Energy scheduling method and device, computer equipment and readable storage medium
By building a target scheduling model, combining the uncertainties of renewable energy power generation, basic load and electric vehicle load, traditional power systems are solved by not being able to cope with volatility and unpredictability, improving energy utilization and scheduling accuracy, and reducing the need for reducing energy use and scheduling. Energy wasted.
Patent Information
- Application Number
- CN202411122976.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional power systems are unable to effectively cope with the volatility of renewable energy production capacity and the unpredictability of charging behaviors of electric vehicle users, resulting in reduced accuracy of energy scheduling strategies, which in turn leads to waste of renewable and non-renewable energy.
By obtaining the set of variable factors of the power system, including uncertainty variables of renewable energy generation, uncertainty variables of basic load and uncertainty variables of electric vehicle load, the initial scheduling model is constructed, the target scheduling model is determined, and the overall situation is carried out. Energy systems and charging stations carry out energy dispatch to improve energy utilization.
By considering uncertain factors, the utilization rate of energy is improved, energy waste is reduced, and the accuracy of energy scheduling is enhanced.
Smart Images

Figure CN119093495A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power system operation analysis, and in particular to an energy scheduling method, apparatus, computer equipment, computer-readable storage medium, and computer program product. Background Art
[0002] In the context of the continued prominence of environmental protection and climate change issues, the coordinated optimization of integrated energy systems and charging stations has attracted widespread attention. This attention stems from the rapid rise of renewable energy, especially solar and wind energy, and the widespread popularity of electric vehicles. The organic integration of these two fields not only provides strong support for renewable energy, but also accelerates the reliability and efficiency of the power system. The integrated energy system plays a key role in the energy Internet system, promoting the integration of renewable energy and distributed energy management, and plays a vital role in promoting sustainable transportation and reducing carbon emissions.
[0003] However, the power system is also facing a series of challenges of uncertainties, such as the volatility of renewable energy production or the unpredictability of electric vehicle users’ charging behavior. Therefore, the traditional power system cannot cope with these uncertainties, which reduces the accuracy of energy dispatch strategies and leads to a huge waste of renewable energy and non-renewable energy. Summary of the invention
[0004] Based on this, it is necessary to provide an energy scheduling method, device, computer equipment, computer-readable storage medium and computer program product that can reduce energy waste in response to the above technical problems.
[0005] In a first aspect, the present application provides an energy scheduling method, the method comprising:
[0006] Obtain a variable factor set, a first initial dispatch model, and a second initial dispatch model of the power system; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of base load, and uncertainty variables of electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial dispatch model is determined based on the integrated energy system; and the second initial dispatch model is determined based on the charging station;
[0007] Determining a first target scheduling model based on the uncertainty variables of the renewable energy generation, the uncertainty variables of the base load and the first initial scheduling model;
[0008] Determining a second target scheduling model based on the uncertainty variables of the renewable energy power generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model;
[0009] Obtaining a target scheduling model according to the first target scheduling model and the second target scheduling model;
[0010] The energy of the integrated energy system and the charging station is scheduled based on the target scheduling model.
[0011] In one embodiment, the first initial scheduling model includes a first initial objective function and a first initial constraint condition; the first target scheduling model is determined based on the uncertainty variable of the renewable energy generation, the uncertainty variable of the base load and the first initial scheduling model, including:
[0012] Obtain the constraint conditions of the interactive product value of the integrated energy system and the charging station and the loss value of the interactive product of the integrated energy system and the charging station;
[0013] Determine a first target constraint condition based on the constraint condition of the interactive product value between the integrated energy system and the charging station, the first initial constraint condition, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of the base load;
[0014] Adjusting the first initial objective function based on the interactive product loss value between the integrated energy system and the charging station to determine the first objective function;
[0015] Based on the first objective constraint and the first objective function, a first objective scheduling model is determined.
[0016] In one embodiment, the method for generating the value constraint of the uncertainty variable of renewable energy power generation includes:
[0017] Acquire a first scheduling parameter of an uncertainty variable of renewable energy power generation, wherein the first scheduling parameter includes a first prediction value, a first minimum prediction error, a first maximum prediction error, and a first elastic adjustment parameter;
[0018] Determining a value constraint of an uncertainty variable of renewable energy power generation based on the first prediction value, the first minimum prediction error, the first maximum prediction error, and the first elastic adjustment parameter;
[0019] The generation method of the value constraint of the uncertainty variable of the basic load includes:
[0020] Acquire a second dispatch parameter of the uncertainty variable of the base load, wherein the second dispatch parameter includes a second prediction value, a second minimum prediction error, a second maximum prediction error, and a second elastic adjustment parameter;
[0021] Based on the second prediction value, the second minimum prediction error, the second maximum prediction error, and the second elastic adjustment parameter, a value constraint of the uncertainty variable of the base load is determined.
[0022] In one embodiment, the first initial constraint condition includes a load supply and demand balance constraint, an equipment operation constraint, a network transmission constraint, and a demand response constraint of the integrated energy system; wherein the network transmission constraint includes a node power constraint, a node voltage constraint, and a node flow constraint;
[0023] The first initial objective function includes the first sub-objective function and the second sub-objective function of the integrated energy system, wherein the first sub-objective function is determined based on the interactive product value entering the integrated energy system, the equipment maintenance value, the fuel value consumed by the equipment, and the equipment depreciation value; the second sub-objective function is determined based on the total consumption of energy types, the emission coefficient of pollutants generated by the consumed energy types, and the control value of pollutants.
[0024] In one embodiment, the second initial scheduling model includes a second initial objective function and a second initial constraint condition; based on the uncertainty variables of the renewable energy generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model, determining the second objective scheduling model includes:
[0025] Determining a second target constraint condition according to the second initial constraint condition, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of electric vehicle load;
[0026] Based on the second initial objective function, determining a second objective function;
[0027] Based on the second objective constraint and the second objective function, a second objective scheduling model is determined.
[0028] In one embodiment, the method for generating the value constraint of the uncertainty variable of renewable energy power generation includes:
[0029] Acquire a first scheduling parameter of an uncertainty variable of renewable energy power generation, wherein the first scheduling parameter includes a first prediction value, a first minimum prediction error, a first maximum prediction error, and a first elastic adjustment parameter;
[0030] Determining a value constraint of an uncertainty variable of renewable energy power generation based on the first prediction value, the first minimum prediction error, the first maximum prediction error, and the first elastic adjustment parameter;
[0031] The generation method of the value constraint of the uncertain variable of the electric vehicle load includes:
[0032] Acquire a third dispatch parameter of the uncertainty variable of the electric vehicle load, wherein the third dispatch parameter includes a third prediction value, a third minimum prediction error, a third maximum prediction error, and a third elastic adjustment parameter;
[0033] Based on the third prediction value, the third minimum prediction error, the third maximum prediction error and the third elastic adjustment parameter, the value constraint of the uncertainty variable of the electric vehicle load is determined.
[0034] In one embodiment, the second initial constraint condition includes a power balance constraint of the charging station, a dispatchable generator set constraint, and a battery energy storage system constraint;
[0035] The second initial objective function includes the loss value of the dispatchable generator set of the charging station, the loss value of the battery energy storage system and the value gain generated by charging of electric vehicles.
[0036] In a second aspect, the present application further provides an energy scheduling device, the device comprising:
[0037] An acquisition module is used to acquire a variable factor set of the power system and a first initial scheduling model and a second initial scheduling model; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of base load and uncertainty variables of electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial scheduling model is determined based on the integrated energy system; and the second initial scheduling model is determined based on the charging station;
[0038] A first target scheduling model determination module, configured to determine a first target scheduling model based on the uncertainty variables of the renewable energy power generation, the uncertainty variables of the base load and the first initial scheduling model;
[0039] A second target scheduling model determination module, used to determine a second target scheduling model based on the uncertainty variables of the renewable energy power generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model;
[0040] A target scheduling model determination module, used to obtain a target scheduling model according to the first target scheduling model and the second target scheduling model;
[0041] The scheduling module is used to schedule the energy of the integrated energy system and the charging station based on the target scheduling model.
[0042] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
[0043] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the above method when executed by a processor.
[0044] The above-mentioned energy scheduling method, device, computer equipment and computer-readable storage medium obtain a variable factor set of the power system, wherein the variable factor set includes uncertainty variables of renewable energy power generation, uncertainty variables of basic load and uncertainty variables of electric vehicle load; the uncertainty factors in the power system are incorporated into the model, and the first initial scheduling model and the second initial scheduling model are adjusted through the uncertainty factors, that is, the variable factor set, so as to obtain the target scheduling model. At this time, a scheduling model taking into account the uncertainty factors is formed, and then the energy of the integrated energy system and the charging station is scheduled through the target scheduling model, thereby improving energy utilization and reducing energy waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0046] Figure 1 An application environment diagram of an energy scheduling method in an embodiment;
[0047] Figure 2 A schematic diagram of a flow chart of an energy scheduling method in one embodiment;
[0048] Figure 3 A schematic diagram of a process for determining a first target scheduling model in one embodiment;
[0049] Figure 4 A schematic diagram of a flow chart of a method for generating a value constraint of an uncertain variable in one embodiment;
[0050] Figure 5 A schematic diagram of a process for determining a second target scheduling model in one embodiment;
[0051] Figure 6 A schematic flow chart of a method for generating value constraints of uncertain variables in another embodiment;
[0052] Figure 7 A structural block diagram of an energy scheduling device in one embodiment;
[0053] Figure 8FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0055] The energy scheduling method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Among them, the power system terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. The server 104 obtains the variable factor set, the first initial scheduling model and the second initial scheduling model of the power system from the power system terminal; the variable factor set includes the uncertainty variables of renewable energy power generation, the uncertainty variables of the basic load and the uncertainty variables of the electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial scheduling model is determined based on the integrated energy system; the second initial scheduling model is determined based on the charging station; based on the uncertainty variables of renewable energy power generation, the uncertainty variables of the basic load and the first initial scheduling model, the first target scheduling model is determined; based on the uncertainty variables of renewable energy power generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model, the second target scheduling model is determined; according to the first target scheduling model and the second target scheduling model, the target scheduling model is obtained; based on the target scheduling model, the energy of the integrated energy system and the charging station is scheduled. Among them, the terminal 102 can be, but is not limited to, a power generation equipment, such as a generator, a gas boiler, a gas storage equipment, and a charging pile. The integrated energy system is based on the power system and is coupled with multiple energy subsystems such as heat, cold, and natural gas. The corresponding terminal equipment includes but is not limited to generators, gas boilers, gas storage equipment, etc. The charging station is a station with several charging piles as clusters. The server 104 can be an independent physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services.
[0056] In an exemplary embodiment, Figure 2 As shown, an energy scheduling method is provided, which is applied to Figure 1 The server 104 in the example is used as an example to illustrate the method, which includes the following steps S202 to S206. Among them:
[0057] Step S202, obtaining a variable factor set, a first initial scheduling model and a second initial scheduling model of the power system; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of base load and uncertainty variables of electric vehicle load.
[0058] Among them, the power system includes an integrated energy system and a charging station. The integrated energy system transmits electric energy resources to the charging station. The first initial scheduling model is determined based on the integrated energy system. The integrated energy system includes a renewable energy subsystem and a non-renewable energy subsystem. The integrated energy system is composed of generators, gas boilers, and gas storage equipment. The second initial scheduling model is determined based on the charging station, which includes several charging piles.
[0059] Variable factors refer to unpredictable factors in the power system, such as the volatility of renewable energy production or the charging behavior of electric vehicle users. The set of variable factors includes uncertainty variables of renewable energy generation, uncertainty variables of base load, and uncertainty variables of electric vehicle load.
[0060] Optionally, the server obtains a variable factor set U in the power system, and the variable factor set U includes uncertainty variables of renewable energy generation, uncertainty variables of base load, and uncertainty variables of electric vehicle load. At the same time, the server also obtains a first initial scheduling model and a second initial scheduling model. Among them, the uncertainty variable of renewable energy generation is denoted as u Re (t), the uncertainty variable of the base load is u L (t), the uncertainty variable of electric vehicle load is denoted as u EV (t).
[0061] Step S204: determining a first target scheduling model based on the uncertainty variables of renewable energy power generation, the uncertainty variables of base load and the first initial scheduling model.
[0062] Among them, the first initial scheduling model M1 is determined based on the integrated energy system, including the first initial objective function H1 and the first initial constraint condition Y1.
[0063] Optionally, the uncertainty variable of the server based on renewable energy generation is denoted as u Re (t), the uncertainty variable of the base load is u L (t) The first initial constraint condition Y1 of the first initial scheduling model M1 is adjusted to obtain the first target constraint condition Y'1. The server adjusts the first initial target function H1 to obtain the first target function H'1. The first target scheduling model M'1 is determined based on the first target constraint condition and the first target function.
[0064] Step S206, determining a second target scheduling model based on the uncertainty variables of renewable energy power generation, the uncertainty variables of electric vehicle loads and the second initial scheduling model.
[0065] Among them, the second initial scheduling model M2 is determined based on the charging station, including the second initial objective function H2 and the second initial constraint condition Y2.
[0066] Optionally, the server can use the uncertainty variable u based on the renewable energy generation Re (t), uncertainty variable u of electric vehicle load EV (t) The second initial constraint condition Y2 of the second initial scheduling model M2 is adjusted to obtain the second target constraint condition Y'2. The server adjusts the second initial target function H2 to obtain the second target function H'2. The second target scheduling model M'2 is determined based on the second target constraint condition and the second target function.
[0067] Step S208, obtaining a target scheduling model according to the first target scheduling model and the second target scheduling model.
[0068] Optionally, the server combines the first target scheduling model M'1 and the second target scheduling model M'2 to obtain a target scheduling model.
[0069] Step S210, scheduling the energy of the integrated energy system and the charging station based on the target scheduling model.
[0070] Optionally, the server dispatches the energy of the integrated energy system and the charging stations in the power system based on the dispatch plan output by the target dispatch model to reduce energy waste.
[0071] In the above energy dispatching method, a variable factor set of the power system is obtained, wherein the variable factor set includes uncertainty variables of renewable energy power generation, uncertainty variables of basic load and uncertainty variables of electric vehicle load; the uncertainty factors in the power system are incorporated into the model, and the first initial dispatching model and the second initial dispatching model are adjusted through the uncertainty factors, that is, the variable factor set, so as to obtain the target dispatching model. At this time, a dispatching model taking uncertainty factors into consideration is formed, and then the energy of the integrated energy system and the charging station is dispatched through the target dispatching model, so as to improve energy utilization and reduce energy waste.
[0072] In an exemplary embodiment, Figure 3 As shown, the first initial scheduling model includes a first initial objective function and a first initial constraint condition; based on the uncertainty variables of renewable energy generation, the uncertainty variables of base load and the first initial scheduling model, the first target scheduling model is determined, including steps S302 to S306. Among them:
[0073] Step S302, obtaining the constraint conditions of the interactive product value between the integrated energy system and the charging station and the interactive product loss value between the integrated energy system and the charging station.
[0074] Among them, the interactive product value of the integrated energy system and the charging station is recorded as The loss value of the interactive product between the integrated energy system and the charging station is recorded as The loss value of the interactive products between the integrated energy system and the charging station It is the interactive product value of entering the charging station from the integrated energy system The interactive product value output by the charging station Therefore, the loss value of the interactive product between the integrated energy system and the charging station can also be recorded as
[0075] Optionally, the server obtains the interactive product value of the integrated energy system and the charging station The loss value of the interactive products between the integrated energy system and the charging station
[0076] Step S304, determining the first target constraint condition based on the constraint condition of the interactive product value between the integrated energy system and the charging station, the first initial constraint condition, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of the basic load.
[0077] Optionally, the server adds constraints on the interactive product value of the integrated energy system and the charging station, constraints on the value of the uncertainty variables of renewable energy power generation, and constraints on the value of the uncertainty variables of the basic load on the basis of the first initial constraint Y1 to determine the first target constraint Y'1.
[0078] Among them, the constraints of the interactive product value of the integrated energy system and the charging station are shown in formulas (1) and (2).
[0079]
[0080] in, It is denoted as the interactive product value between the integrated energy system and the charging station; T represents the time scale, ranging from 1 to 24; λ1(t) represents the interactive product value of entering the charging station.
[0081]
[0082] in, Recorded as the interactive product value of the integrated energy system and the charging station; and Represents the upper and lower limits of integrated energy system pricing.
[0083] The value constraints of the uncertainty variables of renewable energy generation are shown in formula (3).
[0084]
[0085] Among them, u Re (t) represents the uncertainty variable of renewable energy generation, represents the predicted value of the uncertainty variable of renewable energy generation, represents the minimum prediction error of the uncertainty variable of renewable energy generation, represents the maximum prediction error of the uncertainty variable of renewable energy generation, γ Re ∈[0,1], represents the elastic adjustment parameter of the uncertainty variable of renewable energy generation.
[0086] The value constraints of the uncertainty variables of the base load are shown in formula (4).
[0087]
[0088] in, The predicted value of the uncertainty variable representing the base load, u L (t) represents the uncertainty variable of the base load, represents the minimum prediction error of the uncertainty variable of base load electricity, The maximum prediction error of the uncertainty variable representing the base load, γ L ∈[0,1] represents the elastic adjustment parameter of the uncertainty variable of the foundation load.
[0089] Therefore, the first target constraint includes formulas (1)(2)(3)(4) and the first initial constraint Y1.
[0090] Step S306: adjusting the first initial objective function based on the loss value of the interactive product between the integrated energy system and the charging station to determine the first objective function.
[0091] Optionally, the server is based on the interactive product loss value of the integrated energy system and the charging station The first initial objective function H1 is adjusted to determine the first objective function.
[0092] The first objective function is shown in formula (5):
[0093]
[0094] Among them, F e represents the first sub-objective function; F cThe second sub-objective function; It represents the loss value of interactive products between the integrated energy system and the charging station.
[0095] Step S308: Determine a first objective scheduling model based on the first objective constraint condition and the first objective function.
[0096] Optionally, the server combines the first target constraint, including formula (1), (2), (3), (4) and the first initial constraint Y1, and the first target function formula (5) to determine the first target scheduling model.
[0097] In this embodiment, the first initial scheduling model is adjusted by constraining the values of the uncertainty variables of renewable energy power generation and the uncertainty variables of the basic load to obtain a first target scheduling model. The first target scheduling model can take into account the uncertain variables in the power system and improve the accuracy of the first target scheduling model. Therefore, when the first target scheduling model is used to schedule energy, the utilization rate of energy is improved and the waste of energy is reduced.
[0098] Following the above exemplary embodiments, Figure 4 As shown, the method for generating the value constraint of the uncertainty variable of renewable energy power generation includes steps S402 to S404. Among them:
[0099] Step S402, obtaining a first scheduling parameter of an uncertainty variable of renewable energy power generation, the first scheduling parameter including a first prediction value, a first minimum prediction error, a first maximum prediction error and a first elastic adjustment parameter.
[0100] Among them, the first scheduling parameter includes obtaining the predicted value of the uncertainty variable of renewable energy power generation, also called the first predicted value, the minimum prediction error of the uncertainty variable of renewable energy power generation, also called the first minimum prediction error, the maximum prediction error of the uncertainty variable of renewable energy power generation, the first maximum prediction error, and the elastic adjustment parameter of the uncertainty variable of renewable energy power generation, also called the first elastic adjustment parameter.
[0101] Optionally, the server obtains the predicted value of the uncertainty variable of renewable energy generation Minimum prediction error of uncertain variables in renewable energy generation Maximum prediction error of uncertain variables in renewable energy generation and the elastic adjustment parameter γ of the uncertainty variable of renewable energy generation Re .
[0102] Step S404: determining the value constraints of the uncertainty variables of renewable energy power generation based on the first prediction value, the first minimum prediction error, the first maximum prediction error, and the first elastic adjustment parameter.
[0103] Optionally, the server multiplies the first minimum prediction error by the first elastic adjustment parameter plus the first prediction value as the uncertainty variable u of renewable energy power generation Re The server multiplies the first maximum prediction error by the first elastic adjustment parameter plus the first prediction value as the uncertainty variable u of renewable energy generation Re The lower upper limit value of (t).
[0104] The value constraints of the uncertainty variables of renewable energy generation are shown in formula (3).
[0105]
[0106] Among them, u Re (t) represents the uncertainty variable of renewable energy generation, represents the predicted value of the uncertainty variable of renewable energy generation, represents the minimum prediction error of the uncertainty variable of renewable energy generation, represents the maximum prediction error of the uncertainty variable of renewable energy generation, γ Re ∈[0,1], represents the elastic adjustment parameter of the uncertainty variable of renewable energy generation.
[0107] The method for generating the value constraint of the uncertainty variable of the base load includes steps S406 to S408. Among them:
[0108] Step S406, obtaining second scheduling parameters of the uncertainty variables of the base load, the second scheduling parameters including a second prediction value, a second minimum prediction error, a second maximum prediction error and a second elastic adjustment parameter.
[0109] Among them, the second scheduling parameters include obtaining the predicted value of the uncertainty variable of the basic load, also called the second predicted value, obtaining the minimum prediction error of the uncertainty variable of the basic load, also called the second minimum prediction error, the maximum prediction error of the uncertainty variable of the basic load, the second maximum prediction error, and the elastic adjustment parameter of the uncertainty variable of the basic load, also called the second elastic adjustment parameter.
[0110] Optionally, the server obtains the predicted value of the uncertainty variable of the base load Minimum prediction error of uncertainty variables of base load Maximum prediction error of uncertainty variables of base load and the elastic adjustment parameter γ of the uncertainty variable of the foundation load L .
[0111] Step S408: determining the value constraint of the uncertainty variable of the base load based on the second prediction value, the second minimum prediction error, the second maximum prediction error and the second elastic adjustment parameter.
[0112] Optionally, the server multiplies the second minimum prediction error by the second elastic adjustment parameter plus the second prediction value as the uncertainty variable u of the basic load Re The server multiplies the second maximum prediction error by the second elastic adjustment parameter plus the second prediction value as the uncertainty variable u of the basic load Re The lower upper limit value of (t).
[0113] The value constraints of the uncertainty variables of the base load are shown in formula (4).
[0114]
[0115] in, The predicted value of the uncertainty variable representing the base load, u L (t) represents the uncertainty variable of the base load, represents the minimum prediction error of the uncertainty variable of base load electricity, The maximum prediction error of the uncertainty variable representing the base load, γ L ∈[0,1] represents the elastic adjustment parameter of the uncertainty variable of the foundation load.
[0116] In this embodiment, the value constraints of the uncertainty variables of renewable energy power generation are determined by the first scheduling parameter, and the value constraints of the uncertainty variables of basic load electricity are determined by the second scheduling parameter, which can accurately constrain the scope of uncertain factors and improve the accuracy of the model.
[0117] Continuing with the above-mentioned embodiment, the first initial constraint condition includes the load supply and demand balance constraint, equipment operation constraint, network transmission constraint, and demand response constraint of the integrated energy system; wherein the network transmission constraint includes node power constraint, node voltage constraint, and node flow constraint; the first initial objective function includes the first sub-objective function and the second sub-objective function of the integrated energy system, wherein the first sub-objective function is determined based on the interactive product value entering the integrated energy system, the equipment maintenance value, the fuel value consumed by the equipment, and the equipment depreciation value; the second sub-objective function is determined based on the total consumption of energy types, the emission coefficient of pollutants generated by the consumed energy types, and the control value of pollutants.
[0118] Optionally, the first initial constraint condition includes the load supply and demand balance constraint, equipment operation constraint, network transmission constraint, and demand response constraint of the integrated energy system; wherein the network transmission constraint includes node power constraint, node voltage constraint, and node flow constraint, as shown in formulas (6)-(11).
[0119] Among them, the load supply and demand balance constraint is shown in formula (6):
[0120] ∑P m (t) = L m m∈e,g,h,c(6)
[0121] Among them, e, g, h, c represent electricity, gas, heat and cold respectively. The left side of the equation represents the energy supply in the system, and the right side of the equation represents the total load demand in the area.
[0122] The equipment operation constraints are shown in formula (7):
[0123]
[0124] Where γ(t) is the operating state of device k, γ(t) = 1 means on, γ(t) = 0 means off; are the maximum and minimum output powers of device k, respectively; are the climbing speeds at which device k reduces or increases its output, respectively.
[0125] The network transmission constraints include node power constraints as shown in formula (8), node voltage constraints as shown in formula (9), and node flow constraints as shown in formula (10).
[0126]
[0127] in, It represents the maximum power that grid node n is allowed to transmit; represents the minimum power allowed to be transmitted by grid node n; P Te,n (t) represents the power that grid node n is allowed to transmit.
[0128]
[0129] in Indicates the maximum voltage allowed at grid node n, Indicates the minimum voltage allowed at grid node n, U Te,n (t) represents the voltage allowed at grid node n.
[0130]
[0131] in, represents the maximum flow rate allowed by node n when the natural gas network, heating network and cooling network transmit energy, F represents the minimum flow rate allowed at node n when the natural gas network, heating network and cooling network transmit energy. m,n (t) represents the flow rate allowed at node n when the natural gas network, heating network and cooling network transmit energy.
[0132] The demand response constraint is shown in formula (11).
[0133]
[0134] Among them, P m,DR (t) represents the electricity, gas, heating and cooling loads of the system at time t respectively; Indicates the lower limit of each type of demand response load; Indicates the upper limit of each type of demand response load; e, g, h, c represent electricity, gas, heating and cooling respectively.
[0135] Optionally, the first initial objective function includes a first sub-objective function F of the integrated energy system e and the second sub-objective function F c , where the first sub-objective function F e It is determined based on the interactive product value entering the integrated energy system, the equipment maintenance value, the fuel value consumed by the equipment, and the equipment depreciation value; the second sub-objective function F c It is determined based on the total consumption of energy types, the emission coefficient of pollutants generated by the consumed energy types, and the governance value of the pollutants. The first initial objective function is shown in formula (12).
[0136]
[0137] Among them, F e represents the first sub-objective function; C EN represents the interactive product value entering the integrated energy system, C m Indicates the equipment maintenance value, C FU Indicates the value of fuel consumed by the equipment, C DE Indicates the depreciation value of the equipment. c The second sub-objective function: P i represents the total consumption of the i-th energy; ω i,j It represents the emission coefficient of pollutant j generated by consuming energy i; represents the treatment cost of pollutant j.
[0138] Interactive product value of entering the integrated energy system C EN =∑ t λ1(t).P1(t), λ1(t) represents the value coefficient of the interactive products entering the charging station, and P1(t) represents the number of interactive products entering the charging station at time t.
[0139] Indicates the value of equipment maintenance is the maintenance value of device k.
[0140] Value of fuel consumed by equipment The fuel value coefficient consumed by the equipment entering the charging station, is the fuel consumed by device k.
[0141] Equipment depreciation value is the depreciation value of equipment k.
[0142] In this embodiment, the first initial scheduling model is restricted by the first initial constraint condition and the first initial objective function to improve the accuracy of the first initial scheduling model.
[0143] In an exemplary embodiment, Figure 5 As shown, the second initial scheduling model M2 includes a second initial objective function H2 and a second initial constraint condition Y2; based on the uncertainty variables of renewable energy generation, the uncertainty variables of electric vehicle loads and the second initial scheduling model, the second target scheduling model is determined, including steps S502 to S506. Among them:
[0144] Step S502, determining a second target constraint condition according to the second initial constraint condition, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of electric vehicle load.
[0145] Optionally, the server adds the value constraints of the uncertainty variables of renewable energy power generation and the value constraints of the uncertainty variables of the electric vehicle load on the basis of the second initial constraint Y2 to determine the second target constraint.
[0146] The value constraints of the uncertainty variables of renewable energy generation are shown in formula (3).
[0147]
[0148] Among them, u Re (t) represents the uncertainty variable of renewable energy generation, represents the predicted value of the uncertainty variable of renewable energy generation, represents the minimum prediction error of the uncertainty variable of renewable energy generation, represents the maximum prediction error of the uncertainty variable of renewable energy generation, γ Re ∈[0,1], represents the elastic adjustment parameter of the uncertainty variable of renewable energy generation.
[0149] The value constraints of the uncertain variables of electric vehicle load are shown in formula (13).
[0150]
[0151] Among them, u EV (t) represents the uncertainty variable of electric vehicle load, represents the predicted value of the uncertainty variable of the electric vehicle load, represents the minimum prediction error of the uncertainty variable of electric vehicle load, represents the maximum prediction error of the uncertainty variable of electric vehicle load, γ EV The elastic adjustment parameter representing the uncertainty variable of electric vehicle load.
[0152] Step S504: determine a second objective function based on the second initial objective function.
[0153] Optionally, the server uses the second initial objective function as the second objective function. The second objective function is as shown in formula (14). The second initial objective function is the same as the second objective function.
[0154]
[0155] Among them, C G,m represents the loss value of the dispatchable generator set of the charging station; C BESS Represents the loss value of the battery energy storage system; R CS represents the value gain generated by charging electric vehicles; P G,m (t) represents the output of the mth dispatchable generator set; SOC(t) represents the state of charge of the battery energy storage system; Indicates the loss value of the interactive products between the integrated energy system and the charging station; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the interactive product value output by the charging station u EV (t) represents the uncertainty variable of electric vehicle load.
[0156] Step S506: Determine a second objective scheduling model based on the second objective constraint and the second objective function.
[0157] Optionally, the server combines the second target constraint, including formulas (3), (13) and the second initial constraint Y2, with the second target function such as formula (14) to obtain a second target scheduling model.
[0158] In this embodiment, the second initial scheduling model is adjusted by constraining the values of the uncertainty variables of renewable energy power generation and the uncertainty variables of the electric vehicle load to obtain a second target scheduling model. The second target scheduling model can take into account the uncertain variables in the power system and improve the accuracy of the second target scheduling model. Therefore, when the second target scheduling model is used to schedule energy, the utilization rate of energy is improved and the waste of energy is reduced.
[0159] Following the above embodiment, Figure 6 As shown, the method for generating the value constraint of the uncertainty variable of renewable energy power generation includes steps S602 to S604. Among them:
[0160] Step S602, obtaining first scheduling parameters for renewable energy power generation, the first scheduling parameters including a first prediction value, a first minimum prediction error, a first maximum prediction error and a first elastic adjustment parameter.
[0161] Among them, the first scheduling parameter includes obtaining the predicted value of the uncertainty variable of renewable energy power generation, also called the first predicted value, the minimum prediction error of the uncertainty variable of renewable energy power generation, also called the first minimum prediction error, the maximum prediction error of the uncertainty variable of renewable energy power generation, the first maximum prediction error, and the elastic adjustment parameter of the uncertainty variable of renewable energy power generation, also called the first elastic adjustment parameter.
[0162] Optionally, the server obtains the predicted value of the uncertainty variable of renewable energy generation Minimum prediction error of uncertain variables in renewable energy generation Maximum prediction error of uncertain variables in renewable energy generation and the elastic adjustment parameter γ of the uncertainty variable of renewable energy generation Re .
[0163] Step S604: determining the value constraints of the uncertainty variables of renewable energy power generation based on the first prediction value, the first minimum prediction error, the first maximum prediction error, and the first elastic adjustment parameter.
[0164] Optionally, the server multiplies the first minimum prediction error by the first elastic adjustment parameter plus the first prediction value as the uncertainty variable u of renewable energy power generation Re The server multiplies the first maximum prediction error by the first elastic adjustment parameter plus the first prediction value as the uncertainty variable u of renewable energy generation Re The lower upper limit value of (t).
[0165] The value constraints of the uncertainty variables of renewable energy generation are shown in formula (3).
[0166]
[0167] Among them, u Re (t) represents the uncertainty variable of renewable energy generation, represents the predicted value of the uncertainty variable of renewable energy generation, represents the minimum prediction error of the uncertainty variable of renewable energy generation, represents the maximum prediction error of the uncertainty variable of renewable energy generation, γ Re ∈[0,1], represents the elastic adjustment parameter of the uncertainty variable of renewable energy generation.
[0168] The method for generating the value constraint of the uncertain variable of the electric vehicle load includes steps S606 to S608. Among them:
[0169] Step S606, obtaining a third dispatch parameter of the uncertainty variable of the electric vehicle load, the third dispatch parameter including a third prediction value, a third minimum prediction error, a third maximum prediction error and a third elastic adjustment parameter.
[0170] Among them, the third scheduling parameter includes obtaining the predicted value of the uncertainty variable of the electric vehicle load, also called the third predicted value, the minimum prediction error of the uncertainty variable of the electric vehicle load, also called the third minimum prediction error, the maximum prediction error of the uncertainty variable of the electric vehicle load, the third maximum prediction error, and the elastic adjustment parameter of the uncertainty variable of the electric vehicle load, also called the third elastic adjustment parameter.
[0171] Optionally, the server obtains the predicted value of the uncertain variable of the electric vehicle load Minimum prediction error of uncertain variables of electric vehicle load Maximum prediction error of uncertain variables of electric vehicle load and the elastic adjustment parameter γ of the uncertainty variable of electric vehicle load EV .
[0172] Step S608, determining the value constraint of the uncertainty variable of the electric vehicle load based on the third prediction value, the third minimum prediction error, the third maximum prediction error and the third elastic adjustment parameter.
[0173] Optionally, the server multiplies the third minimum prediction error by the third elastic adjustment parameter plus the third prediction value as the uncertainty variable u of the electric vehicle load. EV The server multiplies the third maximum prediction error by the third elastic adjustment parameter plus the third prediction value as the uncertainty variable u of the electric vehicle load EV The lower upper limit value of (t).
[0174] The value constraints of the uncertain variables of electric vehicle load are shown in formula (13).
[0175]
[0176] Among them, u EV (t) represents the uncertainty variable of electric vehicle load, represents the predicted value of the uncertainty variable of the electric vehicle load, represents the minimum prediction error of the uncertainty variable of electric vehicle load, represents the maximum prediction error of the uncertainty variable of electric vehicle load, γ EV The elastic adjustment parameter representing the uncertainty variable of electric vehicle load.
[0177] In this embodiment, the value constraints of the uncertainty variables of renewable energy power generation are determined by the first scheduling parameter, and the value constraints of the uncertainty variables of electric vehicle load are determined by the third scheduling parameter, which can achieve the precise range of constrained uncertainties and improve the accuracy of the model.
[0178] Continuing with the above-mentioned embodiment, the second initial constraint conditions include the power balance constraint of the charging station, the dispatchable generator set constraint and the battery energy storage system constraint; the second initial objective function includes the loss value of the dispatchable generator set of the charging station, the loss value of the battery energy storage system and the value gain generated by charging the electric vehicle.
[0179] Optionally, the second initial constraint Y2 includes a power balance constraint as shown in formula (15).
[0180]
[0181] Among them, u Re (t) represents the uncertainty variable of renewable energy generation; u EV (t) represents the uncertainty variable of electric vehicle load; P G,m (t) represents the output of the mth dispatchable generating unit at time t; P dis (t) represents the discharge power of the battery energy storage system; P ch (t) represents the charging power of the battery energy storage system; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the value of the interactive product output by the charging station.
[0182] The dispatchable generator set constraints are shown in formula (16).
[0183]
[0184] Among them, and Indicates the upper and lower limits of the output of the mth dispatchable generating unit; and represents the upward / downward constraint of the ramp rate of the mth dispatchable generator set; P G,m (t) represents the output of the mth dispatchable generating unit at time t; P G,m (t+1) represents the output of the mth dispatchable generating unit at time t+1; P G,m (t-1) represents the output of the mth dispatchable generating unit at time t-1.
[0185] The constraints of the battery energy storage system are shown in formula (17):
[0186]
[0187] Among them, P dis (t) represents the discharge power of the battery energy storage system, P ch (t) represents the charging power of the battery energy storage system, Indicates the upper limit of the charging power of the battery energy storage system. Indicates the upper limit of the discharge power of the battery energy storage system. SOC(t) indicates the state of charge level of the battery energy storage system, η ch Represents the efficiency of the battery energy storage system charging power; η dis Indicates the efficiency of the battery energy storage system’s discharge power; E BESS Indicates the capacity of the battery energy storage system; SOC min and SOC max Represents the upper and lower limits of the battery energy storage system SOC, P dis (t) represents the discharge power of the battery energy storage system, P ch (t) represents the charging power of the battery energy storage system.
[0188] The second initial objective function is the same as the second objective function as shown in formula (14), including the loss value C of the dispatchable generator set of the charging station G,m 、Loss value of battery energy storage system C BESS 、The value gain generated by electric vehicle charging R CS The loss value of the interactive products between the integrated energy system and the charging station As shown in formula (14).
[0189]
[0190] Among them, C G,m represents the loss value of the dispatchable generator set of the charging station; C BESS Represents the loss value of the battery energy storage system; R CSrepresents the value gain generated by charging electric vehicles; P G,m (t) represents the output of the mth dispatchable generator set; SOC(t) represents the state of charge of the battery energy storage system; Indicates the loss value of the interactive products between the integrated energy system and the charging station; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the interactive product value output by the charging station u EV (t) represents the uncertainty variable of electric vehicle load.
[0191] Among them, the loss value of the dispatchable generator set is C G,m As shown in formula (18).
[0192]
[0193] C G,m P represents the loss value of the dispatchable generator set of the charging station; G,m (t) represents the output of the mth dispatchable generating unit; a 1,m , b 1,m and c 1,m Represents the value coefficient of the mth dispatchable generating unit.
[0194] The loss value of the battery energy storage system C BESS As shown in formula (19).
[0195]
[0196] C BESS represents the loss value of the battery energy storage system; SOC(t) represents the state of charge of the battery energy storage system; a2, b2, c2 and d2 represent the value coefficients of the battery energy storage system.
[0197] The value gain from electric vehicle charging R CS As shown in formula (20).
[0198]
[0199] R CS represents the value gain generated by charging electric vehicles; CS (t) represents the interactive product value of the charging station; u EV (t) represents the uncertainty variable of electric vehicle load; It indicates the value of the reference interactive product in the day-ahead stage.
[0200] Interactive product loss value of integrated energy system and charging station As shown in formula (21).
[0201]
[0202] Indicates the loss value of the interactive products between the integrated energy system and the charging station; Recorded as the interactive product value of the integrated energy system and the charging station; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the interactive product value output by the charging station
[0203] In this embodiment, the second initial scheduling model is restricted by the second initial constraint condition and the second initial objective function to improve the accuracy of the second initial scheduling model.
[0204] In an optional embodiment, the server obtains a variable factor set, a first initial dispatch model, and a second initial dispatch model of the power system; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of base load, and uncertainty variables of electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial dispatch model is determined based on the integrated energy system; and the second initial dispatch model is determined based on the charging station. The variable factor set U includes formula (3), formula (4), and formula (13).
[0205] The value constraints of the uncertainty variables of renewable energy generation are shown in formula (3).
[0206]
[0207] Among them, u Re (t) represents the uncertainty variable of renewable energy generation, represents the predicted value of the uncertainty variable of renewable energy generation, represents the minimum prediction error of the uncertainty variable of renewable energy generation, represents the maximum prediction error of the uncertainty variable of renewable energy generation, γ Re ∈[0,1], represents the elastic adjustment parameter of the uncertainty variable of renewable energy generation.
[0208] The value constraints of the uncertainty variables of the base load are shown in formula (4):
[0209]
[0210] in, The predicted value of the uncertainty variable representing the base load, u L (t) represents the uncertainty variable of the base load, represents the minimum prediction error of the uncertainty variable of base load electricity, The maximum prediction error of the uncertainty variable representing the base load, γ L ∈[0,1] represents the elastic adjustment parameter of the uncertainty variable of the foundation load.
[0211] The value constraints of the uncertain variables of electric vehicle load are shown in formula (13).
[0212]
[0213] Among them, u EV (t) represents the uncertainty variable of electric vehicle load, represents the predicted value of the uncertainty variable of the electric vehicle load, represents the minimum prediction error of the uncertainty variable of electric vehicle load, represents the maximum prediction error of the uncertainty variable of electric vehicle load, γ EV The elastic adjustment parameter representing the uncertainty variable of electric vehicle load.
[0214] The first initial scheduling model includes a first initial objective function as shown in formula (12) and a first initial constraint function as shown in formulas (6)-(11).
[0215] The first initial constraint condition includes the load supply and demand balance constraint of the integrated energy system, equipment operation constraint, network transmission constraint, and demand response constraint; among which the network transmission constraint includes node power constraint, node voltage constraint, and node flow constraint, as shown in formulas (6)-(11).
[0216] Among them, the load supply and demand balance constraint is shown in formula (6):
[0217] ∑P m (t) = L m m∈e,g,h,c (6)
[0218] Among them, e, g, h, c represent electricity, gas, heat and cold respectively. The left side of the equation represents the energy supply in the system, and the right side of the equation represents the total load demand in the area.
[0219] The equipment operation constraints are shown in formula (7):
[0220]
[0221] Where γ(t) is the operating state of device k, γ(t) = 1 means on, γ(t) = 0 means off; are the maximum and minimum output powers of device k, respectively; are the climbing speeds at which device k reduces or increases its output, respectively.
[0222] The network transmission constraints include node power constraints as shown in formula (8), node voltage constraints as shown in formula (9), and node flow constraints as shown in formula (10).
[0223]
[0224] in, It represents the maximum power that grid node n is allowed to transmit; represents the minimum power allowed to be transmitted by grid node n; P Te,n (t) represents the power that grid node n is allowed to transmit.
[0225]
[0226] in Indicates the maximum voltage allowed at grid node n, Indicates the minimum voltage allowed at grid node n, U Te,n (t) represents the voltage allowed at grid node n.
[0227]
[0228] in, represents the maximum flow rate allowed by node n when the natural gas network, heating network and cooling network transmit energy, F represents the minimum flow rate allowed at node n when the natural gas network, heating network and cooling network transmit energy. m,n (t) represents the flow rate allowed at node n when the natural gas network, heating network and cooling network transmit energy.
[0229] The demand response constraint is shown in formula (11).
[0230]
[0231] Among them, P m,DR (t) represents the electricity, gas, heating and cooling loads of the system at time t respectively; Indicates the lower limit of each type of demand response load; Indicates the upper limit of each type of demand response load; e, g, h, c represent electricity, gas, heating and cooling respectively.
[0232] The first initial objective function includes the first sub-objective function F of the integrated energy system e and the second sub-objective function F c , where the first sub-objective function F e It is determined based on the interactive product value entering the integrated energy system, the equipment maintenance value, the fuel value consumed by the equipment, and the equipment depreciation value; the second sub-objective function F cIt is determined based on the total consumption of energy types, the emission coefficient of pollutants generated by the consumed energy types, and the governance value of the pollutants. The first initial objective function is shown in formula (12).
[0233]
[0234] Among them, F e represents the first sub-objective function; C EN represents the interactive product value entering the integrated energy system, C m Indicates the equipment maintenance value, C FU Indicates the value of fuel consumed by the equipment, C DE Indicates the depreciation value of the equipment. c The second sub-objective function: P i represents the total consumption of the i-th energy; ω i,j It represents the emission coefficient of pollutant j generated by consuming energy i; represents the treatment cost of pollutant j.
[0235] Interactive product value of entering the integrated energy system C EN =∑ t λ1(t).P1(t), λ1(t) represents the value coefficient of the interactive products entering the charging station, and P1(t) represents the number of interactive products entering the charging station at time t.
[0236] Indicates the value of equipment maintenance is the maintenance value of device k.
[0237] Value of fuel consumed by equipment The fuel value coefficient consumed by the equipment entering the charging station, is the fuel consumed by device k.
[0238] Equipment depreciation value is the depreciation value of equipment k.
[0239] The second initial scheduling model includes a second initial objective function, such as formulas (14), (18)-(21) and a second initial constraint function, such as formulas (15)-(17).
[0240] The second initial constraint condition Y2 includes a power balance constraint as shown in formula (15).
[0241]
[0242] Among them, u Re (t) represents the uncertainty variable of renewable energy generation; u EV (t) represents the uncertainty variable of electric vehicle load; P G,m(t) represents the output of the mth dispatchable generating unit at time t; P dis (t) represents the discharge power of the battery energy storage system; P ch (t) represents the charging power of the battery energy storage system; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the value of the interactive product output by the charging station.
[0243] The dispatchable generator set constraints are shown in formula (16).
[0244]
[0245] Among them, and Indicates the upper and lower limits of the output of the mth dispatchable generating unit; and represents the upward / downward constraint of the ramp rate of the mth dispatchable generator set; P G,m (t) represents the output of the mth dispatchable generating unit at time t; P G,m (t+1) represents the output of the mth dispatchable generating unit at time t+1; P G,m (t-1) represents the output of the mth dispatchable generating unit at time t-1.
[0246] The constraints of the battery energy storage system are shown in formula (17):
[0247]
[0248] Among them, P dis (t) represents the discharge power of the battery energy storage system, P ch (t) represents the charging power of the battery energy storage system, Indicates the upper limit of the charging power of the battery energy storage system. Indicates the upper limit of the discharge power of the battery energy storage system. SOC(t) indicates the state of charge level of the battery energy storage system, η ch Represents the efficiency of the battery energy storage system charging power; η dis Indicates the efficiency of the battery energy storage system’s discharge power; E BESS Indicates the capacity of the battery energy storage system; SOC min and SOC max Represents the upper and lower limits of the battery energy storage system SOC, P dis (t) represents the discharge power of the battery energy storage system, P ch (t) represents the charging power of the battery energy storage system.
[0249] The second initial objective function is the same as the second objective function as shown in formula (14), including the loss value C of the dispatchable generator set of the charging stationG,m 、Loss value of battery energy storage system C BESS 、The value gain generated by electric vehicle charging R CS The loss value of the interactive products between the integrated energy system and the charging station As shown in formula (14).
[0250]
[0251] Among them, C G,m represents the loss value of the dispatchable generator set of the charging station; C BESS Represents the loss value of the battery energy storage system; R CS represents the value gain generated by charging electric vehicles; P G,m (t) represents the output of the mth dispatchable generator set; SOC(t) represents the state of charge of the battery energy storage system; Indicates the loss value of the interactive products between the integrated energy system and the charging station; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the interactive product value output by the charging station u EV (t) represents the uncertainty variable of electric vehicle load.
[0252] Among them, the loss value of the dispatchable generator set is C G,m As shown in formula (18).
[0253]
[0254] C G,m P represents the loss value of the dispatchable generator set of the charging station; G,m (t) represents the output of the mth dispatchable generating unit; a 1,m , b 1,m and c 1,m Represents the value coefficient of the mth dispatchable generating unit.
[0255] The loss value of the battery energy storage system C BESS As shown in formula (19).
[0256]
[0257] C BESS represents the loss value of the battery energy storage system; SOC(t) represents the state of charge of the battery energy storage system; a2, b2, c2 and d2 represent the value coefficients of the battery energy storage system.
[0258] The value gain from electric vehicle charging R CS As shown in formula (20).
[0259]
[0260] R CS represents the value gain generated by charging electric vehicles; CS (t) represents the interactive product value of the charging station; u EV (t) represents the uncertainty variable of electric vehicle load; It indicates the value of the reference interactive product in the day-ahead stage.
[0261] Interactive product loss value of integrated energy system and charging station As shown in formula (21).
[0262]
[0263] Indicates the loss value of the interactive products between the integrated energy system and the charging station; Recorded as the interactive product value of the integrated energy system and the charging station; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the interactive product value output by the charging station
[0264] On the basis of the first initial constraint Y1, the server adds the constraint of the interactive product value between the integrated energy system and the charging station, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of the basic load to determine the first target constraint Y'1.
[0265] The loss value of server products based on the interaction between integrated energy system and charging station The first initial objective function H1 is adjusted to determine the first objective function.
[0266] The first objective function is shown in formula (5):
[0267]
[0268] Among them, F e represents the first sub-objective function; F c The second sub-objective function; It represents the loss value of interactive products between the integrated energy system and the charging station.
[0269] The first objective constraint and the first objective function determine the first objective scheduling function.
[0270] The server adds the value constraints of the uncertainty variables of renewable energy generation and the value constraints of the uncertainty variables of electric vehicle load to the second initial constraint condition Y2 to determine the second target constraint condition.
[0271] The value constraints of the uncertainty variables of renewable energy generation are shown in formula (3).
[0272]
[0273] Among them, u Re (t) represents the uncertainty variable of renewable energy generation, represents the predicted value of the uncertainty variable of renewable energy generation, represents the minimum prediction error of the uncertainty variable of renewable energy generation, represents the maximum prediction error of the uncertainty variable of renewable energy generation, γ Re ∈[0,1], represents the elastic adjustment parameter of the uncertainty variable of renewable energy generation.
[0274] The value constraints of the uncertainty variables of the base load are shown in formula (4):
[0275]
[0276] in, The predicted value of the uncertainty variable representing the base load, u L (t) represents the uncertainty variable of the base load, represents the minimum prediction error of the uncertainty variable of base load electricity, The maximum prediction error of the uncertainty variable representing the base load, γ L ∈[0,1] represents the elastic adjustment parameter of the uncertainty variable of the foundation load.
[0277] The server uses the second initial objective function as the second objective function. The second objective function is as shown in formula (14). The second initial objective function is the same as the second objective function.
[0278]
[0279] Among them, C G,m represents the loss value of the dispatchable generator set of the charging station; C BESS Represents the loss value of the battery energy storage system; R CS represents the value gain generated by charging electric vehicles; P G,m (t) represents the output of the mth dispatchable generator set; SOC(t) represents the state of charge of the battery energy storage system; Indicates the loss value of the interactive products between the integrated energy system and the charging station; Indicates the interactive product value from the integrated energy system into the charging station; Indicates the interactive product value output by the charging station u EV (t) represents the uncertainty variable of electric vehicle load.
[0280] Based on the second objective constraint and the second objective function, a second objective scheduling model is determined.
[0281] According to the first target scheduling model and the second target scheduling model, a target scheduling model is obtained, including:
[0282] First target scheduling model:
[0283] The first objective function:
[0284]
[0285] The first objective constraint is:
[0286]
[0287]
[0288]
[0289]
[0290] ∑P m (t) = L m m∈e,g,h,c Formula (6)
[0291]
[0292]
[0293]
[0294]
[0295]
[0296] Second target scheduling model:
[0297] The second objective function:
[0298]
[0299] Second objective constraint:
[0300]
[0301]
[0302]
[0303]
[0304]
[0305] The server schedules the energy of the integrated energy system and charging stations based on the target scheduling model.
[0306] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0307] Based on the same inventive concept, the embodiment of the present application also provides an energy scheduling device for implementing the energy scheduling method involved above. The implementation solution provided by the device to solve the problem is similar to the implementation solution recorded in the above method, so the specific limitations in one or more energy scheduling device embodiments provided below can refer to the limitations of the energy scheduling method above, and will not be repeated here.
[0308] In an exemplary embodiment, Figure 7 As shown, an energy scheduling device is provided, including: an acquisition module 701, a first target scheduling model determination module 702, a second target scheduling model determination module 703, a target scheduling model determination module 704 and a scheduling module 705, wherein:
[0309] The acquisition module 701 is used to obtain a variable factor set, a first initial scheduling model and a second initial scheduling model of the power system; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of basic load and uncertainty variables of electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial scheduling model is determined based on the integrated energy system; and the second initial scheduling model is determined based on the charging station.
[0310] The first target scheduling model determination module 702 is used to determine the first target scheduling model based on the uncertainty variables of renewable energy power generation, the uncertainty variables of base load and the first initial scheduling model.
[0311] The second target scheduling model determination module 703 is used to determine the second target scheduling model based on the uncertainty variables of renewable energy generation, the uncertainty variables of electric vehicle loads and the second initial scheduling model.
[0312] The target scheduling model determination module 704 is used to obtain a target scheduling model according to the first target scheduling model and the second target scheduling model.
[0313] The scheduling module 705 is used to schedule the energy of the integrated energy system and the charging station based on the target scheduling model.
[0314] In an exemplary embodiment, the first initial scheduling model includes a first initial objective function and a first initial constraint condition; the first objective scheduling model determination module 702 includes:
[0315] The first acquisition unit is used to acquire the constraint conditions of the interactive product value between the integrated energy system and the charging station and the loss value of the interactive product between the integrated energy system and the charging station.
[0316] The first target constraint determination unit is used to determine the first target constraint based on the constraint of the interactive product value between the integrated energy system and the charging station, the first initial constraint, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of the basic load.
[0317] The first objective function determination unit is used to adjust the first initial objective function based on the loss value of the interactive product between the integrated energy system and the charging station to determine the first objective function.
[0318] The first target scheduling model determining unit is used to determine the first target scheduling model based on the first target constraint condition and the first target function.
[0319] In an exemplary embodiment, the first target constraint condition determination unit includes a renewable energy generation value constraint generation subunit and a base load value constraint generation subunit.
[0320] The renewable energy power generation value constraint generation subunit is used to obtain the first scheduling parameter of the uncertainty variable of renewable energy power generation, the first scheduling parameter includes a first prediction value, a first minimum prediction error, a first maximum prediction error and a first elastic adjustment parameter; based on the first prediction value, the first minimum prediction error, the first maximum prediction error and the first elastic adjustment parameter, the value constraint of the uncertainty variable of renewable energy power generation is determined.
[0321] The basic load value constraint generation subunit is used to obtain the second scheduling parameters of the uncertainty variables of the basic load, the second scheduling parameters include a second prediction value, a second minimum prediction error, a second maximum prediction error and a second elastic adjustment parameter; based on the second prediction value, the second minimum prediction error, the second maximum prediction error and the second elastic adjustment parameter, the value constraints of the uncertainty variables of the basic load are determined.
[0322] In an exemplary embodiment, the first initial constraint condition includes the load supply and demand balance constraint, equipment operation constraint, network transmission constraint, and demand response constraint of the integrated energy system; wherein the network transmission constraint includes node power constraint, node voltage constraint, and node flow constraint.
[0323] The first initial objective function includes the first sub-objective function and the second sub-objective function of the integrated energy system, wherein the first sub-objective function is determined based on the interactive product value entering the integrated energy system, the equipment maintenance value, the fuel value consumed by the equipment, and the equipment depreciation value; the second sub-objective function is determined based on the total consumption of energy types, the emission coefficient of pollutants generated by the consumed energy types, and the control value of pollutants.
[0324] In an exemplary embodiment, the second initial scheduling model includes a second initial objective function and a second initial constraint condition; the second objective scheduling model determination module 703 includes:
[0325] The second target constraint determination unit is used to determine the second target constraint according to the second initial constraint, the value constraint of the uncertainty variable of renewable energy power generation and the value constraint of the uncertainty variable of electric vehicle load.
[0326] The second objective function determining unit is used to determine the second objective function based on the second initial objective function.
[0327] The second objective scheduling model determining unit is used to determine the second objective scheduling model based on the second objective constraint condition and the second objective function.
[0328] In an exemplary embodiment, the second target constraint condition determination unit includes a renewable energy generation value constraint generation subunit and an electric vehicle load value constraint generation subunit.
[0329] The renewable energy power generation value constraint generation subunit is used to obtain the first scheduling parameter of the uncertainty variable of renewable energy power generation, the first scheduling parameter includes a first prediction value, a first minimum prediction error, a first maximum prediction error and a first elastic adjustment parameter; based on the first prediction value, the first minimum prediction error, the first maximum prediction error and the first elastic adjustment parameter, determine the value constraint of the uncertainty variable of renewable energy power generation.
[0330] The electric vehicle load value constraint generation subunit is used to obtain the third scheduling parameter of the uncertainty variable of the electric vehicle load, the third scheduling parameter includes a third prediction value, a third minimum prediction error, a third maximum prediction error and a third elastic adjustment parameter; based on the third prediction value, the third minimum prediction error, the third maximum prediction error and the third elastic adjustment parameter, determine the value constraint of the uncertainty variable of the electric vehicle load.
[0331] In an exemplary embodiment, the second initial constraints include the power balance constraint of the charging station, the dispatchable generator set constraint and the battery energy storage system constraint; the second initial objective function includes the loss value of the dispatchable generator set of the charging station, the loss value of the battery energy storage system and the value gain generated by charging of electric vehicles.
[0332] Each module in the above energy dispatching device can be implemented in whole or in part by software, hardware and their combination. Each module can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each module.
[0333] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Figure 8 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store energy scheduling data. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, an energy scheduling method is implemented.
[0334] Those skilled in the art will understand that Figure 8 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0335] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0336] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.
[0337] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.
[0338] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.
[0339] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0340] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. An energy scheduling method, characterized in that: The method comprises: Obtain a variable factor set, a first initial dispatch model, and a second initial dispatch model of the power system; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of base load, and uncertainty variables of electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial dispatch model is determined based on the integrated energy system; and the second initial dispatch model is determined based on the charging station; Determining a first target scheduling model based on the uncertainty variables of the renewable energy generation, the uncertainty variables of the base load and the first initial scheduling model; Determining a second target scheduling model based on the uncertainty variables of the renewable energy power generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model; Obtaining a target scheduling model according to the first target scheduling model and the second target scheduling model; The energy of the integrated energy system and the charging station is scheduled based on the target scheduling model.
2. The method according to claim 1, characterized in that The first initial scheduling model includes a first initial objective function and a first initial constraint condition; the first target scheduling model is determined based on the uncertainty variables of the renewable energy generation, the uncertainty variables of the base load and the first initial scheduling model, including: Obtain the constraint conditions of the interactive product value of the integrated energy system and the charging station and the loss value of the interactive product of the integrated energy system and the charging station; Determine a first target constraint condition based on the constraint condition of the interactive product value between the integrated energy system and the charging station, the first initial constraint condition, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of the base load; Adjusting the first initial objective function based on the interactive product loss value between the integrated energy system and the charging station to determine the first objective function; Based on the first objective constraint and the first objective function, a first objective scheduling model is determined.
3. The method according to claim 2, characterized in that The method for generating the value constraint of the uncertainty variable of the renewable energy power generation includes: Acquire a first scheduling parameter of an uncertainty variable of renewable energy power generation, wherein the first scheduling parameter includes a first prediction value, a first minimum prediction error, a first maximum prediction error, and a first elastic adjustment parameter; Determining a value constraint of an uncertainty variable of renewable energy power generation based on the first prediction value, the first minimum prediction error, the first maximum prediction error, and the first elastic adjustment parameter; The generation method of the value constraint of the uncertainty variable of the base load includes: Acquire a second dispatch parameter of the uncertainty variable of the base load, wherein the second dispatch parameter includes a second prediction value, a second minimum prediction error, a second maximum prediction error, and a second elastic adjustment parameter; Based on the second prediction value, the second minimum prediction error, the second maximum prediction error, and the second elastic adjustment parameter, a value constraint of the uncertainty variable of the base load is determined.
4. The method according to claim 3, characterized in that The first initial constraint condition includes the load supply and demand balance constraint, equipment operation constraint, network transmission constraint, and demand response constraint of the integrated energy system; wherein the network transmission constraint includes node power constraint, node voltage constraint, and node flow constraint; The first initial objective function includes the first sub-objective function and the second sub-objective function of the integrated energy system, wherein the first sub-objective function is determined based on the interactive product value entering the integrated energy system, the equipment maintenance value, the fuel value consumed by the equipment, and the equipment depreciation value; the second sub-objective function is determined based on the total consumption of energy types, the emission coefficient of pollutants generated by the consumed energy types, and the control value of pollutants.
5. The method according to claim 1, characterized in that The second initial scheduling model includes a second initial objective function and a second initial constraint condition; based on the uncertainty variables of the renewable energy generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model, determining the second objective scheduling model includes: Determining a second target constraint condition according to the second initial constraint condition, the value constraint of the uncertainty variable of renewable energy power generation, and the value constraint of the uncertainty variable of electric vehicle load; Based on the second initial objective function, determining a second objective function; Based on the second objective constraint and the second objective function, a second objective scheduling model is determined.
6. The method according to claim 5, characterized in that The method for generating the value constraint of the uncertainty variable of the renewable energy power generation includes: Acquire a first scheduling parameter of an uncertainty variable of renewable energy power generation, wherein the first scheduling parameter includes a first prediction value, a first minimum prediction error, a first maximum prediction error, and a first elastic adjustment parameter; Determining a value constraint of an uncertainty variable of renewable energy power generation based on the first prediction value, the first minimum prediction error, the first maximum prediction error, and the first elastic adjustment parameter; The generation method of the value constraint of the uncertain variable of the electric vehicle load includes: Acquire a third dispatch parameter of the uncertainty variable of the electric vehicle load, wherein the third dispatch parameter includes a third prediction value, a third minimum prediction error, a third maximum prediction error, and a third elastic adjustment parameter; Based on the third prediction value, the third minimum prediction error, the third maximum prediction error and the third elastic adjustment parameter, the value constraint of the uncertainty variable of the electric vehicle load is determined.
7. The method according to claim 5, characterized in that The second initial constraint condition includes a power balance constraint of the charging station, a dispatchable generator set constraint and a battery energy storage system constraint; The second initial objective function includes the loss value of the dispatchable generator set of the charging station, the loss value of the battery energy storage system and the value gain generated by charging of electric vehicles.
8. An energy dispatching device, characterized in that: The device comprises: An acquisition module is used to acquire a variable factor set of the power system and a first initial scheduling model and a second initial scheduling model; the variable factor set includes uncertainty variables of renewable energy generation, uncertainty variables of base load and uncertainty variables of electric vehicle load; the power system includes an integrated energy system and a charging station; wherein the first initial scheduling model is determined based on the integrated energy system; and the second initial scheduling model is determined based on the charging station; A first target scheduling model determination module, configured to determine a first target scheduling model based on the uncertainty variables of the renewable energy power generation, the uncertainty variables of the base load and the first initial scheduling model; A second target scheduling model determination module, used to determine a second target scheduling model based on the uncertainty variables of the renewable energy power generation, the uncertainty variables of the electric vehicle load and the second initial scheduling model; A target scheduling model determination module, used to obtain a target scheduling model according to the first target scheduling model and the second target scheduling model; The scheduling module is used to schedule the energy of the integrated energy system and the charging station based on the target scheduling model.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.