Intelligent highway construction fence arrangement system
Through the intelligent highway construction fence layout system, multi-dimensional monitoring and integration processing of construction, traffic and accident data is generated to generate an adaptive construction fence layout solution, which solves the problem of poor data supervision effect in the existing technology and improves the construction site Safety and efficiency.
Patent Information
- Application Number
- CN202411117150.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing highway construction fence layout plan cannot conduct multi-dimensional data monitoring and analysis on the overall road conditions and historical accidents of the construction highway, resulting in poor supervision and poor adaptive effects of data arranged in different dimensions of construction fence layout.
Design an intelligent highway construction fence layout system, including construction data acquisition and processing module, highway data acquisition and processing module and highway construction fence layout module. By conducting multi-dimensional monitoring, statistics and digitization of construction, traffic and accident data, integrating calculations and generating Adaptable construction fence layout plan.
The supervision and adaptive layout effect of data in different dimensions of highway construction fence layout have been improved to ensure that the layout plan of the construction fence is more in line with the actual needs of the construction site.
Smart Images

Figure CN119090265A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction fence arrangement, and in particular to an intelligent highway construction fence arrangement system. Background Art
[0002] In order to ensure the safety of pedestrians and vehicles during highway construction and to regulate the order of the construction site, it is usually necessary to set up fences. The layout of the fences should comply with relevant safety standards and regulations to ensure smooth traffic and smooth construction.
[0003] After searching, the prior art with application number CN2024100083258 and name of an intelligent highway construction fence layout system discloses an ecological impact minimization module to reduce environmental impact, an intelligent path planning module to reduce time and energy consumption, an intelligent fence layout module to optimize fence layout through linear planning to improve safety and efficiency, a noise control and management module to effectively reduce construction noise and reduce interference, a load optimization scheduling module to optimize resource utilization and reduce costs through precise analysis and scheduling, and an environmentally friendly construction strategy module to promote a greener construction method and further reduce the impact on the ecology.
[0004] However, the existing highway construction fence layout scheme still has certain defects in implementation. For example, it is impossible to conduct multi-dimensional data monitoring and analysis on the overall road conditions and historical accidents of the construction highway, integrate the multi-dimensional analysis results and adaptively and dynamically generate a construction fence layout scheme suitable for the highway to be constructed, resulting in poor supervision of data of different dimensions of highway construction fence layout and poor adaptive layout effect. Summary of the invention
[0005] The object of the present invention is to provide an intelligent highway construction fence arrangement system, which is used to solve the technical problems of poor supervision effect of different dimensional data of highway construction fence arrangement and poor adaptive arrangement effect in existing solutions.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] An intelligent highway construction fence arrangement system, comprising:
[0008] The construction data collection and processing module is used to monitor and count the data in the construction dimension of the highway under construction, and digitally process the monitored and counted data to obtain the corresponding construction monitoring values and construction monitoring impact sequences;
[0009] The highway data collection and processing module is used to monitor and count the multi-dimensional data of the highway under construction, and digitally process the monitored and counted data to obtain the corresponding traffic impact sequence and accident impact sequence;
[0010] The highway construction fence layout module is used to integrate and calculate the construction monitoring impact sequence, traffic impact sequence and accident impact sequence obtained by processing in different dimensions, and to analyze the data to obtain the corresponding construction impact sequence, and to adaptively generate the construction fence layout plan corresponding to the highway to be constructed according to the construction impact sequence; including:
[0011] Among them, the adaptively generated construction fence layout scheme includes a conventional layout scheme, a complete reinforcement layout scheme or a partial reinforcement layout scheme.
[0012] Preferably, when monitoring and counting the data of the construction dimension of the road to be constructed, the construction coordinates, construction type, total construction area and total construction time corresponding to the road to be constructed are obtained;
[0013] The obtained construction type is searched in the construction type database to obtain the corresponding construction type weight and the corresponding construction area standard value and construction time standard value;
[0014] The construction type weights obtained by processing and the corresponding standard values of construction area, total construction area and total construction time are calculated through formulas to obtain the construction monitoring values corresponding to the highway to be constructed;
[0015] The calculated construction monitoring value is set as the head element and sorted and combined with the construction coordinates, construction type, total construction area and total construction duration to obtain the construction monitoring impact sequence corresponding to the construction dimension.
[0016] Preferably, the construction monitoring value corresponds to the calculation formula as follows: In the formula, QS is the weight of the construction type; T is the total construction time; T′ is the standard value of the construction time; SS is the total construction area; SB is the standard value of the construction area; α and β are different weight coefficients, 0<α<β<1, α+β=1.
[0017] Preferably, when monitoring and counting the traffic dimension data of the highway under construction, the total number of vehicles appearing in the monitoring area and the average speed of different vehicles passing through the monitoring area are counted according to a number of preset monitoring time periods;
[0018] According to the preset monitoring cycle, the total number of all monitored vehicles and the speed of all monitored vehicles in the statistical monitoring area corresponding to different monitoring time periods are obtained, and the median value of the total number of all monitored vehicles and the median value of all monitored speeds are marked as the total number of selected monitored vehicles and the selected monitored speed respectively;
[0019] The total number of selected monitored vehicles and the selected monitored vehicle speed are calculated through a formula to obtain the corresponding traffic monitoring value;
[0020] The calculated traffic monitoring value is set as the head element and sorted and combined with the total number of selected monitored vehicles and the selected monitored vehicle speed to obtain the traffic impact sequence of the corresponding traffic impact dimension.
[0021] Preferably, the expression of the calculation formula corresponding to the traffic monitoring value TJ is: Wherein, NC is the total number of selected monitoring vehicles; NC′ is the total number of standard monitoring vehicles; NS is the selected monitoring speed; NS′ is the standard monitoring speed; a and b are different weight coefficients, 0<a≤b<1, a+b=1.
[0022] Preferably, when monitoring and counting data on accident impact dimensions for the highway under construction, all traffic accidents that have occurred in the monitoring area in the past and the severity of each traffic accident are counted;
[0023] Digitally process the severity of each traffic accident to obtain the corresponding accident impact value;
[0024] The total number of traffic accidents that occurred, the accident severity and the accident impact value corresponding to each traffic accident are sorted and combined to obtain accident monitoring data;
[0025] When the accident monitoring data is digitally processed, each data in the accident monitoring data is calculated through the accident monitoring identification piecewise function to obtain the corresponding accident monitoring value;
[0026] The calculated accident monitoring value is set as the head element and is sorted and combined with the total number of traffic accidents and the accident impact value corresponding to each traffic accident to obtain the accident impact sequence of the corresponding accident impact dimension.
[0027] Preferably, the expression of the accident monitoring identification piecewise function is: Wherein, SJ is the accident monitoring value; N is the total number of traffic accidents; SYi is the impact value of different accidents; i is different traffic accidents; i = 1, 2, 3, ..., N; N is a positive integer; A is the standard accident impact value.
[0028] Preferably, the head elements in the construction monitoring impact sequence, the traffic impact sequence and the accident impact sequence are respectively obtained and sorted and combined to obtain an impact combination sequence;
[0029] The different element values in the impact combination sequence are sequentially calculated through the construction impact identification piecewise function to obtain the construction impact degrees corresponding to different dimensions;
[0030] The calculated construction impacts are sorted and combined to obtain a construction impact sequence;
[0031] When adaptively generating a construction fence arrangement plan corresponding to the highway to be constructed according to the construction impact sequence, a traversal analysis of the construction impact sequence is performed.
[0032] Preferably, if the values of the elements in the construction impact sequence are all 0, a conventional layout plan corresponding to the highway to be constructed is generated;
[0033] If the values of the elements in the construction impact sequence are all 1, a complete reinforcement layout plan corresponding to the highway to be constructed is generated;
[0034] If there is an element with a value of 1 in the construction impact sequence, a local reinforcement layout plan corresponding to the highway to be constructed is generated.
[0035] Preferably, the expression of the construction impact identification piecewise function is: Where SYk is the construction impact degree corresponding to different dimensions; k = 1, 2, 3; Xk is X1, X2, X3, which are the values corresponding to the construction monitoring value GJ, the traffic monitoring value TJ, and the accident monitoring value SJ respectively; X′k is X′1, X′2, X′3, which are the standard requirement values corresponding to the construction monitoring dimension, the traffic monitoring dimension, and the accident monitoring dimension respectively.
[0036] Compared with the existing solutions, the present invention achieves the following beneficial effects:
[0037] The present invention obtains corresponding construction monitoring values, traffic monitoring values and accident monitoring values by performing data monitoring statistics and digital processing from the construction dimension, traffic dimension and accident dimension of the highway to be constructed. The present invention can not only obtain the digital monitoring status corresponding to the construction dimension, traffic dimension and accident dimension, but also provide reliable local different dimensional processing data support for the subsequent overall construction impact analysis corresponding to the highway to be constructed.
[0038] The present invention integrates and calculates the data processed in different dimensions in the early stage to obtain the corresponding construction impact sequence, and adaptively generates a construction fence layout plan corresponding to the highway to be constructed according to the construction impact sequence, thereby improving the supervision effect of different dimensional data of highway construction fence layout and the adaptive layout effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The present invention will be further described below in conjunction with the accompanying drawings.
[0040] Figure 1 This is a module block diagram of an intelligent highway construction fence arrangement system of the present invention. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] like Figure 1 As shown, the present invention is an intelligent highway construction fence arrangement system, comprising:
[0043] The construction data collection and processing module is used to monitor and count the data in the construction dimension of the highway under construction, and digitally process the monitored and counted data to obtain the corresponding construction monitoring values and construction monitoring impact sequences; including:
[0044] When monitoring and counting the data of the construction dimension of the road to be constructed, the construction coordinates, construction type, total construction area and total construction time corresponding to the road to be constructed are obtained;
[0045] It should be noted that the data corresponding to the road to be constructed can be obtained based on the survey and design data corresponding to the road to be constructed; the construction coordinates correspond to the specific longitude and latitude coordinates of the road to be constructed; the construction type includes but is not limited to earthwork type, structure construction type, road surface engineering type, etc.;
[0046] The obtained construction type is searched in the construction type database to obtain the corresponding construction type weight and the corresponding construction area standard value and construction time standard value;
[0047] Among them, the construction type database pre-stores a number of different construction types and their corresponding construction type weights, construction area standard values, and construction duration standard values; the construction type weight is used to digitally represent the construction impact degree corresponding to the construction type; the specific value of the construction type weight can be determined by professional and technical personnel in this field based on construction experience and construction requirements; the construction area standard value and construction duration standard value corresponding to the construction type can be determined based on all construction area values and all construction duration values corresponding to the same construction type in history;
[0048] The construction type weights obtained through processing and the corresponding construction area standard values, total construction area and total construction time are calculated through formulas to obtain the construction monitoring value GJ corresponding to the road to be constructed; the corresponding calculation formula of the construction monitoring value GJ is expressed as follows: In the formula, QS is the weight of the construction type; T is the total construction time; T′ is the standard value of the construction time; SS is the total construction area; SB is the standard value of the construction area; α and β are different weight coefficients, 0<α<β<1, α+β=1;
[0049] It should be noted that the construction monitoring value is used to integrate and calculate various data corresponding to the construction dimension of the highway to be constructed to digitally represent its construction monitoring status;
[0050] The calculated construction monitoring value is set as the head element and sorted and combined with the construction coordinates, construction type, total construction area and total construction time to obtain the construction monitoring impact sequence corresponding to the construction dimension;
[0051] In the embodiment of the present invention, by performing data monitoring statistics and digital processing from the construction dimension of the highway to be constructed to obtain the corresponding construction monitoring value, it is possible to obtain the digital construction monitoring status corresponding to the construction dimension, and provide reliable local construction dimension processing data support for the subsequent overall construction impact analysis corresponding to the highway to be constructed.
[0052] The highway data collection and processing module is used to monitor and count the multi-dimensional data of the highway under construction, and digitally process the monitored and counted data to obtain the corresponding traffic impact sequence and accident impact sequence; including:
[0053] When monitoring and counting traffic data for the construction highway, the total number of vehicles appearing in the monitoring area and the average speed of different vehicles passing through the monitoring area are counted according to a number of preset monitoring time periods;
[0054] Among them, some monitoring time periods can be determined according to the actual road construction time periods; for example, the road construction time periods are usually from 8:00 to 12:00 and 14:00 to 18:00 on weekdays. Construction from 12:00 to 14:00 and from 18:00 to 6:00 the next day on weekdays is considered a nuisance unless special permission is obtained;
[0055] The monitoring area can be a road area to be constructed; the total number of vehicles in the monitoring area can be achieved through sensor technology, such as burying a magnetic induction coil under the road surface. When a metal object (such as a vehicle) passes by, the magnetic field will change, thereby triggering counting; the average speed of different vehicles passing through the monitoring area can also be achieved through sensor technology; for example, burying a magnetic induction coil under the road surface can detect the time when the vehicle passes, and calculate the speed in combination with the distance information;
[0056] According to the preset monitoring cycle, which can be seven days, the total number of all monitored vehicles and all monitored vehicle speeds corresponding to the statistics in the statistical monitoring area in different monitoring time periods are obtained, and the median value of the total number of all monitored vehicles and the median value of all monitored vehicle speeds are marked as the total number of selected monitored vehicles and the selected monitored vehicle speed respectively;
[0057] The total number of selected monitored vehicles and the selected monitored vehicle speed are calculated through the formula to obtain the corresponding traffic monitoring value TJ; the corresponding calculation formula of the traffic monitoring value TJ is expressed as follows: Wherein, NC is the total number of selected monitoring vehicles; NC′ is the total number of standard monitoring vehicles; NS is the selected monitoring speed; NS′ is the standard monitoring speed, which can be determined according to the existing construction requirement data; a and b are different weight coefficients, 0<a≤b<1, a+b=1;
[0058] It should be noted that the traffic monitoring value is used to integrate and calculate various data corresponding to the traffic dimension of the highway to be constructed to digitally represent its traffic monitoring status;
[0059] The traffic monitoring value obtained by calculation is set as the head element and is sorted and combined with the total number of selected monitoring vehicles and the selected monitoring vehicle speed to obtain the traffic impact sequence of the corresponding traffic impact dimension;
[0060] In the embodiment of the present invention, by performing data monitoring statistics and digital processing on the traffic dimension of the highway to be constructed to obtain the corresponding traffic monitoring value, it is possible to obtain the digital traffic monitoring state corresponding to the traffic dimension, and provide reliable local traffic dimension processing data support for the subsequent overall construction impact analysis corresponding to the highway to be constructed;
[0061] When monitoring and counting data on accident impacts of construction roads, all historical traffic accidents in the monitoring area and the corresponding severity of each traffic accident are counted; the severity of the accident is determined by the damage to the vehicle and the casualties;
[0062] The accident severity corresponding to each traffic accident is digitally processed to obtain the corresponding accident impact value; specifically, the accident impact value corresponding to vehicle damage is 1, the accident impact value corresponding to personal injury is 2, and the accident impact value corresponding to personal death is 3; the accident impact value corresponding to the traffic accident is obtained by accumulating the accident impact values corresponding to different aspects;
[0063] The total number of traffic accidents that occurred, the accident severity and the accident impact value corresponding to each traffic accident are sorted and combined to obtain accident monitoring data;
[0064] When the accident monitoring data is digitally processed, each data in the accident monitoring data is calculated through the accident monitoring identification piecewise function to obtain the corresponding accident monitoring value;
[0065] Among them, the expression of the piecewise function of accident monitoring identification is: Where, SJ is the accident monitoring value; N is the total number of traffic accidents; SYi is the impact value of different accidents; i is different traffic accidents; i = 1, 2, 3, ..., N; N is a positive integer; A is the standard accident impact value, which is determined according to the median value of all accident impact values that have occurred in the history of the same construction type;
[0066] It should be noted that the accident monitoring value is used to integrate and calculate various data corresponding to the accident dimension of the highway to be constructed to digitally represent its accident monitoring status;
[0067] The accident monitoring value contains a 0 or non-0 value, indicating that the accident monitoring status corresponding to the road to be constructed is normal or abnormal;
[0068] The calculated accident monitoring value is set as the head element and sorted and combined with the total number of traffic accidents and the accident impact value corresponding to each traffic accident to obtain the accident impact sequence of the corresponding accident impact dimension;
[0069] In the embodiment of the present invention, by performing data monitoring statistics and digital processing from the accident dimension of the road to be constructed to obtain the corresponding accident monitoring value, it is possible to obtain the digital accident monitoring status corresponding to the accident dimension, and provide reliable local accident dimension processing data support for the subsequent overall construction impact analysis corresponding to the road to be constructed;
[0070] The highway construction fence layout module is used to integrate and calculate the construction monitoring impact sequence, traffic impact sequence and accident impact sequence obtained by processing in different dimensions, and to analyze the data to obtain the corresponding construction impact sequence, and to adaptively generate the construction fence layout plan corresponding to the highway to be constructed according to the construction impact sequence; including:
[0071] The head elements in the construction monitoring impact sequence, the traffic impact sequence and the accident impact sequence are obtained respectively and sorted and combined to obtain an impact combination sequence;
[0072] The different element values in the impact combination sequence are sequentially calculated through the construction impact identification piecewise function to obtain the construction impact degree corresponding to different dimensions; the expression of the construction impact identification piecewise function is: Where SYk is the construction impact degree corresponding to different dimensions; k = 1, 2, 3; Xk is X1, X2, X3, which are the values corresponding to the construction monitoring value GJ, the traffic monitoring value TJ, and the accident monitoring value SJ respectively; X′k is X′1, X′2, X′3, which are the standard requirement values corresponding to the construction monitoring dimension, the traffic monitoring dimension, and the accident monitoring dimension respectively; it can be determined according to the construction design requirement data corresponding to the construction type, or according to the median value of all the construction monitoring values, traffic monitoring values, and accident monitoring values corresponding to the history of the construction type;
[0073] The calculated construction impacts are sorted and combined to obtain a construction impact sequence;
[0074] When adaptively generating the construction fence arrangement plan corresponding to the highway to be constructed according to the construction impact sequence, the construction impact sequence is traversed and analyzed;
[0075] If the values of the elements in the construction impact sequence are all 0, a conventional layout plan corresponding to the highway to be constructed is generated;
[0076] If the values of the elements in the construction impact sequence are all 1, a complete enhanced layout plan corresponding to the road to be constructed is generated; compared with the conventional layout plan, the complete enhanced layout plan enhances the safety layout requirements and safety precautions requirements in different dimensions, such as adding safety warning prompts in different dimensions;
[0077] If there is an element with a value of 1 in the construction impact sequence, a local reinforcement layout plan corresponding to the highway to be constructed is generated;
[0078] Among them, the local reinforcement layout scheme implements targeted fence layout for the dimension corresponding to the element with a value of 1; for example, if the dimension corresponding to the element with a value of 1 is the accident dimension, then on the basis of the existing conventional layout scheme, more diverse safety warning prompts are added in a targeted manner;
[0079] In an embodiment of the present invention, the corresponding construction impact sequence is obtained by integrating and calculating the data processed in different dimensions in the early stage, and the construction fence layout plan corresponding to the highway to be constructed is adaptively generated according to the construction impact sequence, thereby improving the supervision effect of different dimensional data of highway construction fence layout and the adaptive layout effect.
[0080] In addition, the formulas involved in the above are all dimensionless and numerical calculations. They are a formula that is closest to the actual situation obtained by collecting a large amount of data and simulating it with simulation software.
[0081] In the several embodiments provided by the present invention, it should be understood that the disclosed system can be implemented in other ways. For example, the above-described embodiments of the invention are only illustrative, for example, the division of modules is only a logical function division, and there may be other division methods in actual implementation.
[0082] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, and may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0083] In addition, each functional module in each embodiment of the present invention may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of hardware plus software functional modules.
[0084] It is obvious to a person skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the essential characteristics of the present invention.
[0085] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.
Claims
1. An intelligent highway construction fence layout system, It is characterized in that include: The construction data collection and processing module is used to monitor and count the data in the construction dimension of the highway under construction, and digitally process the monitored and counted data to obtain the corresponding construction monitoring values and construction monitoring impact sequences; The highway data collection and processing module is used to monitor and count the multi-dimensional data of the highway under construction, and digitally process the monitored and counted data to obtain the corresponding traffic impact sequence and accident impact sequence; The highway construction fence layout module is used to integrate and calculate the construction monitoring impact sequence, traffic impact sequence and accident impact sequence obtained by processing in different dimensions, and to analyze the data to obtain the corresponding construction impact sequence, and to adaptively generate the construction fence layout plan corresponding to the highway to be constructed according to the construction impact sequence; include: Among them, the adaptively generated construction fence layout scheme includes a conventional layout scheme, a complete reinforcement layout scheme or a partial reinforcement layout scheme.
2. An intelligent highway construction fence arrangement system according to claim 1, It is characterized in that When monitoring and counting the data of the construction dimension of the road to be constructed, the construction coordinates, construction type, total construction area and total construction time corresponding to the road to be constructed are obtained; The obtained construction type is searched in the construction type database to obtain the corresponding construction type weight and the corresponding construction area standard value and construction time standard value; The construction type weights obtained by processing and the corresponding standard values of construction area, total construction area and total construction time are calculated through formulas to obtain the construction monitoring values corresponding to the highway to be constructed; The calculated construction monitoring value is set as the head element and sorted and combined with the construction coordinates, construction type, total construction area and total construction duration to obtain the construction monitoring impact sequence corresponding to the construction dimension.
3. An intelligent highway construction fence arrangement system according to claim 2, It is characterized in that The calculation formula corresponding to the construction monitoring value is as follows: In the formula, QS is the weight of the construction type; T is the total construction time; T′ is the standard value of the construction time; SS is the total construction area; SB is the standard value of the construction area; α and β are different weight coefficients, 0<α<β<1, α+β=1.
4. The intelligent highway construction fence arrangement system according to claim 2, It is characterized in that When monitoring and counting traffic data for the construction highway, the total number of vehicles appearing in the monitoring area and the average speed of different vehicles passing through the monitoring area are counted according to a number of preset monitoring time periods; According to the preset monitoring cycle, the total number of all monitored vehicles and the speed of all monitored vehicles corresponding to the statistical monitoring area in different monitoring time periods are obtained, and the median value of the total number of all monitored vehicles and the median value of all monitored speeds are marked as the total number of selected monitored vehicles and the selected monitored speed respectively; The total number of selected monitored vehicles and the selected monitored vehicle speed are calculated through a formula to obtain the corresponding traffic monitoring value; The calculated traffic monitoring value is set as the head element and sorted and combined with the total number of selected monitored vehicles and the selected monitored vehicle speed to obtain the traffic impact sequence of the corresponding traffic impact dimension.
5. An intelligent highway construction fence arrangement system according to claim 4, It is characterized in that The corresponding calculation formula of the traffic monitoring value TJ is expressed as follows: Wherein, NC is the total number of selected monitoring vehicles; NC′ is the total number of standard monitoring vehicles; NS is the selected monitoring speed; NS′ is the standard monitoring speed; a and b are different weight coefficients, 0<a≤b<1, a+b=1.
6. The intelligent highway construction fence arrangement system according to claim 4, It is characterized in that When monitoring and counting data on accident impact dimensions for construction roads, all historical traffic accidents in the monitoring area and the severity of each traffic accident are counted; Digitally process the severity of each traffic accident to obtain the corresponding accident impact value; The total number of traffic accidents that occurred, the accident severity and the accident impact value corresponding to each traffic accident are sorted and combined to obtain accident monitoring data; When the accident monitoring data is digitally processed, each data in the accident monitoring data is calculated through the accident monitoring identification piecewise function to obtain the corresponding accident monitoring value; The calculated accident monitoring value is set as the head element and is sorted and combined with the total number of traffic accidents and the accident impact value corresponding to each traffic accident to obtain the accident impact sequence of the corresponding accident impact dimension.
7. The intelligent highway construction fence arrangement system according to claim 6, It is characterized in that The expression of the piecewise function for accident monitoring and identification is: Wherein, SJ is the accident monitoring value; N is the total number of traffic accidents; SYi is the impact value of different accidents; i is different traffic accidents; i = 1, 2, 3, ..., N; N is a positive integer; A is the standard accident impact value.
8. The intelligent highway construction fence arrangement system according to claim 6, It is characterized in that The head elements in the construction monitoring impact sequence, the traffic impact sequence and the accident impact sequence are obtained respectively and sorted and combined to obtain an impact combination sequence; The different element values in the impact combination sequence are sequentially calculated through the construction impact identification piecewise function to obtain the construction impact degrees corresponding to different dimensions; The calculated construction impacts are sorted and combined to obtain a construction impact sequence; When adaptively generating a construction fence arrangement plan corresponding to the highway to be constructed according to the construction impact sequence, a traversal analysis of the construction impact sequence is performed.
9. The intelligent highway construction fence arrangement system according to claim 8, It is characterized in that If the values of the elements in the construction impact sequence are all 0, a conventional layout plan corresponding to the highway to be constructed is generated; If the values of the elements in the construction impact sequence are all 1, a complete reinforcement layout plan corresponding to the highway to be constructed is generated; If there is an element with a value of 1 in the construction impact sequence, a local reinforcement layout plan corresponding to the highway to be constructed is generated.
10. The intelligent highway construction fence arrangement system according to claim 8, It is characterized in that The expression of the piecewise function for construction impact identification is: Where SYk is the construction impact degree corresponding to different dimensions; k = 1, 2, 3; Xk is X1, X2, X3, which are the values corresponding to the construction monitoring value GJ, the traffic monitoring value TJ, and the accident monitoring value SJ respectively; X′k is X′1, X′2, X′3, which are the standard requirement values corresponding to the construction monitoring dimension, the traffic monitoring dimension, and the accident monitoring dimension respectively.
