exhaust passage and is connected to the controller signal.
[0014] Preferably, the two-compartment rotary air preheater includes a main body and a secondary air compartment and a hot air compartment arranged in the main body, the bottom of the secondary air compartment is connected to the secondary air inlet duct, the top of the secondary air compartment is connected to the air outlet duct, the top of the hot air compartment is connected to the smoke inlet channel, and the bottom of the hot air compartment is connected to the smoke exhaust channel.
[0015] Preferably, the secondary air after heat exchange in the two-compartment rotary air preheater enters the secondary air box through the air outlet duct.
[0016] Preferably, the air inlet channel is connected to the primary fan, the air inlet duct is connected to the air supply fan, and both the primary fan and the air supply fan are connected to the controller signal.
[0017] Preferably, the flue gas after heat exchange in the first-stage tubular air preheater enters the dust collector through the smoke exhaust channel, the dust collector is connected to the induced draft fan, and both the dust collector and the induced draft fan are connected to the controller signal.
[0018] Preferably, the primary air after heat exchange in the second-stage tubular air preheater is connected to the powder making system through the hot primary air main pipe, and a temperature regulating structure for controlling the temperature of the primary air after heat exchange in the second-stage tubular air preheater is provided in the air outlet channel.
[0019] Preferably, the temperature control structure includes a partition plate arranged on the periphery of the second-stage tubular air preheater and extending into the air outlet channel, the partition plate is used to separate the air outlet channel into an upper channel and a lower channel, the upper channel is provided with a second adjustment baffle for adjusting the primary air flow rate, and the second adjustment baffle is connected to the controller signal.
[0020] A working method of an air preheater system is applied to the above-mentioned air preheater system, and the working method comprises:
[0021] Controlling the operation of the air preheater system and controlling the first regulating damper and the second regulating damper to open;
[0022] When the controller receives the information that the exhaust gas temperature detected by the temperature measuring device reaches the first preset temperature value, the controller controls the opening of the first regulating damper to keep the exhaust gas temperature at the first preset temperature value;
[0023] When the pulverizing system is operating normally and the outlet temperature of the coal mill needs to be lowered, the second regulating damper is controlled to be closed;
[0024] When the smoke resistance of the air preheater system increases, the first regulating damper is controlled to open. When the controller receives the exhaust gas temperature detected by the temperature measuring device and the temperature rises to the second preset temperature, the controller starts timing and controls the first regulating damper to close after the timing reaches the preset time.
[0025] The air preheater system provided by the present invention includes a two-compartment rotary air preheater for heat exchange between flue gas and secondary air, and the heat of the flue gas is transferred to the secondary air through the two-compartment rotary air preheater to achieve preheating of the secondary air. It also includes a first-stage tubular air preheater and a second-stage tubular air preheater for heat exchange between flue gas and primary air, and the heat of the flue gas is transferred to the primary air through the first-stage tubular air preheater and the second-stage tubular air preheater to achieve preheating of the primary air. By arranging the first-stage tubular air preheater and the second-stage tubular air preheater, effective preheating of the primary air is achieved, and the utilization rate of the flue gas is improved.
[0026] The first-stage tubular air preheater is arranged in the smoke exhaust channel of the two-compartment rotary air preheater, and the second-stage tubular air preheater is arranged in the smoke inlet channel of the two-compartment rotary air preheater. The smoke passes through the second-stage tubular air preheater, the two-compartment rotary air preheater, and the first-stage tubular air preheater in sequence, and changes from a high-temperature state to a low-temperature state. The input end of the first-stage tubular air preheater is connected to the air inlet channel of the primary air, and the output end of the first-stage tubular air preheater is connected to the second-stage tubular air preheater through the air outlet channel. The primary air entering from the input end of the first-stage tubular air preheater is discharged from the output end after the first heat exchange, and undergoes a second heat exchange in the second-stage tubular air preheater through the air outlet channel to increase the temperature of the primary air after heat exchange, thereby improving the heat exchange effect of the primary air.
[0027] The air inlet channel is connected with the air outlet channel through a bypass air duct. The bypass air duct is provided with a first regulating damper for adjusting the air volume of the primary air entering the first-stage tubular air preheater. When the smoke resistance of the air preheater system increases, that is, when the air preheater system is blocked, the first regulating damper is opened to reduce the air volume of the primary air entering the first-stage tubular air preheater, thereby reducing the heat exchange capacity of the first-stage tubular air preheater, increasing the exhaust temperature, and volatilizing the ammonium bisulfate blocking the air preheater system, thereby promoting the falling off of accumulated ash. When the system is operating normally, the first regulating damper is closed to increase the heat exchange capacity of the first-stage tubular air preheater and reduce the exhaust temperature. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0029] Figure 1 A schematic diagram of the structure of the air preheater system provided by the present invention;
[0030] Figure 2 A top view of the two-compartment rotary air preheater provided by the present invention;
[0031] Figure 3 This is a step diagram of the working method of the air preheater system provided by the present invention.
[0032] Reference numerals:
[0033] 1-two-compartment rotary air preheater, 101-sealing plate, 102-heat storage element; 2-first-stage tubular air preheater; 3-second-stage tubular air preheater; 4-smoke exhaust channel; 5-smoke inlet channel; 6-air inlet channel; 7-air outlet channel; 8-bypass air duct; 9-first regulating baffle; 10-air inlet duct; 11-air outlet duct; 12-primary fan; 13-air supply fan; 14-hot primary air main pipe; 15-temperature adjustment structure, 151-partition plate, 152-second regulating baffle. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] It should be noted that the directional words such as "upper" and "lower" mentioned below are defined based on the drawings in the specification.
[0037] The core of the present invention is to provide an air preheater system, which can adjust the exhaust gas temperature when the system is operating normally to obtain the lowest exhaust gas temperature possible and achieve a higher boiler efficiency. Another core of the present invention is to provide a working method including the above air preheater system, which can adjust the exhaust gas temperature to obtain the lowest exhaust gas temperature possible.
[0038] Please refer to Figure 1 An air preheater system includes a two-compartment rotary air preheater 1 for heat exchange between flue gas and secondary air, through which the heat of the flue gas is transferred to the secondary air to achieve preheating of the secondary air, and also includes a first-stage tubular air preheater 2 and a second-stage tubular air preheater 3 for heat exchange between flue gas and primary air, through which the heat of the flue gas is transferred to the primary air to achieve preheating of the primary air. By arranging the first-stage tubular air preheater 2 and the second-stage tubular air preheater 3, effective preheating of the primary air is achieved, and the utilization rate of the flue gas is improved.
[0039] The first-stage tubular air preheater 2 is arranged in the smoke exhaust channel 4 of the two-compartment rotary air preheater 1, and the second-stage tubular air preheater 3 is arranged in the smoke inlet channel 5 of the two-compartment rotary air preheater 1. The smoke passes through the second-stage tubular air preheater 3, the two-compartment rotary air preheater 1, and the first-stage tubular air preheater 2 in sequence, and changes from a high-temperature state to a low-temperature state. The input end of the first-stage tubular air preheater 2 is connected to the air inlet channel 6 of the primary air, and the output end of the first-stage tubular air preheater 2 is connected to the second-stage tubular air preheater 3 through the air outlet channel 7. The primary air entering from the input end of the first-stage tubular air preheater 2 is discharged from the output end after the first heat exchange, and undergoes a second heat exchange in the second-stage tubular air preheater 3 through the air outlet channel 7 to increase the temperature of the primary air after heat exchange, thereby improving the heat exchange effect of the primary air.
[0040] The air inlet channel 6 is connected with the air outlet channel 7 through the bypass air channel 8. The bypass air channel 8 is provided with a first regulating damper 9 for adjusting the amount of primary air entering the first-stage tubular air preheater 2. When the smoke resistance of the air preheater system increases, that is, when the air preheater system is blocked, the first regulating damper 9 is opened to reduce the amount of primary air entering the first-stage tubular air preheater 2, thereby reducing the heat exchange of the first-stage tubular air preheater 2, increasing the exhaust temperature, and volatilizing the ammonium bisulfate blocked in the air preheater system, thereby promoting the falling off of accumulated ash. When the system operates normally, the first regulating damper 9 is closed to increase the heat exchange of the first-stage tubular air preheater 2 and reduce the exhaust temperature.
[0041] The flue gas flowing out of the denitration system first passes through the second-stage tubular air preheater 3 for cooling, and the flue gas temperature drops by 20-50°C, and then enters the two-chamber rotary air preheater 1 for cooling, and the flue gas temperature drops by 150-220°C, and then passes through the first-stage tubular air preheater 2 for heat exchange. When the flue gas temperature reaches 10-130°C, the flue gas is discharged. In actual application, the flue gas flows through the tube of the second-stage tubular air preheater 3, and the primary air flows through the outside of the tube of the second-stage tubular air preheater 3; the flue gas flows through the outside of the tube of the first-stage tubular air preheater 2, and the primary air flows through the tube of the first-stage tubular air preheater 2.
[0042] The first-stage tubular air preheater 2 and the second-stage tubular air preheater 3 heat the primary air accounting for 25-30% of the total air volume of the boiler, and the two-compartment rotary air preheater 1 heats the secondary air accounting for 70-75% of the total air volume of the boiler. In actual applications, the heating proportion of the primary air used for the boiler by the tubular air preheater and the two-compartment rotary air preheater 1 can be set according to the actual needs of the boiler.
[0043] The overall air leakage rate of the first-stage tubular air preheater 2 and the second-stage tubular air preheater 3 is controlled within 2%, and the air leakage rate of the two-compartment rotary air preheater 1 is controlled within 2%, which can significantly reduce the power consumption of the boiler auxiliary equipment.
[0044] The first-stage tubular air preheater 2 has the risk of low-temperature corrosion, and can use Corten steel or enameled carbon steel pipes to improve corrosion resistance. The second-stage tubular air preheater 3 does not have the risk of low-temperature corrosion, so the material can be ordinary carbon steel, which is low in price.
[0045] In practical applications, how to judge whether the air preheater is blocked can be done by observing whether the efficiency of the air preheater is significantly reduced, for example, the outlet air temperature of the air preheater is lower than the temperature during normal operation; measuring the pressure difference between the inlet and outlet of the air preheater, if the pressure difference increases, it may indicate a blockage; checking whether the air flow through the air preheater shows signs of reduction, which may be due to air flow obstruction caused by blockage; using a thermal imager to check the temperature distribution on the surface of the air preheater, uneven temperature distribution may indicate blockage in certain areas; regularly checking and recording the sound and vibration of the air preheater during operation, blockage may cause abnormal sound or vibration; using computational fluid dynamics (CFD) simulation and predictive models to analyze air flow and potential blockage areas; performing regular maintenance and cleaning to prevent the accumulation of dust and dirt, which is an effective way to prevent blockage; sensors can also be installed to monitor air quality, flow and temperature, and these data can be used to predict and diagnose blockage. The means for judging whether the air preheater is blocked are not limited to the above means, and can refer to the prior art, which is not the focus of the present invention.
[0046] The air preheater system arranged in the above manner, in which the tubular air preheater is divided into a first stage and a second stage, can lower the exhaust gas temperature, reduce exhaust gas loss and improve boiler efficiency while ensuring that the air preheater is not blocked.
[0047] In the above embodiment, a controller is also included for controlling the operating status of the two-compartment rotary air preheater 1, the first-stage tubular air preheater 2, the second-stage tubular air preheater 3 and the first regulating damper 9. The two-compartment rotary air preheater 1, the first-stage tubular air preheater 2, the second-stage tubular air preheater 3 and the first regulating damper 9 are all connected to the controller signal.
[0048] It should be noted that the operation of the two-compartment rotary air preheater 1, the first-stage tubular air preheater 2 and the second-stage tubular air preheater 3 is controlled by a unified controller to achieve effective preheating of the primary air and the secondary air, while improving the utilization rate of the flue gas. The opening of the first regulating damper 9 is controlled by the controller to control the primary air volume entering the first-stage tubular air preheater 2.
[0049] In the above case, a temperature measuring device for real-time detection of the exhaust temperature is also included. The temperature measuring device is arranged in the exhaust passage 4 and is connected to the controller signal.
[0050] It can be understood that the exhaust gas temperature is detected in real time by the temperature measuring device, and the detected exhaust gas temperature signal is sent to the controller in real time. The controller compares the received temperature signal with the required temperature signal and adjusts the next operation of the entire system.
[0051] Specifically, when the air preheater system is operating normally, the controller controls the first adjusting damper 9 to be gradually closed to reduce the exhaust temperature. The temperature measuring device is used to detect the exhaust temperature in real time and send the detected exhaust temperature signal to the controller in real time, wherein a rated value of the exhaust temperature has been pre-set in the controller. By comparing the real-time detected exhaust temperature value with the rated value and controlling the opening of the first adjusting damper 9 through the controller, the real-time detected exhaust temperature reaches the rated value and remains unchanged, so as to realize the normal operation of the air preheater system.
[0052] When the air preheater system is blocked, the controller controls the first regulating damper 9 to open gradually to increase the exhaust temperature. The temperature measuring device is used to detect the exhaust temperature in real time and send the detected exhaust temperature signal to the controller in real time, wherein a numerical value that meets the exhaust temperature has been pre-set in the controller. By comparing the exhaust temperature value detected in real time with the required numerical value, when the controller receives the exhaust temperature detected by the temperature measuring device and it rises to the required numerical value, the controller starts timing and controls the first regulating damper 9 to close gradually after the timing reaches the required time, so that the ammonium bisulfate blocked in the air preheater system can be volatilized, the accumulated ash can be removed, and the air preheater system can be restored to normal operation.
[0053] Furthermore, the two-compartment rotary air preheater 1 includes a main body and a secondary air compartment and a hot air compartment arranged in the main body, the bottom of the secondary air compartment is connected to the secondary air inlet duct 10, the top of the secondary air compartment is connected to the air outlet duct 11, the top of the hot air compartment is connected to the smoke inlet channel 5, and the bottom of the hot air compartment is connected to the smoke exhaust channel 4.
[0054] It should be noted that the secondary air enters the secondary air bin from the air inlet duct 10, and is discharged from the air outlet duct 11 after heat exchange in the secondary air bin. The smoke enters the hot air bin from the smoke inlet channel 5, and is discharged from the smoke exhaust channel 4 after heat exchange in the hot air bin. The two-bin rotary air preheater 1 is provided with a heat storage element 102 and a sealing plate 101. Figure 2 , refer to the prior art.
[0055] In the above embodiment, the secondary air after heat exchange in the two-compartment rotary air preheater 1 enters the secondary air box through the air outlet duct 11 .
[0056] It can be understood that the secondary air is heated to 290°C-360°C by heat exchange in the secondary air chamber of the two-chamber rotary air preheater 1 and then discharged from the air outlet duct 11, and then enters the furnace to assist combustion.
[0057] On the basis of the above-mentioned embodiment, the air inlet channel 6 is connected to the primary fan 12, the air inlet duct 10 is connected to the blower 13, and both the primary fan 12 and the blower 13 are connected to the controller signal.
[0058] It should be noted that the controller controls the operation of the blower 13, so that the blower 13 supplies air to the two-chamber rotary air preheater 1, and the air is heated to 290℃-360℃ in the secondary air chamber before entering the furnace for combustion assistance. The controller controls the operation of the primary fan 12, so that the primary fan 12 supplies air to the first-stage tubular air preheater 2, and the primary air sent in from the outlet of the primary fan 12 is heated to 70℃-100℃ by the first-stage tubular air preheater 2 and then sent to the second-stage tubular air preheater 3, further heated to 280℃-350℃ and sent to the hot primary air main pipe 14, and then sent to the coal powder to the furnace for combustion through the pulverizing system.
[0059] In the above embodiment, the flue gas after heat exchange in the first-stage tubular air preheater 2 enters the dust collector through the smoke exhaust channel 4, the dust collector is connected to the induced draft fan, and both the dust collector and the induced draft fan are connected to the controller signal.
[0060] It can be understood that the dust collector is controlled by the controller so that the flue gas after heat exchange is discharged to the dust collector for dust removal, and the induced draft fan is controlled by the controller so that the flue gas treated by the dust collector is discharged to the chimney after the induced draft fan and desulfurization.
[0061] As a preferred embodiment, the primary air after heat exchange in the second-stage tubular air preheater 3 is connected to the powder making system through the hot primary air main pipe 14, and a temperature regulating structure 15 for controlling the temperature of the primary air after heat exchange in the second-stage tubular air preheater 3 is provided in the air outlet channel 7.
[0062] It should be noted that the cold primary air sent in from the outlet of the primary fan 12 enters the first-stage tubular air preheater 2 through the air inlet channel 6, is heated to 70°C-100°C, and then is sent to the second-stage tubular air preheater 3 through the air outlet channel 7, is further heated to 280°C-350°C and sent to the hot primary air main pipe 14, and then is sent to the furnace for combustion through the pulverizing system. Among them, the primary air heat exchange capacity of the first-stage tubular air preheater 2 accounts for 20%-40%, and the second-stage tubular air preheater 3 accounts for 60%-80%.
[0063] In a coal-fired boiler, the functions of the hot primary air main pipe 14 include: transporting the air (primary air) heated from the air preheater to the boiler's burner to provide the oxygen required for combustion; by adjusting the air volume and temperature in the hot primary air main pipe 14, the combustion process and the heat load of the boiler can be controlled; hot air can improve combustion efficiency because it helps in the transportation and combustion of coal powder; in some boiler designs, part of the hot flue gas may be introduced into the hot primary air main pipe 14 to increase the combustion temperature and efficiency; the hot primary air main pipe 14 distributes the hot air to multiple burners of the boiler to ensure the uniformity and stability of the combustion process.
[0064] The hot primary air main pipe 14 is usually made of heat-resistant materials to withstand high temperatures and corrosive environments. They are a key component of the boiler system and are essential to ensure efficient and stable operation of the boiler. In the daily operation and maintenance of the boiler, the integrity and performance of the hot primary air main pipe 14 need to be regularly checked to prevent leaks and other potential problems.
[0065] In the above situation, the temperature control structure 15 includes a partition plate 151 arranged on the periphery of the second-stage tubular air preheater 3 and extending into the air outlet channel 7. The partition plate 151 is used to separate the air outlet channel 7 into an upper channel and a lower channel. The upper channel is provided with a second adjustment baffle 152 for adjusting the primary air flow rate. The second adjustment baffle 152 is connected to the controller signal.
[0066] It is understandable that the opening of the second regulating damper 152 can be controlled by the controller to reduce the heat exchange capacity of the second-stage tubular air preheater 3, thereby adjusting the temperature of the hot primary air and reducing the amount of cold air used in the powder making system, thereby reducing the boiler exhaust temperature and improving the boiler efficiency. The upper channel and the lower channel of the air outlet channel 7 are separated by a partition plate 151, so that the primary air is divided into two parts to pass through the second-stage tubular air preheater 3, and the second regulating damper 152 is set in the upper channel to reasonably control the outlet primary air temperature of the second-stage tubular air preheater 3 according to the needs of the powder making system, greatly reducing the amount of cold primary air added to the powder making system, reducing the boiler exhaust temperature, reducing the exhaust heat loss, and improving the boiler efficiency.
[0067] Please refer to Figure 3 , a working method of an air preheater system, applied to the above-mentioned air preheater system, the working method comprising:
[0068] Step S1, controlling the air preheater system to operate, and controlling the first adjustment damper 9 and the second adjustment damper 152 to open;
[0069] Step S2: When the controller receives the information that the exhaust gas temperature detected by the temperature measuring device reaches the first preset temperature value, the controller controls the opening of the first regulating damper 9 so that the exhaust gas temperature maintains the first preset temperature value;
[0070] Step S3: When the coal mill outlet temperature needs to be lowered for the normal operation of the pulverizing system, the second regulating damper 152 is controlled to be closed;
[0071] Step S4, when the smoke resistance of the air preheater system increases, the first regulating damper 9 is controlled to open, and when the controller receives the exhaust gas temperature detected by the temperature measuring device and rises to the second preset temperature, the controller starts timing and controls the first regulating damper 9 to close after the timing reaches the preset time.
[0072] It should be noted that before the unit is started, the first regulating damper 9 and the second regulating damper 152 are controlled to be fully opened to reduce the primary air volume entering the first-stage tubular air preheater 2, quickly increase the exhaust gas temperature, shorten the dust collector input time, and reduce the smoke emission. After that, the induced draft fan, the forced draft fan 13 and the primary fan 12 are controlled to start in sequence, the boiler is ignited, and the load is gradually increased. When the controller receives the exhaust gas temperature detected by the temperature measuring device and rises to above 90°C (that is, the first preset temperature value, which can be determined according to the actual situation without limitation), the first regulating damper is controlled to be fully opened to reduce the primary air volume entering the first-stage tubular air preheater 2, quickly increase the exhaust gas temperature, shorten the dust collector input time, and reduce the smoke emission. Plate 9 is gradually closed to maintain the exhaust temperature until the first adjusting damper 9 is fully closed, and the boiler efficiency is the highest. When the exhaust temperature of the unit is too low under low load conditions, the first adjusting damper 9 is gradually increased until the required exhaust temperature is reached. When the load increases, the hot primary air temperature rises, and the pulverizer needs cold air to adjust the pulverizer outlet temperature, the second adjusting damper 152 is controlled to be gradually closed to reduce the hot primary air temperature until the second adjusting damper 152 at the pulverizer inlet is fully closed. During normal operation, the second adjusting damper 152 can be adjusted according to the pulverizer outlet temperature.
[0073] When the resistance of the air preheater system tends to increase, the first regulating damper 9 is controlled to be gradually opened. When the controller receives the exhaust gas temperature detected by the temperature measuring device and it rises to 150°C (i.e. the second preset temperature, which can be determined according to the actual situation without restriction), the controller starts timing and controls the first regulating damper 9 to be gradually closed after the timing reaches 3 hours (i.e. the preset time, which can be determined according to the actual situation without restriction) to restore the air preheater system to normal operation.
[0074] Or the first-stage tubular air preheater 2 may be heated up regularly once a week to avoid blockage of the air preheater system.
[0075] In summary, in the air preheater system provided by the present invention, when ammonium bisulfate deposition occurs in the air preheater system and causes the flue gas resistance to increase, the first regulating damper 9 can be opened for a short time to reduce the amount of cold primary air entering the first-stage tubular air preheater 2, reduce the heat exchange amount of the first-stage tubular air preheater 2, increase the flue gas temperature, volatilize the ammonium bisulfate, promote the ash accumulation to fall off, and prevent the air preheater system from being blocked. By adjusting the first regulating damper 9, the amount of air entering the first-stage tubular air preheater 2 is adjusted, and then the exhaust temperature is adjusted. By adjusting the exhaust temperature, a lower exhaust temperature can be obtained, and a higher boiler efficiency can be achieved.
[0076] Compared with the prior art, the present invention has the following advantages and effects: the present invention can reduce the air leakage rate of the air preheater and greatly reduce the power consumption of the boiler auxiliary machine; the rotary air preheater and the two-stage tubular air preheater are combined to solve the problem of air preheater blockage; the flue gas passes through the air preheater in three stages, which can reduce the exhaust gas temperature and improve the boiler efficiency; at the same time, the steam heater is replaced to prevent the air preheater from clogging, which can save soot blowing steam, increase the power generation of the unit, and reduce the water replenishment rate of the unit; the method of controlling the primary air volume entering the first-stage tubular air preheater 2, temporarily raising the exhaust gas temperature, and promoting the volatilization of the ammonium bisulfate deposited on the first-stage tubular air preheater 2, so as to achieve the purpose of preventing blockage.
[0077] It should be noted that, in this specification, relational terms such as first and second are merely used to distinguish one entity from other entities, but do not necessarily require or imply any actual relationship or order between these entities.
[0078] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0079] The above is a detailed introduction to an air preheater system and its working method provided by the present invention. This article uses specific examples to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims
1. An air preheater system, characterized in that: include: A two-compartment rotary air preheater (1) for heat exchange between flue gas and secondary air; A first-stage tubular air preheater (2) and a second-stage tubular air preheater (3) for heat exchange between flue gas and primary air, wherein the first-stage tubular air preheater (2) is arranged in a smoke exhaust passage (4) of the two-compartment rotary air preheater (1), and the second-stage tubular air preheater (3) is arranged in a smoke inlet passage (5) of the two-compartment rotary air preheater (1); the input end of the first-stage tubular air preheater (2) is connected to an air inlet passage (6) of the primary air, and the output end of the first-stage tubular air preheater (2) is connected to the second-stage tubular air preheater (3) via an air outlet passage (7); the air inlet passage (6) is connected to the air outlet passage (7) via a bypass air passage (8), and the bypass air passage (8) is provided with a first regulating baffle (9) for adjusting the air volume of the primary air entering the first-stage tubular air preheater (2).
2. The air preheater system according to claim 1, characterized in that: The invention also comprises a controller for controlling the operating states of the two-compartment rotary air preheater (1), the first-stage tubular air preheater (2), the second-stage tubular air preheater (3) and the first regulating damper (9); the two-compartment rotary air preheater (1), the first-stage tubular air preheater (2), the second-stage tubular air preheater (3) and the first regulating damper (9) are all connected to the controller by signal.
3. The air preheater system according to claim 2, characterized in that: It also comprises a temperature measuring device for real-time detection of the exhaust smoke temperature, wherein the temperature measuring device is arranged in the exhaust smoke passage (4) and is connected to the controller signal.
4. The air preheater system according to claim 3, characterized in that: The two-compartment rotary air preheater (1) comprises a main body and a secondary air compartment and a hot air compartment arranged in the main body, the bottom of the secondary air compartment is connected to a secondary air inlet duct (10), the top of the secondary air compartment is connected to an air outlet duct (11), the top of the hot air compartment is connected to the smoke inlet channel (5), and the bottom of the hot air compartment is connected to the smoke exhaust channel (4).
5. The air preheater system according to claim 4, characterized in that: The secondary air after heat exchange in the two-compartment rotary air preheater (1) enters the secondary air box through the air outlet duct (11).
6. The air preheater system according to claim 5, characterized in that The air inlet channel (6) is connected to a primary fan (12), the air inlet duct (10) is connected to a blower (13), and both the primary fan (12) and the blower (13) are connected to the controller signal.
7. The air preheater system according to claim 6, characterized in that The flue gas after heat exchange in the first-stage tubular air preheater (2) enters the dust collector through the smoke exhaust passage (4); the dust collector is connected to an induced draft fan; and both the dust collector and the induced draft fan are connected to the controller signal.
8. The air preheater system according to claim 7, characterized in that The primary air after heat exchange in the second-stage tubular air preheater (3) is connected to the powder making system via a hot primary air main pipe (14), and a temperature regulating structure (15) for controlling the temperature of the primary air after heat exchange in the second-stage tubular air preheater (3) is provided in the air outlet channel (7).
9. The air preheater system according to claim 8, characterized in that The temperature adjustment structure (15) comprises a partition plate (151) arranged on the outer periphery of the second-stage tubular air preheater (3) and extending into the air outlet channel (7), the partition plate (151) being used to separate the air outlet channel (7) into an upper channel and a lower channel, the upper channel being provided with a second adjustment baffle (152) for adjusting the primary air flow rate, the second adjustment baffle (152) being connected to the controller signal.
10. A method for operating an air preheater system, applied to the air preheater system according to claim 9, characterized in that: The working method comprises: Controlling the operation of the air preheater system, and controlling the first adjustment damper (9) and the second adjustment damper (152) to open; When the controller receives information that the exhaust gas temperature detected by the temperature measuring device reaches a first preset temperature value, the controller controls the opening of the first regulating damper (9) so that the exhaust gas temperature remains at the first preset temperature value; When the pulverizing system is operating normally and the outlet temperature of the coal mill needs to be lowered, the second regulating damper (152) is controlled to be closed; When the smoke resistance of the air preheater system increases, the first regulating damper (9) is controlled to open, and when the controller receives the exhaust gas temperature detected by the temperature measuring device and increases to a second preset temperature, the controller starts timing and controls the first regulating damper (9) to close after the timing reaches the preset time.
Citation Information
Cited By
Air preheater system and control method
CN119957938A