Offshore wind power cluster orderly quit and recovery grid connection method and system
By preprocessing data and establishing a typhoon disaster model, offshore wind turbines are withdrawn and restored in batches in an orderly manner, and dynamic compensation is performed using energy storage and active loads, the impact of offshore wind power on the power grid during typhoons is solved and the utilization of the power grid is improved. rate and stability.
Patent Information
- Application Number
- CN202410963829.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-12-06
AI Technical Summary
The exit and recovery of offshore wind power clusters during typhoons have caused a huge impact on the power grid, affecting the safe and stable operation of the power grid, and reducing the utilization rate of offshore wind power.
By acquiring and preprocessing data, a Batts typhoon disaster model is established, the units affected by the typhoon are predicted, combined with the power regulation resources of the local power grid, offshore wind turbines are withdrawn and restored in batches in an orderly manner, and dynamic compensation is used for energy storage and active loads, and optimization Grid load balance.
It has achieved a balance between supply and demand of the power grid load when a typhoon passes, reduced system operating costs, improved offshore wind power utilization, and ensured the safe and stable operation of the power grid.
Smart Images

Figure CN119093488A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of stable operation of an electric power system including an offshore wind power cluster, and specifically to a method and system for orderly exiting and restoring grid connection of an offshore wind power cluster under a typhoon. Background Art
[0002] As offshore wind power tends to be large-scale and clustered, the withdrawal and restoration of offshore wind power clusters during typhoon weather can easily cause an imbalance in the supply and demand of regional power grids, seriously affecting the safe and stable operation of power grids containing offshore wind power clusters. The development of offshore wind power is also gradually tending towards deep sea, clustering and scale. Large-scale offshore wind power is mostly concentrated in the southeastern coastal areas of my country. It has the advantages of high output level, gentle fluctuations, and small wind shear, and plays an important role in supplementing the power grid. However, extreme typhoon weather frequently occurs in the eastern coastal areas in summer, and the volatility of offshore wind power output increases, causing power imbalance in the receiving end power grid. In order to ensure the safety of wind turbines during the typhoon, they are forced to shut down and withdraw quickly, and resume grid connection after the typhoon is away from the offshore wind power cluster. During this period, if the backup resources in the system are insufficient, it will cause an imbalance in active power in a short period of time, affecting the reliability of the regional power grid.
[0003] Typhoon weather makes offshore wind power output more random and volatile, posing severe challenges to the supply and demand balance of the power system. Conventional units start and stop quickly during the day, and use multiple types of flexible resources such as hydropower plants, gas power plants, energy storage, and elastic loads to complement the sharp fluctuations of offshore wind power during typhoons. With the high penetration of offshore wind power in the power grid, offshore wind farms are more vulnerable to typhoons. Therefore, when responding to typhoons, it is of great significance for offshore wind power to take appropriate measures to exit the operation of wind turbines and restore grid connection for reliable supply of loads.
[0004] Combined with the resilience of the power grid, the whole process of offshore wind power clusters being hit by typhoons can be divided into the following three stages: prevention stage, disaster stage and recovery stage. Corresponding measures are taken in each stage to improve the level of power grid resilience and ensure the supply of loads. In actual dispatching, offshore wind farms often adopt the method of early planned withdrawal to cope with typhoon weather. Although it ensures the safety of the units and reduces the impact of rapid wind power ramp-up on the power grid, the planned shutdown causes a significant reduction in the utilization rate of offshore wind power, which does not conform to the principle of absorbing wind power as much as possible and reduces economic efficiency. Summary of the invention
[0005] In view of the above-mentioned problems, the present invention is proposed.
[0006] Therefore, the technical problem solved by the present invention is: when a typhoon passes through an offshore wind power cluster, the concentrated exit and restoration of wind turbines causes a huge impact on the power grid, affecting the safe and stable operation of the local power grid.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for orderly exiting and restoring grid connection of an offshore wind power cluster, which comprises the following steps:
[0008] Acquire data and perform data preprocessing;
[0009] Establish the Batts typhoon disaster model to predict the units in each offshore wind farm that will be affected by the typhoon;
[0010] Combined with the power regulation resources of the local power grid to maintain real-time supply of loads;
[0011] Divide the unit exit batches and determine the isolation and shutdown schedule to complete the orderly exit of wind turbines in the cluster in batches;
[0012] After the typhoon passed, the units in the cluster were restored in batches.
[0013] As a preferred solution of the method for orderly exiting and restoring grid connection of an offshore wind power cluster described in the present invention, the data includes obtaining typhoon forecast path, arrival time, and offshore wind power ramp data;
[0014] The preprocessing is to obtain the typhoon forecast path, arrival time and offshore wind power ramp data, clean up and eliminate inaccurate or abnormal data points, perform standardization, calculate the expected wind force level and wind direction changes based on the relative relationship between the typhoon path forecast and the geographical location of the wind farm, perform time series analysis on the offshore wind power ramp data, and predict the power change trend during and after the typhoon.
[0015] As a preferred solution of the method for orderly exiting and restoring grid connection of an offshore wind power cluster described in the present invention, the Batts typhoon disaster model is expressed as follows:
[0016] ΔH(t)=0.75ΔH0-0.508[1+sinθ]t
[0017] Among them, ΔH(t) is the pressure difference of the typhoon at time t; ΔH0 is the initial pressure difference of the typhoon; θ is the angle between the typhoon moving direction and the horizontal axis of the reference position coordinate;
[0018] The typhoon's gradient wind speed v can be calculated based on the pressure difference at the typhoon's center. gt and the maximum wind speed radius R max , the maximum wind speed at the maximum wind speed radius is calculated based on the gradient wind speed, and the expression is:
[0019]
[0020] R max (t) = exp(2.63-5.086×10 -5ΔH(t) 2 +0.0395y(t))
[0021] V Rmax (t) = 0.865v gx (t)+0.5v T
[0022] Among them, v T is the moving speed of the typhoon.
[0023] As a preferred solution of the method for orderly exiting and restoring grid connection of an offshore wind power cluster described in the present invention, the prediction of the units in the offshore wind farm that will be affected by the typhoon includes determining the wind speed at the research point according to the maximum wind speed radius and the wind speed at the radius, and the distance between the typhoon center and the research point, and the expression is:
[0024]
[0025] Among them, V r (t) is the wind speed at the studied point; d(t) is the distance between the typhoon center and the studied point.
[0026] As a preferred solution of the method for orderly exit and grid connection restoration of an offshore wind power cluster described in the present invention, wherein: the real-time supply of loads maintained in combination with the power regulation resources of the local power grid is to avoid the imbalance of local load power caused by the sudden exit and grid connection restoration of wind turbines when a typhoon passes through, and according to the typhoon movement path and the power ramp data of offshore wind power, conventional thermal power units are dispatched in advance and coordinated response with active loads and energy storage to achieve orderly exit and grid connection restoration of offshore wind power clusters under typhoons. The expression of power regulation resources is:
[0027] The unit capacity and ramp rate limitations of conventional units are expressed as:
[0028]
[0029] Among them, P min ,P max is the minimum and maximum output of the unit power; R up ,R down It is the maximum up and down climbing rate of the unit;
[0030] The active load regulation capability is evaluated by the load aggregation entropy model, and the expression is:
[0031]
[0032] in, are the responsive powers of air conditioner, water heater and electric vehicle at time t respectively; S i (t),Sj (t),S m (t) is the state corresponding to time t; K1, K2, K3 are the total number of
[0033] Energy storage dynamically compensates the output of offshore wind power clusters to alleviate the contradiction between supply and demand with the regional power grid. The expression is:
[0034]
[0035] in, is the state of charge of the energy storage at time t; is the minimum and maximum state of charge of energy storage; η ch , η dis It is the charging and discharging efficiency of the energy storage system.
[0036] As a preferred solution of the method for orderly exiting and restoring grid connection of an offshore wind power cluster described in the present invention, the method of dividing the exit batches of the units and determining the isolation and shutdown schedule is to divide the wind turbines into batches according to the performance and health status of the units themselves before the typhoon arrives, so as to tap the control potential of the wind turbines;
[0037] Acquire monitoring parameters related to the health status of wind turbines from the data acquisition and monitoring control system, construct health status evaluation indicators, use fuzzy comprehensive evaluation models to evaluate the health status of wind turbines, output the health status classification table of offshore wind power cluster units, and complete the classification of unit exit and recovery batches;
[0038] Based on the wind speed and direction measured at the wind tower in each offshore wind farm, the wind condition information of each wind turbine is calculated in combination with the typhoon movement path model, and a segmented sequence of different shutdown schedules is generated according to the wind condition information of the wind turbines in each offshore wind farm;
[0039] Each batch consists of a predetermined number of wind turbines that are shut down at the same time. The exit time of each batch of units is the minimum time of the typhoon's arrival. The shutdown start time of each batch in the cluster is determined by subtracting the exit duration from the end time. The exit order of each batch of wind turbines is determined according to the established shutdown schedule.
[0040] As a preferred solution of the method for orderly exiting and restoring grid connection of an offshore wind power cluster described in the present invention, the orderly exiting and restoring grid connection is to control the offshore wind power cluster units in batches during the whole process of the typhoon passing, and to combine the power regulation resources in the power grid in the prevention, disaster and recovery stages, and to construct an objective function with the minimum operating cost and the maximum utilization rate of offshore wind power as the goal, and the expression is:
[0041]
[0042] Among them, CGi is the operating cost of the i-th thermal power unit, C W ,C Agg ,C ES are wind abandonment penalty cost, active load response cost and energy storage operation cost respectively; is the total system optimization time for the entire typhoon transit process; N G is the number of thermal power units; is the offshore wind power abandonment power at time t; is the response of active load at time t;
[0043] The objective function constraints include active power balance constraints, unit start-stop constraints, generator unit ramp constraints, energy storage charging and discharging power and capacity constraints, active load response constraints, and wind power exit timing characteristics constraints;
[0044] The active power balance constraint is expressed as:
[0045]
[0046] in, is the active power injected into the local power grid by the offshore wind power cluster at time t; is the power released by the energy storage at time t; is the output of conventional unit i at time t; is the load demand of the local power grid at time t; is the energy storage charging power at time t; is the active load response power at time t.
[0047] The start-stop constraint of the unit is expressed as:
[0048]
[0049] Among them, T i up , T i down are the minimum startup and shutdown time limits of thermal power unit i respectively; are the continuous on / off time of thermal power unit i, where t1 and t3 are the time when the unit starts to start and shut down, and t2 and t4 are the time when the unit ends to start and shut down;
[0050] The conventional unit climbing constraint is expressed as:
[0051]
[0052] in, It is the maximum up and down climbing rate of the generator set;
[0053] The energy storage charging and discharging power and capacity constraints are expressed as:
[0054]
[0055]
[0056] in, is the upper limit of energy storage power; is the upper limit of energy storage capacity; are the upper and lower limits of the energy storage charge state respectively;
[0057] Active load response constraint, the expression is:
[0058]
[0059] in, is the response potential of the load aggregation entropy at time t;
[0060] The wind power exit timing characteristic constraint is expressed as:
[0061]
[0062] in, are the rated power and total installed capacity of a single wind turbine in an offshore wind farm, respectively; They are respectively the number of wind turbines that abandon wind when the total number of wind turbines exits in an orderly manner at time t and the number of wind turbines that abandon wind when they are scheduled to shut down at time t.
[0063] Another object of the present invention is to provide a system for orderly exiting and restoring grid connection of offshore wind power clusters, which can achieve supply and demand balance of the regional power grid containing offshore wind power clusters under typhoons through predicted offshore wind power ramp-up data combined with power regulation resources in the local power grid, thereby solving the problems of huge impact on the power grid caused by natural shutdown of existing wind turbines and failure to maximize the utilization of offshore wind power due to planned shutdown.
[0064] In order to solve the above technical problems, the present invention provides the following technical solutions: an offshore wind power cluster orderly exit and grid recovery system, comprising: a data acquisition and preprocessing module, a typhoon disaster prediction model module, a unit management and scheduling module, an energy storage management module and an active load response module and an optimization and control module;
[0065] The data acquisition and preprocessing module collects data in real time, performs data cleaning, eliminates abnormal data points, and performs standardization processing;
[0066] The typhoon disaster prediction model module uses the preprocessed data to establish and run a typhoon disaster model, calculates the possibility and degree of each wind turbine being affected by the typhoon, and provides decision support for the withdrawal of each batch of turbines;
[0067] The unit management and dispatching module divides the exit batches of wind turbines and determines the isolation and shutdown schedule according to the output of the typhoon model and the offshore wind power ramp-up data, dispatches conventional units, active loads and energy storage throughout the typhoon entry process, and ensures the orderly exit of wind turbines in the offshore wind power cluster and optimizes the real-time balance of the grid load when the grid is restored;
[0068] The active load response module is used to respond to the demand changes of the power grid by adjusting the power consumption behavior through incentives;
[0069] The energy storage management module dynamically manages the charging and discharging activities of the energy storage system, releasing the stored energy when the wind power output is lower than the demand to increase the grid supply; charging when the output is in excess to reduce wind abandonment;
[0070] The optimization and control module uses a computational model and an optimization algorithm to implement coordinated control of offshore wind power clusters and conventional units, active loads and energy storage.
[0071] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the above-mentioned method for orderly exiting and restoring grid connection of an offshore wind power cluster are implemented.
[0072] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a method for orderly exiting and restoring grid connection of an offshore wind power cluster as described above.
[0073] The beneficial effects of the present invention are as follows: through the orderly exit and grid restoration of offshore wind turbines, the supply and demand balance of the local power grid load power is guaranteed when a typhoon passes through the offshore wind power cluster, while reducing the system operation cost while ensuring the safe and stable operation of the power grid, and improving the utilization rate of offshore wind power. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0075] Figure 1 An overall flow chart of a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in the first embodiment of the present invention;
[0076] Figure 2 A schematic diagram of a conventional unit coping with wind power ramping in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided by a second embodiment of the present invention;
[0077] Figure 3 A trapezoidal curve diagram of power generation change of an offshore wind power cluster in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a second embodiment of the present invention;
[0078] Figure 4 A structural diagram of an offshore wind power cluster orderly exit and grid-connection restoration system provided in a second embodiment of the present invention;
[0079] Figure 5 A schematic diagram of an IEEE14 node system in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0080] Figure 6 A timing diagram of an offshore wind power cluster being affected by a typhoon in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided by a third embodiment of the present invention;
[0081] Figure 7 A diagram of regional power grid dispatching results under measure 1 of a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0082] Figure 8 A diagram of regional power grid dispatching results under measure 2 of a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0083] Fig. 9 A diagram of regional power grid dispatching results under measure 3 of a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0084] Fig.10 A capacity variation trend diagram of an energy storage system during a typhoon in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0085] Fig.11 A thermal power unit output comparison diagram showing power output comparisons under three measures in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0086] Fig.12 An offshore wind power cluster output power comparison diagram showing power output comparisons under three measures in a method for orderly exiting and restoring grid connection of an offshore wind power cluster provided in a third embodiment of the present invention;
[0087] Fig.13 A schematic diagram of the exit and recovery of offshore wind turbines under three measures in a method for orderly exit and grid-connection recovery of an offshore wind power cluster provided in a third embodiment of the present invention. DETAILED DESCRIPTION
[0088] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0089] Example 1
[0090] Reference Figure 1 According to an embodiment of the present invention, a method for orderly exiting and restoring grid connection of an offshore wind power cluster is provided, comprising:
[0091] As offshore wind power tends to be large-scale and clustered, the withdrawal and restoration of offshore wind power clusters during typhoon weather can easily cause an imbalance in the supply and demand of regional power grids, seriously affecting the safe and stable operation of power grids containing offshore wind power clusters. The development of offshore wind power is also gradually tending towards deep sea, clustering and scale. Large-scale offshore wind power is mostly concentrated in the southeastern coastal areas of my country. It has the advantages of high output level, gentle fluctuations, and small wind shear, and plays an important role in supplementing the power grid. However, extreme typhoon weather frequently occurs in the eastern coastal areas in summer, and the volatility of offshore wind power output increases, causing power imbalance in the receiving end power grid. In order to ensure the safety of wind turbines during the typhoon, they are forced to shut down and withdraw quickly, and resume grid connection after the typhoon is away from the offshore wind power cluster. During this period, if the backup resources in the system are insufficient, it will cause a shortage of active power in a short period of time, resulting in load shedding, affecting the reliability of the regional power grid.
[0092] Typhoon weather makes offshore wind power output more random and volatile, posing severe challenges to the supply and demand balance of the power system. Conventional units start and stop quickly during the day, and use multiple types of flexible resources such as hydropower plants, gas power plants, energy storage, and elastic loads to complement the sharp fluctuations of offshore wind power during typhoons. With the high penetration of offshore wind power in the power grid, offshore wind farms are more vulnerable to typhoons. Therefore, when responding to typhoons, it is of great significance for offshore wind power to take appropriate measures to exit the operation of wind turbines and restore grid connection for the reliable supply of urban loads.
[0093] Combined with the resilience of the power grid, the whole process of offshore wind power clusters being hit by typhoons can be divided into the following three stages: prevention stage, disaster stage and recovery stage. Corresponding measures are taken in each stage to improve the level of power grid resilience and ensure the supply of loads. In actual dispatching, offshore wind farms often adopt the method of early planned withdrawal to cope with typhoon weather. Although it ensures the safety of the units and reduces the impact of rapid wind power ramp-up on the power grid, the planned shutdown causes a significant reduction in the utilization rate of offshore wind power, which does not conform to the principle of absorbing wind power as much as possible and reduces economic efficiency.
[0094] To this end, the present invention considers the coordinated dispatching of source-load-storage for the regional power grid containing offshore wind power clusters from three stages: prevention, disaster, and recovery, so as to realize the orderly withdrawal and grid restoration of offshore wind turbines. The utilization rate of offshore wind power is used as an elastic evaluation indicator, and the goal is to minimize the operating cost of the regional power grid. During the entire process of the typhoon passing through the offshore wind power cluster, based on the typhoon prediction path and the dispatching characteristics of source-load-storage in response to typhoons, combined with the power ramping data of offshore wind power and thermal power units, conventional thermal power units, active loads and energy storage are coordinated to orderly withdraw wind turbines and restore grid connection to ensure the safe and stable operation of the regional power grid.
[0095] The present invention uses the Batts typhoon model as an example to simulate the impact of the entire process of typhoon entry on offshore wind power clusters and regional power grids, including a wind farm model and an attenuation model after the typhoon moves. This model can determine the wind speed value of the research point based on the distance between the typhoon center and the research point. The research point is the location of the wind turbine in the wind farm, and then determine whether the wind turbine needs to be shut down when the typhoon arrives. During the movement of the typhoon, the pressure difference gradually decays with time t, and its model is:
[0096] ΔH(t)=0.75ΔH0-0.508[1+sinθ]t
[0097] Among them, ΔH(t) is the pressure difference of the typhoon at time t; ΔH0 is the initial pressure difference of the typhoon; θ is the angle between the typhoon moving direction and the horizontal axis of the reference position coordinate.
[0098] The typhoon's gradient wind speed v can be calculated based on the pressure difference at the typhoon's center. gt and the maximum wind speed radius R max , thus calculating the maximum wind speed at the maximum wind speed radius based on the gradient wind speed.
[0099]
[0100] R max (t) = exp(2.63-5.086×10 -5 ΔH(t) 2 +0.0395y(t))
[0101] V Rmax (t) = 0.865v gx (t)+0.5v T
[0102] Among them, v T is the moving speed of the typhoon.
[0103] The wind speed at the research point can be determined based on the maximum wind speed radius and the wind speed at its radius, and the distance between the typhoon center and the research point:
[0104]
[0105] Among them, V r (t) is the wind speed at the studied point; d(t) is the distance between the typhoon center and the studied point.
[0106] Usually, when long-term extreme weather occurs, it is easy to cause wind power ramping events, and the power changes significantly in one direction in a short period of time. When extreme weather such as typhoons and low-altitude jet streams occur, the wind speed in the offshore wind farm rises sharply, causing its output power to increase sharply, and an up-ramp event occurs; when extreme weather continues to evolve, the wind turbine unit wind speed is higher than the cut-out wind speed and exits, the offshore wind power drops sharply, and a down-ramp event occurs. After the system has a ramp event, it will cause a serious shortage of power in the power grid, causing instability in the power system. Figure 2 The figure shows the principle diagram of how conventional units cope with wind power ramping. The adjustment speed is subject to the unit capacity and ramp rate. Therefore, it is necessary to tap into rapid power adjustment resources to maintain system power stability during the passage of a typhoon.
[0107] The impact of typhoons on the source side is mainly a threat to wind turbines in offshore wind power clusters. According to the principle of protecting equipment during typhoons, they should be shut down safely to avoid major equipment damage. From the output characteristics of wind turbines, we know that the active power output of wind turbines under different natural wind speeds is as follows:
[0108]
[0109] Where ρ is the ocean air density; C P is the wind energy utilization coefficient, which is a complex function of the tip speed ratio and pitch angle of the wind turbine; r is the impeller radius; v is the natural wind speed at the wind turbine; v in ,v rated ,v out are the cut-in wind speed, rated wind speed and cut-out wind speed of the fan respectively; P rated is the rated power of the fan.
[0110] During a typhoon, offshore wind power clusters generally stop generating electricity to protect wind turbines. The rapid drop in offshore wind power output and the resulting large amount of wind abandonment may cause a regional load shortage and affect the safe and stable operation of the entire system. The present invention defines resilience as the wind power utilization rate of offshore wind power clusters during the entire process of typhoon prevention, disaster and recovery. The power generation change curve of a certain offshore wind power cluster during a typhoon is shown in the figure below: Figure 3 As shown in Figure 1, the entire typhoon transit process can generally be divided into the following three stages: prevention stage (T0-T1), disaster stage (T1-T3) and recovery stage (T3-T4).
[0111] from Figure 3It can be seen that: as the typhoon approaches the offshore wind power cluster, the output of the offshore wind power cluster increases. At T0, the typhoon approaches the offshore wind power, and the output rapidly increases to a state close to "full power". At T1, it threatens the offshore wind power. In order to protect the units, power generation is stopped. At this time, the load responds actively, and the backup power supply and energy storage in the system are pre-dispatched; after T1, the typhoon intensifies, and a large number of wind turbines exit after reaching the cut-out wind speed. In order to reduce the impact of wind turbine exit on the system, the thermal power units and the energy storage system continue to output to achieve a new steady state. At T2, the typhoon has the greatest impact on the power grid, and the output of the offshore wind power cluster drops to 0; from T3, it enters the recovery stage. After the typhoon moves away from the offshore wind power, in order to avoid the impact of the simultaneous resumption of operation of wind turbines on the power grid, the principle of orderly recovery is still adopted; at T4, the typhoon ends, and the output of offshore wind power returns to its initial state.
[0112] The utilization rate of offshore wind power E can be used as an indicator to measure the level of grid flexibility, indicating the ability of the regional grid to cope with extreme weather such as typhoons. The larger the value of this indicator, the higher the utilization rate and the less offshore wind power abandonment, that is, the ratio of the blue shaded area to the green shaded area in the figure, and the expression is:
[0113]
[0114] Among them, P w,AS (t) is the actual operating output of the offshore wind power cluster at time t; P w,IS (t) is the ideal output of the offshore wind power cluster not affected by the typhoon at time t.
[0115] As the penetration rate of offshore wind power in the power grid increases significantly, the safe and stable operation of the power grid faces huge challenges, especially during typhoon weather. Due to the anti-peaking characteristics and volatility of wind power, conventional thermal power units are frequently started and stopped or are in a deep peaking state; at the same time, traditional conventional units as backup resources have the disadvantages of slow start-up and minimum technical output restrictions, which can easily cause the risk of offshore wind power abandonment and load shedding during typhoons. Therefore, it is necessary to tap into fast power regulation resources to assist wind power grid connection during the typhoon.
[0116] Thermal power units and hydropower units still account for a large proportion of the current power system, and they are an important part of maintaining the stability of the system power grid, but the regulation capabilities of the two are subject to the rated capacity and ramp rate of the units themselves. In the eastern coastal areas, peak-shaving units are mainly thermal power, so the present invention only considers thermal power units in the case study, and their ramp rate is generally 2% to 5% of the rated capacity per minute, and the response and regulation speed is slow. Therefore, in order to avoid the sudden withdrawal of wind turbines and the interruption of local loads during the typhoon, conventional thermal power units in the system are scheduled in advance in the prevention stage according to the predicted path and arrival time of the typhoon. Considering the high cost of starting and stopping thermal power units, units in the system that are in rotating standby should be selected as much as possible to participate in the regulation. At the same time, units with output regulation capabilities are limited by the ramp rate and output range. When the units are outside the output range, they will not have the ability to regulate output, as follows:
[0117]
[0118] Among them, P min ,P max is the minimum and maximum output of the unit power; R up ,R down It is the maximum up and down climbing rate of the unit.
[0119] Some loads in the power system have the ability to respond actively. When a power shortage event occurs in the system, the active response of the load can reduce the loss of important loads in the system. When a typhoon comes, the active load is adjusted in advance according to the forecast of the meteorological station and the situational awareness technology of the power grid, and the interruptible load is actively reduced. Generally, the load reduction on the demand side can reach about 5%. The approaching typhoon also causes changes in the weather in coastal cities, with increased rainfall, lower temperatures, and reduced power consumption of refrigeration equipment in user loads. According to the load characteristics in the "Shanghai Economic and Information Commission Document": air conditioning load is expected to account for more than 40% of the maximum power load in the whole society, and its increasing proportion has become the main feature of the Shanghai power grid.
[0120] Active load response can effectively deal with the active power shortage in the system, mainly including refrigeration equipment such as air conditioners, heating devices such as water heaters, and electric vehicles. The load aggregation entropy model is used to evaluate its response capability. The model is as follows:
[0121]
[0122] in, are the responsive powers of air conditioner, water heater and electric vehicle at time t respectively; S i (t),S j (t),S m (t) is the state corresponding to time t in sequence; K1, K2, K3 are the total quantities corresponding to each other.
[0123] For offshore wind farms, although the frequent typhoons will bring certain risks, strong typhoons will cause great damage to offshore wind farms. When a typhoon comes, if the wind turbines are withdrawn from operation too early, a large amount of wind power will be abandoned, affecting the economic efficiency of the system operation. In order to alleviate the above problems, the energy storage system is used to dynamically compensate for the output of the offshore wind power cluster, effectively smooth out the fluctuations in the output of the offshore wind power cluster, alleviate the contradiction between its output and the supply and demand of the regional power grid, and improve the utilization rate of offshore wind power. When the regional power grid is insufficient to accept offshore wind power, the energy storage system is charged to reduce wind abandonment. On the contrary, when the power grid has sufficient acceptance capacity, the energy storage system is used to discharge. In typhoon weather, the energy storage system is conducive to improving the absorption of available wind energy. The energy storage system can also be controlled by the dispatching center during typhoons, giving play to the rapid output characteristics of energy storage and improving the flexibility of the power grid.
[0124]
[0125] in, is the energy storage discharge power at time t; is the energy storage charging power at time t; is the state of charge of the energy storage system at time t; is the minimum and maximum charge state of the energy storage system; η ch , η dis It is the charging and discharging efficiency of the energy storage system.
[0126] At present, the development of offshore wind power in my country is tending towards scale and clustering, but large-scale offshore wind farms are easily affected by strong typhoons in summer. If the shutdown time is too late, a large number of units will be damaged, and the maintenance and replacement costs will increase; premature shutdown of wind turbines will lead to a large amount of wind abandonment and reduced system economic efficiency. Therefore, it is particularly important to formulate reasonable and orderly exit and grid recovery measures in the three stages of typhoon passage.
[0127] Figure 1The overall framework for the orderly withdrawal and grid restoration of offshore wind power in multi-stage coordination under typhoons. The Batts typhoon disaster model is established based on the data predicted by the China Meteorological Observatory to determine the movement path of the typhoon at the subsequent moment and the wind speed at the wind turbine; combined with the power ramp data predicted by the wind turbines, the shutdown time and area of each batch of units in the offshore wind power cluster are determined in the prevention stage, and conventional thermal power units are dispatched in advance when the load supply is met, and the active load participates in the response; as the typhoon approaches, the wind turbine withdrawal speed intensifies in the disaster response stage, and conventional units continue to output. In order to quickly track the load changes and the sudden drop in the output power of the offshore wind farm, the energy storage system is quickly released, and the offshore wind turbines are orderly withdrawn in batches and protective measures are taken. After the typhoon is away from the offshore wind power cluster, most of the units are in a shutdown state. At the same time, in order to avoid the impact of the full resumption of operation of the wind power cluster on the power grid, it is also necessary to coordinate the conventional thermal power units and the energy storage system to restore the corresponding batches of wind turbines to the grid.
[0128] Cut off the generators in sections in advance. Due to the dispersed geographical location of offshore wind farms, wind power clusters are generally divided into two major sections for orderly withdrawal, and the grid restoration process is also carried out in sections.
[0129] The special operating environment of offshore wind turbines affects the status, output and performance of wind turbines. In addition, there are a large number of units in the field and they are widely distributed, which leads to differences in the health status and output capacity between units. Therefore, in the offshore wind power ramp-up stage, in order to improve the certainty and controllability of wind power output, before the typhoon arrives, the wind turbines are classified according to their own performance and health status, the control potential of the wind turbines is excavated, and the pertinence of exit and recovery during the typhoon is improved. A fuzzy comprehensive evaluation model is used to evaluate the health status of wind turbines. Through the offshore wind power status monitoring system, the reliability of wind turbine status information collection and control is improved, and the health status of offshore wind turbines in operation is obtained in real time. Since this part is not the research focus of the present invention, it will not be elaborated in the text. The division results are shown in Table 1. During the whole process of the typhoon passing through the offshore wind farm, the control of various types of wind turbines is fully coordinated to realize the orderly exit and recovery of wind turbines in the offshore wind power cluster in batches.
[0130] Table 1 Classification of health status of offshore wind power cluster units
[0131] batch definition Quantity / unit Type 1 Excellent (best performance, exit 5-15 minutes before the typhoon arrives) 76 Type 2 Good (withdraw 20-30 minutes before the typhoon arrives) 42 Type 3 Normal (need to exit 35-45 minutes before the typhoon arrives) 25 Type 4 Poor (need to exit 55-65 minutes before the typhoon arrives) 16
[0132] The offshore wind power wind mast (WM) is installed according to technical requirements and combined with the planning of offshore wind farms. It is an important part of obtaining offshore wind resource data. First, based on the wind speed and wind direction measured at the wind mast in each offshore wind farm, the wind condition information of each wind turbine is calculated in combination with the typhoon movement path model, including the approximate arrival time and wind speed of the typhoon; then, a segmented sequence of different shutdown schedules is generated according to the wind condition information of wind turbines in different offshore wind farms. Each segment consists of a predetermined number of wind turbines that are shut down at the same time. The end time of each shutdown is determined as the minimum arrival time of the typhoon in the batch, and the shutdown start time of each batch in the cluster is determined by subtracting the shutdown duration from the end time. Finally, the exit order of the wind turbines in each segment is determined according to the established shutdown schedule.
[0133] During the entire process of the typhoon passing, the offshore wind power cluster units are controlled in batches and coordinated in the three stages of prevention, disaster and recovery, with the goal of minimizing system operation costs and maximizing offshore wind power utilization. The effectiveness of the proposed response measures is verified by taking an offshore wind power cluster in a certain region as an example, thereby taking into account the economy and reliability of the regional power grid.
[0134] When a typhoon comes, offshore wind power can reduce its operating costs while ensuring the system operation reliability. The objective function is:
[0135]
[0136] Among them, C Gi is the operating cost of the i-th thermal power unit, C W ,C Agg ,C ES are wind abandonment penalty cost, active load response cost and energy storage operation cost respectively; is the total system optimization time for the entire typhoon transit process; N G is the number of thermal power units; is the offshore wind power abandonment power at time t; is the response of the active load at time t.
[0137] Constraints:
[0138] Active power balance constraints:
[0139]
[0140] in, is the active power injected into the local power grid by the offshore wind power cluster at time t; is the power released by the energy storage at time t; is the output of conventional unit i at time t; is the load demand of the local power grid at time t; is the energy storage charging power at time t; is the active load response power at time t.
[0141] Conventional unit climbing constraints:
[0142]
[0143] in, It is the maximum up and down climbing rate of the generator set.
[0144] Energy storage charging and discharging power and capacity constraints:
[0145]
[0146] in, is the upper limit of energy storage power; is the upper limit of energy storage capacity; are the upper and lower limits of the energy storage charge state respectively.
[0147] Active load response constraints:
[0148]
[0149] in, is the response potential of the load aggregation entropy at time t.
[0150] Wind power exit timing characteristic constraints:
[0151]
[0152] in, are the rated power and total installed capacity of a single wind turbine in an offshore wind farm, respectively; They are respectively the number of wind turbines that abandon wind when the total number of wind turbines exits in an orderly manner at time t and the number of wind turbines that abandon wind when they are scheduled to shut down at time t.
[0153] The present invention utilizes the MATLAB optimization toolbox yalmip and calls the Cplex solver to solve the above optimization model. The results verify the effectiveness of the strategy proposed in the present invention.
[0154] Example 2
[0155] Reference Figure 4 , which is an embodiment of the present invention, provides a system for an orderly exit and grid-connection restoration method for an offshore wind power cluster, including: a data acquisition and preprocessing module, a typhoon disaster prediction model module, a unit management and scheduling module, an energy storage management module, an active load response module, and an optimization and control module.
[0156] The data acquisition and preprocessing module collects data in real time, implements data cleaning, eliminates abnormal data points, and performs standardized processing.
[0157] The typhoon disaster prediction model module uses preprocessed data to build and run a typhoon disaster model, calculates the possibility and extent of each wind turbine being affected by the typhoon, and provides decision support for the withdrawal of each batch of turbines.
[0158] The unit management and dispatching module divides the exit batches of wind turbines and determines the isolation and shutdown schedule based on the output of the typhoon model and the offshore wind power ramp-up data. It dispatches conventional units, active loads and energy storage throughout the entire process of the typhoon entry to ensure the orderly exit of wind turbines in the offshore wind power cluster and optimize the real-time balance of the grid load when they are restored to the grid.
[0159] The active load response module responds to grid demand changes by adjusting power consumption behavior through incentives;
[0160] The energy storage management module dynamically manages the charging and discharging activities of the energy storage system, releasing stored energy when wind power output is lower than demand to increase grid supply; and charging when output is in excess to reduce wind curtailment.
[0161] The optimization and control module uses computational models and optimization algorithms to implement coordinated control of offshore wind power clusters, conventional units, active loads and energy storage.
[0162] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program code.
[0163] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.
[0164] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.
[0165] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0166] Example 3
[0167] Reference Figure 5 to Figure 13 This is another embodiment of the present invention. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation experiments. This embodiment experiments the existing traditional method and the method of this embodiment respectively.
[0168] This paper takes the 2022 No. 12 typhoon and three large offshore wind farms in a certain area as an example. This typhoon has had a great impact on the power grid and offshore wind power clusters in the southeast coastal cities of my country. Figure 5As shown in Figure 2, the offshore wind power cluster consisting of three offshore wind farms is taken as the research object. The capacities of offshore wind farms A, B, and C are 212.8MW, 204.2MW, and 206.4MW respectively. They are connected to system node 1 through the offshore converter station and the onshore converter station. The parameters of the units in the three selected offshore wind farms are shown in Table 2. At the same time, the onshore thermal power plants are connected to nodes 2, 3, and 8 of the system respectively, including two units of 300MW, 900MW, and 1000MW respectively. The technical parameters, cost parameters, and initial state parameters of conventional thermal power units are shown in Table 3. The energy storage system is connected to node 6 and adopts electrochemical energy storage. According to the configuration of 15% of the installed capacity of the offshore wind power cluster, the parameters of the energy storage system are shown in Table 4.
[0169] Table 2 Wind turbine parameters
[0170]
[0171] Table 3 gives the operating cost, ramp rate and other parameters of each conventional thermal power unit, and sets the wind abandonment penalty cost coefficient C of this system. W The active load response cost is C Agg The energy storage operation cost is 93.233 yuan / MWh. ES It is 72 yuan / MWh.
[0172] Table 3 Parameters of conventional thermal power units
[0173]
[0174] Table 4 Energy storage system parameters
[0175]
[0176] Assume that 19:00 on September 14th is the initial time of this study, that is, time 0. Figure 6 It is the time series process of offshore wind power clusters being affected by typhoons. As the typhoon moves forward, the meteorological center predicts the current typhoon wind circle level and the areas that will be affected.
[0177] Wind farms B and C in the offshore wind power cluster were first affected by the strong typhoon at the 150th minute, and wind farm A was affected by the typhoon at the 195th minute, with a wind circle level of about level 10. During this process, wind turbines in the offshore wind power cluster were phased out in an orderly manner, and all units in the offshore wind power cluster had been completely shut down at the 200th minute. At the 400th minute, as the wind power weakened after the typhoon landed, conventional thermal power units and energy storage systems were combined to restore the offshore wind power in the cluster to the grid in an orderly manner.
[0178] In order to verify the effectiveness of the measures for orderly withdrawal and grid restoration of offshore wind power clusters proposed in this paper, the following three measures are taken and analyzed from the perspective of system reliability and economy. Measure 1: Only conventional thermal power units are considered to participate in dispatch; Measure 2: Consider the combination of conventional thermal power units and active load response; Measure 3 (proposed in this paper): Consider the combination of conventional thermal power units, active load response and energy storage system.
[0179] Figure 7 The offshore wind power cluster under measure 1 has not been optimized and orderly withdrawn and restored. The relationship between the output and load of offshore wind power and conventional thermal power units. When the typhoon did not reach the offshore wind farm, the increase in sea surface wind speed caused the output of the offshore wind power cluster to increase rapidly. At the 75th minute, the offshore wind power was close to the maximum output of the "full power state". The load increased at night. In order to ensure that the load was not insufficient, the increase in offshore wind power output alone could not fully make up for the load demand. Conventional thermal power units were mobilized in advance to increase the output, and the wind turbines were withdrawn in advance at the 75th minute. The output power decreased and a large amount of wind was abandoned. Subsequently, the typhoon approached, and a large number of wind turbines withdrew after reaching the cut-out wind speed, and the output power dropped sharply. At this time, conventional thermal power units with higher operating costs needed to be dispatched to cooperate with offshore wind power to ensure the reliability of regional power grid power supply. At the 180th minute, all wind turbines withdrew, and the output of thermal power units met the load requirements of the power grid. After the 420th minute, when the wind was far away from the offshore wind farm, the wind turbines in the cluster resumed operation, and the output of thermal power units decreased. However, due to the difference in the climbing power between the two, a certain amount of wind was abandoned.
[0180] Relying solely on conventional thermal power units to directly provide flexible reserve is difficult to solve the contradiction between economy and reliability caused by the uncertainty of offshore wind power during typhoons. Considering the time for the orderly phased withdrawal of offshore wind power forward, the energy storage system and active load response can reduce the flexible reserve capacity of conventional units while avoiding frequent start and stop of units, thus improving the economy of the system. The coordination of energy storage system, active load and wind power reduces the risk of wind abandonment and load shortage of offshore wind power, and improves the reliability of the system.
[0181] Figure 8 Measure 2: Consider the changes in active output of offshore wind power clusters combining conventional thermal power units with active load response under typhoon disasters.
[0182] Before the typhoon arrived, due to weather changes, some loads in the regional power grid, mainly air conditioners and electric vehicles, began to actively reduce at the 105th minute, and the active load response reached a maximum value of 317.2MW at 195 minutes. The response of active loads can make up for the problem of insufficient ramp rate of conventional thermal power units to a certain extent, and give priority to dispatching thermal power units with lower operating costs in the system, thereby reducing the overall operating cost and improving the economy of the system. However, the wind abandonment of offshore wind power clusters is still relatively serious, wasting a large amount of wind resources before the typhoon approaches.
[0183] Fig. 9 Measure 3: Consider various active power output changes under the coordinated dispatch of conventional thermal power units, active load response and energy storage systems during typhoons. At night, the regional power grid load increases, and conventional thermal power units increase their output at a low ramp rate stage. At the same time, the output power of offshore wind power increases significantly before the typhoon, and part of the wind power and thermal power units jointly adjust the increased load demand during this period. In the first 90 minutes before the typhoon arrives at offshore wind farms B and C, since the offshore wind power cannot be fully absorbed, the energy storage system charges the unabsorbed power at this time. During this time, the power of the energy storage system is negative, which improves the utilization rate of offshore typhoon resources. After the 90th minute, in order to ensure the real-time supply of load and reduce the impact of the typhoon on offshore wind turbines, it began to exit in stages and orderly, and the output power was greatly reduced. In order to alleviate the power ramp pressure of thermal power units, the active load and energy storage system responded quickly during this period. This measure ensures the reliability of power supply on the one hand, and improves the utilization rate of offshore wind power on the other.
[0184] Fig.10 The capacity change trend of the energy storage system during the whole typhoon process is taken into account. The rapid adjustment capability and active load response capability of the energy storage system are used to make up for the short-term power shortage, thus avoiding the deep peak regulation of conventional thermal power units, reducing their operating costs, and effectively responding to the downward climbing event of offshore wind power during typhoons.
[0185] Fig.11 The figure compares the power increase and decrease of conventional thermal power units and offshore wind power clusters under three response measures when a typhoon passes.
[0186] Measure 1 does not optimize the exit and recovery of offshore wind turbines, and only thermal power units are adjusted in the system when wind power ramps down. The significant difference in the ramp rates of the two increases the operating cost of the regional power grid and reduces the economy of the system. Measure 2 adds active load response to relieve the ramp pressure of thermal power units when offshore wind power is greatly reduced, and increases power at a low ramp rate with lower cost, ensuring the real-time supply of regional power grid load. Measure 3 adds an energy storage system on the basis of the above, which improves the utilization rate of offshore wind power. At the same time, thermal power units are dispatched in advance before the typhoon approaches to ensure sufficient time for thermal power ramping, and wind turbines are exited in stages and in an orderly manner. The energy storage system absorbs excess offshore wind power. When the typhoon arrives at the offshore wind power cluster, the exit speed of wind turbines is accelerated. At this stage, the rapid adjustment capabilities of the energy storage system discharge and active load reduction are relied on to cope with the ramping of offshore wind power, while taking into account economy and ensuring the operational reliability of the regional power grid.
[0187] Fig.12The curve of the number of wind turbines in operation during the entire process of the typhoon entering the offshore wind power cluster is shown in Figure 1. In order to avoid the peak-shaving pressure of thermal power units in the later period and ensure the reliable supply of regional power grid load, the wind turbines are withdrawn from operation in advance at the 75th minute, which increases the ramp-up time of conventional thermal power units and the cost is higher when running at a high ramp rate, resulting in a significant increase in the operating cost of thermal power units. The early withdrawal of wind turbines reduces the utilization rate of offshore wind power, increases the penalty cost of wind abandonment, and thus increases the total operating cost of the system. Measure 2 Active load response alleviates the power ramp-up of thermal power units to a certain extent, avoids the continuous operation of units at a high ramp rate stage, and reduces the peak-shaving operating cost of conventional thermal power units. Measure 3 orderly withdraws wind turbines in the cluster through the coordinated dispatch of conventional thermal power units, active load response and energy storage systems. On the one hand, the energy storage system ensures the supply of regional loads through high-rate discharge, alleviates the power ramp-up pressure of conventional units, and on the other hand, significantly improves the utilization rate of offshore wind power. The energy storage system is charged in the prevention stage before the typhoon approaches, and discharged quickly in the disaster stage, which significantly improves the economic efficiency of the regional power grid.
[0188] Table 5 Regional power grid dispatch results under different measures
[0189] measure Regional power grid operation cost / yuan Offshore wind power utilization rate / % 1 468746.64 76.4 2 450485.24 82.7 3 442682.56 92.6
[0190] Table 6 Comparison of various grid costs under 3 measures
[0191] measure Thermal power operation cost / yuan Wind power abandonment cost / yuan Active load cost / yuan 1 351114.11 117632.53 / 2 343594.36 98438.24 8452.64 3 331007.86 66837.45 4348.31
[0192] Tables 5 and 6 show the dispatch results and various operating costs of the regional power grid under the three response measures when the typhoon weather approaches the offshore wind power cluster. From the data in the table, we can see that: Measure 1: When the offshore wind power cluster exits under the typhoon, only conventional thermal power units cooperate. In order to ensure the balance of load supply and demand, it is necessary to peak at a high ramp rate, so the thermal power operation cost is the highest. At the same time, the wind turbines in the cluster exit too quickly, making the utilization rate of offshore wind power the lowest, resulting in the highest total operating cost of the regional power grid. Measure 3: When responding to typhoons, source-load-storage synergistic optimization of the orderly exit and grid restoration of wind turbines in the offshore wind power cluster has increased the utilization rate of offshore wind power by 21.2% and reduced the operating cost of the regional power grid by 5.56%.
[0193] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A method for orderly exiting and restoring grid connection of an offshore wind power cluster, characterized in that: include: Acquire data and perform data preprocessing; Establish the Batts typhoon disaster model to predict the units in each offshore wind farm that will be affected by the typhoon; Combined with the power regulation resources of the local power grid to maintain real-time supply of loads; Divide the unit exit batches and determine the isolation and shutdown schedule to complete the orderly exit of wind turbines in the cluster in batches; After the typhoon passed, the units in the cluster were restored in batches.
2. A method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in claim 1, characterized in that: The data includes obtaining typhoon forecast path, arrival time, and offshore wind power ramp data; The preprocessing is to obtain the typhoon forecast path, arrival time and offshore wind power ramp data, clean up and eliminate inaccurate or abnormal data points, perform standardization, calculate the expected wind force level and wind direction changes based on the relative relationship between the typhoon path forecast and the geographical location of the wind farm, perform time series analysis on the offshore wind power ramp data, and predict the power change trend during and after the typhoon.
3. A method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in claim 2, characterized in that: The Batts typhoon disaster model is expressed as: ΔH(t)=0.75ΔH0-0.508[1+sinθ]t Among them, ΔH(t) is the pressure difference of the typhoon at time t; ΔH0 is the initial pressure difference of the typhoon; θ is the angle between the typhoon moving direction and the horizontal axis of the reference position coordinate; The typhoon's gradient wind speed v can be calculated based on the pressure difference at the typhoon's center. gt and the maximum wind speed radius R max , the maximum wind speed at the maximum wind speed radius is calculated based on the gradient wind speed, and the expression is: R max (t)=exp(2.63-5.086×10 -5 ΔH(t) 2 +0.0395y(t)) V Rmax (t)=0.865v gx (t)+0.5v T Among them, v T is the moving speed of the typhoon.
4. A method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in claim 3, characterized in that: The prediction of the units in the offshore wind farm that will be affected by the typhoon includes the wind speed at the research point, which is determined according to the maximum wind speed radius and the wind speed at the radius, and the distance between the typhoon center and the research point. The expression is: Among them, V r (t) is the wind speed at the studied point; d(t) is the distance between the typhoon center and the studied point.
5. A method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in claim 4, characterized in that: The power regulation resources combined with the local power grid are used to maintain the real-time supply of loads in order to avoid the imbalance of local load power caused by the sudden exit and grid connection recovery of wind turbines when a typhoon passes. According to the typhoon movement path and the power ramp data of offshore wind power, conventional thermal power units are dispatched in advance to participate in the regulation, and the orderly exit and grid connection recovery of offshore wind power clusters under typhoons are achieved through coordinated response with active loads and energy storage. The expression of power regulation resources is: The unit capacity and ramp rate limitations of conventional units are expressed as: Among them, P min ,P max is the minimum and maximum output of the unit power; R up ,R down It is the maximum up and down climbing rate of the unit; The active load regulation capability is evaluated by the load aggregation entropy model, and the expression is: in, are the responsive powers of air conditioner, water heater and electric vehicle at time t respectively; S i (t),S j (t),S m (t) is the state corresponding to time t; K1, K2, K3 are the total number of Energy storage dynamically compensates the output of offshore wind power clusters to alleviate the contradiction between supply and demand with the regional power grid. The expression is: in, is the state of charge of the energy storage at time t; is the minimum and maximum charge state of energy storage; η ch , η dis It is the charging and discharging efficiency of the energy storage system.
6. A method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in claim 5, characterized in that: The division of unit exit batches and determination of the isolation and shutdown schedule is to divide the wind turbine units into batches according to the unit's own performance and health status before the typhoon arrives, so as to tap the control potential of the wind turbines; Acquire monitoring parameters related to the health status of wind turbines from the data acquisition and monitoring control system, construct health status evaluation indicators, use fuzzy comprehensive evaluation models to evaluate the health status of wind turbines, output the health status classification table of offshore wind power cluster units, and complete the classification of unit exit and recovery batches; Based on the wind speed and direction measured at the wind tower in each offshore wind farm, the wind condition information of each wind turbine is calculated in combination with the typhoon movement path model, and a segmented sequence of different shutdown schedules is generated according to the wind condition information of the wind turbines in each offshore wind farm; Each batch consists of a predetermined number of wind turbines that are shut down at the same time. The exit time of each batch of units is the minimum time of the typhoon's arrival. The shutdown start time of each batch in the cluster is determined by subtracting the exit duration from the end time. The exit order of each batch of wind turbines is determined according to the established shutdown schedule.
7. A method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in claim 6, characterized in that: The orderly exit and grid connection restoration is to control the offshore wind power cluster units in batches during the whole process of the typhoon passing, and combine the power regulation resources in the power grid in the prevention, disaster and recovery stages to construct an objective function with the minimum operating cost and the maximum utilization rate of offshore wind power as the goal. The expression is: Among them, C Gi is the operating cost of the i-th thermal power unit, C W ,C Agg ,C ES are wind abandonment penalty cost, active load response cost and energy storage operation cost respectively; is the total system optimization time for the entire typhoon transit process; N G is the number of thermal power units; is the offshore wind power abandonment power at time t; is the response of active load at time t; The objective function constraints include active power balance constraints, unit start-stop constraints, generator unit ramp constraints, energy storage charging and discharging power and capacity constraints, active load response constraints, and wind power exit timing characteristics constraints; The active power balance constraint is expressed as: in, is the active power injected into the local power grid by the offshore wind power cluster at time t; is the power released by the energy storage at time t; is the output of conventional unit i at time t; is the load demand of the local power grid at time t; is the energy storage charging power at time t; is the active load response power at time t. The start-stop constraint of the unit is expressed as: in, are the minimum startup and shutdown time limits of thermal power unit i respectively; are the continuous on / off time of thermal power unit i, where t1 and t3 are the time when the unit starts to start and shut down, and t2 and t4 are the time when the unit ends to start and shut down; The conventional unit climbing constraint is expressed as: in, It is the maximum up and down climbing rate of the generator set; The energy storage charging and discharging power and capacity constraints are expressed as: in, is the upper limit of energy storage power; is the upper limit of energy storage capacity; are the upper and lower limits of the energy storage charge state respectively; Active load response constraint, the expression is: in, is the response potential of the load aggregation entropy at time t; The wind power exit timing characteristic constraint is expressed as: in, are the rated power and total installed capacity of a single wind turbine in an offshore wind farm, respectively; They are respectively the number of wind turbines that abandon wind when the total number of wind turbines exits in an orderly manner at time t and the number of wind turbines that abandon wind when they are scheduled to shut down at time t.
8. A system using the method for orderly exiting and restoring grid connection of an offshore wind power cluster as claimed in any one of claims 1 to 7, characterized in that: It includes data acquisition and preprocessing module, typhoon disaster prediction model module, unit management and scheduling module, energy storage management module, active load response module and optimization and control module; The data acquisition and preprocessing module collects data in real time, performs data cleaning, eliminates abnormal data points, and performs standardization processing; The typhoon disaster prediction model module uses the preprocessed data to establish and run a typhoon disaster model, calculates the possibility and degree of each wind turbine being affected by the typhoon, and provides decision support for the withdrawal of each batch of turbines; The unit management and dispatching module divides the exit batches of wind turbines and determines the isolation and shutdown schedule according to the output of the typhoon model and the offshore wind power ramp-up data, dispatches conventional units, active loads and energy storage throughout the typhoon entry process, and ensures the orderly exit of wind turbines in the offshore wind power cluster and optimizes the real-time balance of the grid load when the grid is restored; The active load response module is to respond to the demand changes of the power grid by adjusting the power consumption behavior through incentives; The energy storage management module dynamically manages the charging and discharging activities of the energy storage system, releasing the stored energy when the wind power output is lower than the demand to increase the grid supply; charging when the output is in excess to reduce wind abandonment; The optimization and control module uses a computational model and an optimization algorithm to implement coordinated control of offshore wind power clusters and conventional units, active loads and energy storage.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of a method for orderly exiting and restoring grid connection of an offshore wind power cluster as described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of a method for orderly exiting and restoring grid connection of an offshore wind power cluster as described in any one of claims 1 to 7 are implemented.