By introducing a fast rest state into the water heater system, the water heater state is controlled according to the idle time and threshold value, the problem of overuse of equipment caused by the fixed-duration start-stop strategy is solved, which extends the equipment life and improves system stability.
Patent Information
- Application Number
- CN202411373334.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-12-06
AI Technical Summary
The fixed-duration start-stop strategy causes unreasonable start of the water heater in the parallel system of multiple machines, and excessive use of some equipment, affecting the service life of the equipment.
By introducing a fast rest state into the water heater system, the state of the water heater is controlled according to the comparison results of the idle time and threshold value. If the threshold value is not reached, it will enter a fast rest state. Cold water passes through but does not burn. If the threshold value is reached, it will enter a combustion working state. Optimize the equipment to start Stop strategy to avoid overuse and shorten rest time.
It effectively avoids the problem of excessive use of water heater due to unreasonable start-up, extends the service life of the equipment, and improves the stable output of the system.
Smart Images

Figure CN119085135A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water heater control, and in particular to a system control method. Background Art
[0002] Gas water heaters are a common household appliance. When the demand for domestic hot water is high, a single gas water heater often cannot meet the demand. In this case, multiple water heaters can work together in parallel to meet the greater water demand. When multiple water heaters are connected together, they can work together to share the load, ensuring sufficient output when demand is high. At the same time, they can dynamically adjust when demand is low and shut down some equipment to save energy.
[0003] As the requirements for energy efficiency and system reliability continue to increase, multi-machine parallel systems are widely used in industrial, commercial and home environments. At present, the most common multi-machine parallel system is a fixed-duration start-stop strategy that uses a fixed running time to start and stop multiple machines in turn within a cycle to prevent the problem of shortening the life of a single water heater due to long-term operation.
[0004] However, when performing start-stop control, the fixed-duration start-stop strategy usually causes multiple water heaters to start and stop in turn within a cycle, without considering the interval adjustment of the water heaters, resulting in unreasonable start-up of the water heaters, causing excessive use of some equipment and affecting the service life of the equipment. Summary of the invention
[0005] In view of this, the present invention provides a system control method to solve the problem that excessive use of some equipment affects the service life of the equipment when start-stop control is performed through a start-stop strategy with a fixed duration.
[0006] In a first aspect, the present invention provides a system control method, which is applied to a water heater system, wherein the water heater system includes a plurality of water heaters connected in parallel with water circuits, and the method includes:
[0007] Based on the instruction to increase the water heater operation, a first water heater matching the instruction to increase the water heater operation is determined among the idle water heaters; and a state of the first water heater is controlled according to a comparison result between the idle time of the first water heater and a first threshold value:
[0008] If the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a fast rest state, wherein in the fast rest state, cold water flows through the water path of the first water heater and the first water heater is not ignited;
[0009] If the idle time of the first water heater reaches a first threshold, the first water heater is controlled to enter a combustion working state.
[0010] The system control method of the present invention can first determine the first water heater that matches the increase in water heater operation instruction among the idle water heaters based on the increase in water heater operation instruction; control the state of the first water heater according to the comparison result of the idle time of the first water heater and the first threshold value: if the idle time of the first water heater does not reach the first threshold value, the first water heater is controlled to enter a quick rest state, wherein, in the quick rest state, cold water passes through the water path of the first water heater and the first water heater is not ignited and burned; if the idle time of the first water heater reaches the first threshold value, the first water heater is controlled to enter a combustion working state, thereby optimizing the equipment start and stop strategy, avoiding the water heater from entering the combustion working state when the rest time is insufficient, avoiding excessive use of the equipment and affecting the service life of the equipment, and shortening the rest time and reducing the system waiting time through the quick rest state.
[0011] In an optional embodiment, the method further includes:
[0012] Get quick break duration;
[0013] When the time duration for the first water heater to enter the fast rest state reaches the fast rest time duration, the first water heater exits the fast rest state and enters the combustion working state.
[0014] In an optional implementation, before obtaining the quick rest duration, the method includes:
[0015] Get the preset cooling coefficient;
[0016] The quick rest duration is determined according to a preset cooling coefficient, an idle time and a first threshold; wherein the cooling coefficient is less than 1.
[0017] In an optional implementation, the fast rest state includes a first fast rest state and a second fast rest state; if the idle time of the first water heater does not reach the first threshold, controlling the first water heater to enter the fast rest state includes:
[0018] If the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a first fast rest state, wherein in the first fast rest state, cold water flows through the water path of the first water heater and the burner of the first water heater does not work;
[0019] If the idle time of the first water heater does not reach the second threshold, the first water heater is controlled to enter a second fast rest state, wherein in the second fast rest state, cold water flows through the water path of the first water heater, the burner of the first water heater does not work, and the fan works;
[0020] The duration of the first threshold is greater than the duration of the second threshold.
[0021] In an optional embodiment, the method further includes:
[0022] When the first water heater is in the fast rest state, the outlet water temperature of the water heater in the working combustion state is increased.
[0023] In an optional embodiment, increasing the outlet water temperature of the water heater in a working combustion state includes:
[0024] Obtain the inlet water temperature, total set water temperature and total water flow of the water heater system; determine the required heat load of the water heater system based on the inlet water temperature, total set water temperature and total water flow;
[0025] Obtaining the sum of the working water flow rates of the water heaters in the working combustion state in the water heater system as the first water flow rate;
[0026] Determine a ratio of the required heat load to the first water flow rate, and determine a set water temperature of the water heater in a working combustion state based on the sum of the ratio and the inlet water temperature;
[0027] The water heater in the working combustion state performs working combustion according to the set water temperature to increase the outlet water temperature.
[0028] In an optional implementation, determining the required heat load of the water heater system based on the inlet water temperature, the total set water temperature and the total water flow rate includes:
[0029] Determine the water temperature difference between the total set water temperature and the inlet water temperature;
[0030] The required heat load is determined based on the product of the total water flow and the water temperature difference.
[0031] In an optional embodiment, the method further includes:
[0032] After the first water heater enters the combustion working state, the set water temperature of the water heater with increased water outlet temperature is adjusted back to the total set water temperature.
[0033] In an optional implementation, determining a first water heater matching the instruction to increase water heater operation among idle water heaters includes:
[0034] Get the total startup time or idle time of all idle water heaters;
[0035] An idle water heater with the shortest total startup time or the longest idle time is selected as the first water heater that matches the instruction to increase the water heater operation.
[0036] In an optional embodiment, the method further includes:
[0037] When the operating time of at least one water heater in the combustion working state reaches a third threshold, generating an instruction to increase the water heater operation; or
[0038] When the operation state of at least one water heater in the combustion working state is a fault state, generating an instruction to increase the operation of the water heater; or
[0039] The heat load provided by the existing water heater in the combustion working state cannot meet the required heat load of the water heater system, and an instruction to increase the operation of the water heater is generated.
[0040] In a second aspect, the present invention provides a system control device, the device comprising:
[0041] A determination module, configured to determine, based on the water heater operation increase instruction, a first water heater matching the water heater operation increase instruction among the idle water heaters;
[0042] A control module is used to control the state of the first water heater according to a comparison result between the idle time of the first water heater and a first threshold value: if the idle time of the first water heater does not reach the first threshold value, the first water heater is controlled to enter a quick rest state, wherein, in the quick rest state, cold water passes through the water path of the first water heater and the first water heater is not ignited and burned; if the idle time of the first water heater reaches the first threshold value, the first water heater is controlled to enter a combustion working state.
[0043] In a third aspect, the present invention provides a water heater system, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the system control method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0044] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the system control method of the first aspect or any corresponding embodiment thereof.
[0045] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the system control method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0047] Figure 1 is a flow chart of a system control method according to an embodiment of the present invention;
[0048] Figure 2 is a structural diagram of a water heater system according to an embodiment of the present invention;
[0049] Figure 3 is a structural diagram of a water heater according to an embodiment of the present invention;
[0050] Figure 4 is a flow chart of another system control method according to an embodiment of the present invention;
[0051] Figure 5 is a start-up flow chart of starting the first water heater m according to an embodiment of the present invention;
[0052] Figure 6 is a structural block diagram of a system control device according to an embodiment of the present invention;
[0053] Figure 7 Schematic diagram of the hardware structure of the water heater system according to the embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0055] In conjunction with the application scenarios on which the execution of the system control method depends, the application scenarios are described here.
[0056] Gas water heaters are a common household appliance. When the demand for domestic hot water is high, a single gas water heater often cannot meet the demand. In this case, multiple water heaters can work together in parallel to meet the greater water demand. When multiple water heaters are connected together, they can work together to share the load, ensuring sufficient output when demand is high. At the same time, they can dynamically adjust when demand is low and shut down some equipment to save energy.
[0057] As the requirements for energy efficiency and system reliability continue to increase, multi-machine parallel systems are widely used in industrial, commercial and home environments. At present, the most common multi-machine parallel system is a fixed-duration start-stop strategy that uses a fixed running time to start and stop multiple machines in turn within a cycle to prevent the problem of shortening the life of a single water heater due to long-term operation.
[0058] However, when performing start-stop control, the fixed-duration start-stop strategy usually causes multiple water heaters to start and stop in turn within a cycle, without considering the interval adjustment of the water heaters, resulting in unreasonable start-up of the water heaters, causing excessive use of some equipment and affecting the service life of the equipment.
[0059] Based on this, an embodiment of the present invention provides a system control method, which is applied to a water heater system, wherein the water heater system includes multiple water heaters connected in parallel with water circuits. First, based on the increase in water heater operation instructions, a first water heater that matches the increase in water heater operation instructions can be determined among the idle water heaters; based on the comparison result of the idle time of the first water heater and a first threshold, the state of the first water heater is controlled: if the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a fast rest state, wherein in the fast rest state, cold water passes through the water circuit of the first water heater and the first water heater is not ignited and burned; if the idle time of the first water heater reaches the first threshold, the first water heater is controlled to enter a combustion working state, thereby ensuring the stable output of the water heater system on the basis of optimizing the equipment start and stop strategy.
[0060] According to an embodiment of the present invention, a system control method embodiment is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0061] In this embodiment, a system control method is provided, which can be used for the above water heater system. Figure 1 is a flow chart of a system control method according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0062] Step S101: based on the water heater operation instruction, determining a first water heater matching the water heater operation instruction from among the idle water heaters.
[0063] In the embodiment of the present invention, the water heater system may be the above-mentioned multi-machine parallel system, such as Figure 2 The structure diagram of the water heater system is shown, wherein the water heater system includes a host and a slave, the slave being the water heater, the host being used to execute the start-stop control strategy of the present invention to control the state of the water heater, the water inlet pipe being used to deliver cold water to the water heater, the water outlet pipe being used to output hot water, and the gas inlet pipe being used to deliver gas to the water heater to heat the cold water. Here, each water heater can be provided with a corresponding water proportional valve to control the water flow of the water inlet.
[0064] After the water heater system is turned on, the water proportional valve of any water heater can be opened to obtain the total water flow of the incoming water, and then the set water temperature can be obtained, which can be the water temperature of the output hot water set by the user. Then, the total heat load can be determined based on the product of the set water temperature and the total water flow, and the number of startups can be determined based on the total heat load.
[0065] Here, the rated power of each water heater in the water heater system can be obtained, and the heat load of each water heater can be calculated according to the rated power. The specific method of calculating the heat load is based on what can be achieved, and will not be repeated here. Then, based on the heat load, the number of first water heaters that meet the total heat load is calculated, and the first water heater that meets the start-up number is determined.
[0066] Specifically, the cumulative startup time of each water heater in the water heater system can be sorted, and the water heater with the shortest cumulative startup time can be preferentially determined as the first water heater. In addition, when determining the first water heater, the idle time of the water heater, that is, the shutdown time, can also be comprehensively considered, that is, while determining the water heater with the shortest cumulative startup time, the water heater with the longest shutdown time is determined as the first water heater, and the first water heater is started.
[0067] It should be understood that during the operation of the water heater system, the amount of water in the turned-on water heater can be increased in response to an increase in the water heater operation instruction. For example, when the set temperature is increased, an increase in the water heater operation instruction can be generated, and the first water heater that matches the increase in the water heater operation instruction can be determined among the idle water heaters.
[0068] Step S102, based on the comparison result of the idle time of the first water heater and the first threshold, control the state of the first water heater: if the idle time of the first water heater does not reach the first threshold, control the first water heater to enter a quick rest state, wherein, in the quick rest state, cold water passes through the water path of the first water heater and the first water heater does not ignite and burn; if the idle time of the first water heater reaches the first threshold, control the first water heater to enter a combustion working state.
[0069] In the embodiment of the present invention, considering that the power-on instruction for the first water heater often has a certain degree of randomness, at this time, the first water heater may not have been completely cooled down. Therefore, it is possible to detect whether the idle time of the first water heater reaches the first threshold value x, thereby verifying the cooling degree of the first water heater.
[0070] Specifically, when the idle time of the first water heater reaches the first threshold value x, it can be considered that the first water heater has been cooled down, and at this time, the first water heater can be started. It should be understood that the first threshold value x can be adjusted based on the running time before the first water heater is shut down. For example, the shorter the running time before the first water heater is shut down, the shorter the required cooling time, and the smaller the first threshold value x.
[0071] In addition, when the idle time of the first water heater does not reach the first threshold, the host can start the fast rest mode to cool down the first water heater to achieve the purpose of fast cooling. Figure 3 The water heater is shown in the structural diagram. As can be seen from the figure, the water heater has an independent water outlet. Figure 2 Therefore, the water proportional valve can be opened without opening the valve of the gas inlet, so that the water heater can be quickly cooled down by the cold water in the water inlet pipe without turning on the heating mode. Of course, in other embodiments, a switch valve can also be selected, as long as the water path can be opened to quickly cool down the water heater with the cold water in the water inlet pipe.
[0072] It can be seen from the above description that in an embodiment of the present invention, first, based on adding the water heater operation instruction, a first water heater that matches the increase in water heater operation instruction can be determined among the idle water heaters; based on the comparison result of the idle time of the first water heater and the first threshold, the state of the first water heater is controlled: if the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a quick rest state, wherein, in the quick rest state, cold water passes through the water path of the first water heater and the first water heater is not ignited and burned; if the idle time of the first water heater reaches the first threshold, the first water heater is controlled to enter a combustion working state, thereby ensuring the stable output of the water heater system on the basis of optimizing the equipment start and stop strategy.
[0073] In some optional embodiments, the above Figure 1 The corresponding embodiments also include:
[0074] Step S11, obtaining the quick rest duration.
[0075] Step S12, when the time duration of the first water heater entering the fast rest state reaches the fast rest time duration, the first water heater exits the fast rest state and enters the combustion working state.
[0076] In the embodiment of the present invention, the fast rest time can be a fixed time or a dynamic time, and it should be understood that the fast rest time is less than the first threshold x. Specifically, when the fast rest time is a dynamic time, the value of the fast rest time can be calculated before obtaining the fast rest time, which specifically includes the following process:
[0077] Step a1, obtaining a preset cooling coefficient.
[0078] Step a2, determining the quick rest duration according to the preset cooling coefficient, the idle duration and the first threshold; wherein the cooling coefficient is less than 1.
[0079] In an embodiment of the present invention, after the quick rest mode is turned on, the rest time of the first water heater can be reduced. Specifically, a preset cooling coefficient r can be set in advance, and then the original remaining rest time x is determined by subtracting the idle time from the first threshold, and then the preset cooling coefficient r×the original remaining rest time x is determined as the quick rest time.
[0080] In some optional implementations, the fast rest state includes a first fast rest state and a second fast rest state, and the step S102 includes:
[0081] If the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a first quick rest state, wherein, in the first quick rest state, cold water passes through the water path of the first water heater and the burner of the first water heater does not work; if the idle time of the first water heater does not reach the second threshold, the first water heater is controlled to enter a second quick rest state, wherein, in the second quick rest state, cold water passes through the water path of the first water heater and the burner of the first water heater does not work, and the fan works; wherein, the duration of the first threshold is greater than the duration of the second threshold.
[0082] In an embodiment of the present invention, a fan may be configured for each water heater in the above-mentioned water heater system. The fan may not be started when the system is operating normally to save energy, and may be started after the fast rest mode is turned on, thereby further accelerating the cooling speed of the water heater.
[0083] Specifically, a second threshold value may be preset, wherein the second threshold value is less than the first threshold value, and if the idle time of the first water heater is greater than the second threshold value and less than the first threshold value, the first water heater is adjusted to the first fast rest state to cool the first water heater with cold water, so as to accelerate the cooling speed of the first water heater. In addition, if the idle time of the first water heater is less than the second threshold value, the first water heater is adjusted to the second fast rest state to cool the first water heater with cold water and cool the fan at the same time, so as to further accelerate the cooling speed of the water heater.
[0084] In an embodiment of the present invention, it is considered that there is often a certain degree of randomness when it is detected that the first water heater meets the shutdown condition. At this time, the idle water heaters in the water heater system may not have been completely cooled down. Therefore, the first quick rest mode or the second quick rest mode can be selected to start according to the idle time of the first water heater, thereby reducing the startup time of the first water heater.
[0085] It should be understood that multiple cooling coefficients can be pre-set (each cooling coefficient must be less than 1 to ensure that the quick rest time is less than the original remaining rest time), and an association relationship between the cooling coefficient and the first quick rest mode and the second quick rest mode can be established, so as to select a suitable preset cooling coefficient based on the type of quick rest mode, thereby further reducing the start-up time of the first water heater. Specifically, the first quick rest mode corresponds to the first cooling coefficient r1, and the second quick rest mode corresponds to the second cooling coefficient r2, wherein r1 is greater than r2. After the first quick rest mode is turned on, the quick rest time is the preset cooling coefficient r1×the original remaining rest time x, and after the second quick rest mode is turned on, the quick rest time is the preset cooling coefficient r2×the original remaining rest time x. When the original remaining rest time is longer, by selecting the second quick rest mode and starting the fan to enhance the cooling effect, the rest time of the water heater is further reduced. In some optional embodiments, the above Figure 1 The corresponding embodiments also include:
[0086] When the first water heater is in the fast rest state, the outlet water temperature of the water heater in the working combustion state is increased.
[0087] In the embodiment of the present invention, it is taken into consideration that after the quick rest state of the first water heater is turned on, the cold water for cooling the first water heater will flow into the total water outlet flow of the water heater system through the water outlet pipe of the first water heater. Therefore, during the period of turning on the quick rest state, the water outlet temperature of the water heater in the working combustion state in the water heater system is increased, thereby improving the stability of the total water outlet temperature of the entire water heater system.
[0088] Specifically, increasing the outlet water temperature of the water heater in a working combustion state includes:
[0089] Step S21, obtaining the inlet water temperature, the total set water temperature and the total water flow of the water heater system; based on the inlet water temperature, the total set water temperature and the total water flow, determining the required heat load of the water heater system.
[0090] Step S22, obtaining the sum of the working water flow rates of the water heaters in the working combustion state in the water heater system as the first water flow rate.
[0091] Step S23, determining the ratio of the required heat load to the first water flow rate, and determining the set water temperature of the water heater in the working combustion state based on the sum of the ratio and the inlet water temperature.
[0092] Step S24, the water heater in the working combustion state performs working combustion according to the set water temperature to increase the outlet water temperature.
[0093] In the embodiment of the present invention, when calculating the above-mentioned water outlet temperature, considering that there may be differences in models and performances between water heaters, the heating temperature of each water heater currently in operation can be calculated separately based on the water heater.
[0094] When calculating the outlet water temperature, we can first obtain the inlet water temperature T of the water heater system. i , here, you can Figure 2 A temperature sensor is provided in the water inlet pipe shown in the figure to collect the water temperature T i Next, the required heat load of the water heater system can be determined. The specific process of calculating the required heat load is as follows:
[0095] Step b1, determining the water temperature difference between the total set water temperature and the inlet water temperature.
[0096] Step b2, determining the required heat load based on the product of the total water flow and the water temperature difference.
[0097] In the embodiment of the present invention, it can be seen from the above that the heat load is calculated as the product of the water flow rate and the temperature difference. Therefore, when calculating the required heat load, the total set water temperature T can be calculated first. set With inlet water temperature T i The water temperature difference T set -T i Then, the total water flow L of the current water heater system can be obtained total , and multiply the total water flow and the water temperature difference by L total ×(T set -T i ) is determined as the required heat load Q1.
[0098] After determining the required heat load Q1, the working water flow L of the water heater in the working combustion state in the water heater system can be obtained. work Specifically, the water heaters in working state can be determined, and the sum of the water flow rates of the water heaters can be determined. For example, if the water heaters in working state include water heater 1, water heater 2, and water heater 3, wherein the water flow rates of water heater 1, water heater 2, and water heater 3 are L1, L2, and L3 respectively, then L work =L1+L2+L3. After determining the working water flow L work Then, based on the working water flow L work Calculate the water temperature Specifically, In another embodiment, the working water flow rate L work According to the total water flow L total and the current water flow rate L of the first water heater kx Get, through the total water flow L totalSubtract the current water flow rate L of the first water heater kx Get the working water flow L work , that is, L work =L total -L kx .
[0099] It should be understood that after the first water heater enters the combustion working state, the set water temperature of the water heater that increases the outlet water temperature is adjusted back to the total set water temperature.
[0100] Specifically, the water heater in the combustion working state may open the gas valve to heat the cold water. Therefore, after the first water heater enters the combustion working state, the set water temperature of the water heater in the combustion working state may be lowered, so that the set water temperature of the water heater in the combustion working state is adjusted back to the total set water temperature, so that the outlet water temperature of the water heater system meets the set temperature.
[0101] In an embodiment of the present invention, when calculating the above-mentioned heating temperature, the differences in models and performances between water heaters may be taken into account. Therefore, the heating temperature of each water heater currently in operation can be calculated separately on a water heater basis, thereby improving the temperature control accuracy of the water heater system.
[0102] In some optional implementations, the above step S101 includes:
[0103] Step S31, obtaining the total startup time or idle time of all idle water heaters.
[0104] Step S32: Select an idle water heater with the shortest total startup time or the longest idle time as the first water heater that matches the instruction to add a water heater to run.
[0105] In the embodiment of the present invention, after determining the idle water heater with the shortest total startup time or the longest idle time, the water heater whose corresponding heat load matches the instruction to increase the water heater operation can be determined as the first water heater.
[0106] Specifically, the rated power Prated of the water heater = heat load × temperature rise × water flow rate. Therefore, the heat load of the idle water heater can be calculated based on the rated power, water flow rate and temperature rise corresponding to the idle water heater, thereby obtaining the first water heater that matches the instruction to increase the water heater operation.
[0107] In an embodiment of the present invention, a target water heater whose idle time meets the start-up condition can be determined among the idle water heaters, and a first water heater can be determined among the idle water heaters, so that the idle water heaters can be fully cooled to avoid a reduction in life span due to a single water heater working for a long time.
[0108] In some optional embodiments, the above Figure 1 The corresponding embodiments also include:
[0109] When the operating time of at least one water heater in the combustion working state reaches a third threshold, an instruction to increase the water heater operation is generated; or when the operating state of at least one water heater in the combustion working state is a fault state, an instruction to increase the water heater operation is generated; or when the heat load provided by the existing water heater in the combustion working state cannot meet the required heat load of the water heater system, an instruction to increase the water heater operation is generated.
[0110] In an embodiment of the present invention, the water heaters in operation in the water heater system can be detected in real time, and when it is detected that there is a water heater s with an operation failure or a timeout water heater k with an operation time exceeding a third threshold, an instruction to increase the water heater operation is generated to instruct the water heater s or the water heater k to shut down, and to instruct the first water heater to replace the shut-down water heater.
[0111] Specifically, the first water heater may be an idle water heater in the water heater system whose heat load matches that of water heater s or water heater k. Considering that the real-time water temperature in the water heater system will change after the first water heater is switched to operate, the heating temperature of the first water heater during operation may be calculated to ensure that the output hot water temperature is consistent with the set water temperature. It should be understood that the heating temperature is an internal parameter of the system, which may be the same as or different from the set water temperature, and may be selected not to be displayed to the user.
[0112] In addition, it is possible to detect in real time whether the heat load provided by the water heater system can meet the required heat load of the water heater system. If not, an instruction to increase the operation of the water heater can be generated.
[0113] In this embodiment, another system control method is provided, which can be used for the above water heater system. Figure 4 is a flow chart of another system control method according to an embodiment of the present invention. Figure 4 As shown, the process includes the following steps:
[0114] Step S401, start any water heater in the water heater system, determine the total water flow and the set temperature, and determine the total heat load based on the total water flow and the set temperature.
[0115] Step S402, determining the combustion quantity based on the total heat load, turning on the water heaters of the combustion quantity, and entering the combustion working state.
[0116] Step S403, obtaining the operating status of the water heater in the combustion working state.
[0117] Step S404, determining whether the total heat load of the water heater system increases to require starting the next water heater, if so, executing step S409, if not, executing step S405.
[0118] Step S405, based on the running status, detect whether there is a faulty water heater s, if so, execute step S406, if not, execute step S407.
[0119] Step S406, shut down the faulty water heater s, and proceed to step S409.
[0120] Step S407, detecting whether the running time of any water heater reaches the third threshold, if so, executing step S408, if not, executing step S411.
[0121] Step S408, marking the water heater k whose operating time reaches the third threshold, and extending the heating time of the water heater k, and then entering step S409.
[0122] Step S409, marking the first water heater m with the longest rest time.
[0123] Step S410, starting the startup process of the first water heater m.
[0124] Step S411, shut down.
[0125] In the embodiment of the present invention, the first water heater is determined, and the switching strategy is executed when the first water heater fails or runs for too long. Figure 1 The corresponding embodiments are described in detail and will not be repeated here.
[0126] In addition, in an embodiment of the present invention, Figure 5 The figure shows a flowchart corresponding to step S410, which is a process of starting the first water heater m. The process includes the following steps:
[0127] Step S501, detecting whether the idle time of the first water heater m reaches a first threshold, if so, executing step S503, if not, executing step S502.
[0128] Step S502, turning on the fast rest mode to cool down the first water heater m, and determining the fast rest duration. During the fast rest duration, the outlet water temperature of the water heater in the combustion working state is increased until the time when the first water heater m enters the fast rest mode reaches the fast rest duration.
[0129] Step S503, determine whether there is a marked water heater k, if so, proceed to step S504; if not, proceed to step S506.
[0130] Step S504, determine whether the water heater k is shut down, if so, execute step S506, if not, execute step S505.
[0131] Step S505, shut down water heater k, and proceed to step S506.
[0132] Step S506, switching the state of the first water heater m to a combustion working state.
[0133] In the embodiment of the present invention, the startup process of the first water heater m is as follows: Figure 1 The corresponding embodiments are described in detail and will not be repeated here.
[0134] In summary, firstly, based on adding the water heater operation instruction, the first water heater that matches the increase in water heater operation instruction can be determined among the idle water heaters; based on the comparison result of the idle time of the first water heater and the first threshold, the state of the first water heater is controlled: if the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a fast rest state, wherein, in the fast rest state, cold water passes through the water path of the first water heater and the first water heater is not ignited and burned; if the idle time of the first water heater reaches the first threshold, the first water heater is controlled to enter a combustion working state, thereby ensuring the stable output of the water heater system on the basis of optimizing the start and stop strategy of the equipment.
[0135] In this embodiment, a system control device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0136] This embodiment provides a system control device, such as Figure 6 As shown, including:
[0137] A determination module 601 determines, based on the water heater operation increase instruction, a first water heater matching the water heater operation increase instruction among the idle water heaters;
[0138] The control module 602 controls the state of the first water heater according to the comparison result between the idle time of the first water heater and the first threshold value: if the idle time of the first water heater does not reach the first threshold value, the first water heater is controlled to enter a quick rest state, wherein, in the quick rest state, cold water passes through the water path of the first water heater and the first water heater is not ignited and burned; if the idle time of the first water heater reaches the first threshold value, the first water heater is controlled to enter a combustion working state.
[0139] In some optional embodiments, the device is also used for:
[0140] Get quick break duration;
[0141] When the time duration for the first water heater to enter the fast rest state reaches the fast rest time duration, the first water heater exits the fast rest state and enters the combustion working state.
[0142] In some optional embodiments, the device is also used for:
[0143] Get the preset cooling coefficient;
[0144] The quick rest duration is determined according to a preset cooling coefficient, an idle time and a first threshold; wherein the cooling coefficient is less than 1.
[0145] In some optional implementations, the fast rest state includes a first fast rest state and a second fast rest state; if the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter the fast rest state, and the control module 602 is further used to:
[0146] If the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a first fast rest state, wherein in the first fast rest state, cold water flows through the water path of the first water heater and the burner of the first water heater does not work;
[0147] If the idle time of the first water heater does not reach the second threshold, the first water heater is controlled to enter a second fast rest state, wherein in the second fast rest state, cold water flows through the water path of the first water heater, the burner of the first water heater does not work, and the fan works;
[0148] The duration of the first threshold is greater than the duration of the second threshold.
[0149] In some optional embodiments, the device is also used for:
[0150] When the first water heater is in the fast rest state, the outlet water temperature of the water heater in the working combustion state is increased.
[0151] In some optional embodiments, the device is also used for:
[0152] Obtaining the inlet water temperature, the total set water temperature and the total water flow of the water heater system, and determining the required heat load of the water heater system based on the inlet water temperature, the total set water temperature and the total water flow;
[0153] Obtaining the sum of the working water flow rates of the water heaters in the working combustion state in the water heater system as the first water flow rate;
[0154] Determine a ratio of the required heat load to the first water flow rate, and determine a set water temperature of the water heater in a working combustion state based on the sum of the ratio and the inlet water temperature;
[0155] The water heater in the working combustion state performs working combustion according to the set water temperature to increase the outlet water temperature.
[0156] In some optional embodiments, the device is also used for:
[0157] Determine the water temperature difference between the total set water temperature and the inlet water temperature;
[0158] The required heat load is determined based on the product of the total water flow and the water temperature difference.
[0159] In some optional embodiments, the device is also used for:
[0160] After the first water heater enters the combustion working state, the set water temperature of the water heater that increases the outlet water temperature is adjusted back to the total set water temperature.
[0161] In some optional implementations, the determination module 601 is further configured to:
[0162] Get the total startup time or idle time of all idle water heaters;
[0163] An idle water heater with the shortest total startup time or the longest idle time is selected as the first water heater that matches the instruction to increase the water heater operation.
[0164] In some optional embodiments, the device is also used for:
[0165] When the operating time of at least one water heater in the combustion working state reaches a third threshold, generating an instruction to increase the water heater operation; or
[0166] When the operation state of at least one water heater in the combustion working state is a fault state, generating an instruction to increase the operation of the water heater; or
[0167] The heat load provided by the existing water heater in the combustion working state cannot meet the required heat load of the water heater system, and an instruction to increase the operation of the water heater is generated.
[0168] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0169] The system control device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0170] The embodiment of the present invention also provides a water heater system having the above Figure 6The system controls shown.
[0171] See also Figure 7 , Figure 7 is a schematic diagram of the structure of a water heater system provided by an optional embodiment of the present invention, such as Figure 7 As shown, the water heater system includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. The various components are connected to each other using different buses for communication, and can be installed on a common motherboard or installed in other ways as needed. The processor can process instructions executed in the water heater system, including instructions stored in or on the memory to display graphical information of the GUI on an external input / output device (such as a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple water heater systems can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 7 A processor 10 is taken as an example.
[0172] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0173] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0174] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required by at least one function; the data storage area may store data created according to the use of the water heater system, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the water heater system via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0175] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0176] The water heater system further comprises a communication interface 30 for the water heater system to communicate with other devices or a communication network.
[0177] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0178] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of computer program instructions in computer-readable media includes, but is not limited to, source files, executable files, installation package files, etc., and accordingly, the way in which computer program instructions are executed by a computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0179] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A system control method, characterized in that: Applied to a water heater system, the water heater system includes a plurality of water heaters connected in parallel with water circuits, the method includes: Based on the water heater operation increase instruction, determining a first water heater matching the water heater operation increase instruction among the idle water heaters; According to a comparison result of the idle time of the first water heater and a first threshold, the state of the first water heater is controlled: If the idle time of the first water heater does not reach the first threshold, the first water heater is controlled to enter a fast rest state, wherein in the fast rest state, cold water flows through the water path of the first water heater and the first water heater is not ignited; If the idle time of the first water heater reaches a first threshold, the first water heater is controlled to enter a combustion working state.
2. The method according to claim 1, characterized in that The method further comprises: Get quick break duration; When the time duration for the first water heater to enter the fast rest state reaches the fast rest time duration, the first water heater exits the fast rest state and enters the combustion working state.
3. The method according to claim 2, characterized in that Before obtaining the quick rest duration, include: Get the preset cooling coefficient; The quick rest duration is determined according to the preset cooling coefficient, the idle duration and the first threshold; wherein the cooling coefficient is less than 1.
4. The method according to claim 1, characterized in that: The fast rest state includes a first fast rest state and a second fast rest state; if the idle time of the first water heater does not reach a first threshold, controlling the first water heater to enter the fast rest state includes: If the idle time of the first water heater does not reach a first threshold, controlling the first water heater to enter a first fast rest state, wherein in the first fast rest state, cold water flows through a water path of the first water heater and a burner of the first water heater does not work; If the idle time of the first water heater does not reach the second threshold, the first water heater is controlled to enter a second fast rest state, wherein in the second fast rest state, cold water flows through the water path of the first water heater, the burner of the first water heater does not work, and the fan works; The duration of the first threshold is greater than the duration of the second threshold.
5. The method according to claim 1, characterized in that The method further comprises: When the first water heater is in the fast rest state, the outlet water temperature of the water heater in the working combustion state is increased.
6. The method according to claim 5, characterized in that The method of increasing the outlet water temperature of the water heater in a working combustion state comprises: Obtaining an inlet water temperature, a total set water temperature, and a total water flow rate of the water heater system, and determining a required heat load of the water heater system based on the inlet water temperature, the total set water temperature, and the total water flow rate; Obtaining the sum of the working water flow rates of the water heaters in the working combustion state in the water heater system as the first water flow rate; Determining a ratio of the required heat load to the first water flow rate, and determining a set water temperature of the water heater in a working combustion state based on the sum of the ratio and the inlet water temperature; The water heater in the working combustion state performs working combustion according to the set water temperature to increase the outlet water temperature.
7. The method according to claim 6, characterized in that The step of determining the required heat load of the water heater system based on the inlet water temperature, the total set water temperature and the total water flow rate includes: Determine the water temperature difference between the total set water temperature and the inlet water temperature; The required heat load is determined based on the product of the total water flow and the water temperature difference.
8. The method according to claim 6, characterized in that The method further comprises: After the first water heater enters the combustion working state, the set water temperature of the water heater with increased water outlet temperature is adjusted back to the total set water temperature.
9. The method according to claim 1, characterized in that: The step of determining a first water heater matching the instruction to add a water heater to operate from among the idle water heaters comprises: Get the total startup time or idle time of all idle water heaters; An idle water heater with the shortest total startup time or the longest idle time is selected as the first water heater matching the instruction to increase the water heater operation.
10. The method according to claim 1, characterized in that The method further comprises: When the operating time of at least one water heater in the combustion working state reaches a third threshold, generating an instruction to increase the water heater operation; or When the operation state of at least one water heater in the combustion working state is a fault state, generating an instruction to increase the operation of the water heater; or The heat load provided by the existing water heater in the combustion working state cannot meet the required heat load of the water heater system, and an instruction to increase the operation of the water heater is generated.