Typical daily load curve generation method and device for energy storage capacity configuration
By sorting and fitting load curve data, the method generates a typical daily load curve for energy storage systems, enhancing the rationality and accuracy of energy storage capacity configuration.
Patent Information
- Application Number
- CN202411092761.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-12-06
AI Technical Summary
The fluctuation of electricity load due to factors like season, output, and holidays affects the accuracy of installed energy storage capacity in peak-valley arbitrage projects, necessitating a more precise method for generating a daily load curve.
A method for generating a typical daily load curve by sorting charging and discharging time periods based on power load data, determining normal power load data, and performing curve fitting to create a reasonable load curve for energy storage capacity configuration.
This approach improves the rationality of energy storage capacity configuration by ensuring optimal operation and accurate calculation of energy storage capacity that meets annual full-power working days.
Smart Images

Figure CN119093387A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of integrated energy systems, and in particular to a method for generating a typical daily load curve for energy storage capacity configuration, a device for generating a typical daily load curve for energy storage capacity configuration, a storage medium and a server. Background Art
[0002] Energy storage peak-valley arbitrage projects mainly use energy storage systems to charge during the low electricity price stage, and store energy for load use during the peak electricity price stage. Since electricity load fluctuates due to factors such as season, output, and holidays, the installed capacity of energy storage in energy storage peak-valley arbitrage projects is calculated based on the daily electricity curve of the load (called daily load curve). Because electricity load fluctuates, the selection and determination method of the daily load curve will directly affect the installed capacity of energy storage. Summary of the invention
[0003] In view of this, the embodiments of the present disclosure are intended to provide a method for generating a typical daily load curve for energy storage capacity configuration, an apparatus for generating a typical daily load curve for energy storage capacity configuration, a storage medium, and a server.
[0004] The technical solution of the present disclosure is achieved as follows:
[0005] In a first aspect, the present disclosure provides a method for generating a typical daily load curve for energy storage capacity configuration.
[0006] The method for generating a typical daily load curve for energy storage capacity configuration provided by an embodiment of the present disclosure includes:
[0007] Obtaining the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein the full-power working is determined as the total power output of the energy storage electricity in the energy storage system;
[0008] Based on the power load at the same time of each day in the predetermined time period, the charging time periods are sorted in order from small to large and the discharging time periods are sorted in order from large to small, and combined with the power load corresponding to the ranking position of the full-power working days, the normal power load data in the power load at the same time of each day in the predetermined time period is determined;
[0009] Based on the normal power load data at the same time of each day in the predetermined time period, predetermined rule data processing is performed to determine the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days;
[0010] Based on the typical daily load curve values corresponding to each time in the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period.
[0011] In some embodiments, the charging time periods are sorted in order from small to large and the discharging time periods are sorted in order from large to small based on the power load at the same time of each day in the predetermined time period, and the normal power load data in the power load at the same time of each day in the predetermined time period is determined in combination with the power load corresponding to the ranking position of the full-power working days, including:
[0012] If the current moment is the charging moment, then the normal power load data in the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the ranking position of the full-power working days;
[0013] If the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period, which is sorted in descending order and combined with the power load corresponding to the ranking position of the full-power working days.
[0014] In some embodiments, if the current moment is a charging moment, the normal power load data in the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the ranking position of the full-power working days, including:
[0015] Determine the number of full-power working days n that exist within the predetermined time period;
[0016] Based on the i-th data in the ascending order of the power load at each current moment in the predetermined time period, the i-th data is compared with half of the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1;
[0017] If the i-th data is greater than half of the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
[0018] In some embodiments, if the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period being sorted in descending order, and combined with the power load corresponding to the ranking position of the full-power working days, including:
[0019] Determine the number of full-power working days n that exist within the predetermined time period;
[0020] Based on the i-th data in the descending order of the power load at each current moment in the predetermined time period, the i-th data is compared with twice the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1;
[0021] If the i-th data is less than twice the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
[0022] In some embodiments, the predetermined rule data processing includes: if the current moment is a charging moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with twice the average between the i-th data and the n-th data;
[0023] The method of performing predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determining the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days, includes:
[0024] Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is less than twice the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period;
[0025] If the nth data is greater than twice the average of the ith data and the nth data, the power load corresponding to the previous position in the ranking of the full-power working days n is determined to be the typical daily load curve value corresponding to each charging time in the predetermined time period.
[0026] In some embodiments, the predetermined rule data processing includes: if the current moment is a discharge moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with half of the average between the i-th data and the n-th data;
[0027] The method of performing predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determining the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days, includes:
[0028] Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is greater than half of the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period;
[0029] If the nth data is less than half of the average between the ith data and the nth data, the power load corresponding to the previous position of the ranking position where the full-power working days n are located is determined to be the typical daily load curve value corresponding to each discharge time in the predetermined time period. In some embodiments, the curve fitting is performed based on the typical daily load curve value corresponding to each time in the predetermined time period to generate the typical daily load curve corresponding to the predetermined time period, including:
[0030] Based on the typical daily load curve values corresponding to each charging moment in the predetermined time period and the typical daily load curve values corresponding to each discharging moment in the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period.
[0031] In a second aspect, the present disclosure provides a typical daily load curve generating device for energy storage capacity configuration, comprising:
[0032] A data acquisition module, used to obtain the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein the full-power working is determined as the total power output of the energy storage electricity in the energy storage system;
[0033] A data determination module, for sorting the charging time periods from small to large and the discharging time periods from large to small based on the power load at the same time of each day in the predetermined time period, and determining the normal power load data in the power load at the same time of each day in the predetermined time period in combination with the power load corresponding to the ranking position of the full-power working days;
[0034] A curve value determination module, configured to perform predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determine the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days;
[0035] The curve generation module is used to perform curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period, so as to generate a typical daily load curve corresponding to the predetermined time period.
[0036] In a third aspect, the present disclosure provides a computer-readable storage medium having stored thereon a typical daily load curve generation program for energy storage capacity configuration, which, when executed by a processor, implements the typical daily load curve generation method for energy storage capacity configuration described in the first aspect above.
[0037] In a fourth aspect, the present disclosure provides a server comprising a memory, a processor, and a typical daily load curve generation program for energy storage capacity configuration stored in the memory and executable on the processor, wherein when the processor executes the typical daily load curve generation program for energy storage capacity configuration, the typical daily load curve generation method for energy storage capacity configuration described in the first aspect above is implemented.
[0038] According to an embodiment of the present disclosure, a typical daily load curve generation method for energy storage capacity configuration includes: obtaining the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein full-power working is determined as the total power output of the energy storage electricity in the energy storage system; based on the power load at each time of each day within the predetermined time period, the charging time period is sorted in order from small to large and the discharging time period is sorted in order from large to small, and in combination with the power load corresponding to the ranking position where the full-power working days are located, the normal power load data in the power load at the same time of each day within the predetermined time period is determined; based on the normal power load data in the power load at the same time of each day within the predetermined time period, predetermined rule data processing is performed, and the typical daily time load curve value corresponding to each time within the predetermined time period is determined from the power load corresponding to the ranking position where the full-power working days are located and the power load corresponding to the previous ranking position where the full-power working days are located; based on the typical daily time load curve value corresponding to each time within the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period. In the present application, based on the energy storage system sorting the charging periods from small to large and the discharging periods from large to small within a predetermined time period, and combining the number of full-power working days within the predetermined time period, normal power load data is screened, and the load curve value of the typical day is determined more reasonably, which is conducive to obtaining a more reasonable and effective typical daily load curve, and then it is conducive to configuring the energy storage capacity of the energy storage system based on the more reasonable and effective typical daily load curve, so as to improve the rationality of the energy storage capacity configuration.
[0039] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 is a flow chart of a typical daily load curve generation method for energy storage capacity configuration according to an exemplary embodiment;
[0041] Figure 2 is a schematic diagram of a typical daily load curve generation process for energy storage capacity configuration according to an exemplary embodiment;
[0042] Figure 3 It is a schematic diagram of the structure of a typical daily load curve generating device for energy storage capacity configuration according to an exemplary embodiment. DETAILED DESCRIPTION
[0043] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present disclosure, and should not be construed as limiting the present disclosure.
[0044] Energy storage peak-valley arbitrage projects mainly use energy storage systems to charge during the low electricity price stage, and store energy for load use during the peak electricity price stage. Since electricity load fluctuates due to factors such as season, output, and holidays, the installed capacity of energy storage in energy storage peak-valley arbitrage projects is calculated based on the daily electricity curve of the load (called daily load curve). Because electricity load fluctuates, the selection and determination method of the daily load curve will directly affect the installed capacity of energy storage.
[0045] In view of the above situation, the present disclosure provides a method for generating a typical daily load curve for energy storage capacity configuration. Figure 1 FIG. 1 is a flow chart of a typical daily load curve generation method for energy storage capacity configuration according to an exemplary embodiment. Figure 1 As shown, the typical daily load curve generation method for energy storage capacity configuration includes:
[0046] Step 10, obtaining the power load of the energy storage system at each time of each day within a predetermined time period and the number of days of full-power operation within the predetermined time period; wherein the full-power operation is determined as the total power output of the energy storage in the energy storage system;
[0047] Step 11: Based on the power load at the same time of each day in the predetermined time period, the charging time periods are sorted in order from small to large and the discharging time periods are sorted in order from large to small, and the normal power load data among the power loads at the same time of each day in the predetermined time period is determined in combination with the power load corresponding to the ranking position of the full-power working days;
[0048] Step 12: Based on the normal power load data at the same time of each day in the predetermined time period, predetermined rule data processing is performed to determine the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days;
[0049] Step 13: Perform curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period to generate a typical daily load curve corresponding to the predetermined time period.
[0050] In this exemplary embodiment, the rationality of the energy storage capacity is a decisive indicator for the optimal operation of the energy storage system; based on the characteristics of energy storage charging and discharging, a reasonable typical daily load curve is generated, which is conducive to accurately calculating the energy storage capacity that meets the annual full power working days of the energy storage.
[0051] In this exemplary embodiment, when counting power load data, it is necessary to obtain the power load of the energy storage system at each time of each day within a predetermined time period. For example, count the user load at multiple times from the 1st to the 30th of each month. For example, count the user load at each hour from 8:00 to 20:00 every day from the 1st to the 30th of each month, and so on. The specific time of statistical data can be determined according to user needs, which is only an example here and has no limiting effect.
[0052] In this exemplary embodiment, the number of full-power working days within the predetermined time period can be determined according to specific scenarios or requirements. For example, the number of full-power working days is determined to be 25 days.
[0053] In this exemplary embodiment, since the collected power load data may contain data that is too large or too small, which will affect the fitting of the typical daily load curve, the power load at the same time on each day within the predetermined time period can be sorted in order from small to large for charging periods and from large to small for discharging periods, and the normal power load data in the power load at the same time on each day within the predetermined time period can be determined by combining the power load corresponding to the sorting position of the full-power working days.
[0054] According to an embodiment of the present disclosure, a typical daily load curve generation method for energy storage capacity configuration includes: obtaining the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein full-power working is determined as the total power output of the energy storage electricity in the energy storage system; based on the power load at each time of each day within the predetermined time period, the charging time period is sorted in order from small to large and the discharging time period is sorted in order from large to small, and in combination with the power load corresponding to the ranking position where the full-power working days are located, the normal power load data in the power load at the same time of each day within the predetermined time period is determined; based on the normal power load data in the power load at the same time of each day within the predetermined time period, predetermined rule data processing is performed, and the typical daily time load curve value corresponding to each time within the predetermined time period is determined from the power load corresponding to the ranking position where the full-power working days are located and the power load corresponding to the previous ranking position where the full-power working days are located; based on the typical daily time load curve value corresponding to each time within the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period. In the present application, based on the energy storage system sorting the charging periods from small to large and the discharging periods from large to small within a predetermined time period, and combining the number of full-power working days within the predetermined time period, normal power load data is screened, and the load curve value of the typical day is determined more reasonably, which is conducive to obtaining a more reasonable and effective typical daily load curve, and then it is conducive to configuring the energy storage capacity of the energy storage system based on the more reasonable and effective typical daily load curve, so as to improve the rationality of the energy storage capacity configuration.
[0055] In some embodiments, the charging time periods are sorted in order from small to large and the discharging time periods are sorted in order from large to small based on the power load at the same time of each day in the predetermined time period, and the normal power load data in the power load at the same time of each day in the predetermined time period is determined in combination with the power load corresponding to the ranking position of the full-power working days, including:
[0056] If the current moment is the charging moment, then the normal power load data in the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the ranking position of the full-power working days;
[0057] If the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period, which is sorted in descending order and combined with the power load corresponding to the ranking position of the full-power working days.
[0058] In this exemplary embodiment, if the current moment is a charging moment, the normal power load data in the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the sorting position of the full-power working days, including:
[0059] Determine the number of full-power working days n that exist within the predetermined time period;
[0060] Based on the i-th data in the ascending order of the power load at each current moment in the predetermined time period, the i-th data is compared with half of the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1;
[0061] If the i-th data is greater than half of the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
[0062] In this exemplary embodiment, if the current moment is a charging moment, the power load at each current moment in the predetermined time period is sorted in order from small to large, and combined with the power load corresponding to the sorting position of the full-power working days, the normal power load data in the power load at each current moment in the predetermined time period is determined. For example, the number of full-power working days n is 25, 1≤i≤24. Starting from i being 1, if the first data is greater than half of the average between the first data and the 25th data, the first data is determined to be the normal power load data in the power load. The average between the first data and the 25th data is the average of the 25 data from the first data to the 25th data. If the first data is less than or equal to half of the average between the first data and the 25th data, the first data is determined to be the abnormal power load data in the power load, and the first data can be discarded at this time. Similarly, by analogy, if i is 2, if the second data is greater than half of the average between the second data and the 25th data, then the second data is determined to be normal power load data in the power load. Among them, from the first data to the nth data, when the i-th data is normal power load data, the i-th data to the n-th data are taken as normal power load data. In this way, the smaller abnormal values in the power load data can be discarded to obtain normal power load data.
[0063] In some embodiments, if the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period being sorted in descending order, and combined with the power load corresponding to the ranking position of the full-power working days, including:
[0064] Determine the number of full-power working days n that exist within the predetermined time period;
[0065] Based on the i-th data in the descending order of the power load at each current moment in the predetermined time period, the i-th data is compared with twice the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1;
[0066] If the i-th data is less than twice the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
[0067] In this exemplary embodiment, if the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period, which is sorted from large to small, and combined with the power load corresponding to the sorting position of the full-power working days. For example, the number of full-power working days n is 25, 1≤i≤24. Starting from i being 1, if the first data is less than 2 times the average between the first data and the 25th data, the first data is determined to be the normal power load data in the power load. The average between the first data and the 25th data is the average of the 25 data from the first data to the 25th data. If the first data is greater than or equal to 2 times the average between the first data and the 25th data, the first data is determined to be the abnormal power load data in the power load, and the first data can be discarded at this time. Similarly, by analogy, if i is 2, if the second data is greater than half of the average between the second data and the 25th data, then the second data is determined to be normal power load data in the power load. Among them, from the first data to the nth data, when the i-th data is normal power load data, the i-th data to the n-th data are taken as normal power load data. In this way, the larger abnormal values in the power load data can be discarded to obtain normal power load data.
[0068] In some embodiments, the predetermined rule data processing includes: if the current moment is a charging moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with twice the average between the i-th data and the n-th data;
[0069] The method of performing predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determining the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days, includes:
[0070] Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is less than twice the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period;
[0071] If the nth data is greater than twice the average of the ith data and the nth data, the power load corresponding to the previous position in the ranking of the full-power working days n is determined to be the typical daily load curve value corresponding to each charging time in the predetermined time period.
[0072] In this exemplary embodiment, when determining the load curve value at a typical day, the charging period statistics the charging capacity of the energy storage. Among them, the charging capacity of the energy storage = load transformer capacity - load power, so the greater the load power, the smaller the energy storage charging capacity. Therefore, the loads are sorted from small to large, which is equivalent to sorting the energy storage charging capacity from large to small. By taking the nth data, it can be ensured that the energy storage before the nth data can work at full power, and there is no waste of energy storage.
[0073] If the nth data is less than 2 times the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each moment in the predetermined time period; if the nth data is greater than 2 times the average between the ith data and the nth data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each charging moment in the predetermined time period. In this way, the value of the typical daily load curve value is as large as possible, and there is no waste of energy storage.
[0074] In some embodiments, the predetermined rule data processing includes: if the current moment is a discharge moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with half of the average between the i-th data and the n-th data;
[0075] The method of performing predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determining the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days, includes:
[0076] Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is greater than half of the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period;
[0077] If the nth data is less than half of the average between the ith data and the nth data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each discharge time in the predetermined time period.
[0078] In this exemplary embodiment, when determining the load curve value of a typical day, since the discharge period is the discharge capacity requirement of the statistical energy storage, it is the load curve data. When the current moment is the discharge moment, if the nth data is greater than half of the average between the i-th data and the n-th data, the power load corresponding to the ranking position of the full-power working days n is determined to be the load curve value of the typical day corresponding to each moment in the predetermined time period; if the nth data is less than half of the average between the i-th data and the n-th data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the load curve value of the typical day corresponding to each discharge moment in the predetermined time period. By sorting from large to small, when taking the nth data, it can be ensured that the energy storage of the data before n can work at full power, so that there is no waste of energy storage on the basis of maximizing the energy storage capacity as much as possible when storing energy.
[0079] In some embodiments, performing curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period to generate the typical daily load curve corresponding to the predetermined time period includes:
[0080] Based on the typical daily load curve values corresponding to each charging moment in the predetermined time period and the typical daily load curve values corresponding to each discharging moment in the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period.
[0081] In this exemplary embodiment, when performing curve fitting to determine the typical daily load curve, there are charging moments and discharging moments. Both the charging moments and the discharging moments correspond to typical daily load curve values. Therefore, when performing curve fitting, it is necessary to perform curve fitting based on the typical daily load curve values corresponding to each charging moment in the predetermined time period and the typical daily load curve values corresponding to each discharging moment in the predetermined time period to generate the typical daily load curve corresponding to the predetermined time period.
[0082] Figure 2 FIG. 1 is a schematic diagram of a typical daily load curve generation process for energy storage capacity configuration according to an exemplary embodiment. Figure 2 As shown in Figure 1, the typical daily load curve generation process for energy storage capacity configuration includes:
[0083] Step 20, calculate the value at a certain time of a typical day;
[0084] Step 21: Determine whether this moment is the energy storage charging period
[0085] Step 22: If this moment is the energy storage charging period, sort all the data at the current moment from small to large;
[0086] Step 23, take the nth data, n = number of days of full power operation;
[0087] Step 24, calculate the average value of the array (i to n) within the value range, and the initial value of i is 1;
[0088] Step 25, determine whether the i-th data is greater than the average value / 2;
[0089] Step 26: If the i-th data is greater than the average value / 2, determine whether the n-th data is less than the average value*2;
[0090] Step 27: If the nth data is less than the average value*2, the nth data is used as the typical daily load curve value at this moment;
[0091] Step 28: If the nth data is greater than or equal to the average value*2, the n-1th data is used as the typical daily load curve value at this moment;
[0092] Step 29, if the i-th data is less than or equal to the average value / 2, then i=i+1, and the next data is determined to execute steps 24 to 28;
[0093] Step 30: This moment is the energy storage discharge period;
[0094] Step 31: If this moment is the energy storage discharge period, sort all the data at the current moment from large to small;
[0095] Step 32, take the nth data, n = number of days of full power operation;
[0096] Step 33, calculate the average value of the array (i to n) within the value range, and the initial value of i is 1;
[0097] Step 34, determine whether the i-th data is greater than the average value*2;
[0098] Step 35: If the ith data is less than the average value*2, determine whether the nth data is greater than the average value / 2; if the nth data is greater than the average value / 2, use the nth data as the typical daily load curve value at this moment;
[0099] Step 36: If the i-th data is greater than or equal to the average value*2, then i=i+1 is taken, and the next data is determined to execute steps 33 to 35.
[0100] In this application, the energy storage charging and discharging status at the current moment is judged according to the peak and valley electricity price periods. The valley belongs to the charging period, and the peak belongs to the discharging period.
[0101] Sort all data at this moment according to the energy storage charging and discharging status at this moment. The sorting rules are:
[0102] Charging period: all data are sorted from small to large;
[0103] Discharge period: all data are sorted from large to small;
[0104] Take the value of the sorted array and take the nth data, where n is equal to the number of days of full-power operation. Example: When calculating the typical daily load curve of each month, n is taken as 25. And ensure that the energy storage works at full power for 25 days each month;
[0105] Exclude abnormal data that has a significant impact on the validity analysis of the value. The specific method is as follows:
[0106] Charging period: Calculate from the first minimum data. If this data cannot meet the requirement of less than half of the average, the data is invalid. Calculate one by one in this way until the data meets the requirement.
[0107] Discharge period: Calculate from the first maximum data. If this data cannot meet the requirement of less than 2 times the average, this data is invalid. Repeat this process until the data meets the requirement.
[0108] Conduct validity analysis on the values;
[0109] Charging period: If the value is less than 2 times the average value of the array after excluding abnormal data, the data is valid, otherwise the previous data of this data is taken as the valid value of the data;
[0110] Discharge period: If the value is greater than 1 / 2 of the array average after excluding abnormal data, the data is valid, otherwise the previous data of this data is taken as the valid value of the data;
[0111] The load data at each moment of a typical day is calculated once, and the final value results form a typical day load curve.
[0112] In this exemplary embodiment, the typical daily load curve generated by the present application can be applied to the energy storage capacity configuration of the energy storage system, that is, the energy storage capacity configuration of the energy storage system is performed based on the generated typical daily load curve corresponding to the predetermined time period.
[0113] The configuring of the energy storage capacity of the energy storage system based on the generated typical daily load curve corresponding to the predetermined time period includes:
[0114] According to the typical day load curve, the energy storage discharge capacity demand in each discharge period of a typical day is counted;
[0115] According to the typical day load curve, the energy storage charging capacity of each charging period on a typical day is calculated;
[0116] According to the statistical energy storage discharge capacity demand and energy storage charging capacity, the minimum value is taken as the energy storage configuration capacity; among them, the energy storage discharge capacity demand is to meet the load power demand, so the energy storage discharge capacity demand is equal to the typical daily load power demand; the energy storage charging capacity is equal to the load configuration transformer capacity minus the load power consumption, so the greater the load power consumption, the smaller the energy storage charging capacity.
[0117] Because energy storage charging and discharging are relative, you can only discharge as much as you can charge, and you must be able to charge in as much electricity as you want to discharge. Therefore, based on the statistical energy storage discharge capacity demand and energy storage charging capacity, the minimum value can be taken as the energy storage configuration capacity.
[0118] The present disclosure provides a typical daily load curve generating device for energy storage capacity configuration. Figure 3 FIG. 1 is a schematic diagram of a typical daily load curve generating device for energy storage capacity configuration according to an exemplary embodiment. Figure 3 As shown, a typical daily load curve generation device for energy storage capacity configuration includes:
[0119] The data acquisition module 30 is used to obtain the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein the full-power working is determined as the total power output of the energy storage power in the energy storage system;
[0120] The data determination module 31 is used to sort the charging time periods from small to large and the discharging time periods from large to small based on the power load at the same time of each day in the predetermined time period, and to determine the normal power load data in the power load at the same time of each day in the predetermined time period in combination with the power load corresponding to the ranking position of the full-power working days;
[0121] The curve value determination module 32 is used to perform predetermined rule data processing based on the normal power load data in the power load at the same time of each day in the predetermined time period, and determine the typical daily time load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days;
[0122] The curve generating module 33 is used to perform curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period, so as to generate a typical daily load curve corresponding to the predetermined time period.
[0123] In this exemplary embodiment, the rationality of the energy storage capacity is a decisive indicator for the optimal operation of the energy storage system; based on the characteristics of energy storage charging and discharging, a reasonable typical daily load curve is generated, which is conducive to accurately calculating the energy storage capacity that meets the annual full power working days of the energy storage.
[0124] In this exemplary embodiment, when counting power load data, it is necessary to obtain the power load of the energy storage system at each time of each day within a predetermined time period. For example, count the user load at multiple times from the 1st to the 30th of each month. For example, count the user load at each hour from 8:00 to 20:00 every day from the 1st to the 30th of each month, and so on. The specific time of statistical data can be determined according to user needs, which is only an example here and has no limiting effect.
[0125] In this exemplary embodiment, the number of full-power working days within the predetermined time period can be determined according to specific scenarios or requirements. For example, the number of full-power working days is determined to be 25 days.
[0126] In this exemplary embodiment, since the collected power load data may contain data that is too large or too small, which will affect the fitting of the typical daily load curve, the power load at the same time on each day within the predetermined time period can be sorted in order from small to large for charging periods and from large to small for discharging periods, and the normal power load data in the power load at the same time on each day within the predetermined time period can be determined by combining the power load corresponding to the sorting position of the full-power working days.
[0127] According to the typical daily load curve generating device for energy storage capacity configuration of the embodiment of the present disclosure, it is used to obtain the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein, full-power working is determined as the total power output of the energy storage electricity in the energy storage system; based on the power load at each time of each day within the predetermined time period, the charging time period is sorted in order from small to large and the discharging time period is sorted in order from large to small, and combined with the power load corresponding to the ranking position where the full-power working days are located, the normal power load data in the power load at the same time of each day within the predetermined time period is determined; based on the normal power load data in the power load at the same time of each day within the predetermined time period, predetermined rule data processing is performed, and the typical daily time load curve value corresponding to each time within the predetermined time period is determined from the power load corresponding to the ranking position where the full-power working days are located and the power load corresponding to the previous ranking position where the full-power working days are located; based on the typical daily time load curve value corresponding to each time within the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period. In the present application, based on the energy storage system sorting the charging periods from small to large and the discharging periods from large to small within a predetermined time period, and combining the number of full-power working days within the predetermined time period, normal power load data is screened, and the load curve value of the typical day is determined more reasonably, which is conducive to obtaining a more reasonable and effective typical daily load curve, and then it is conducive to configuring the energy storage capacity of the energy storage system based on the more reasonable and effective typical daily load curve, so as to improve the rationality of the energy storage capacity configuration.
[0128] In some embodiments, the data determination module 31 is used to
[0129] If the current moment is the charging moment, then the normal power load data in the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the ranking position of the full-power working days;
[0130] If the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period, which is sorted in descending order and combined with the power load corresponding to the ranking position of the full-power working days.
[0131] In this exemplary embodiment, the data determination module 31 is used to
[0132] Determine the number of full-power working days n that exist within the predetermined time period;
[0133] Based on the i-th data in the ascending order of the power load at each current moment in the predetermined time period, the i-th data is compared with half of the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1;
[0134] If the i-th data is greater than half of the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
[0135] In this exemplary embodiment, if the current moment is a charging moment, the power load at each current moment in the predetermined time period is sorted in order from small to large, and combined with the power load corresponding to the sorting position of the full-power working days, the normal power load data in the power load at each current moment in the predetermined time period is determined. For example, the number of full-power working days n is 25, 1≤i≤24. Starting from i being 1, if the first data is greater than half of the average between the first data and the 25th data, the first data is determined to be the normal power load data in the power load. The average between the first data and the 25th data is the average of the 25 data from the first data to the 25th data. If the first data is less than or equal to half of the average between the first data and the 25th data, the first data is determined to be the abnormal power load data in the power load, and the first data can be discarded at this time. Similarly, by analogy, if i is 2, if the second data is greater than half of the average between the second data and the 25th data, then the second data is determined to be the normal power load data in the power load. Among them, from the 1st data to the nth data, when the i-th data is the normal power load data, the i-th data to the n-th data are taken as the normal power load data.
[0136] In some embodiments, the data determination module 31 is used to
[0137] Determine the number of full-power working days n that exist within the predetermined time period;
[0138] Based on the i-th data in the descending order of the power load at each current moment in the predetermined time period, the i-th data is compared with twice the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1;
[0139] If the i-th data is less than twice the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
[0140] In this exemplary embodiment, if the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period, which is sorted from large to small, and combined with the power load corresponding to the sorting position of the full-power working days. For example, the number of full-power working days n is 25, 1≤i≤24. Starting from i being 1, if the first data is less than 2 times the average between the first data and the 25th data, the first data is determined to be the normal power load data in the power load. The average between the first data and the 25th data is the average of the 25 data from the first data to the 25th data. If the first data is greater than or equal to 2 times the average between the first data and the 25th data, the first data is determined to be the abnormal power load data in the power load, and the first data can be discarded at this time. Similarly, by analogy, if i is 2, if the second data is greater than half of the average between the second data and the 25th data, then the second data is determined to be the normal power load data in the power load. Among them, from the 1st data to the nth data, when the i-th data is the normal power load data, the i-th data to the n-th data are taken as the normal power load data.
[0141] In some embodiments, the predetermined rule data processing includes: if the current moment is a charging moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with twice the average between the i-th data and the n-th data;
[0142] The curve value determination module 32 is used to
[0143] Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is less than twice the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period;
[0144] If the nth data is greater than twice the average of the ith data and the nth data, the power load corresponding to the previous position in the ranking of the full-power working days n is determined to be the typical daily load curve value corresponding to each charging time in the predetermined time period.
[0145] In this exemplary embodiment, when determining the load curve value at a typical day, the charging period statistics the charging capacity of the energy storage. Among them, the charging capacity of the energy storage = load transformer capacity - load power, so the greater the load power, the smaller the energy storage charging capacity. Therefore, the loads are sorted from small to large, which is equivalent to sorting the energy storage charging capacity from large to small. By taking the nth data, it can be ensured that the energy storage before the nth data can work at full power, and there is no waste of energy storage.
[0146] If the nth data is less than 2 times the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each moment in the predetermined time period; if the nth data is greater than 2 times the average between the ith data and the nth data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each charging moment in the predetermined time period. In this way, the value of the typical daily load curve value is as large as possible, and there is no waste of energy storage.
[0147] In some embodiments, the predetermined rule data processing includes: if the current moment is a discharge moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with half of the average between the i-th data and the n-th data;
[0148] The curve value determination module 32 is used to
[0149] Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is greater than half of the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period;
[0150] If the nth data is less than half of the average between the ith data and the nth data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each discharge time in the predetermined time period.
[0151] In this exemplary embodiment, when determining the load curve value of a typical day, since the discharge period is the discharge capacity requirement of the statistical energy storage, it is the load curve data. When the current moment is the discharge moment, if the nth data is greater than half of the average between the i-th data and the n-th data, the power load corresponding to the ranking position of the full-power working days n is determined to be the load curve value of the typical day corresponding to each moment in the predetermined time period; if the nth data is less than half of the average between the i-th data and the n-th data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the load curve value of the typical day corresponding to each discharge moment in the predetermined time period. By sorting from large to small, when taking the nth data, it can be ensured that the energy storage of the data before n can work at full power, so that there is no waste of energy storage on the basis of maximizing the energy storage capacity as much as possible when storing energy.
[0152] In some embodiments, performing curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period to generate the typical daily load curve corresponding to the predetermined time period includes:
[0153] Based on the typical daily load curve values corresponding to each charging moment in the predetermined time period and the typical daily load curve values corresponding to each discharging moment in the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period.
[0154] In this exemplary embodiment, when performing curve fitting to determine the typical daily load curve, there are charging moments and discharging moments. Both the charging moments and the discharging moments correspond to typical daily load curve values. Therefore, when performing curve fitting, it is necessary to perform curve fitting based on the typical daily load curve values corresponding to each charging moment in the predetermined time period and the typical daily load curve values corresponding to each discharging moment in the predetermined time period to generate the typical daily load curve corresponding to the predetermined time period.
[0155] The present disclosure provides a computer-readable storage medium on which a typical daily load curve generation program for energy storage capacity configuration is stored. When the typical daily load curve generation program for energy storage capacity configuration is executed by a processor, the typical daily load curve generation method for energy storage capacity configuration described in the above embodiments is implemented.
[0156] The present disclosure provides a server, comprising a memory, a processor, and a typical daily load curve generation program for energy storage capacity configuration stored in the memory and executable on the processor. When the processor executes the typical daily load curve generation program for energy storage capacity configuration, the typical daily load curve generation method for energy storage capacity configuration described in the above-mentioned embodiments is implemented.
[0157] It should be noted that the logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as a sequenced list of executable instructions for implementing logical functions, and can be specifically implemented in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection portion with one or more wirings (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or otherwise processing in a suitable manner if necessary, and then stored in a computer memory.
[0158] It should be understood that the various parts of the present disclosure can be implemented in hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0159] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0160] In the description of the present disclosure, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present disclosure and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present disclosure.
[0161] In addition, the terms "first", "second", etc. used in the embodiments of the present disclosure are only used for descriptive purposes and should not be understood as indicating or implying relative importance, or implicitly indicating the number of technical features indicated in the embodiments. Therefore, the features defined by the terms "first", "second", etc. in the embodiments of the present disclosure may explicitly or implicitly indicate that at least one of the features is included in the embodiment. In the description of the present disclosure, the word "multiple" means at least two or two or more, such as two, three, four, etc., unless otherwise clearly and specifically defined in the embodiments.
[0162] In the present disclosure, unless otherwise clearly specified or limited in the embodiments, the terms "installed", "connected", "connected" and "fixed" etc. appearing in the embodiments should be understood in a broad sense. For example, the connection can be a fixed connection, a detachable connection, or an integrated connection. It can be understood that it can also be a mechanical connection, an electrical connection, etc.; of course, it can also be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal connection of two elements, or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to the specific implementation situation.
[0163] In the present disclosure, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0164] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.
Claims
1. A method for generating a typical daily load curve for energy storage capacity configuration, characterized in that: include: Obtaining the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein the full-power working is determined as the total power output of the energy storage electricity in the energy storage system; Based on the power load at the same time of each day in the predetermined time period, the charging time periods are sorted in order from small to large and the discharging time periods are sorted in order from large to small, and combined with the power load corresponding to the ranking position of the full-power working days, the normal power load data in the power load at the same time of each day in the predetermined time period is determined; Based on the normal power load data at the same time of each day in the predetermined time period, predetermined rule data processing is performed to determine the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days; Based on the typical daily load curve values corresponding to each time in the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period.
2. The method for generating a typical daily load curve for energy storage capacity configuration according to claim 1, characterized in that: The method of sorting the charging time periods from small to large and the discharging time periods from large to small based on the power load at the same time of each day in the predetermined time period, and determining the normal power load data in the power load at the same time of each day in the predetermined time period in combination with the power load corresponding to the ranking position of the full-power working days, includes: If the current moment is the charging moment, then the normal power load data in the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the ranking position of the full-power working days; If the current moment is the discharge moment, the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period, which is sorted in descending order and combined with the power load corresponding to the ranking position of the full-power working days.
3. The typical daily load curve generation method for energy storage capacity configuration according to claim 2, characterized in that: If the current moment is the charging moment, the normal power load data of the power load at each current moment in the predetermined time period is determined based on the power load at each current moment in the predetermined time period being sorted in ascending order and combined with the power load corresponding to the ranking position of the full-power working days, including: Determine the number of full-power working days n that exist within the predetermined time period; Based on the i-th data in the ascending order of the power load at each current moment in the predetermined time period, the i-th data is compared with half of the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1; If the i-th data is greater than half of the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
4. The method for generating a typical daily load curve for energy storage capacity configuration according to claim 2, characterized in that: If the current moment is the discharge moment, then the normal power load data in the power load at the current moment of each day in the predetermined time period is determined based on the power load at the current moment of each day in the predetermined time period being sorted in descending order, and combined with the power load corresponding to the ranking position of the full-power working days, including: Determine the number of full-power working days n that exist within the predetermined time period; Based on the i-th data in the descending order of the power load at each current moment in the predetermined time period, the i-th data is compared with twice the average between the i-th data and the n-th data to determine whether the i-th data is normal power load data in the power load; 1≤i≤n-1; If the i-th data is less than twice the average between the i-th data and the n-th data, it is determined that the i-th data is normal power load data in the power load.
5. The method for generating a typical daily load curve for energy storage capacity configuration according to claim 3, characterized in that: The predetermined rule data processing includes: if the current moment is a charging moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with twice the average between the i-th data and the n-th data; The method of performing predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determining the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days, includes: Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is less than twice the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period; If the nth data is greater than twice the average of the ith data and the nth data, the power load corresponding to the previous position in the ranking of the full-power working days n is determined to be the typical daily load curve value corresponding to each charging time in the predetermined time period.
6. The method for generating a typical daily load curve for energy storage capacity configuration according to claim 4, characterized in that: The predetermined rule data processing includes: if the current moment is a discharge moment, and the i-th data is normal power load data in the power load, then the n-th data is compared with half of the average between the i-th data and the n-th data; The method of performing predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determining the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days, includes: Based on the normal power load data in the power load at the same time of each day in the predetermined time period, a predetermined rule data processing is performed, and if the nth data is greater than half of the average between the ith data and the nth data, the power load corresponding to the ranking position of the full-power working day n is determined to be the typical daily time load curve value corresponding to each time in the predetermined time period; If the nth data is less than half of the average between the ith data and the nth data, the power load corresponding to the previous ranking position of the full-power working days n is determined to be the typical daily load curve value corresponding to each discharge time in the predetermined time period.
7. The method for generating a typical daily load curve for energy storage capacity configuration according to claim 6, characterized in that: The method of performing curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period to generate a typical daily load curve corresponding to the predetermined time period includes: Based on the typical daily load curve values corresponding to each charging moment in the predetermined time period and the typical daily load curve values corresponding to each discharging moment in the predetermined time period, curve fitting is performed to generate a typical daily load curve corresponding to the predetermined time period.
8. A typical daily load curve generating device for energy storage capacity configuration, characterized in that: include: A data acquisition module, used to obtain the power load of the energy storage system at each time of each day within a predetermined time period and the number of full-power working days within the predetermined time period; wherein the full-power working is determined as the total power output of the energy storage electricity in the energy storage system; A data determination module, for sorting the charging time periods from small to large and the discharging time periods from large to small based on the power load at the same time of each day in the predetermined time period, and determining the normal power load data in the power load at the same time of each day in the predetermined time period in combination with the power load corresponding to the ranking position of the full-power working days; A curve value determination module, configured to perform predetermined rule data processing based on normal power load data in the power load at the same time of each day in the predetermined time period, and determine the typical daily load curve value corresponding to each time in the predetermined time period from the power load corresponding to the ranking position of the full-power working days and the power load corresponding to the previous ranking position of the full-power working days; The curve generation module is used to perform curve fitting based on the typical daily load curve values corresponding to each time in the predetermined time period, so as to generate a typical daily load curve corresponding to the predetermined time period.
9. A computer-readable storage medium, characterized in that: A typical daily load curve generation program for energy storage capacity configuration is stored thereon. When the typical daily load curve generation program for energy storage capacity configuration is executed by a processor, the typical daily load curve generation method for energy storage capacity configuration described in any one of claims 1-7 is implemented.
10. A server, characterized in that: The invention comprises a memory, a processor and a typical daily load curve generation program for energy storage capacity configuration which is stored in the memory and can be run on the processor. When the processor executes the typical daily load curve generation program for energy storage capacity configuration, the typical daily load curve generation method for energy storage capacity configuration described in any one of claims 1 to 7 is implemented.
