Shuttle vehicle scheduling method and device in automatic production process
By generating and scheduling process main tasks and sub-tasks in the multi-deep shuttle vehicle three-dimensional library, the shuttle vehicle is controlled to perform outbound/inbound tasks, which solves the problem of frequent layer replacement between different layers of the shuttle vehicle, and improves the automated production process efficiency and storage density.
Patent Information
- Application Number
- CN202411387239.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-12-06
AI Technical Summary
In the multi-deep shuttle vehicle three-dimensional library, frequent layer replacement between different layers leads to mutual interference, reducing task execution efficiency, and the existing technology has failed to effectively solve this problem.
By generating and scheduling process main tasks and sub-tasks between the warehouse management system WMS and the warehouse control system WCS, the equipment scheduling strategy is determined, and the shuttle car is controlled to perform outbound/inbound tasks during the automated production process, reducing the frequency of layer replacement, and preventing vehicles from Layer change tasks interfere with each other.
It realizes reducing the frequent layer change of shuttle vehicles between different layers, reducing time costs, ensuring that there are cars available on the task layer, and improving the storage density and overall operating efficiency of the three-dimensional library.
Smart Images

Figure CN119087947A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of automated production, and in particular to a method and device for dispatching a shuttle vehicle in an automated production process. Background Art
[0002] Different from the traditional warehouse management mode, the multi-depth shuttle car stereoscopic warehouse allows goods to be stored at different depths in the same warehouse, greatly improving the utilization rate of storage space. This involves stepping down to reduce the occupation of ground space, and also through vertical expansion, the storage space is developed to high altitude, achieving a significant increase in storage capacity. The intelligent stereoscopic warehouse WMS (Warehouse Management System) and WCS (Warehouse Control System) system software combined with storage equipment has gradually become an important choice for modern logistics, storage and management with its high efficiency, intelligence, flexibility, scalability and green environmental protection.
[0003] However, in multi-depth shuttle car warehouses, it is easy for shuttle cars to frequently change between different layers, and vehicles are prone to mutual interference when changing layers, thereby reducing the shuttle car's task execution efficiency.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiments of the present invention provide a method and device for scheduling shuttle vehicles in an automated production process, so as to at least solve the technical problem in the related art that shuttle vehicles used in stereoscopic warehouses in an automated production process are prone to mutual interference during operation.
[0006] According to one aspect of an embodiment of the present invention, a method for scheduling shuttle vehicles in an automated production process is provided, comprising: upon receiving an outbound / inbound task generated by a warehouse management system WMS, generating a process main task according to the outbound / inbound task; decomposing the process main task to obtain process subtasks; sending the process main task and the process subtasks to a warehouse control system WCS, so as to generate an equipment scheduling strategy in the automated production process through the warehouse control system WCS according to the process main task and the process subtasks; controlling the warehouse control system WCS to schedule each shuttle vehicle required in the automated production process according to the equipment scheduling strategy to execute the outbound / inbound task, wherein the shuttle vehicle is used to execute the outbound / inbound task in the automated production process.
[0007] Optionally, before generating the main process task according to the outbound / inbound task, the shuttle scheduling method in the automated production process also includes: creating a storage location table, a process task table and an equipment task table in a database, wherein the storage location table is used to record the storage location information and material information in the automated production process, the process task table is used to record the main process task and the process subtask, and the equipment task table is used to record the task information of each of the shuttles and the production equipment in the automated production.
[0008] Optionally, the fields of the storage location table include at least: serial number, lane name, row, column, layer, depth, whether the storage location is locked, and material code; the fields of the process task table include at least: serial number, task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material batch, order number, material box number, quantity, task start time and task end time; the fields of the equipment task table include at least: serial number, process task number, equipment task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material box number, task start time and task end time.
[0009] Optionally, the process main task and the process subtask are sent to a warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: when it is determined through the process main task and the process subtask that a new material needs to be put into the warehouse, query the storage location table to determine whether there is a material of the same type as the new material in the three-dimensional warehouse, wherein the three-dimensional warehouse is used to store the materials required in the automated production process; when the query result indicates that the material of the same type as the new material is stored in the three-dimensional warehouse, check whether the depth of the storage layer where the material of the same type as the new material is currently located is full; when the check result indicates that the depth of the storage layer is not full, determine that the equipment scheduling strategy is: control the shuttle vehicle where the new material is located to travel to the storage layer to store the new material in the storage layer; when the check result indicates that the depth of the storage layer is full, determine that the equipment scheduling strategy is: find out whether the storage layer is expandable or find a new storage location to store the new material.
[0010] Optionally, the process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: when the query result indicates that no material of the same type as the new material is stored in the three-dimensional warehouse, obtaining the material characteristics of the new material and the layout information of the three-dimensional warehouse; searching for a target storage location in the three-dimensional warehouse according to the material characteristics and the layout information; and storing the new material at the maximum depth of the target storage location.
[0011] Optionally, the process main task and the process subtask are sent to a warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: when it is determined through the process main task and the process subtask that materials are to be shipped out, obtaining the storage time of the materials to be shipped out; sorting the materials to be shipped out according to the storage time to obtain a sorting result; calling the shuttle car according to the sorting result to preferentially ship out the materials to be shipped out whose storage time exceeds the storage time threshold.
[0012] Optionally, the process main task and the process subtask are sent to a warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: when it is determined through the process main task and the process subtask that materials are to be shipped out, obtaining the storage location number of the materials to be shipped out; when it is determined according to the storage location number that the materials to be shipped out are located in the same storage location, the materials to be shipped out are shipped out in order from small to large according to the depth of the materials to be shipped out.
[0013] Optionally, after controlling the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, the shuttle vehicle scheduling method in the automated production process also includes: updating the storage location table and the equipment task table; deleting the outbound / inbound tasks from the process task table or marking the outbound / inbound tasks as completed in the process task table.
[0014] According to another aspect of an embodiment of the present invention, a shuttle scheduling device in an automated production process is also provided, including: a first generation unit, for generating a process main task according to the outbound / inbound task generated by a warehouse management system WMS when receiving the outbound / inbound task; a decomposition unit, for decomposing the process main task to obtain process subtasks; a second generation unit, for sending the process main task and the process subtask to the warehouse control system WCS, so as to generate an equipment scheduling strategy in the automated production process according to the process main task and the process subtasks through the warehouse control system WCS; a control unit, for controlling the warehouse control system WCS to schedule each shuttle required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound task, wherein the shuttle is used to perform the outbound / inbound task in the automated production process.
[0015] Optionally, the shuttle scheduling device in the automated production process also includes: a creation unit, which is used to create a storage location table, a process task table and an equipment task table in the database before generating a process main task based on the outbound / inbound task, wherein the storage location table is used to record the storage location information and material information in the automated production process, the process task table is used to record the process main task and the process subtask, and the equipment task table is used to record the task information of each of the shuttles and the production equipment in the automated production.
[0016] Optionally, the fields of the storage location table include at least: serial number, lane name, row, column, layer, depth, whether the storage location is locked, and material code; the fields of the process task table include at least: serial number, task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material batch, order number, material box number, quantity, task start time and task end time; the fields of the equipment task table include at least: serial number, process task number, equipment task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material box number, task start time and task end time.
[0017] Optionally, the second generation unit includes: a query module, which is used to query the storage location table to determine whether there are materials of the same type as the new material in the three-dimensional warehouse when it is determined through the process main task and the process subtask that new materials need to be put into the warehouse, wherein the three-dimensional warehouse is used to store materials required in the automated production process; an inspection module, which is used to check whether the depth of the storage layer where the materials of the same type as the new material are currently located is full when the query result indicates that the three-dimensional warehouse stores materials of the same type as the new material; a first determination module, which is used to determine that the equipment scheduling strategy is: to store the new material in the storage layer by controlling the shuttle vehicle where the new material is located to travel to the storage layer when the inspection result indicates that the depth of the storage layer is not full; and a second determination module, which is used to determine that the equipment scheduling strategy is: to find out whether the storage layer is expandable or to find a new storage location to store the new material when the inspection result indicates that the depth of the storage layer is full.
[0018] Optionally, the second generation unit includes: a first acquisition module, used to obtain the material characteristics of the new material and the layout information of the three-dimensional warehouse when the query result indicates that the three-dimensional warehouse does not store any material of the same type as the new material; a search module, used to search for a target storage location in the three-dimensional warehouse based on the material characteristics and the layout information; and a storage module, used to store the new material to the maximum depth of the target storage location.
[0019] Optionally, the second generation unit includes: a second acquisition module, used to obtain the storage time of the materials to be shipped out when it is determined that there are materials to be shipped out through the process main task and the process subtask; a sorting module, used to sort the materials to be shipped out according to the storage time to obtain a sorting result; and a calling module, used to call the shuttle vehicle according to the sorting result to preferentially ship out the materials to be shipped out whose storage time exceeds a storage time threshold.
[0020] Optionally, the second generation unit includes: a third acquisition module, which is used to obtain the storage location number of the material to be shipped out when it is determined through the process main task and the process subtask that there is material shipping out; and a shipping module, which is used to ship out the materials to be shipped out in order from small to large according to the depth of the materials to be shipped out when it is determined according to the storage location number that the materials to be shipped out are located in the same storage location.
[0021] Optionally, the shuttle scheduling device in the automated production process also includes: an updating unit, which is used to update the storage location table and the equipment task table after controlling the warehouse control system WCS to schedule each shuttle required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound task; a processing unit, which is used to delete the outbound / inbound task from the process task table or mark the outbound / inbound task as completed in the process task table.
[0022] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein the program executes any one of the above-described methods for scheduling shuttle vehicles in an automated production process.
[0023] According to another aspect of an embodiment of the present invention, a processor is provided, wherein the processor is used to run a program, wherein when the program is run, the shuttle vehicle scheduling method in the automated production process described above is executed.
[0024] According to another aspect of an embodiment of the present invention, a computer program product is provided, comprising computer instructions, which, when executed by a processor, execute any one of the above-described methods for scheduling shuttle vehicles in an automated production process.
[0025] In an embodiment of the present invention, upon receiving a warehouse outbound / inbound task generated by a warehouse management system WMS, a process main task is generated according to the warehouse outbound / inbound task; the process main task is decomposed to obtain process subtasks; the process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask; the warehouse control system WCS is controlled to schedule each shuttle vehicle required in the automated production process according to the equipment scheduling strategy to perform the warehouse outbound / inbound task, wherein the shuttle vehicle is used to perform the warehouse outbound / inbound task in the automated production process. Through the above technical solution provided by the present invention, the purpose of reducing the frequent switching of shuttle vehicles between different layers through the scheduling algorithm is achieved, the time cost caused by switching layers is reduced, and the defects of mutual interference of vehicle switching tasks can be prevented, ensuring that there are vehicles available at the task layer, and improving the storage density and overall operation efficiency of the stereoscopic warehouse, thereby solving the technical problem that the shuttle vehicles used for stereoscopic warehouses in the automated production process in the related technology are prone to mutual interference when working. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0027] Figure 1 It is a hardware structure block diagram of a mobile terminal of a shuttle vehicle scheduling method in an automated production process according to an embodiment of the present invention;
[0028] Figure 2 is a flow chart of a shuttle vehicle scheduling method in an automated production process according to an embodiment of the present invention;
[0029] Figure 3 is a flow chart of a method for scheduling a shuttle in an optional automated production process according to an embodiment of the present invention;
[0030] Figure 4 is a schematic diagram of a shuttle vehicle scheduling device in an automated production process according to an embodiment of the present invention. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0032] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0033] As introduced in the background technology, in the related art, shuttles used in stereoscopic warehouses in the automated production process are prone to mutual interference during operation. In view of the above defects, a method and device for scheduling shuttles in an automated production process, a computer-readable storage medium, a processor, and a computer program product are provided in an embodiment of the present invention.
[0034] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0035] The method embodiments provided in the embodiments of the present invention can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal for a shuttle vehicle scheduling method in an automated production process according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is for illustration only and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0036] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the shuttle scheduling method in the automated production process in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0037] According to an embodiment of the present invention, a method embodiment of a shuttle scheduling method in an automated production process is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0038] Figure 2 is a flow chart of a shuttle vehicle scheduling method in an automated production process according to an embodiment of the present invention. Figure 2 As shown, the shuttle scheduling method in the automated production process includes the following steps:
[0039] Step S202, when receiving the outbound / inbound task generated by the warehouse management system WMS, a process main task is generated according to the outbound / inbound task.
[0040] In this embodiment, when the WMS system generates a warehouse-out / warehouse-in task, a process main task can be generated according to the warehouse-out / warehouse-in task.
[0041] Figure 3 is a flow chart of a method for scheduling a shuttle vehicle in an optional automated production process according to an embodiment of the present invention, such as Figure 3 As shown, when WMS generates an outbound / inbound task, the task generation path will be written into the F_TaskList main task list.
[0042] Step S204, decompose the process main task to obtain process subtasks.
[0043] In this embodiment, the main task flow may be decomposed into task flow to obtain various flow subtasks.
[0044] Step S206, sending the process main task and the process subtask to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask.
[0045] Step S208, controlling the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, wherein the shuttle vehicles are used to perform the outbound / inbound tasks in the automated production process.
[0046] From the above, it can be seen that in an embodiment of the present invention, when a warehouse outbound / inbound task generated by a warehouse management system WMS is received, a process main task is generated according to the warehouse outbound / inbound task; the process main task is decomposed to obtain process subtasks; the process main task and the process subtasks are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtasks; the warehouse control system WCS is controlled to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the warehouse outbound / inbound task, wherein the shuttle vehicle is used to perform the warehouse outbound / inbound task in the automated production process, thereby achieving the purpose of reducing the frequent switching of shuttle vehicles between different layers through the scheduling algorithm, reducing the time cost caused by switching layers, and preventing the defects of mutual interference between vehicle layer switching tasks, ensuring that there are vehicles available at the task layer, and improving the storage density and overall operation efficiency of the stereoscopic warehouse.
[0047] Therefore, the above technical solution provided by the embodiment of the present invention solves the technical problem in the related art that shuttle vehicles used in stereoscopic warehouses in the automated production process are prone to mutual interference during operation.
[0048] According to the above embodiment of the present invention, before generating the main task of the process according to the outbound / inbound task, the shuttle scheduling method in the automated production process may also include: creating a storage location table, a process task table and an equipment task table in the database, wherein the storage location table is used to record the storage location information and material information in the automated production process, the process task table is used to record the main task of the process and the process subtasks, and the equipment task table is used to record the task information of each shuttle and the production equipment in the automated production.
[0049] In this embodiment, the storage location table PositionList, the process task table ProTaskList, and the equipment task table DeciceTaskList can be created in advance.
[0050] In an embodiment of the present invention, the fields of the storage location table include at least: serial number, lane name, row, column, layer, depth, whether the storage location is locked, and material code; the fields of the process task table include at least: serial number, task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material batch, order number, material box number, quantity, task start time, and task end time; the fields of the equipment task table include at least: serial number, process task number, equipment task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material box number, task start time, and task end time.
[0051] Among them, the storage location table can contain the following fields: serial number, lane name, row, column, layer, depth, whether the storage location is locked, material code and other information; the task process table, the fields are serial number, task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material batch, order number, material box number, quantity, task start time, task end time, etc.; the equipment task table, the fields are serial number, process task number, equipment task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material box number, task start time, task end time, etc.
[0052] According to the above embodiment of the present invention, the process main task and the process subtask are sent to the warehouse control system WCS, so as to generate the equipment scheduling strategy in the automated production process through the warehouse control system WCS according to the process main task and the process subtask, which may include: when it is determined through the process main task and the process subtask that a new material needs to be put into the warehouse, query the storage location table to determine whether there is a material of the same type as the new material in the three-dimensional warehouse, wherein the three-dimensional warehouse is used to store the materials required in the automated production process; when the query result indicates that the material of the same type as the new material is stored in the three-dimensional warehouse, check whether the depth of the storage layer where the material of the same type as the new material is currently located is full; when the check result indicates that the depth of the storage layer is not full, determine the equipment scheduling strategy as follows: control the shuttle vehicle where the new material is located to drive to the storage layer to store the new material in the storage layer; when the check result indicates that the depth of the storage layer is full, determine the equipment scheduling strategy as follows: find out whether the storage layer is an expandable depth or find a new storage location to store the new material.
[0053] In this embodiment, if a new material needs to be put into storage, first check whether there is the same material in the PositionList. If there is the same material, check whether the current depth is full. If not, place it in order by depth; if full, consider whether the depth can be expanded in the same storage location or find a new storage location.
[0054] Among them, when detecting whether the storage depth is full, it can be implemented based on the following example: 1 row, 1 column, and 1 layer in 1 aisle represents a large storage location, and there are two small storage locations in 1 large storage location, representing depth 1 and depth 2; the current depth is full, which means that the current storage location can be queried in the storage location table to see whether the current storage location is locked or there are material boxes stored in the storage location in the inventory table, which means that both depth 1 and depth 2 have material boxes stored or are locked.
[0055] In addition, when expanding the depth of the same storage location or searching for a new storage location, look for a certain storage location to see if there is a material box or it is locked at the location with the largest depth. If not, expand the depth and search for locations with decreasing depths to see if they are available. If not, search for a new storage location.
[0056] According to the above embodiment of the present invention, the process main task and the process subtask are sent to the warehouse control system WCS, so as to generate the equipment scheduling strategy in the automated production process through the warehouse control system WCS according to the process main task and the process subtask, which may include: when the query result indicates that there is no material of the same type as the new material stored in the three-dimensional warehouse, obtaining the material characteristics of the new material and the layout information of the three-dimensional warehouse; searching for the target storage location in the three-dimensional warehouse according to the material characteristics and the layout information; and storing the new material at the maximum depth of the target storage location.
[0057] In this embodiment, if there is no material of the same kind in the above query results, a suitable storage location can be found according to the material characteristics and warehouse layout, and the material can be placed at the maximum depth of the storage location.
[0058] According to the above embodiment of the present invention, the process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, which may include: when it is determined through the process main task and the process subtask that there is material out of the warehouse, the storage time of the material to be out of the warehouse is obtained; the materials to be out of the warehouse are sorted according to the storage time to obtain the sorting result; according to the sorting result, the shuttle car is called to prioritize the materials to be out of the warehouse whose storage time exceeds the storage time threshold.
[0059] In this embodiment, when leaving the warehouse, the materials are first sorted according to the storage time, and the materials with a long storage time are given priority.
[0060] According to the above embodiment of the present invention, the process main task and the process subtask are sent to the warehouse control system WCS, so that the equipment scheduling strategy in the automated production process is generated by the warehouse control system WCS according to the process main task and the process subtask, including: when it is determined through the process main task and the process subtask that there is material out of the warehouse, the warehouse location number of the material to be out of the warehouse is obtained; when it is determined according to the warehouse location number that the materials to be out of the warehouse are located in the same warehouse location, the materials to be out of the warehouse are out of the warehouse in order from small to large according to the depth of the materials to be out of the warehouse.
[0061] In this embodiment, within the same storage location, materials with a small storage depth are prioritized to reduce the complexity of subsequent tasks.
[0062] According to the above embodiment of the present invention, after controlling the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, the shuttle vehicle scheduling method in the automated production process also includes: updating the storage location table and the equipment task table; deleting the outbound / inbound tasks from the process task table or marking the outbound / inbound tasks as completed in the process task table.
[0063] In this embodiment, each storage and retrieval operation will generate a corresponding process task and record it in the ProTaskList table.
[0064] In addition, in the embodiment of the present invention, the tasks in ProTaskList are checked regularly, and the tasks that have not yet generated device tasks are decomposed. During the decomposition process, specific device tasks are generated according to information such as task type and target warehouse location, and recorded in the DeviceTaskList table. Among them, when decomposing the outbound task, it may be necessary to consider the warehouse transfer operation to ensure that the target material can be taken out directly.
[0065] In addition, it should be noted that according to the generated process tasks, the process tasks are subdivided into corresponding equipment tasks, such as conveyor line tasks, elevator tasks, shuttle tasks, etc. If a judgment is made before executing the shuttle task and there is no available shuttle on the current floor, a new shuttle floor-changing task is added.
[0066] In an embodiment of the present invention, during the execution of a device task, the tasks in the DeviceTaskList are executed in the order in which they were created. When the task is a shuttle task, the WriteCarTask() method is called. This function is to write the execution task operation for the shuttle, so that the shuttle can perform the material box handling task from the starting point to the target point. Here in the WriteCarTask() method, first query whether there is an available shuttle in the task execution layer. If there is no available shuttle, call the ChangeFloor() method to schedule the idle and task-free shuttle to the task execution layer. If there is an available shuttle on the current layer, the task is directly assigned to the shuttle for execution. If the task cannot be executed for some reason (such as a shuttle failure, insufficient power, etc.), the task status is updated to waiting, and an attempt is made to reallocate. In addition, this function is to schedule the shuttle to perform a layer-changing task. When there is no available shuttle on the execution task layer, other available shuttles are scheduled to arrive at the layer to perform the shuttle handling task on the layer.
[0067] When the shuttle completes the task, the relevant records in DeviceTaskList and PositionList will be updated. If the task involves a warehouse transfer operation, the material information of the corresponding warehouse location must also be updated. Finally, the completed process task is removed from ProTaskList or marked as completed.
[0068] like Figure 3 As shown, in an embodiment of the present invention, it is assumed that there are four-way vehicles on the starting layer and the destination layer, that is, no layer changing task is generated; the conveyor line, elevator, and four-way vehicle tasks are diverted to generate process subtasks, which will be written into the S_TaskLis task list; after the process subtasks and the process main tasks are created, the WCS system schedules the equipment according to the process sequence; then the process task execution object can be divided into elevators, conveyor lines, and four-way vehicles; for elevators and conveyor lines, the task types are distinguished: 4-outgoing, 5-incoming, 6-transferring, and then the type of task is executed according to the task information; for the four-way vehicle, the layer where the task is located is obtained, and whether there is a vehicle on the task layer; if there is a vehicle on the task layer, the task type is distinguished: 1-outgoing, 2-incoming, 3-transferring; otherwise, a cross-layer task layer to task layer is generated.
[0069] Through the above technical solution provided by the embodiment of the present invention, through the scheduling algorithm, the frequent switching of shuttle vehicles between different floors is reduced, the time cost caused by switching floors is reduced, the mutual interference of vehicle switching tasks can be prevented, and the availability of vehicles on the task layer is ensured. It can also improve the storage density and overall operation efficiency, and ensure that the shuttle vehicle scheduling does not affect the smooth progress of the task, which brings great convenience to warehouse management.
[0070] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0071] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods described in each embodiment of the present application.
[0072] According to an embodiment of the present invention, there is also provided a shuttle scheduling device in an automated production process for implementing the shuttle scheduling method in an automated production process. Figure 4is a schematic diagram of a shuttle vehicle scheduling device in an automated production process according to an embodiment of the present invention, such as Figure 4 As shown, the device includes: a first generating unit 401, a decomposing unit 403, a second generating unit 405 and a control unit 407. The shuttle scheduling device in the automated production process is described below.
[0073] The first generating unit 401 is used to generate a process main task according to the outbound / inbound task when receiving the outbound / inbound task generated by the warehouse management system WMS.
[0074] The decomposition unit 403 is used to decompose the process main task to obtain process subtasks.
[0075] The second generating unit 405 is used to send the process main task and the process subtask to the warehouse control system WCS, so as to generate the equipment scheduling strategy in the automated production process according to the process main task and the process subtask through the warehouse control system WCS.
[0076] The control unit 407 is used to control the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, wherein the shuttle vehicles are used to perform the outbound / inbound tasks in the automated production process.
[0077] It should be noted here that the above-mentioned first generation unit 401, decomposition unit 403, second generation unit 405 and control unit 407 correspond to steps S202 to S208 in the above-mentioned embodiments, and the four units and the corresponding steps implement the same instances and application scenarios, but are not limited to the contents disclosed in the above-mentioned embodiments.
[0078] As can be seen from the above, in the scheme recorded in the above-mentioned embodiment of the present invention, the first generation unit can be used to generate a process main task according to the outbound / inbound task when receiving the outbound / inbound task generated by the warehouse management system WMS; the decomposition unit can be used to decompose the process main task to obtain the process subtask; the second generation unit is used to send the process main task and the process subtask to the warehouse control system WCS, so that the warehouse control system WCS generates the equipment scheduling strategy in the automated production process according to the process main task and the process subtask; the control unit is used to control the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound task, wherein the shuttle vehicle is used to perform the outbound / inbound task in the automated production process, thereby achieving the purpose of reducing the frequent switching of shuttle vehicles between different layers through the scheduling algorithm, reducing the time cost caused by switching layers, and preventing the defects of mutual interference between vehicle layer switching tasks, ensuring that there are vehicles available on the task layer, and improving the storage density and overall operation efficiency of the stereoscopic warehouse.
[0079] Therefore, the above technical solution provided by the embodiment of the present invention solves the technical problem in the related art that shuttle vehicles used in stereoscopic warehouses in the automated production process are prone to mutual interference during operation.
[0080] Optionally, the shuttle scheduling device in the automated production process also includes: a creation unit, which is used to create a storage location table, a process task table and an equipment task table in the database before generating a process main task based on the outbound / inbound task, wherein the storage location table is used to record the storage location information and material information in the automated production process, the process task table is used to record the process main task and process subtasks, and the equipment task table is used to record the task information of each shuttle and production equipment in the automated production.
[0081] Optionally, the fields of the storage location table include at least: serial number, lane name, row, column, layer, depth, whether the storage location is locked, and material code; the fields of the process task table include at least: serial number, task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material batch, order number, material box number, quantity, task start time and task end time; the fields of the equipment task table include at least: serial number, process task number, equipment task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material box number, task start time and task end time.
[0082] Optionally, the second generation unit includes: a query module, which is used to query the storage location table to determine whether there are materials of the same type as the new material in the three-dimensional warehouse when it is determined through the process main task and the process subtask that new materials need to be put into the warehouse, wherein the three-dimensional warehouse is used to store materials required in the automated production process; an inspection module, which is used to check whether the depth of the storage layer where the materials of the same type as the new material are currently located is full when the query result indicates that the three-dimensional warehouse stores materials of the same type as the new material; a first determination module, which is used to determine that the equipment scheduling strategy is: to store the new material in the storage layer by controlling the shuttle vehicle where the new material is located to travel to the storage layer when the inspection result indicates that the depth of the storage layer is not full; and a second determination module, which is used to determine that the equipment scheduling strategy is: to find out whether the storage layer has an expandable depth or to find a new storage location to store the new material when the inspection result indicates that the depth of the storage layer is full.
[0083] Optionally, the second generation unit includes: a first acquisition module, used to obtain the material characteristics of the new material and the layout information of the three-dimensional warehouse when the query result indicates that there is no material of the same type as the new material stored in the three-dimensional warehouse; a search module, used to search for the target storage location in the three-dimensional warehouse according to the material characteristics and layout information; and a storage module, used to store the new material to the maximum depth of the target storage location.
[0084] Optionally, the second generation unit includes: a second acquisition module, which is used to obtain the storage time of materials to be shipped out when it is determined that materials are to be shipped out through the process main task and the process subtask; a sorting module, which is used to sort the materials to be shipped out according to the storage time to obtain the sorting result; and a calling module, which is used to call the shuttle vehicle according to the sorting result to give priority to shipping out the materials to be shipped out whose storage time exceeds the storage time threshold.
[0085] Optionally, the second generation unit includes: a third acquisition module, which is used to obtain the storage location number of the material to be shipped out when it is determined through the process main task and the process subtask that there is material shipping out; an outbound module, which is used to ship out the materials to be shipped out in order of depth from small to large in the materials to be shipped out when it is determined according to the storage location number that the materials to be shipped out are located in the same storage location.
[0086] Optionally, the shuttle scheduling device in the automated production process also includes: an updating unit, which is used to update the storage location table and the equipment task table after controlling the warehouse control system WCS to schedule each shuttle required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks; a processing unit, which is used to delete the outbound / inbound tasks from the process task table or mark the outbound / inbound tasks as completed in the process task table.
[0087] According to another aspect of an embodiment of the present invention, a processor is provided, and the processor is used to run a program, wherein when the program is run, any one of the above-mentioned shuttle vehicle scheduling methods in an automated production process is executed.
[0088] According to another aspect of an embodiment of the present invention, a computer program product is provided, including computer instructions, which, when executed by a processor, execute any one of the above-mentioned methods for scheduling shuttle vehicles in an automated production process.
[0089] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium including a stored program, wherein the program executes any one of the above-mentioned shuttle vehicle scheduling methods in an automated production process.
[0090] Optionally, in this embodiment, the computer-readable storage medium may be located in any one of the computer terminals in a computer terminal group in a computer network, or in any one of the communication devices in a communication device group.
[0091] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: upon receiving an outbound / inbound task generated by a warehouse management system WMS, generating a process main task according to the outbound / inbound task; decomposing the process main task to obtain process subtasks; sending the process main task and the process subtasks to the warehouse control system WCS, so as to generate an equipment scheduling strategy for the automated production process through the warehouse control system WCS according to the process main task and the process subtasks; controlling the warehouse control system WCS to schedule each shuttle vehicle required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound task, wherein the shuttle vehicle is used to perform the outbound / inbound task in the automated production process.
[0092] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: before generating a process main task based on the outbound / inbound task, creating a storage location table, a process task table, and an equipment task table in the database, wherein the storage location table is used to record storage location information and material information in the automated production process, the process task table is used to record the process main task and process subtasks, and the equipment task table is used to record the task information of each shuttle vehicle and production equipment in automated production.
[0093] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: when it is determined through the process main task and the process subtask that a new material needs to be put into the warehouse, query the storage location table to determine whether there is a material of the same type as the new material in the three-dimensional warehouse, wherein the three-dimensional warehouse is used to store materials required in the automated production process; when the query result indicates that the three-dimensional warehouse stores materials of the same type as the new material, check whether the depth of the storage layer where the material of the same type as the new material is currently located is full; when the check result indicates that the depth of the storage layer is not full, determine the equipment scheduling strategy as follows: control the shuttle vehicle where the new material is located to travel to the storage layer to store the new material in the storage layer; when the check result indicates that the depth of the storage layer is full, determine the equipment scheduling strategy as follows: check whether the storage layer has an expandable depth or find a new storage location to store the new material.
[0094] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: when the query result indicates that no material of the same type as the new material is stored in the three-dimensional warehouse, obtaining the material characteristics of the new material and the layout information of the three-dimensional warehouse; searching for a target storage location in the three-dimensional warehouse based on the material characteristics and the layout information; and storing the new material at the maximum depth of the target storage location.
[0095] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: when it is determined through the process main task and the process subtask that materials are to be shipped out, the storage time of the materials to be shipped out is obtained; the materials to be shipped out are sorted according to the storage time to obtain the sorting result; according to the sorting result, a shuttle vehicle is called to prioritize the materials to be shipped out whose storage time exceeds the storage time threshold.
[0096] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: when it is determined through the process main task and the process subtask that materials are to be shipped out, the storage location number of the materials to be shipped out is obtained; when it is determined according to the storage location number that the materials to be shipped out are located in the same storage location, the materials to be shipped out are shipped out in order from small to large according to the depth of the materials to be shipped out.
[0097] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: after controlling the warehouse control system WCS to schedule each shuttle vehicle required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, updating the storage location table and the equipment task table; deleting the outbound / inbound tasks from the process task table or marking the outbound / inbound tasks as completed in the process task table.
[0098] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0099] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0100] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0101] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0102] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0103] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0104] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A shuttle vehicle scheduling method in an automated production process, characterized in that: include: When receiving the outbound / inbound task generated by the warehouse management system WMS, a process main task is generated according to the outbound / inbound task; Decomposing the main task of the process to obtain process subtasks; Sending the process main task and the process subtask to the warehouse control system WCS, so as to generate an equipment scheduling strategy in the automated production process according to the process main task and the process subtask through the warehouse control system WCS; The warehouse control system WCS is controlled to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, wherein the shuttle vehicles are used to perform the outbound / inbound tasks in the automated production process.
2. The shuttle vehicle scheduling method in the automated production process according to claim 1, characterized in that: Before generating the main process task according to the outbound / inbound task, it also includes: creating a storage location table, a process task table and an equipment task table in the database, wherein the storage location table is used to record the storage location information and material information in the automated production process, the process task table is used to record the main process task and the process subtask, and the equipment task table is used to record the task information of each of the shuttle vehicles and the production equipment in the automated production.
3. The shuttle vehicle scheduling method in the automated production process according to claim 2, characterized in that: The fields of the storage location table include at least: serial number, lane name, row, column, layer, depth, whether the storage location is locked, and material code; the fields of the process task table include at least: serial number, task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material batch, order number, material box number, quantity, task start time, and task end time; the fields of the equipment task table include at least: serial number, process task number, equipment task number, lane, starting row, starting column, starting layer, starting depth, destination point, destination row, destination column, destination layer, destination depth, task type, task status, material box number, task start time, and task end time.
4. The shuttle vehicle scheduling method in the automated production process according to claim 2 or 3, characterized in that: The process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: When it is determined through the process main task and the process subtask that a new material needs to be put into storage, the storage location table is queried to determine whether there is a material of the same type as the new material in the three-dimensional warehouse, wherein the three-dimensional warehouse is used to store the materials required in the automated production process; When the query result indicates that the three-dimensional warehouse stores materials of the same type as the new material, checking whether the depth of the storage layer where the materials of the same type as the new material are currently located is full; When the inspection result indicates that the depth of the storage layer is not full, the equipment scheduling strategy is determined as: controlling the shuttle vehicle where the new material is located to travel to the storage layer to store the new material in the storage layer; When the inspection result indicates that the depth of the storage layer is full, the device scheduling strategy is determined as: Find out whether the storage layer can be expanded in depth or find a new storage location to store the new material.
5. The shuttle vehicle scheduling method in the automated production process according to claim 4, characterized in that: The process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: When the query result indicates that the three-dimensional warehouse does not store materials of the same type as the new material, obtaining material properties of the new material and layout information of the three-dimensional warehouse; Searching for a target storage location in the three-dimensional warehouse according to the material characteristics and the layout information; The new material is stored to the maximum depth of the target storage location.
6. The shuttle vehicle scheduling method in the automated production process according to claim 2 or 3, characterized in that: The process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: When it is determined through the process main task and the process subtask that materials are to be shipped out, the storage time of the materials to be shipped out is obtained; Sorting the materials to be shipped out according to the storage time to obtain a sorting result; The shuttle vehicle is called according to the sorting result to preferentially dispatch the materials to be dispatched whose storage time exceeds a storage time threshold.
7. The shuttle vehicle scheduling method in the automated production process according to claim 1, characterized in that: The process main task and the process subtask are sent to the warehouse control system WCS, so that the warehouse control system WCS generates an equipment scheduling strategy in the automated production process according to the process main task and the process subtask, including: When it is determined through the process main task and the process subtask that there is material to be shipped out, the warehouse location number of the material to be shipped out is obtained; When it is determined according to the storage location number that the materials to be shipped out are located in the same storage location, the materials to be shipped out are shipped out in order from small to large depths in the materials to be shipped out.
8. The shuttle vehicle scheduling method in the automated production process according to claim 2 or 3, characterized in that: After controlling the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, the method further includes: Updating the storage location table and the equipment task table; The outbound / inbound task is deleted from the process task table or the outbound / inbound task is marked as completed in the process task table.
9. A shuttle dispatching device in an automated production process, characterized in that: include: The first generating unit is used to generate a process main task according to the outbound / inbound task when receiving the outbound / inbound task generated by the warehouse management system WMS; A decomposition unit, used to decompose the main task of the process to obtain process subtasks; A second generating unit is used to send the process main task and the process subtask to the warehouse control system WCS, so as to generate an equipment scheduling strategy in the automated production process according to the process main task and the process subtask through the warehouse control system WCS; A control unit is used to control the warehouse control system WCS to schedule the shuttle vehicles required in the automated production process according to the equipment scheduling strategy to perform the outbound / inbound tasks, wherein the shuttle vehicles are used to perform the outbound / inbound tasks in the automated production process.
10. A computer program product comprising computer instructions, characterized in that When the computer instructions are executed by the processor, the shuttle scheduling method in the automated production process described in any one of claims 1 to 8 is performed.
