Transformer operation parameter prediction method and device, electronic equipment and storage medium

By using dynamic shared layer and dynamic specific layer in the transformer operating parameters prediction model, orthogonal transformation and random nonlinear mapping of transformer operating parameters is achieved, and the difficulty in prediction in the existing technology is solved. The problem of transformer operating parameters improves maintenance efficiency and equipment reliability.

CN119090027AActive Publication Date: 2024-12-06GUANGDONG POWER GRID CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411127555.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-12-06
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The prior art is difficult to accurately predict multiple operating parameters of transformers, affecting maintenance efficiency and equipment reliability.

Method used

Using a transformer operating parameter prediction model that includes dynamic shared layer and dynamic specific layer, the common and specific changes of operating parameters are determined by performing orthogonal transformation and random nonlinear mapping of the operating parameter group, thereby achieving multiple operations of the target transformer. Prediction of parameters.

Benefits of technology

It improves the prediction accuracy and efficiency of transformer operating parameters, enhances the prediction ability of transformer failures, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090027A_ABST
    Figure CN119090027A_ABST
Patent Text Reader

Abstract

The invention discloses a transformer operation parameter prediction method and device, electronic equipment and a storage medium. According to the technical scheme, at least one current operation parameter group of the target transformer is determined, the operation parameter group sequence is determined according to the at least one current operation parameter group, and the current operation parameter group comprises at least one operation parameter. Sorting the operation parameter sequence according to the time sequence of the collection time corresponding to the current operation parameter group, inputting the operation parameter group sequence into a pre-constructed transformer operation parameter prediction model, and obtaining at least one predicted operation parameter group of the target transformer through the transformer operation parameter prediction model, therefore, the multiple operation parameters of the target transformer are predicted, the prediction efficiency is improved, meanwhile, the multiple operation parameters of the target transformer are accurately predicted by means of the dynamic specific layer and the dynamic shared layer in the transformer operation parameter prediction model, and the prediction accuracy is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data prediction technology, and in particular to a transformer operating parameter prediction method, device, electronic equipment and storage medium. Background Art

[0002] In power transmission, the transformer is a common and important electrical device that can increase or decrease the input AC voltage to meet different power requirements.

[0003] During the operation of the transformer, there are various types of transformer failures, including but not limited to insulation aging, overheating, electrical breakdown, partial discharge, mechanical damage, and cooling system failure. The occurrence of these failures is often closely related to the operating parameters of the equipment itself. How to accurately predict the transformer parameters is important for the maintenance of the transformer. Summary of the invention

[0004] The present invention provides a transformer operating parameter prediction method, device, electronic device and storage medium to solve the problem that it is difficult to accurately predict multiple operating parameters of the transformer.

[0005] According to one aspect of the present invention, a method for predicting transformer operating parameters is provided, the method comprising:

[0006] Determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the corresponding acquisition time of the current operating parameter group;

[0007] Input the operating parameter group sequence into a pre-built transformer operating parameter prediction model, obtain at least one predicted operating parameter group of the target transformer through the transformer operating parameter prediction model, the number of predicted operating parameter groups in at least one predicted operating parameter group is less than the number of current operating parameter groups in at least one current operating parameter group, the time interval between the acquisition time of each current operating parameter group in at least one current operating parameter group is a preset time interval, the time interval between the prediction time of each predicted operating parameter group in at least one predicted operating parameter group is a preset time interval, the time interval between the prediction time of the first predicted operating parameter group in at least one predicted operating parameter group and the acquisition time of the first current operating parameter group in at least one current operating parameter group is a preset time interval; the first predicted operating parameter group is the predicted operating parameter group with the earliest prediction time in at least one predicted operating parameter group, and the first current operating parameter group is the current operating parameter group with the latest acquisition time in at least one current operating parameter group;

[0008] Among them, the transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer. The dynamic shared layer is used to perform orthogonal transformation on the operating parameter group sequence to generate a dynamic shared space, and the dynamic specific layer is used to perform random nonlinear mapping on the dynamic shared space to generate a dynamic specific space. The transformer operating parameter prediction model determines the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determines the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the corresponding operating parameter group of the target transformer.

[0009] According to another aspect of the present invention, a transformer operating parameter prediction device is provided, the device comprising:

[0010] A current parameter determination module, used to determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the corresponding acquisition time of the current operating parameter group;

[0011] A parameter prediction module, used for inputting an operating parameter group sequence into a pre-built transformer operating parameter prediction model, obtaining at least one predicted operating parameter group of a target transformer through the transformer operating parameter prediction model, wherein the number of predicted operating parameter groups in at least one predicted operating parameter group is less than the number of current operating parameter groups in at least one current operating parameter group, the time interval between the acquisition time of each current operating parameter group in at least one current operating parameter group is a preset time interval, the time interval between the prediction time of each predicted operating parameter group in at least one predicted operating parameter group is a preset time interval, the time interval between the prediction time of the first predicted operating parameter group in at least one predicted operating parameter group and the acquisition time of the first current operating parameter group in at least one current operating parameter group is a preset time interval; the first predicted operating parameter group is the predicted operating parameter group with the earliest prediction time in at least one predicted operating parameter group, and the first current operating parameter group is the current operating parameter group with the latest acquisition time in at least one current operating parameter group;

[0012] Among them, the transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer. The dynamic shared layer is used to perform orthogonal transformation on the operating parameter group sequence to generate a dynamic shared space, and the dynamic specific layer is used to perform random nonlinear mapping on the dynamic shared space to generate a dynamic specific space. The transformer operating parameter prediction model determines the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determines the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the corresponding operating parameter group of the target transformer.

[0013] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0014] at least one processor; and

[0015] a memory communicatively connected to at least one processor; wherein,

[0016] The memory stores a computer program executable by at least one processor, and the computer program is executed by at least one processor so that the at least one processor can execute the transformer operating parameter prediction method according to any embodiment of the present invention.

[0017] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the transformer operating parameter prediction method according to any embodiment of the present invention when executed.

[0018] The technical solution of the embodiment of the present invention determines at least one current operating parameter group of the target transformer, and determines an operating parameter group sequence based on the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the acquisition time corresponding to the current operating parameter group, and the operating parameter group sequence is input into a pre-constructed transformer operating parameter prediction model, and at least one predicted operating parameter group of the target transformer is obtained through the transformer operating parameter prediction model, thereby realizing prediction of multiple operating parameters of the target transformer, thereby improving the prediction efficiency, and realizing accurate prediction of multiple operating parameters of the target transformer with the help of the dynamic specific layer and the dynamic shared layer in the transformer operating parameter prediction model, thereby improving the prediction accuracy.

[0019] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0021] Figure 1 is a flowchart of a transformer operating parameter prediction method provided according to the first embodiment of the present invention;

[0022] Figure 2 is a flow chart of another transformer operating parameter prediction method provided according to the second embodiment of the present invention;

[0023] Figure 3 is a schematic diagram of the structure of a transformer operating parameter prediction device provided according to Embodiment 3 of the present invention;

[0024] Figure 4 It is a structural schematic diagram of an electronic device for implementing the transformer operating parameter prediction method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0027] Embodiment 1

[0028] Figure 1 A flowchart of a transformer operating parameter prediction method is provided for the first embodiment of the present invention. This embodiment is applicable to the case where multiple operating parameters of a target transformer are predicted. The method can be executed by a transformer operating parameter prediction device. The transformer operating parameter prediction device can be implemented in the form of hardware and / or software. The transformer operating parameter prediction device can be configured in an electronic device with data processing capabilities. Figure 1 As shown, the method includes:

[0029] S110. Determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the acquisition time corresponding to the current operating parameter group.

[0030] The current operating parameter group is composed of at least one current operating parameter, and each current operating parameter group is composed of all current operating parameters at the collection time after at least one current operating parameter is collected once.

[0031] Among them, the operating parameter group includes winding temperature, dissolved gas H2 in oil, dissolved gas C2H2 in oil, dissolved gas CO in oil, dissolved gas CO2 in oil, dissolved gas C2H4 in oil, dissolved gas CH4 in oil, oil temperature, oil pressure, ultrasonic partial discharge, high-frequency partial discharge, core grounding current, clamp grounding current and transformer operation soundprint, etc. This application does not impose any restrictions on this.

[0032] When obtaining at least one current operating parameter group of the target transformer, a preset number of current operating parameter groups before the current acquisition time will be obtained as at least one current operating parameter group of the target transformer, and each current operating parameter group will be sorted according to the time sequence of the acquisition time corresponding to each current operating parameter group, and an operating parameter group sequence will be generated according to the sorting results.

[0033] Exemplarily, at the current time of 2 o'clock, the current operating parameter groups are collected once every minute, and the preset number is 50. At this time, the current operating parameter group collected at 1:59, the current operating parameter group collected at 1:58, ... and the current operating parameter group collected at 1:10 will be obtained as at least one current operating parameter group.

[0034] S120. Input the operating parameter group sequence into a pre-built transformer operating parameter prediction model, and obtain at least one predicted operating parameter group of the target transformer through the transformer operating parameter prediction model, wherein the number of predicted operating parameter groups in at least one predicted operating parameter group is less than the number of current operating parameter groups in at least one current operating parameter group, the time interval between the acquisition time of each current operating parameter group in at least one current operating parameter group is a preset time interval, the time interval between the prediction time of each predicted operating parameter group in at least one predicted operating parameter group is a preset time interval, and the time interval between the prediction time of the first predicted operating parameter group in at least one predicted operating parameter group and the acquisition time of the first current operating parameter group in at least one current operating parameter group is a preset time interval; the first predicted operating parameter group is the predicted operating parameter group with the earliest prediction time among the at least one predicted operating parameter group, and the first current operating parameter group is the current operating parameter group with the latest acquisition time among the at least one current operating parameter group.

[0035] Among them, the transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer. The dynamic shared layer is used to perform orthogonal transformation on the operating parameter group sequence to generate a dynamic shared space, and the dynamic specific layer is used to perform random nonlinear mapping on the dynamic shared space to generate a dynamic specific space. The transformer operating parameter prediction model determines the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determines the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the corresponding operating parameter group of the target transformer.

[0036] The predicted operating parameter group may be an operating parameter group that will be collected from the target transformer at a plurality of subsequent collection times through an operating parameter group sequence.

[0037] Since the pre-built transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer, it is possible to determine the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determine the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the corresponding operating parameter group of the target transformer.

[0038] Therefore, the operating parameter group sequence will be input into the pre-built transformer operating parameter prediction model, and the transformer operating parameter prediction model will process the input operating parameter group sequence to obtain the predicted operating parameter group corresponding to each collection moment in at least one collection moment after the current collection time.

[0039] To ensure the accuracy of the prediction results and the stability of the overall system, too many current operating parameter groups will not be predicted. Therefore, it is necessary to set the number of predicted operating parameter groups in at least one predicted operating parameter group to be less than the number of current operating parameter groups in at least one current operating parameter group.

[0040] For example, after obtaining 50 current operating parameter groups, the corresponding operating parameter group sequence is determined based on the 50 current operating parameter groups, and the operating parameter group sequence is input into the transformer operating parameter prediction model. The transformer operating parameter prediction model predicts the operating parameter groups to be collected at the next 20 collection moments, and obtains the predicted operating parameter group corresponding to 2:01, the predicted operating parameter group corresponding to 2:02, ..., and the predicted operating parameter group corresponding to 2:20.

[0041] By inputting an operating parameter group sequence into a pre-built transformer operating parameter prediction model, at least one predicted operating parameter group of the target transformer is obtained through the transformer operating parameter prediction model. By making use of the characteristic that the transformer operating parameter prediction model can calculate a large amount of data with relatively fast computing efficiency, rapid prediction of at least one predicted operating parameter group can be achieved, and by making use of the dynamic shared layer and the dynamic specific layer of the transformer operating parameter prediction model, accurate prediction of at least one predicted operating parameter group can be achieved.

[0042] In an optional solution, the training process of the transformer operation parameter prediction model may include steps A1-A6:

[0043] Step A1, obtain a training sample data group of a target transformer, wherein the training sample data group includes at least one training sample operating parameter group of the target transformer and at least one first training sample operating parameter group corresponding to at least one training sample operating parameter group, wherein the first training sample operating parameter group is an actual training sample operating parameter group corresponding to the training sample operating parameter group.

[0044] Step A2: Determine a training sample operating parameter group sequence according to at least one training sample operating parameter group.

[0045] Step A3: Perform an orthogonal transformation on the training sample running parameter group sequence to determine the sample dynamic shared space.

[0046] Step A4: Perform random nonlinear mapping on the dynamic shared space to obtain a sample dynamic specific space.

[0047] Step A5, according to the pre-set initial shared weight of the dynamic shared space, the pre-set initial specific weight of the dynamic specific space, the sample dynamic shared space and the sample dynamic specific space, determine at least one second training sample operating parameter group of the target transformer, the second training sample operating parameter group is the predicted training sample operating parameter group corresponding to the training sample operating parameter group.

[0048] Step A6: According to at least one second training sample operating parameter group and at least one first training sample operating parameter group of the sample transformer, the initial shared weights of the pre-set dynamic shared space and the initial specific weights of the pre-set dynamic specific space are adjusted, the training sample data group of the target transformer is obtained again, and the initial specific weights and the initial shared weights are adjusted again until the number of adjustments reaches the preset number of times, thereby obtaining a transformer operating parameter prediction model.

[0049] When training the transformer operation parameter prediction model, it is necessary to first obtain the sample data required for training, and for this purpose, a training sample data group of the target transformer is obtained.

[0050] The training sample data group includes at least one training sample operating parameter group of the target transformer and at least one first training sample operating parameter group corresponding to the at least one training sample operating parameter group. The first training sample operating parameter group may be an operating parameter group collected at each collection time after the corresponding collection time of the training sample operating parameter.

[0051] Exemplarily, the collection time of the training sample operating parameter group with the latest collection time in at least one training sample operating parameter group is 2:10. At this time, the collection time of the first training sample operating parameter group with the earliest collection time in the corresponding at least one first training sample operating parameter group will be 2:11.

[0052] Before inputting into the initial transformer operating parameter prediction model, in order to ensure that the initial transformer operating parameter prediction model can accurately understand the meaning of the input data, a training sample operating parameter group sequence that can be accurately understood by the initial transformer operating parameter prediction model is generated based on at least one training sample operating parameter group.

[0053] In the initial transformer operating parameter prediction model, the input training sample operating parameter group sequence will be orthogonally transformed in the dynamic shared layer to obtain the sample dynamic shared space. And random nonlinear mapping will be performed in the dynamic specific layer to obtain the sample dynamic specific space.

[0054] After obtaining the sample dynamic specific space and the sample dynamic shared space, at least one second training sample operating parameter group of the target transformer is determined according to the preset initial shared weight of the dynamic shared space, the preset initial specific weight of the dynamic specific space, the sample dynamic shared space, and the sample dynamic specific space. The second training sample operating parameter group is an operating parameter group obtained after prediction based on the training sample data group.

[0055] According to at least one first training sample operating parameter group and at least one second training sample operating parameter group of the sample transformer, the initial specific weights and the initial shared weights in the initial transformer operating parameter prediction model may be adjusted.

[0056] Thereafter, the above steps are repeated until the number of repetitions reaches a preset number, thereby obtaining a transformer operation parameter prediction model.

[0057] In an optional solution, adjusting the initial shared weight of the preset dynamic shared space and the initial specific weight of the preset dynamic specific space may include steps B1-B2:

[0058] Step B1: Determine the weight objective function of the initial specific weight.

[0059] Step B2: Using a Crank-Nicolson type parameter solving optimization algorithm based on an alternating direction multiplier method, the weight objective function is solved to obtain an adjusted initial specific weight.

[0060] The calculation of at least one predicted operating parameter group in the transformer operating parameter prediction model can be expressed by the following formula:

[0061] Y=XΘW m +ξ(XW e )W n

[0062] where Y∈R s×r To predict the operating parameter set, X∈R s×r is the operating parameter group sequence of the target transformer; r is the output and input dimension, i.e., the number of operating parameters; s is the number of samples; W n ∈R t×r , W n ∈R d×r are the weights of the dynamic shared layer and the dynamic specific layer respectively; t is the dimension of the dynamic shared subspace; d is the dimension of the dynamic specific subspace; Θ∈R D×t is the orthogonal decoupling matrix; W e ∈R r×d is a random matrix with a value range of [-1, 1]; ξ is a nonlinear activation function and ξ(XW e ) is a dynamic specific space.

[0063] Introduce the Lagrange multiplicative factor and define the objective function for training the network until convergence:

[0064]

[0065] Where Δ is the Lagrange multiplicative factor; Where α, ρ and β are equilibrium parameters; E = Y-XΘW m -ξ(XW e )W n is the residual term; is the F norm

[0066] Since the above objective function is a non-stationary objective function, it needs to be transformed to obtain the weighted objective function, as shown in the following formula:

[0067]

[0068] in, ε is the set tolerance threshold, ε>0, and wi is the i-th row of Wn.

[0069] Then, the weight objective function is solved based on the Crank-Nicolson type parameter solving optimization algorithm of the alternating direction multiplier method to obtain the adjusted initial specific weights.

[0070] Optionally, a Crank-Nicolson type parameter solving optimization algorithm based on an alternating direction multiplier method is used to solve the weighted objective function, including:

[0071] (1) Fixed W n , Θ, E and other parameters, update the dynamic shared layer weight coefficient Wm;

[0072] First, calculate the derivative of the objective function with respect to Wm:

[0073]

[0074] By making it approach 0, the optimal solution of Wm is obtained as

[0075]

[0076] (2) Fixed W m , Θ, E and other parameters, update the dynamic specific layer weight coefficient Wn

[0077] First, calculate the derivative of the objective function with respect to Wn:

[0078]

[0079] By making it approach 0, the optimal solution of Wn is obtained as

[0080]

[0081] (3) Fixed W m , Θ, W n And other parameters, update the residual term E

[0082] First, calculate the derivative of the objective function with respect to E:

[0083]

[0084] By making it approach 0, the optimal solution of E is obtained as E k+1 :

[0085]

[0086] Fixed W m , E, W n And other parameters, update the orthogonal decoupling matrix Θ;

[0087] The sub-objective function for solving the orthogonal decoupling matrix is:

[0088]

[0089] Since solving this function can be regarded as an orthogonal constraint problem, it is also called the Stiefel manifold optimization problem. Calculate the derivative of the objective function with respect to Θ:

[0090]

[0091] By setting the partially symmetric matrix A, the calculated optimal solution Θ k+1 :

[0092] Δ k+1 =Δ k +ρ(Y-XθW m -ξ(XW e )W n -E);

[0093] Where A = Gθ T -ΘG T ; I is the identity matrix; τ is the acceleration gradient parameter. In addition, during the update, τ is continuously updated in an inner loop for Stiefel manifold optimization solution.

[0094] Update the Lagrange multiplicative factor Δ. Continuously update the solution through the double ascending iteration mode:

[0095] Δ k+1 =Δ k +ρ(Y-XθW m -ξ(XW e )W n -E);

[0096] The final model parameters are updated and solved through (1)-(5) iterations to output the final weight coefficients.

[0097] In an optional solution, adjusting the initial shared weights of the preset dynamic shared space and the initial specific weights of the preset dynamic specific space according to at least one second training sample operating parameter group and at least one first training sample operating parameter group of the sample transformer may include steps C1-C2:

[0098] Step C1: constraining the initial specific weights based on the row sparsity constraint to obtain constrained initial specific weights.

[0099] Step C2: adjusting the preset initial specific weights of the constraints of the dynamic specific space according to at least one predicted training sample operating parameter group and at least one first training sample operating parameter group of the sample transformer.

[0100] Since the high-dimensional random nonlinear features obtained in the dynamic specific layer may be redundant and various strategies of row sparsity constrained feature selection have shown effectiveness in latent shared feature extraction, we introduce row sparsity constraints on the initial specific weights of the dynamic specific layer.

[0101] Subsequently, the preset initial specific weights of the constraints of the dynamic specific space are adjusted through at least one predicted training sample operating parameter group and at least one first training sample operating parameter group of the sample transformer.

[0102] Optionally, based on the row sparsity constraint, the initial specific weight is constrained to obtain the initial specific weight, including:

[0103] Based on the L1 norm and the L2 norm, the initial specific weights are constrained to obtain the initial specific weights.

[0104] Based on the L1 norm and L2 norm, after constraining the initial specific weights, the following expression can be obtained:

[0105]

[0106] d is the dimension of the dynamic specific subspace; W n represents the initial specific weight.

[0107] According to the technical solution of the embodiment of the present invention, by determining at least one current operating parameter group of the target transformer, and determining an operating parameter group sequence based on at least one current operating parameter group, the current operating parameter group includes at least one operating parameter, the operating parameter sequence is sorted according to the time sequence of the current operating parameter group corresponding to the acquisition time, and the operating parameter group sequence is input into a pre-constructed transformer operating parameter prediction model, and at least one predicted operating parameter group of the target transformer is obtained through the transformer operating parameter prediction model, thereby realizing prediction of multiple operating parameters of the target transformer, thereby improving the prediction efficiency, and realizing accurate prediction of multiple operating parameters of the target transformer with the help of the dynamic specific layer and the dynamic shared layer in the transformer operating parameter prediction model, thereby improving the prediction accuracy.

[0108] Embodiment 2

[0109] Figure 2 The present invention provides a flowchart of another transformer operating parameter prediction method. Based on the above embodiment, this embodiment further optimizes the process of obtaining at least one predicted operating parameter group of the target transformer through the transformer operating parameter prediction model in the above embodiment. This embodiment can be combined with various optional solutions in one or more of the above embodiments. Figure 2 As shown, the transformer operating parameter prediction method of this embodiment may include the following steps:

[0110] S210. Determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the corresponding acquisition time of the current operating parameter group.

[0111] S220: Perform an orthogonal transformation on the operating parameter group sequence to generate a current dynamic shared space.

[0112] S230 , performing random nonlinear mapping on the dynamic shared space to generate a current dynamic specific space.

[0113] S240. Determine at least one predicted operating parameter group of the target transformer according to the current dynamic shared space, the current dynamic specific space, the shared weight predetermined by the current dynamic shared space, and the specific weight predetermined by the current dynamic specific space, wherein the sum of the shared weight and the specific weight is 1.

[0114] After at least one current operating parameter group is input into the transformer operating parameter prediction model, an orthogonal transformation is performed on the dynamic shared layer in the transformer operating parameter prediction model to generate a current dynamic shared space, and then a random nonlinear mapping is performed on the dynamic shared space in the dynamic specific layer to generate a current dynamic specific space.

[0115] Then, at least one predicted operating parameter group of the target transformer is determined according to the current dynamic shared space, the current dynamic specific space, the shared weight predetermined by the current dynamic shared space, and the specific weight predetermined by the current dynamic specific space.

[0116] The calculation of at least one predicted operating parameter group in the transformer operating parameter prediction model can be expressed by the following formula:

[0117] Y=XΘW n +ξ(XW e )W n

[0118] where Y∈R s×r To predict the operating parameter set, X∈R s×r is the operating parameter group sequence of the target transformer; r is the output and input dimension, i.e., the number of operating parameters; s is the number of samples; W m ∈R t×r , W n ∈R d×r are the weights of the dynamic shared layer and the dynamic specific layer respectively; t is the dimension of the dynamic shared subspace; d is the dimension of the dynamic specific subspace; Θ∈R D×t is the orthogonal decoupling matrix; W e ∈R r×dis a random matrix with a value range of [-1, 1]; ξ is a nonlinear activation function and ξ(XW e ) is a dynamic specific space.

[0119] According to the technical solution of the embodiment of the present invention, by performing an orthogonal transformation on the operating parameter group sequence to generate the current dynamic shared space, the dynamic shared characteristics of multiple operating parameters of the target transformer can be determined. By performing random nonlinear mapping on the dynamic shared space to generate the current dynamic specific space, the dynamic specific characteristics of multiple operating parameters of the target transformer can be determined, and dynamic analysis of multiple parameter sequences can be achieved, effectively separating the complex relationships between multivariate chaotic time series, thereby ensuring the accuracy of the final prediction results.

[0120] Embodiment 3

[0121] Figure 3 The present invention provides a structural block diagram of a transformer operating parameter prediction device, which can be applied to the case of predicting multiple operating parameters of a target transformer. The transformer operating parameter prediction device can be implemented in the form of hardware and / or software, and the transformer operating parameter prediction device can be configured in an electronic device with data processing capabilities. Figure 3 As shown, the transformer operation parameter prediction device of this embodiment may include: a current parameter determination module 310 and a parameter prediction module 320. Among them:

[0122] The current parameter determination module 310 is used to determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the corresponding acquisition time of the current operating parameter group;

[0123] The parameter prediction module 320 is used to input the operation parameter group sequence into a pre-built transformer operation parameter prediction model, and obtain at least one predicted operation parameter group of the target transformer through the transformer operation parameter prediction model, wherein the number of predicted operation parameter groups in at least one predicted operation parameter group is less than the number of current operation parameter groups in at least one current operation parameter group, the time interval between the acquisition time of each current operation parameter group in at least one current operation parameter group is a preset time interval, the time interval between the prediction time of each predicted operation parameter group in at least one predicted operation parameter group is a preset time interval, and the time interval between the prediction time of the first predicted operation parameter group in at least one predicted operation parameter group and the acquisition time of the first current operation parameter group in at least one current operation parameter group is a preset time interval; the first predicted operation parameter group is the predicted operation parameter group with the earliest prediction time in at least one predicted operation parameter group, and the first current operation parameter group is the current operation parameter group with the latest acquisition time in at least one current operation parameter group;

[0124] Among them, the transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer. The dynamic shared layer is used to perform orthogonal transformation on the operating parameter group sequence to generate a dynamic shared space, and the dynamic specific layer is used to perform random nonlinear mapping on the dynamic shared space to generate a dynamic specific space. The transformer operating parameter prediction model determines the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determines the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the corresponding operating parameter group of the target transformer.

[0125] Based on the above embodiment, optionally, the parameter prediction module 320 includes:

[0126] orthogonally transforming the sequence of operation parameter groups to generate a current dynamic shared space;

[0127] Perform random nonlinear mapping on the dynamic shared space to generate the current dynamic specific space;

[0128] At least one predicted operating parameter group of the target transformer is determined according to the current dynamic shared space, the current dynamic specific space, the shared weight predetermined by the current dynamic shared space, and the specific weight predetermined by the current dynamic specific space, and the sum of the shared weight and the specific weight is 1.

[0129] The transformer operating parameter prediction device provided in the embodiment of the present invention can execute the transformer operating parameter prediction method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0130] Embodiment 4

[0131] Figure 4 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0132] like Figure 4As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0133] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0134] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a transformer operating parameter prediction method.

[0135] In some embodiments, the transformer operating parameter prediction method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the transformer operating parameter prediction method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the transformer operating parameter prediction method in any other appropriate manner (e.g., by means of firmware).

[0136] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0137] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0138] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0139] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0140] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0141] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.

[0142] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0143] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A transformer operating parameter prediction method, characterized in that: include: Determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the current operating parameter group corresponding to the acquisition time; The operating parameter group sequence is input into a pre-built transformer operating parameter prediction model, and at least one predicted operating parameter group of the target transformer is obtained through the transformer operating parameter prediction model, the number of predicted operating parameter groups in the at least one predicted operating parameter group is less than the number of current operating parameter groups in the at least one current operating parameter group, the time interval between the acquisition time of each current operating parameter group in the at least one current operating parameter group is a preset time interval, the time interval between the prediction time of each predicted operating parameter group in the at least one predicted operating parameter group is a preset time interval, and the time interval between the prediction time of the first predicted operating parameter group in the at least one predicted operating parameter group and the acquisition time of the first current operating parameter group in the at least one current operating parameter group is a preset time interval; the first predicted operating parameter group is the predicted operating parameter group with the earliest prediction time in the at least one predicted operating parameter group, and the first current operating parameter group is the current operating parameter group with the latest acquisition time in the at least one current operating parameter group; Among them, the transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer. The dynamic shared layer is used to perform an orthogonal transformation on the operating parameter group sequence to generate a dynamic shared space, and the dynamic specific layer is used to perform random nonlinear mapping on the dynamic shared space to generate a dynamic specific space. The transformer operating parameter prediction model determines the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determines the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the operating parameter group corresponding to the target transformer.

2. The method according to claim 1, characterized in that Obtaining at least one predicted operating parameter group of a target transformer through the transformer operating parameter prediction model includes: Performing an orthogonal transformation on the operating parameter group sequence to generate a current dynamic shared space; Performing random nonlinear mapping on the dynamic shared space to generate a current dynamic specific space; At least one predicted operating parameter group of the target transformer is determined based on the current dynamic shared space, the current dynamic specific space, the shared weight predetermined by the current dynamic shared space, and the specific weight predetermined by the current dynamic specific space, and the sum of the shared weight and the specific weight is 1.

3. The method according to claim 1, characterized in that The training process of the transformer operation parameter prediction model includes: Acquire a training sample data group of the target transformer, wherein the training sample data group includes at least one training sample operating parameter group of the target transformer and at least one first training sample operating parameter group corresponding to the at least one training sample operating parameter group, wherein the first training sample operating parameter group is an actual training sample operating parameter group corresponding to the training sample operating parameter group; Determine a training sample operating parameter group sequence according to the at least one training sample operating parameter group; Performing an orthogonal transformation on the training sample operation parameter group sequence to determine a sample dynamic shared space; Performing random nonlinear mapping on the dynamic shared space to obtain a sample dynamic specific space; Determine at least one second training sample operation parameter group of the target transformer according to the preset initial sharing weight of the dynamic shared space, the preset initial specific weight of the dynamic specific space, the sample dynamic shared space and the sample dynamic specific space, wherein the second training sample operation parameter group is a predicted training sample operation parameter group corresponding to the training sample operation parameter group; According to the at least one second training sample operating parameter group and the at least one first training sample operating parameter group of the sample transformer, the initial shared weights pre-set for the dynamic shared space and the initial specific weights pre-set for the dynamic specific space are adjusted, the training sample data group of the target transformer is obtained again, and the initial specific weights and the initial shared weights are adjusted again until the number of adjustments reaches the preset number, thereby obtaining the transformer operating parameter prediction model.

4. The method according to claim 3, characterized in that The step of presetting the initial shared weight of the dynamic shared space and presetting the initial specific weight of the dynamic specific space comprises: Determining a weight objective function of the initial specific weights; The weight objective function is solved based on a Crank-Nicolson type parameter solving optimization algorithm of an alternating direction multiplier method to obtain an adjusted initial specific weight.

5. The method according to claim 3, characterized in that: According to the at least one second training sample operation parameter group and the at least one first training sample operation parameter group of the sample transformer, adjusting the preset initial shared weight of the dynamic shared space and the preset initial specific weight of the dynamic specific space, including: Based on the row sparsity constraint, constraining the initial specific weight to obtain the constrained initial specific weight; According to the at least one predicted training sample operating parameter group and the at least one first training sample operating parameter group of the sample transformer, the preset constrained initial specific weight of the dynamic specific space is adjusted.

6. The method according to claim 5, characterized in that Based on the row sparsity constraint, the initial specific weight is constrained to obtain the constrained initial specific weight, including: Based on the L1 norm and the L2 norm, the initial specific weight is constrained to obtain the constrained initial specific weight.

7. The method according to claim 4, characterized in that The expression of the weight objective function is: Where Δ is the Lagrange multiplicative factor; Y∈R s×r is at least one prediction operating parameter set of the target transformer in the adjacent second number of prediction acquisition frames, X∈R s×r is the operating parameter group sequence; r is the input and output dimension, i.e., the number of operating parameters; s is the number of samples; W m ∈R t×r , W n ∈R d×r They are shared weights and specific weights respectively; t is the dimension of the dynamic shared subspace; d is the dimension of the dynamic specific subspace; Θ∈R D×t is the orthogonal decoupling matrix; W e ∈R r×d is a random matrix; ξ is a nonlinear activation function; where α, ρ and β are balance parameters; is the F norm; E = Y-XΘW m -ξ(XW e )W n is the residual term.

8. A transformer operating parameter prediction device, characterized in that: include: A current parameter determination module, used to determine at least one current operating parameter group of the target transformer, and determine an operating parameter group sequence according to the at least one current operating parameter group, wherein the current operating parameter group includes at least one operating parameter, and the operating parameter sequence is sorted according to the time sequence of the current operating parameter group corresponding to the acquisition time; A parameter prediction module, used for inputting the operating parameter group sequence into a pre-built transformer operating parameter prediction model, obtaining at least one predicted operating parameter group of the target transformer through the transformer operating parameter prediction model, wherein the number of predicted operating parameter groups in the at least one predicted operating parameter group is less than the number of current operating parameter groups in the at least one current operating parameter group, the time interval between the acquisition time of each current operating parameter group in the at least one current operating parameter group is a preset time interval, the time interval between the prediction time of each predicted operating parameter group in the at least one predicted operating parameter group is a preset time interval, and the time interval between the prediction time of the first predicted operating parameter group in the at least one predicted operating parameter group and the acquisition time of the first current operating parameter group in the at least one current operating parameter group is a preset time interval; the first predicted operating parameter group is the predicted operating parameter group with the earliest prediction time in the at least one predicted operating parameter group, and the first current operating parameter group is the current operating parameter group with the latest acquisition time in the at least one current operating parameter group; Among them, the transformer operating parameter prediction model includes a dynamic shared layer and a dynamic specific layer. The dynamic shared layer is used to perform an orthogonal transformation on the operating parameter group sequence to generate a dynamic shared space, and the dynamic specific layer is used to perform random nonlinear mapping on the dynamic shared space to generate a dynamic specific space. The transformer operating parameter prediction model determines the common change trend of each operating parameter in the operating parameter group through the dynamic shared layer, and determines the specific change trend of each operating parameter in the operating parameter group according to the dynamic specific layer, thereby realizing the prediction of the operating parameter group corresponding to the target transformer.

9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the transformer operating parameter prediction method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the transformer operating parameter prediction method according to any one of claims 1 to 7 when executed.

Citation Information

Patent Citations

  • Oil chromatography data prediction method, device and equipment

    CN115841853A

  • Transformer fault prediction method and device, electronic equipment and storage medium

    CN117851882A

  • Method and device for predicting concentration of dissolved gas in transformer oil, medium and terminal

    CN117935957A

  • Transformer winding temperature calculation method and device, electronic equipment and storage medium

    CN118364217A