Gas well controlled reserve calculation method for heterogeneous reservoir
By obtaining the real gas well control reserves and well test analysis, the gas well control radius is established using the least squares method and probability theory, the relationship curve between gas well control reserves and heterogeneous reservoirs is solved, and the calculation error of gas well control reserves in heterogeneous reservoirs is solved. Problem, high accuracy and high accuracy single well reserve evaluation is achieved.
Patent Information
- Application Number
- CN202310662841.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-06
- Publication Date
- 2024-12-06
AI Technical Summary
In heterogeneous reservoirs, there are errors in the calculation of gas well control reserves. The prior art depends on the measurement hysteresis of gas well control radius and low accuracy, making it difficult to accurately solve the gas well in the early stage of production.
By obtaining the true gas well control reserves and the gas well control radius obtained by well trial analysis, the least squares method is used to determine the relationship curve between gas well control reserves and gas well control reserves in heterogeneous reservoirs, and the correlation coefficient and significance of the regression equation are performed. Test and establish a normal distribution probability model, and combine the voltage recovery derivative curve to determine the control reserve value.
Improve the calculation accuracy of gas well control reserves, and can accurately evaluate single well reserves in the early stages of gas well production, solve the calculation error problem caused by uneven distribution of reservoir physical parameters in heterogeneous reservoirs, and the calculation scientificity and accuracy reach 95. %above.
Smart Images

Figure CN119089127A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and gas field development, and in particular to a method for calculating gas well controlled reserves of heterogeneous reservoirs. Background Art
[0002] At present, the calculation method of gas well controlled reserves is mainly based on the reserve calculation formula of the oil and gas industry, that is, the controlled reserves of gas wells Equal to the square of the gas well control radius R 2 Multiply by π times the porosity Multiply by the reservoir thickness h multiply by the gas saturation , specifically: ;in , it's time and pressure conductivity Assume that ,but . is a function of the gas well controlled reserves. However, the gas well controlled radius R cannot be obtained immediately after the gas well is put into production. It takes a period of time for the pressure wave to be transmitted to the seepage boundary before it can be determined. At present, most gas reservoirs in the Sichuan Basin are heterogeneous reservoirs with large permeability variations. Usually, in heterogeneous reservoirs, the gas well controlled radius R is obtained based on the gas well logging results. , the controlled reserves are calculated, and Often not equal to ,in , , They are the gas well porosity, reservoir thickness and gas saturation interpreted by well logging. These important parameters vary greatly during the testing process, resulting in errors in the calculated results.
[0003] A Chinese patent document with publication number CN112878987A and publication date June 1, 2021 discloses a method for calculating controlled reserves of shale gas wells using production data, which is characterized by including the following contents: S1. Obtain basic data of gas wells, including static data: matrix bound water saturation, Langmuir volume, Langmuir pressure, matrix porosity, shale density, gas reservoir original temperature, gas reservoir original pressure, kerogen density, adsorption phase porosity in organic matter, free gas porosity in organic matter, TOC content; phase data: pressure and compression factor, pressure and gas viscosity; production data: daily gas production, cumulative gas production, bottom hole flowing pressure; S2. Assuming that a single well controls reserves, the average formation pressure is calculated using the shale gas reservoir pressure drop equation that considers free gas in fractures; S3, according to the average formation pressure calculated in step S2, using the derived equation of the shale gas reservoir pressure drop equation considering free gas in the fractures, and using the gas well production data fitting regression to calculate the single well controlled reserves; S4. Compare the difference between the single-well controlled reserves assumed in step S2 and the single-well controlled reserves calculated in step S3. If the difference meets the accuracy requirement, stop the calculation and the assumed single-well controlled reserves are the required single-well controlled reserves. If not, make the single-well controlled reserves assumed in step S2 equal to the single-well controlled reserves calculated in step S3 and repeat steps S2 to S4.
[0004] The method disclosed in the patent document for calculating the controlled reserves of shale gas wells using production data proposes the idea of using the shale gas reservoir pressure drop equation taking into account the free gas in the fractures, assuming the controlled reserves of a single well, and using the production data of a single well to calculate the formation pressure. The formation pressure can be obtained without shutting down the well; then the derived equation is used to regress the controlled reserves of a single well using the calculated formation pressure and the production data of a single well; finally, the difference between the assumed controlled reserves of a single well and the calculated controlled reserves of a single well is compared until the accuracy requirements are met, and a trial algorithm is used to automatically calculate the controlled reserves of a single well to solve the problem that the average formation pressure is difficult to measure. However, a large amount of basic data of the gas well needs to be obtained, which is prone to errors, resulting in low calculation accuracy of the controlled reserves. Summary of the invention
[0005] In order to overcome the defects of the above-mentioned prior art, the present invention provides a method for calculating the controlled reserves of gas wells in heterogeneous reservoirs. The present invention effectively corrects the controlled radius of the gas wells in heterogeneous gas reservoirs through the controlled reserves of actual gas wells that have been put into production and the controlled radius of the gas wells obtained by well test analysis, thereby improving the calculation accuracy of the controlled reserves and facilitating the accurate evaluation of the reserves of a single well.
[0006] The present invention is achieved through the following technical solutions: A method for calculating controlled reserves of a gas well in a heterogeneous reservoir, characterized by comprising the following steps: a. Obtain the actual controlled reserves G of the gas wells that have been put into production, and then obtain the controlled radius R of the gas wells based on the well test analysis to obtain the function of the controlled reserves of the gas wells ; b. Determine the gas well controlled reserves G and the function a of the gas well controlled reserves in heterogeneous reservoirs according to the least squares method * The relationship curve of Assumptions Formula 2 The regression coefficient A is solved by equation 3; Formula 3 Then we get the regression equation Formula 4; Among them, G is the controlled reserves of the gas well, A is the regression coefficient, and a * is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the function of gas well controlled reserves, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves; c. Conduct correlation coefficient test and significance test on the regression equation; d. Establish a normal distribution probability model based on the probability distribution principle; e. Determine the control reserve value based on the pressure recovery derivative curve.
[0007] In the step a, the function of the gas well controlled reserves is calculated by formula 1; Formula 1 in, is a function of the gas well controlled reserves, G is the gas well controlled reserves, and R is the gas well controlled radius.
[0008] In the step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test through formula 5. When r is greater than the critical value, it indicates that the regression equation is reasonable; Formula 5 Among them, r is the correlation coefficient, G is the controlled reserves of the gas well, is the maximum controlled reserves of the gas well, It is the average value of controlled reserves of gas wells.
[0009] The r greater than the critical value means that r is greater than 0.361.
[0010] In step c, the significance test refers to testing the significance of the regression coefficient A through formula 6 to determine the function a of the gas well controlled reserves G and the heterogeneous reservoir gas well controlled reserves. * Is the assumption between the two reasonable? If it is greater than the critical value, then the gas well controlled reserves G and the function a of the gas well controlled reserves of the heterogeneous reservoir are determined. * The assumptions between them are reasonable; Formula 6 in, is the significance test coefficient, is the function of gas well controlled reserves, is the maximum controlled reserves of the gas well, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves, is the number of samples.
[0011] Said Greater than the critical value means greater than 2.0484.
[0012] In the step d, the normal distribution probability model is determined by formula 7; Formula 7 in, is the integral of the normal distribution function of the heterogeneous reservoir, is the mathematical expectation of the normal distribution, is the standard deviation, Take 2.8, is the circumference of a circle, is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the differential of the function of controlling reserves of a gas well in a heterogeneous reservoir.
[0013] In the step e, the controlled reserve value is determined to include two states: the physical properties of the gas well far from the wellbore area are improved; and the physical properties of the gas well far from the wellbore area are deteriorated.
[0014] When the physical properties of the gas well far well area improve, the pressure derivative value decreases, then a>a * The controlled reserves of the gas well are 0.8315a * +5.32.
[0015] When the physical properties of the gas well far from the wellbore area deteriorate, the pressure derivative value increases, then a<a * The controlled reserves of the gas well are 0.8315a * -5.32.
[0016] The beneficial effects of the present invention are mainly manifested in the following aspects: 1. The present invention, "a. Obtain the actual controlled reserves G of the gas wells that have been put into production, and then obtain the controlled radius R of the gas wells based on the well test analysis, and obtain the function of the controlled reserves of the gas wells b. Determine the gas well controlled reserves G and the function a of the gas well controlled reserves of heterogeneous reservoirs according to the least squares method * c. Conduct correlation coefficient test and significance test on the regression equation; d. Establish normal distribution probability model according to probability distribution principle; e. Determine the controlled reserve value according to pressure recovery derivative curve. Compared with the existing technology, the controlled reserve of real gas wells put into production and the controlled radius of gas wells obtained by well test analysis can effectively correct the controlled radius of gas wells in heterogeneous gas reservoirs, thereby improving the calculation accuracy of controlled reserves and facilitating accurate evaluation of single well reserves.
[0017] 2. The present invention solves the problem that the solution of the controlled reserves of a gas well depends on the lag in the solution of the gas well control radius R. The controlled reserves can be solved at the initial stage of gas well production. At the same time, it can solve the problem of controlled reserves calculation error caused by the uneven distribution of reservoir physical property parameters in heterogeneous reservoirs.
[0018] 3. The present invention, by introducing probability theory and well test instability analysis derivative curve, can more accurately solve the controlled reserves in the initial stage of production, and can control the probability to more than 95%, greatly improving the scientificity and accuracy of the calculation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments: Figure 1 It is a flowchart of the present invention; Figure 2 This is the least squares relationship diagram of the Carboniferous sample gas wells. DETAILED DESCRIPTION
[0020] Example 1 See also Figure 1 , a method for calculating the controlled reserves of a gas well in a heterogeneous reservoir, comprising the following steps: a. Obtain the actual controlled reserves G of the gas wells that have been put into production, and then obtain the controlled radius R of the gas wells based on the well test analysis to obtain the function of the controlled reserves of the gas wells ; b. Determine the gas well controlled reserves G and the function of the gas well controlled reserves in heterogeneous reservoirs according to the least squares method The relationship curve of Assumptions Formula 2 The regression coefficient A is solved by equation 3; Formula 3 Then we get the regression equation Formula 4; Among them, G is the controlled reserves of the gas well, A is the regression coefficient, is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the function of gas well controlled reserves, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves; c. Conduct correlation coefficient test and significance test on the regression equation; d. Establish a normal distribution probability model based on the probability distribution principle; e. Determine the control reserve value based on the pressure recovery derivative curve.
[0021] This embodiment is the most basic implementation method. Through the actual controlled reserves of gas wells that have been put into production and the controlled radius of the gas well obtained by well test analysis, the controlled radius of the gas well in the heterogeneous gas reservoir is effectively corrected, thereby improving the calculation accuracy of the controlled reserves and facilitating the accurate evaluation of the reserves of a single well.
[0022] Example 2 See also Figure 1 , a method for calculating the controlled reserves of a gas well in a heterogeneous reservoir, comprising the following steps: a. Obtain the actual controlled reserves G of the gas wells that have been put into production, and then obtain the controlled radius R of the gas wells based on the well test analysis to obtain the function of the controlled reserves of the gas wells ; b. Determine the gas well controlled reserves G and the function of the gas well controlled reserves in heterogeneous reservoirs according to the least squares method The relationship curve of Assumptions Formula 2 The regression coefficient A is solved by equation 3; Formula 3 Then we get the regression equation Formula 4; Among them, G is the controlled reserves of the gas well, A is the regression coefficient, is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the function of gas well controlled reserves, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves; c. Conduct correlation coefficient test and significance test on the regression equation; d. Establish a normal distribution probability model based on the probability distribution principle; e. Determine the control reserve value based on the pressure recovery derivative curve.
[0023] In the step a, the function of the gas well controlled reserves is calculated by formula 1; Formula 1 in, is a function of the gas well controlled reserves, G is the gas well controlled reserves, and R is the gas well controlled radius.
[0024] In the step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test through formula 5. When r is greater than the critical value, it indicates that the regression equation is reasonable; Formula 5 Among them, r is the correlation coefficient, G is the controlled reserves of the gas well, is the maximum controlled reserves of the gas well, It is the average value of controlled reserves of gas wells.
[0025] Furthermore, in step c, the significance test refers to testing the significance of the regression coefficient A through formula 6 to determine the function of the gas well controlled reserves G and the heterogeneous reservoir gas well controlled reserves. Is the assumption between them reasonable? When it is greater than the critical value 2.0484, it is determined that the gas well controlled reserves G is a function of the gas well controlled reserves in the heterogeneous reservoir. The assumptions between them are reasonable; Formula 6 in, is the significance test coefficient, is the function of gas well controlled reserves, is the maximum controlled reserves of the gas well, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves, is the number of samples.
[0026] This embodiment is a preferred implementation method, which solves the problem that the solution of the controlled reserves of the gas well depends on the lag in the solution of the gas well control radius R. The controlled reserves can be solved in the early stage of gas well production, and at the same time, it can solve the problem of controlled reserves calculation errors caused by the uneven distribution of reservoir physical property parameters in heterogeneous reservoirs.
[0027] Example 3 See also Figure 1 , a method for calculating the controlled reserves of a gas well in a heterogeneous reservoir, comprising the following steps: a. Obtain the actual controlled reserves G of the gas wells that have been put into production, and then obtain the controlled radius R of the gas wells based on the well test analysis to obtain the function of the controlled reserves of the gas wells ; b. Determine the gas well controlled reserves G and the function of the gas well controlled reserves in heterogeneous reservoirs according to the least squares method The relationship curve of Assumptions Formula 2 The regression coefficient A is solved by equation 3; Formula 3 Then we get the regression equation Formula 4; Among them, G is the controlled reserves of the gas well, A is the regression coefficient, is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the function of gas well controlled reserves, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves; c. Conduct correlation coefficient test and significance test on the regression equation; d. Establish a normal distribution probability model based on the probability distribution principle; e. Determine the control reserve value based on the pressure recovery derivative curve.
[0028] In the step a, the function of the gas well controlled reserves is calculated by formula 1; Formula 1 in, is a function of the gas well controlled reserves, G is the gas well controlled reserves, and R is the gas well controlled radius.
[0029] In the step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test through formula 5. When r is greater than the critical value, it indicates that the regression equation is reasonable; Formula 5 Among them, r is the correlation coefficient, G is the controlled reserves of the gas well, is the maximum controlled reserves of the gas well, It is the average value of controlled reserves of gas wells.
[0030] In step c, the significance test refers to testing the significance of the regression coefficient A through formula 6 to determine the function of the gas well controlled reserves G and the heterogeneous reservoir gas well controlled reserves. Is the assumption between the two reasonable? If it is greater than the critical value 2.0484, then the gas well controlled reserves G and the function of the gas well controlled reserves of the heterogeneous reservoir are determined. The assumptions between them are reasonable; Formula 6 in, is the significance test coefficient, is the function of gas well controlled reserves, is the maximum controlled reserves of the gas well, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves, is the number of samples.
[0031] Furthermore, in step d, the normal distribution probability model is determined by formula 7; Formula 7 in, is the integral of the normal distribution function of the heterogeneous reservoir, is the mathematical expectation of the normal distribution, is the standard deviation, Take 2.8, is the circumference of a circle, is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the differential of the function of controlling reserves of a gas well in a heterogeneous reservoir.
[0032] Furthermore, in step e, the value of the controlled reserves is determined to be when the physical properties of the gas well far away from the wellbore area become better and the pressure derivative value becomes smaller, then a>a * The controlled reserves of the gas well are 0.8315a * +5.32; when the physical properties of the gas well far from the wellbore area deteriorate, the pressure derivative value increases, then a<a * The controlled reserves of the gas well are 0.8315a * -5.32.
[0033] This embodiment is the best implementation method. By introducing probability theory and well test instability analysis derivative curve, the controlled reserves in the initial stage of production are solved more accurately, and the control probability can reach more than 95%, which greatly improves the scientificity and accuracy of the calculation.
[0034] The present invention is described below using a certain block of the Carboniferous system in the eastern Sichuan Basin: See also Figure 2 The Carboniferous is a carbonate rock fracture-pore reservoir with well-developed microfractures and strong reservoir heterogeneity, as shown in Table 1. Table 1 is a table of gas well controlled reserves calculation parameters for heterogeneous reservoir blocks.
[0035] Table 1 According to formula 5, the correlation coefficient r is calculated to be 0.7052. When the degree of freedom is n-2, n is the sample size of 27 and the significance level is 0.05, r is 0.7052, and r is greater than the critical value of 0.361.
[0036] The significance test coefficient is calculated according to formula 6 =7.26, Greater than 2.0484, determining the function of gas well controlled reserves G and heterogeneous reservoir gas well controlled reserves The assumptions between them are reasonable.
[0037] It can be seen that the calculation method of the present invention can improve the calculation accuracy of controlled reserves and facilitate accurate evaluation of single well reserves.
Claims
1. A method for calculating controlled reserves of a gas well in a heterogeneous reservoir, characterized in that: The following steps are involved: a. Obtain the actual controlled reserves G of the gas wells that have been put into production, and then obtain the controlled radius R of the gas wells based on the well test analysis to obtain the function of the controlled reserves of the gas wells; b. Determine the gas well controlled reserves G and the function a of the gas well controlled reserves in heterogeneous reservoirs according to the least squares method * The relationship curve of Assumptions Formula 2 The regression coefficient A is solved by equation 3; Formula 3 Then we get the regression equation Formula 4; Among them, G is the controlled reserves of the gas well, A is the regression coefficient, and a * is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the function of gas well controlled reserves, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves; c. Conduct correlation coefficient test and significance test on the regression equation; d. Establish a normal distribution probability model based on the probability distribution principle; e. Determine the control reserve value based on the pressure recovery derivative curve.
2. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 1, characterized in that: In the step a, the function of the gas well controlled reserves is calculated by formula 1; Formula 1 in, is a function of the gas well controlled reserves, G is the gas well controlled reserves, and R is the gas well controlled radius.
3. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 1, characterized in that: In the step c, the correlation coefficient test of the regression equation refers to the correlation coefficient test through formula 5. When r is greater than the critical value, it indicates that the regression equation is reasonable; Formula 5 Among them, r is the correlation coefficient, G is the controlled reserves of the gas well, is the maximum controlled reserves of the gas well, It is the average value of controlled reserves of gas wells.
4. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 3, characterized in that: The r greater than the critical value means that r is greater than 0.
361.
5. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 1, characterized in that: In step c, the significance test refers to testing the significance of the regression coefficient A through formula 6 to determine the function a of the gas well controlled reserves G and the heterogeneous reservoir gas well controlled reserves. * Is the assumption between the two reasonable? If it is greater than the critical value, then the gas well controlled reserves G and the function a of the gas well controlled reserves of the heterogeneous reservoir are determined. * The assumptions between them are reasonable; Formula 6 in, is the significance test coefficient, is the function of gas well controlled reserves, is the maximum controlled reserves of the gas well, Control reserves for different gas wells, is the function of controlled reserves of different gas wells, is the function average value of gas well controlled reserves, is the number of samples.
6. A method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 5, characterized in that: Said Greater than the critical value means greater than 2.0484.
7. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 1, characterized in that: In the step d, the normal distribution probability model is determined by formula 7; Formula 7 in, is the integral of the normal distribution function of the heterogeneous reservoir, is the mathematical expectation of the normal distribution, is the standard deviation, Take 2.8, is pi, a * is the function of the controlled reserves of the gas well in the heterogeneous reservoir, is the differential of the function of controlling reserves of a gas well in a heterogeneous reservoir.
8. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 1, characterized in that: In the step e, the controlled reserve value is determined to include two states: the physical properties of the gas well far from the wellbore area are improved; and the physical properties of the gas well far from the wellbore area are deteriorated.
9. A method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 8, characterized in that:When the physical properties of the gas well far well area improve, the pressure derivative value decreases, then a>a * The controlled reserves of the gas well are 0.8315a * +5.
32.
10. The method for calculating controlled reserves of a gas well in a heterogeneous reservoir according to claim 8, characterized in that: When the physical properties of the gas well far from the wellbore area deteriorate, the pressure derivative value increases, then a<a * The controlled reserves of the gas well are 0.8315a * -5.32.
Citation Information
Patent Citations
Discrete numerical well-testing analysis method and system for fracture-cavity-type carbonate oil reservoir
CN109138974A
Shale gas well control reserve calculation method
CN112464586A
Method and device for determining reasonable yield of gas well of heterogeneous gas reservoir
CN115075807A
Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
US20050119911A1
