Model selection method and system for lower structure of multi-layer three-dimensional expansion bridge of urban highway
Through the modular multi-layer three-dimensional expansion bridge substructure selection method of urban highways, data processing and mechanical modeling analysis are used to quickly screen out the best economical pier solution, which solves the traditional design method in the long cycle and complex route environment. The design difficulty issue has achieved rapid selection and economical applicability of bridge structures.
Patent Information
- Application Number
- CN202411085158.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-12-06
AI Technical Summary
During the three-dimensional expansion of urban expressways, traditional graphic widening design is difficult to solve the problems of huge traffic volume and building demolition, and it is difficult to achieve efficient and economical bridge structure design.
The modular urban highway multi-layer three-dimensional expansion bridge substructure selection method includes data processing, selection, display, engineering quantity calculation and drawing steps. Through data integration, mechanical modeling analysis and engineering quantity calculation, the economy can be quickly screened out. The best-performance bridge pier solution is used to match and filter different bridge pier model modules in the database.
It realizes rapid selection of bridge structure design, reduces design cycle and repetitive workload, is suitable for three-dimensional expansion design in complex route environments, saves designers time, and provides economical and applicable solutions.
Smart Images

Figure CN119089538A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of overpass bridge design, and in particular to a method and system for selecting a bridge substructure during a multi-story three-dimensional reconstruction and expansion process. Background Art
[0002] With the rapid development of my country's economy, urban and infrastructure construction has also ushered in a period of rapid development. With the increase in the scale of urban construction, the scale of cities is increasingly approaching the development trend of high density. The high density of cities can reduce costs, expand the production and service industry chain, create economic prosperity through population agglomeration, and enhance innovation by strengthening the diversity of cities. In addition, it can deepen the economic division of labor and social interaction among people, and create a vibrant and safer urban environment. However, with the high-density development of cities, a series of challenges are also brought about, such as traffic congestion and high cost of living. At the same time, the development trend of high-density cities shows that cities have an inherent trend of increasing density, which puts forward higher demands on urban management and services. In order to cope with the challenges and opportunities brought about by the rapid urbanization process, under the concept of smart growth and compact cities, the shortage of urban land and the dense population brought about by high-density development have made the spatial utilization of high-density urban areas continue to move towards three-dimensionality and diversification, aiming to better guide the future development of high-density cities.
[0003] The high density of cities will inevitably lead to a shortage of urban construction space and a dense population. Under the demand for rapid infrastructure development today, it brings huge challenges to the reconstruction and expansion of highways. It is inevitable that in the process of highway construction, full consideration should be given to the use of existing space, effective avoidance of existing buildings and structures, and rational use of new materials and new technologies to reduce the impact on the existing urban infrastructure.
[0004] The traffic volume on highways in high-density urban areas is huge, and all kinds of traffic are mixed. To expand and renovate highways and increase the number of lanes on highways, the traditional plane widening method will occupy a large amount of land on both sides of the road, and the amount of demolition will also be large. Especially when it involves some schools, hospitals and other buildings that cannot be demolished, the traditional plane expansion design method is difficult to solve the problem. Therefore, when the expansion and renovation plan is determined, the three-dimensional composite expansion design form is selected.
[0005] For example, the public document with publication number CN111676745A, publication date 2020-09-18, and patent name "Dual-mode urban road system and driving method thereof" discloses a dual-mode urban road system and driving method thereof, which is a technical innovation for upgrading and expanding urban roads. The urban road system is a "composite road system", including first-class roads that drive on the right and second-class roads that drive on the left. The first-class roads and second-class roads intersect at the third-class intersection; compared with the first-class intersection and the second-class intersection where the same type of roads intersect, the third-class intersection has doubled its capacity.
[0006] However, similar expansion methods face technical problems; in the process of realizing the three-dimensional expansion of urban highways, how to design bridge structures more efficiently and economically. Summary of the invention
[0007] The technical problem to be solved by the present invention is to realize a modular bridge pier, which can be suitable for three-dimensional expansion in different scenarios and has good promotion value.
[0008] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a method for selecting a substructure of a multi-layer three-dimensional expansion bridge on an urban highway, comprising the following steps:
[0009] Data processing steps: input data integration and building of a large data model;
[0010] Selection step: preliminary selection step of pier structure, obtaining one or more pier selection schemes suitable for the existing route;
[0011] Demonstration steps: Structural calculation and analysis steps, conduct mechanical modeling analysis on each pier selection scheme, determine the actual pier size and surrounding relationship of each pier selection scheme by modeling, conduct a second collision screening based on the actual size, and determine the feasible pier structure whose structural force and spatial position meet the requirements;
[0012] Engineering quantity calculation step: engineering quantity generation and economic comparison step, importing feasible pier structures into the engineering quantity calculation module and construction cost calculation module to obtain the most economical bridge pier solution;
[0013] Drawing steps: Draw the steps to determine the bridge pier plan.
[0014] In the data processing step, the input data include: restriction data and demand data, the restriction data are existing roads, underground pipeline networks, topography and landforms, and land use red lines, and the demand data are urban highway routes, bridge span layout, bridge width, bridge clear height, and load level.
[0015] In the screening step, feasible bridge widths and bridge storeys are obtained according to the data big model, and feasible pier model modules in the database are matched based on the bridge widths and bridge storeys to conduct preliminary screening of pier column structures and obtain a pier selection scheme suitable for the existing route.
[0016] In the screening step, the existing road matching scheme is obtained according to the restriction data, the new bridge matching scheme is obtained according to the demand data, and the matching scheme is obtained according to the intersection of the existing road matching scheme and the new bridge matching scheme.
[0017] The pier model modules stored in the database include single-layer T-shaped piers, double-column vase piers, double-column portal piers, three-column portal piers and portal piers with arch ribs, as well as double-layer T-shaped piers, double-column vase piers, double-column portal piers, three-column portal piers and portal piers with arch ribs. The existing roads and newly built roads applicable to each pier are summarized and sorted out to obtain the key control factors of each pier, and the key control factors are used as screening conditions for each pier.
[0018] In the display step, mechanical modeling analysis is used to determine the cross-sectional dimensions of the piers, the bundle arrangement and reinforcement of the cap beams. The specific dimensions of each pier selection scheme are determined based on the mechanical modeling analysis results. A three-dimensional model of each pier selection scheme is generated based on the specific dimensions. The actual pier dimensions and surrounding relationships are displayed in the three-dimensional model, the structural force and spatial position are determined, and unfeasible pier selection schemes are deleted to obtain feasible pier structures.
[0019] The characteristic is that the engineering quantity calculation step includes the calculation of the amount of bridge pier materials, the calculation of the construction period and the calculation of the engineering cost.
[0020] The drawing steps include an information input part, an automatic search and matching part, and an automatic matching of corresponding pier drawing plates. The known cross-sectional parameters, reinforcement and bundle arrangement information are input, and the software automatically draws drawings according to the set style.
[0021] The substructure selection system of the multi-layer stereoscopic expansion bridge of the urban highway comprises a processing device, a display device and an input device, wherein the processing device comprises:
[0022] Data processing module: input data integration and construction of data large model module;
[0023] Selection module: preliminary selection module for pier structure;
[0024] Demonstration steps: Structural calculation and analysis module;
[0025] Engineering quantity calculation module: engineering quantity generation and economic comparison module;
[0026] Drawing module: drawing and determining the bridge pier scheme module.
[0027] The system executes the method for selecting the substructure of the multi-story, stereoscopic expansion bridge on the urban highway.
[0028] The method and system for quickly selecting multi-layer three-dimensional expansion bridge piers of the present invention solve the problems of multiple and complex types of bridge piers and long design cycle in the process of erecting three-dimensional bridges. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The following is a brief description of the contents expressed in each figure in the specification of the present invention:
[0030] Figure 1 The module diagram of the system composition for selecting the substructure of multi-layered three-dimensional expansion bridges on urban highways;
[0031] Figure 2 The flowchart of step 2 of the method for selecting the substructure of a multi-story, three-dimensional expansion bridge on an urban highway is provided;
[0032] Figure 3 This is a schematic diagram of the T-shaped pier structure in a typical single-layer bridge pier module scheme;
[0033] Figure 4 This is a schematic diagram of the double-column pier structure in a typical single-layer bridge pier module;
[0034] Figure 5 This is a schematic diagram of the double-column portal pier structure in a typical single-layer bridge pier module scheme;
[0035] Figure 6 This is a schematic diagram of the three-column portal pier structure in a typical single-layer bridge pier module scheme;
[0036] Figure 7 This is a schematic diagram of the pier structure with arch ribs in a typical single-layer bridge pier module scheme;
[0037] Figure 8 This is a schematic diagram of the T-shaped pier structure in a typical double-layer bridge pier module scheme;
[0038] Fig. 9 This is a schematic diagram of the double-column pier structure in a typical double-layer bridge pier module scheme;
[0039] Fig.10 This is a schematic diagram of the double-column portal pier structure in a typical double-layer scheme of a pier module;
[0040] Fig.11 This is a schematic diagram of the three-column portal pier structure in a typical double-layer bridge pier module scheme;
[0041] Fig.12 This is a schematic diagram of the pier structure with arch ribs in a typical double-layer scheme of bridge pier modules. DETAILED DESCRIPTION
[0042] The following is a further detailed description of the specific implementation methods of the present invention, such as the shape, structure, relative position and connection relationship between the various components involved, the function and working principle of each part, the manufacturing process and operation method, etc., through the description of the embodiments with reference to the accompanying drawings, so as to help those skilled in the art to have a more complete, accurate and in-depth understanding of the inventive concept and technical solution of the present invention.
[0043] The substructure selection method for multi-story, three-dimensional expansion bridges on urban highways is as follows: Figure 1 As shown, it includes the following steps:
[0044] Step 1: Data collation and synthesis. The influencing factors such as existing roads, underground pipeline networks, topography, land use red lines, etc. are collated, and combined with information such as urban highway routes, bridge span layout, bridge width, bridge clear height, etc., all information is collated and synthesized into a large spatial data model;
[0045] The spatial data model includes a real 3D real-life model of the terrain, a preset 3D model and their corresponding key data affecting the bridge piers. The real 3D model is composed of the terrain and landforms surveyed by total station, satellite photography and drone aerial photography, existing road features, and ground pipe network pipeline construction; the newly built preset 3D model is constructed by the newly built road route, the width of the newly built bridge, and the bridge deck elevation.
[0046] Step 2: Preliminary selection of pier structure. Determine the feasible width of the bridge according to step 1 and calculate the required number of bridge layers. Import comprehensive data information into 5 pier model modules, conduct preliminary screening of pier column structures based on the limiting factors in the large model, and obtain several pier selection schemes suitable for the existing route.
[0047] There are five types of pier modules: T-shaped pier, double-column vase pier, double-column portal pier, three-column portal pier and portal pier with arch ribs. Each pier module is suitable for multi-layer bridge structures. The existing roads and newly built roads applicable to each pier are summarized and sorted, and the key control factors are used as screening conditions;
[0048] The pier module includes two parts: matching existing road conditions and matching new bridge conditions. After matching, the common solutions under the two parts are selected.
[0049] The specific pier module scheme selection includes: T-type pier, with a maximum cantilever of 8m, which is suitable for the situation where the width of the newly built bridge is small and the existing road has a central dividing strip and allows the pier to be dropped. Single-column or double-column vase pier, this scheme will inevitably occupy the old road lane after opening to traffic, so it is suitable for the widened central dividing strip in the existing road section, allowing the pier to be dropped, and this scheme can be adopted for the newly built bridge with a width of about 30m. Double-column portal pier, the maximum spacing of the calculated span of the cap beam is set to 40m, which can span the entire existing road without the need to drop the pier in the road. Three-column portal pier, the maximum side pier spacing can reach 40m, which is suitable for the situation where the width of the newly built bridge is greater than 40m, and there is a central dividing strip in the existing road and allows the pier to be dropped. Portal pier with arch ribs is suitable for situations where a larger distance needs to be spanned, and there is no need to drop the pier on the existing road.
[0050] Step 3: Structural calculation and analysis. Perform mechanical modeling analysis on the bridge pier scheme obtained in step 2 to determine the cross-sectional dimensions of the bridge pier, the bundle arrangement of the cap beam, the arrangement of reinforcement, etc.;
[0051] The mechanical model can be verified by finite element structural analysis software such as Midas Civil and Qiaobo to verify the bearing capacity and determine the material characteristics, cross-sectional parameters, reinforcement information, and bundle information of the pier. It can also be extracted from the mechanical model library of similar projects in the early stage, and the closest mechanical model can be matched according to the type of pier and span of the cap beam, and the corresponding mechanical parameters can be adjusted accordingly;
[0052] Step 4: Display the scheme. Generate the three-dimensional models of different piers into the spatial data large model according to the specific dimensions determined in step 3, and display the actual pier dimensions and surrounding relationships in the large model. Perform another collision screening based on the actual dimensions to determine several pier structures that meet the requirements for structural force and spatial position. The display module can establish a three-dimensional spatial model display through the BIM platform, screen the selected pier schemes according to the actual environment and economic benefits, and adjust the pier position coordinates, etc.
[0053] Step 5: Engineering quantity generation and economic comparison. Import the bridge pier structure determined in step 4 into the engineering quantity calculation module and the construction and installation cost calculation module to obtain the most economical bridge pier solution. Import the optimal bridge pier solution into the construction drawing output system for intelligent batch output. ;
[0054] The engineering quantity calculation module includes the calculation of pier material usage, construction period calculation, engineering cost calculation, etc.; the drawing module includes an information input part, an automatic retrieval and matching part, which automatically matches the corresponding pier drawing plate, inputs known section parameters, reinforcement and bundle information, and the software automatically draws drawings according to the set style.
[0055] For example, when designing the Luogang Viaduct, a new separated viaduct was adopted. The starting point of the bridge connects to the Huocun Hub Interchange, and it successively crosses Kaitai Avenue, Kaichuang Avenue, Metro Line 6, Xiangxue Avenue, Tram Line 1, Kailuo Avenue, Guanghui Expressway, Luogang New Town Outer Ring Road (11#-Kaichuang Avenue), Nangang River, Metro Line 21, and Luoping Road before landing. The bridge is about 4.8733km long. The bridge is separated on both sides of the unrestricted sections, and the restricted sections on both sides are set up in the same line with the existing highway. The standard bridge width is 2×16.25m. The lower structure of the separated sections on both sides adopts vase piers; the lower structure of the common line section adopts portal piers.
[0056] For the pier module, T-shaped piers, vase piers or three-column gantry piers may be used for existing routes with central dividing strips. For existing routes without central dividing strips or where the central dividing strips are not suitable for pier placement, double-column gantry piers or gantry piers with arch ribs may be used.
[0057] The drawing output module classifies and processes the preliminary structural dimension information determined by the mechanical analysis. The length, width and height of the piers and the specific reinforcement are adjusted according to the structural requirements. The material and size of the cap beam are counted to form a preliminary engineering quantity, and the relevant structural drawings and reinforcement drawings are drawn according to the dimensions.
[0058] The above method and the corresponding system can solve the problems of the traditional design method, such as the long cycle, large amount of repetitive work, and difficulty in the three-dimensional expansion design under complex route environment. Since the existing route and the newly built bridge information have been included in the design, when the bridge span layout changes and causes the pier position to change, the pier layout at the new pier position can be quickly followed up. According to the finalized engineering quantity calculation module and display module, the best solution that unifies various factors such as economic applicability and aesthetics can be intuitively achieved. Compared with the traditional design method, this method can save a lot of design time for designers, especially for inexperienced designers. This method is suitable for the three-dimensional road expansion plan.
[0059] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention, or the concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.
Claims
1. A method for selecting the substructure of a multi-layered three-dimensional expansion bridge on an urban highway, characterized in that: The following steps are involved: Data processing steps: input data integration and building of a large data model; Selection step: preliminary selection step of pier structure, obtaining one or more pier selection schemes suitable for the existing route; Demonstration steps: Structural calculation and analysis steps, conduct mechanical modeling analysis on each pier selection scheme, determine the actual pier size and surrounding relationship of each pier selection scheme by modeling, conduct a second collision screening based on the actual size, and determine the feasible pier structure whose structural force and spatial position meet the requirements; Engineering quantity calculation step: engineering quantity generation and economic comparison step, importing feasible pier structures into the engineering quantity calculation module and construction cost calculation module to obtain the most economical bridge pier solution; Drawing steps: Draw the steps to determine the bridge pier plan.
2. The method for selecting the substructure of a multi-layered three-dimensional expansion bridge on an urban highway according to claim 1 is characterized in that: In the data processing step, the input data include: restriction data and demand data, the restriction data are existing roads, underground pipeline networks, topography and landforms, and land use red lines, and the demand data are urban highway routes, bridge span layout, bridge width, bridge clear height, and load level.
3. The method for selecting the substructure of a multi-layered three-dimensional expansion bridge on an urban highway according to claim 2 is characterized in that: In the screening step, feasible bridge widths and bridge storeys are obtained according to the data big model, and feasible pier model modules in the database are matched based on the bridge widths and bridge storeys to conduct preliminary screening of pier column structures and obtain a pier selection scheme suitable for the existing route.
4. The method for selecting the substructure of a multi-layered three-dimensional expansion bridge on an urban highway according to claim 3 is characterized in that: In the screening step, the existing road matching scheme is obtained according to the restriction data, the new bridge matching scheme is obtained according to the demand data, and the matching scheme is obtained according to the intersection of the existing road matching scheme and the new bridge matching scheme.
5. The method for selecting the substructure of a multi-layered three-dimensional expansion bridge on an urban highway according to claim 4 is characterized in that: The pier model modules stored in the database include single-layer T-shaped piers, double-column vase piers, double-column portal piers, three-column portal piers and portal piers with arch ribs, as well as double-layer T-shaped piers, double-column vase piers, double-column portal piers, three-column portal piers and portal piers with arch ribs. The existing roads and newly built roads applicable to each pier are summarized and sorted out to obtain the key control factors of each pier, and the key control factors are used as screening conditions for each pier.
6. The method for selecting the substructure of a multi-layered three-dimensional expansion bridge on an urban highway according to claim 5 is characterized in that: In the display step, mechanical modeling analysis is used to determine the cross-sectional dimensions of the piers, the bundle arrangement and reinforcement of the cap beams. The specific dimensions of each pier selection scheme are determined based on the mechanical modeling analysis results. A three-dimensional model of each pier selection scheme is generated based on the specific dimensions. The actual pier dimensions and surrounding relationships are displayed in the three-dimensional model, the structural force and spatial position are determined, and unfeasible pier selection schemes are deleted to obtain feasible pier structures.
7. The method for selecting the substructure of a multi-layered, three-dimensional, expanded bridge on an urban highway according to any one of claims 1 to 6, characterized in that: The engineering quantity calculation steps include calculation of pier material usage, construction period calculation, and engineering cost calculation.
8. The method for selecting the substructure of a multi-story, three-dimensional, expanded bridge on an urban highway according to claim 7 is characterized by: The drawing steps include an information input part, an automatic search and matching part, and an automatic matching of corresponding pier drawing plates. The known cross-sectional parameters, reinforcement and bundle arrangement information are input, and the software automatically draws drawings according to the set style.
9. A system for selecting the substructure of a multi-layered, three-dimensional expansion bridge on an urban highway, the system having a processing device, a display device and an input device, characterized in that: The processing equipment comprises: Data processing module: input data integration and construction of data large model module; Selection module: preliminary selection module for pier structure; Demonstration steps: Structural calculation and analysis module; Engineering quantity calculation module: engineering quantity generation and economic comparison module; Drawing module: drawing and determining the bridge pier scheme module.
10. The substructure selection module for the multi-story, three-dimensional expansion bridge on urban highways according to claim 9 is characterized by: The system executes the method for selecting the substructure of a multi-story, stereoscopic expansion bridge on an urban highway as described in any one of claims 1-9.