Wind power plant active power distribution method, device and equipment and storage medium

By analyzing the historical operation data of wind turbines and building target optimization functions, the allocation of wind turbines in the wind farm is optimized, and the problems of energy efficiency reduction and short life of wind turbines due to frequent speed changes are solved, and energy efficiency improvement and life extension are achieved.

CN119093513APending Publication Date: 2024-12-06华电(宁夏)能源有限公司新能源分公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411281120.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The wind turbine is over-fatigue due to frequent speed changes in harsh operating environments, which seriously affects its energy efficiency and life. The prior art is difficult to effectively improve the overall energy efficiency of the wind turbine during active power distribution of the wind farm and extend its operating life.

Method used

By obtaining the historical operating data of the wind turbine, determining its actual operating power curve, calculating the actual and theoretical annual power generation, building a target optimization function, and optimizing the number of wind turbines in the wind farm to improve energy efficiency and Extend lifespan.

Benefits of technology

The operational energy efficiency and life of wind turbines have been improved. By optimizing the number of wind turbines and allocation strategies, the number of frequent starts and shutdowns has been reduced, and the overall energy efficiency utilization has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093513A_ABST
    Figure CN119093513A_ABST
Patent Text Reader

Abstract

The invention discloses a wind power plant active power distribution method and device, equipment and a storage medium, and relates to the field of wind power generation, and the method comprises the steps: obtaining historical operation data of a wind turbine generator, and determining an actual operation power curve of the wind turbine generator according to the historical operation data; calculating the actual annual energy output of the wind turbine generator based on the actual operation power curve, and determining the theoretical annual energy output of the wind turbine generator according to the theoretical operation power curve of the wind turbine generator; determining the electric quantity increase percentage of the wind turbine generator according to the actual annual energy output and the theoretical annual energy output, and constructing a target optimization function based on the electric quantity increase percentage and the active power of the wind power plant; and determining the number of wind turbine generators of the wind power plant based on the target optimization function, and distributing the active power of the wind power plant according to the number of the wind turbine generators. According to the invention, the active power of the wind power plant is distributed, and the service life of the wind turbine generator is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of wind power generation, and in particular to a method, device, equipment and storage medium for allocating active power of a wind farm. Background Art

[0002] The active power distribution of wind farms is mainly controlled by the site energy management platform to adjust the output power of a single wind turbine unit, so that the overall power of the site can meet the power rationing needs of the grid.

[0003] When allocating active power in a wind farm, the advantages and disadvantages of the energy efficiency of direct-drive wind turbines in low wind speed sections and doubly-fed wind turbines in high wind speed sections can be used to achieve active power distribution in the wind farm, but the overall energy efficiency of the wind turbines may be reduced; the active power of wind turbines in the wind farm can also be distributed based on the real-time operating status of the wind turbines, and the minimum term state and the intermediate term state are optimized when allocating active power. However, this method is due to the harsh operating environment in which wind farms are usually located. Wind turbines are rotating machinery, and their shaft systems and generator systems are prone to serious failures due to excessive fatigue due to long-term and frequent speed changes. After long-term operation, the wind turbines and their energy efficiency will be seriously affected.

[0004] In summary, how to improve the energy efficiency of wind turbines and extend their service life while achieving active power distribution in wind farms is an urgent problem to be solved. Summary of the invention

[0005] In view of this, the purpose of the present invention is to provide a method, device, equipment and storage medium for allocating active power in a wind farm, which can improve the operating efficiency of wind turbines and extend the operating life of wind turbines while realizing active power allocation in wind farms. The specific scheme is as follows:

[0006] In a first aspect, the present application discloses a method for allocating active power of a wind farm, comprising:

[0007] Acquire historical operation data of the wind turbine generator set, and determine an actual operation power curve of the wind turbine generator set according to the historical operation data;

[0008] Calculating the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determining the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set;

[0009] Determine the percentage of power increase of the wind turbine generator set by the actual annual power generation and the theoretical annual power generation, and construct a target optimization function based on the percentage of power increase and the active power of the wind farm;

[0010] The number of wind turbines in the wind farm is determined based on the target optimization function, and the active power of the wind farm is distributed according to the number of wind turbines.

[0011] Optionally, the acquiring historical operation data of the wind turbine generator set and determining the actual operation power curve of the wind turbine generator set according to the historical operation data includes:

[0012] Acquire historical operation data of the wind turbine generator set, and delete data that meets a preset abnormal condition in the historical operation data to obtain target operation data;

[0013] The wind speed interval is divided based on preset intervals to obtain target intervals, and the average wind speed and average output power corresponding to each target interval are calculated using the target operation data and the target interval, and the actual operating power curve of the wind turbine is determined according to the average wind speed and average output power corresponding to each target interval.

[0014] Optionally, the preset abnormal conditions include any one or a combination of the following: the wind speed is greater than a preset cut-out wind speed or less than a preset cut-in wind speed, the wind turbine power is less than or equal to zero when the wind speed is less than the preset cut-out wind speed and greater than the preset cut-in wind speed, the status bit of the wind turbine programmable logic controller is a preset shutdown status bit or a preset power limiting status bit, the wind angle is greater than or equal to a first preset angle threshold when the wind speed is less than a first preset wind speed value, and the wind angle is greater than or equal to a second preset angle threshold when the wind speed is greater than or equal to the first preset wind speed value.

[0015] Optionally, the calculating the average wind speed and the average output power corresponding to each target interval by using the target operation data and the target interval, and determining the actual operation power curve of the wind turbine generator set according to the average wind speed and the average output power corresponding to each target interval, includes:

[0016] The average wind speed of each target interval is calculated using the target operation data and the preset average wind speed calculation formula, and the average output power of each target interval is calculated using the target operation data and the preset average power output calculation formula. The actual operation power curve of the wind turbine is determined according to the average wind speed and average output power corresponding to each target interval; wherein the preset average wind speed calculation formula is:

[0017] ;

[0018] Among them, V i is the average wind speed in the i-th target interval, N i is the number of data points in the i-th target interval, V jis the wind speed of the jth data point in the i-th target interval;

[0019] The preset average output power calculation formula is:

[0020] ;

[0021] Among them, P i is the average output power of the target interval i, N i is the number of data points in the i-th target interval, P j is the output power of the jth data point in the i-th target interval.

[0022] Optionally, the calculating the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determining the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set, includes:

[0023] The actual annual power generation of the wind turbine is calculated based on the annual power generation calculation formula and the actual operating power curve, and the theoretical annual power generation of the wind turbine is determined according to the annual power generation calculation formula and the theoretical operating power curve of the wind turbine; wherein the annual power generation calculation formula is:

[0024] ;

[0025] Among them, N h is the annual power generation hours, N is the total number of target intervals, F(V i ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-th target interval, F(V i-1 ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-1th target interval, P i is the average output power of the i-th target interval, P i-1 is the average output power of the i-1th target interval, wherein the Rayleigh cumulative probability distribution function is:

[0026] ;

[0027] Where F(V) is the Rayleigh cumulative probability distribution function of wind speed, V ave is the annual average wind speed at hub height, and V is the wind speed.

[0028] Optionally, determining the percentage increase in electricity quantity of the wind turbine generator set according to the actual annual electricity quantity and the theoretical annual electricity quantity includes:

[0029] The percentage increase of the power of the wind turbine is determined by the actual annual power generation and the theoretical annual power generation according to the percentage increase calculation formula; the percentage increase calculation formula is:

[0030] ;

[0031] Among them, α i The percentage increase of the power, is the actual annual power generation, is the theoretical annual power generation.

[0032] Optionally, constructing a target optimization function based on the power increase percentage and the active power of the wind farm includes:

[0033] Constructing the target optimization function based on the power increase percentage and the active power of the wind farm;

[0034] The objective optimization function is:

[0035] ;

[0036] Wherein, L is the target optimization function, s i n is the next moment operation state of the wind turbine generator set, s i n-1 is the current operating state of the wind turbine generator set, P i * is the actual output power of the wind turbine at the current wind speed, P AGC is the active power of the wind farm, α i is the percentage increase of the power of the wind turbine generator set, α max is the maximum value of the power increase percentage of the wind turbine group, and c1, c2, and c3 are weight coefficients.

[0037] In a second aspect, the present application discloses a wind farm active power distribution device, comprising:

[0038] A power curve determination module, used to obtain historical operation data of the wind turbine generator set, and determine the actual operation power curve of the wind turbine generator set according to the historical operation data;

[0039] An annual power generation determination module, used to calculate the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determine the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set;

[0040] An optimization function construction module, used to determine the percentage of power increase of the wind turbine generator set according to the actual annual power generation and the theoretical annual power generation, and to construct a target optimization function based on the percentage of power increase and the active power of the wind farm;

[0041] The active power allocation module is used to determine the number of wind turbines in the wind farm based on the target optimization function, and allocate the active power of the wind farm according to the number of wind turbines.

[0042] In a third aspect, the present application discloses an electronic device, comprising:

[0043] Memory, used to store computer programs;

[0044] The processor is used to execute the computer program to implement the steps of the above-mentioned wind farm active power distribution method.

[0045] In a fourth aspect, the present application discloses a computer-readable storage medium for storing a computer program; wherein, when the computer program is executed by a processor, the steps of the aforementioned wind farm active power distribution method are implemented.

[0046] When distributing active power to wind turbines in a wind farm, the present application first obtains historical operating data of the wind turbines, and determines an actual operating power curve of the wind turbines based on the historical operating data; then, calculates the actual annual power generation of the wind turbines based on the actual operating power curve, and determines the theoretical annual power generation of the wind turbines based on the theoretical operating power curve of the wind turbines; determines the percentage increase in electricity of the wind turbines through the actual annual power generation and the theoretical annual power generation, and constructs a target optimization function based on the percentage increase in electricity and the active power of the wind farm; finally, determines the number of wind turbines in the wind farm based on the target optimization function, and distributes the active power of the wind farm based on the number of wind turbines. It can be seen that in this application, the actual operating power curve of the wind turbine is first determined by using the historical operating data of the wind turbine. The actual annual power generation and theoretical annual power generation of the wind turbine are calculated based on the actual operating power curve of the wind turbine and the theoretical operating power curve of the wind turbine given at the factory, thereby calculating the percentage increase in electricity of the wind turbine, and using the percentage increase in electricity and the active power of the wind farm to construct a target optimization function. When constructing the target optimization function, the historical operating conditions of the wind turbine and the percentage increase in electricity for the whole year are taken into account, and the impact of the operating environment on the energy efficiency of the wind turbine in the wind farm over a long time scale is taken into account. Therefore, the required number of wind turbines is calculated according to the target optimization function, and the active power of the wind farm is allocated based on the number of wind turbines, thereby achieving the purpose of improving the overall operating energy efficiency of the wind turbines and extending the operating life of the wind turbines. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0048] Figure 1 A flow chart of a method for allocating active power in a wind farm disclosed in the present application;

[0049] Figure 2 A specific wind turbine power point schematic diagram provided for this application;

[0050] Figure 3 A flow chart of a specific wind farm active power allocation method disclosed in this application;

[0051] Figure 4 A specific wind turbine operating power comparison diagram provided for this application;

[0052] Figure 5 This is a schematic structural diagram of an active power distribution device for a wind farm disclosed in this application;

[0053] Figure 6 This is a structural diagram of an electronic device disclosed in this application. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] At present, when distributing active power in a wind farm, the advantages and disadvantages of the energy efficiency of direct-drive wind turbines in low wind speed sections and doubly-fed wind turbines in high wind speed sections can be used to achieve active power distribution in the wind farm, but the overall energy efficiency of the wind turbines may be reduced; the active power of wind turbines in the wind farm can also be distributed based on the real-time operating status of the wind turbines, and the minimum term state and the intermediate term state are optimized when distributing active power. However, this method is due to the harsh operating environment in which wind farms are usually located. Wind turbines are rotating machinery, and their shaft systems and generator systems are prone to serious failures due to excessive fatigue due to long-term and frequent speed changes. After long-term operation, the wind turbines and wind turbine energy efficiency will be seriously affected. In order to solve the above technical problems, the present application discloses a method, device, equipment and storage medium for distributing active power in a wind farm, which can improve the operating efficiency of wind turbines and extend the operating life of wind turbines while realizing active power distribution in wind farms.

[0056] See also Figure 1 As shown, an embodiment of the present invention discloses a method for allocating active power of a wind farm, comprising:

[0057] Step S11: Acquire historical operating data of the wind turbine generator set, and determine an actual operating power curve of the wind turbine generator set according to the historical operating data.

[0058] In this embodiment, before allocating the active power of the wind farm, the historical operation data of the wind turbine set is first obtained, and the actual operation power curve corresponding to the wind turbine set is determined based on the historical operation data of the wind turbine set, so as to determine the energy efficiency status of the wind turbine set, so as to realize the allocation of the active power of the wind farm where the wind turbine set is located using the energy efficiency status of the wind turbine set. Since the environment of each wind farm is different, the power generation conditions of the wind turbine set will also be different, and then, the actual operation power curve will also be different from the theoretical operation power curve. Therefore, after obtaining the historical operation data of the wind turbine set, the historical operation data of the wind turbine set can be screened to remove abnormal data in the historical operation data, and the actual operation power curve corresponding to the wind turbine set can be determined according to the target operation data obtained after screening. When removing abnormal data in the historical operation data, the abnormal data in the historical operation data can be eliminated based on the preset abnormal conditions, so as to obtain the target operation data when the wind turbine set is operating normally. The preset abnormal conditions here include any one or a combination of the following: the wind speed is greater than the preset cut-out wind speed or less than the preset cut-in wind speed, the wind turbine power is less than or equal to zero when the wind speed is less than the preset cut-out wind speed and greater than the preset cut-in wind speed, the status bit of the wind turbine programmable logic controller is a preset shutdown status bit or a preset power limit status bit, the wind angle is greater than or equal to the first preset angle threshold when the wind speed is less than the first preset wind speed value, and the wind angle is greater than or equal to the second preset angle threshold when the wind speed is greater than or equal to the first preset wind speed value. Specifically, the first preset wind speed value can be 7m / s, the first preset angle can be 16°, and the second preset angle can be 8°. Therefore, the following types of abnormal data for wind turbines are eliminated: non-working point, wind speed greater than the cut-out wind speed V>V cut-out , wind speed is less than the cut-in wind speed V <V cut-IN ; Abnormal working point, when the wind speed is greater than the cut-in wind speed and less than the cut-out wind speed V cut-IN <V<V cut-out , the point where the power is zero or negative; the shutdown point, the point where the PLC (Programmable Logic Controller) status of the wind turbine is shutdown; the power limit point, the wind power PLC status is the power limit point; for the wind deviation point, when the wind speed is <7m / s, the data of the wind deviation angle ≥16° and the wind speed ≥7m / s, the data of the wind deviation angle ≥8° are eliminated. In this way, the target operation data of the wind turbine when it is in normal operation is obtained, and the actual operation power curve corresponding to the wind turbine is determined based on the target operation data.

[0059] In this embodiment, when determining the actual operating power curve of the wind turbine generator set, the wind speed interval is first divided based on the preset interval to obtain each target interval, and the target operating data and the target interval are used to calculate the average wind speed and average output power corresponding to each target interval, and the actual operating power curve of the wind turbine generator set is determined according to the average wind speed and average output power corresponding to each target interval. When dividing the wind speed interval, the preset interval can be 0.5m / s, and 0.5m / s is used as an interval from the cut-in wind speed to the cut-out wind speed. The average wind speed and the average output power are calculated for each interval after the wind speed is standardized, so as to obtain the measured power curve. In the specific calculation process, the average wind speed of each target interval is calculated using the target operating data and the preset average wind speed calculation formula, and the average output power of each target interval is calculated using the target operating data and the preset average power output calculation formula. The actual operating power curve of the wind turbine generator set is determined according to the average wind speed and average output power corresponding to each target interval; wherein the preset average wind speed calculation formula is:

[0060] ;

[0061] Among them, V i is the average wind speed in the i-th target interval, in m / s, N i is the number of data points in the i-th target interval, V j is the wind speed of the jth data point in the ith target interval, in m / s.

[0062] The preset average output power calculation formula is:

[0063] ;

[0064] Among them, P i is the average output power of the i-th target interval, in kilowatt-hours, N i is the number of data points in the i-th target interval, P j is the output power of the jth data point in the i-th target interval, in kilowatt-hours.

[0065] In this embodiment, after the average wind speed and average output power corresponding to each target interval are obtained, the actual operating power curve of the wind turbine generator set can be determined according to the average wind speed and average output power corresponding to each target interval.

[0066] Step S12: calculating the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determining the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set.

[0067] Based on the previous embodiment, it can be seen that Figure 2As shown, since the wind turbine generator set will have different operating power points at different wind speeds, the actual operating power curve of the wind turbine generator set is determined by the average wind speed and average output power corresponding to the target interval. Figure 2 The guaranteed power is the theoretical operating power given to the wind turbine when it leaves the factory, and the actual power is the actual operating power of the wind turbine.

[0068] After obtaining the actual operating power curve corresponding to the wind turbine, the actual annual power generation of the wind turbine can be determined based on the actual operating power curve. Similarly, when calculating the theoretical annual power generation of the wind turbine, the theoretical operating power curve given when the wind turbine leaves the factory is used. When calculating the annual power generation, the actual annual power generation of the wind turbine can be calculated based on the annual power generation calculation formula and the actual operating power curve, and the theoretical annual power generation of the wind turbine can be determined based on the annual power generation calculation formula and the theoretical operating power curve of the wind turbine; where the annual power generation calculation formula is:

[0069] ;

[0070] Among them, N h is the annual power generation hours, which is 8760 hours, N is the total number of target intervals, F(V i ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-th target interval, F(V i-1 ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-1th target interval, P i is the average output power of the i-th target interval, in kilowatts, P i-1 is the average output power in the i-1th target interval, in kilowatts, where the Rayleigh cumulative probability distribution function is:

[0071] ;

[0072] Where F(V) is the Rayleigh cumulative probability distribution function of wind speed, V ave is the annual average wind speed at hub height, in m / s, and V is the wind speed, in m / s.

[0073] Step S13: determining the power increase percentage of the wind turbine generator set according to the actual annual power generation and the theoretical annual power generation, and constructing a target optimization function based on the power increase percentage and the active power of the wind farm.

[0074] In this embodiment, after calculating the actual annual power generation of the wind turbine and the theoretical annual power generation of the wind turbine, the percentage increase of the power of the wind turbine can be calculated. When calculating the percentage increase of the power of the wind turbine, the application determines the percentage increase of the power of the wind turbine by the actual annual power generation and the theoretical annual power generation according to the percentage increase calculation formula; the percentage increase calculation formula is:

[0075] ;

[0076] Among them, α i To increase the percentage of power, is the actual annual power generation, Theoretical annual power generation. It should be noted that the percentage of power increase reflects the efficiency of the wind turbine in actual operation, and the degree to which the power generation efficiency is improved through technical improvement or management optimization. If the percentage of power increase is high, it means that the performance of the wind turbine in actual operation is good, or the power generation efficiency is effectively improved through technical and management measures.

[0077] After that, a target optimization function can be constructed based on the power increase percentage and the active power of the wind farm. When constructing the target optimization function, the active power of the wind farm and the power increase percentage are comprehensively considered. Based on the power increase percentage, at the same time, in order to achieve the minimum deviation of the active power output required by the whole wind farm, reduce the number of start-up and shutdown times of wind turbines in the wind farm, and improve the energy efficiency utilization rate of wind turbines, a target optimization function of the wind turbines in the wind farm is constructed. The target optimization function is:

[0078] ;

[0079] Among them, L is the target optimization function, s i n is the next moment operation state of the wind turbine, s i n-1 is the current operating status of the wind turbine, P i * is the actual output power of the wind turbine at the current wind speed, P AGC is the active power of the wind farm, α i Increase the percentage of wind turbine power, α max is the maximum value of the percentage increase of the power of the wind turbine, and c1, c2, and c3 are weight coefficients.

[0080] Step S14: determining the number of wind turbines in the wind farm based on the target optimization function, and allocating the active power of the wind farm according to the number of wind turbines.

[0081] In this embodiment, the number of wind turbines in the wind farm is determined by solving the target optimization function, and after the number of wind turbines is determined, the active power of the wind farm is allocated based on the number of wind turbines. Since the energy efficiency status of the wind turbines is taken into account when constructing the target optimization function, when the number of wind turbines is determined based on the target optimization function and the active power of the wind farm is allocated based on the number of wind turbines, it is possible to achieve more power generation for wind turbines with high energy efficiency, reduce the number of starts and stops of wind turbines, and thus improve the energy efficiency utilization rate of wind turbines in the wind farm.

[0082] To summarize, in the present application, when implementing the active power distribution of a wind farm, the actual operating power curve of the wind turbine is first determined using the historical operating data of the wind turbine, and the actual annual power generation and theoretical annual power generation of the wind turbine are calculated based on the actual operating power curve of the wind turbine and the theoretical operating power curve of the wind turbine given at the factory, thereby calculating the percentage increase in electricity of the wind turbine, and constructing a target optimization function using the percentage increase in electricity and the active power of the wind farm. When constructing the target optimization function, the historical operating conditions of the wind turbine and the percentage increase in electricity for the whole year are taken into account, and the impact of the operating environment on the energy efficiency of the wind turbine in the wind farm over a long time scale is taken into account, thereby calculating the required number of wind turbines according to the target optimization function, and allocating the active power of the wind farm based on the number of wind turbines, thereby achieving the purpose of extending the operating life of the wind turbines.

[0083] Based on the above embodiment, it can be known that the present application discloses a method for allocating active power of a wind farm, which can realize active power allocation of a wind farm and increase the operating life of wind turbines. Next, a specific process of allocating active power of a wind farm will be described.

[0084] See also Figure 3As shown in FIG, before distributing active power of a wind farm, the historical operation data of the wind turbines are first collected, and the abnormal data in the historical operation data are removed according to the preset abnormal conditions, and the data of the wind turbines in normal operation are retained to obtain the target operation data. Then, the wind speed intervals are standardized based on the preset intervals to obtain each target interval, and the average wind speed and average output power corresponding to each target interval are calculated using the target operation data based on the average wind speed calculation formula and the average output power calculation formula, so as to determine the actual operation power curve of the wind turbines. Based on the actual operation power curve and the annual average output power calculation formula, the wind speed intervals are standardized based on the preset intervals to obtain each target interval. The power generation calculation formula calculates the actual annual power generation of the wind turbine, and the theoretical annual power generation of the wind turbine is calculated based on the theoretical operating power curve and the annual power generation calculation formula. The theoretical annual power generation and the actual annual power generation are used to calculate the percentage increase in power of the wind turbine. Then, with the purpose of improving the energy efficiency of the wind turbine, a target optimization function of the wind turbine is constructed based on the percentage increase in power, and the target optimization function is solved to obtain the number of wind turbines. The active power of the wind farm is issued based on the active power of the wind farm and the number of wind turbines, and the wind turbine generates electricity based on the active power issued by the wind farm.

[0085] See also Figure 4 As shown, the present application provides an operating power curve of a wind turbine set at different wind speeds. Before the technical transformation, it refers to the operating power curve of the wind turbine set when the wind farm active power allocation method of the present application is not applied. After the technical transformation, it refers to the operating power curve of the wind turbine set when the wind farm active power allocation method of the present application is used. Figure 4 It can be seen that the present application improves the overall operating energy efficiency of wind turbines. It should be noted that when collecting historical operating data of wind turbines, the present application collects data in quarterly time periods, so that the seasonal impact on the power generation efficiency of wind turbines is taken into account when determining the target optimization function of wind turbines, and the number of wind turbines determined based on the target optimization function is changed according to the season, and the active power of the wind farm is issued based on the number of wind turbines, so that the wind turbines generate electricity based on the issued active power, thereby making the overall operating energy efficiency of the wind turbines in the wind farm higher over a long time scale.

[0086] To summarize, the present application can collect historical operating data of wind turbines on a quarterly basis, clean the collected historical operating data to obtain target operating data, and then use the target operating data to construct a target optimization function. In this way, when constructing the target optimization function, the impact of seasonal changes on the power generation efficiency of wind turbines can be comprehensively considered. Finally, the number of wind turbines obtained by solving the target optimization function is used to determine the active power issued to the wind turbines based on the number of wind turbines, thereby improving the overall operating efficiency of wind turbines over a long time scale.

[0087] See also Figure 5As shown, the embodiment of the present application discloses a wind farm active power distribution device, comprising:

[0088] A power curve determination module 11 is used to obtain historical operation data of the wind turbine generator set and determine the actual operation power curve of the wind turbine generator set according to the historical operation data;

[0089] An annual power generation determination module 12 is used to calculate the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determine the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set;

[0090] An optimization function construction module 13 is used to determine the percentage of power increase of the wind turbine generator set according to the actual annual power generation and the theoretical annual power generation, and to construct a target optimization function based on the percentage of power increase and the active power of the wind farm;

[0091] The active power allocation module 14 is used to determine the number of wind turbines in the wind farm based on the target optimization function, and allocate the active power of the wind farm according to the number of wind turbines.

[0092] It can be seen that when allocating the active power of a wind farm, the present application first uses the historical operating data of the wind turbine to determine the actual operating power curve of the wind turbine, and calculates the actual annual power generation and theoretical annual power generation of the wind turbine based on the actual operating power curve of the wind turbine and the theoretical operating power curve of the wind turbine given at the factory, thereby calculating the percentage increase in electricity of the wind turbine, and constructing a target optimization function using the percentage increase in electricity and the active power of the wind farm. When constructing the target optimization function, the historical operating conditions of the wind turbine and the percentage increase in electricity for the whole year are taken into account, and the impact of the operating environment on the energy efficiency of the wind turbines in the wind farm over a long time scale is taken into account, thereby calculating the required number of wind turbines according to the target optimization function, and allocating the active power of the wind farm based on the number of wind turbines, thereby achieving the purpose of improving the overall operating energy efficiency of the wind turbines and extending the operating life of the wind turbines.

[0093] In a specific embodiment, the power curve determination module 11 may specifically include:

[0094] An operation data acquisition submodule is used to acquire historical operation data of the wind turbine generator set, and delete the data that meets the preset abnormal conditions in the historical operation data to obtain target operation data;

[0095] The power curve determination submodule is used to divide the wind speed interval based on preset intervals to obtain each target interval, and use the target operation data and the target interval to calculate the average wind speed and average output power corresponding to each target interval, and determine the actual operation power curve of the wind turbine according to the average wind speed and average output power corresponding to each target interval.

[0096] In a specific embodiment, the power curve determination submodule may specifically include:

[0097] The first data calculation unit is used to calculate the average wind speed of each target interval using the target operation data and a preset average wind speed calculation formula, calculate the average output power of each target interval using the target operation data and a preset average power output calculation formula, and determine the actual operation power curve of the wind turbine generator set according to the average wind speed and average output power corresponding to each target interval; wherein the preset average wind speed calculation formula is:

[0098] ;

[0099] Among them, V i is the average wind speed in the i-th target interval, N i is the number of data points in the i-th target interval, V j is the wind speed of the jth data point in the i-th target interval;

[0100] The preset average output power calculation formula is:

[0101] ;

[0102] Among them, P i is the average output power of the target interval i, N i is the number of data points in the i-th target interval, P j is the output power of the jth data point in the i-th target interval.

[0103] In a specific embodiment, the annual power generation determination module 12 may specifically include:

[0104] The second data calculation unit is used to calculate the actual annual power generation of the wind turbine generator set based on the annual power generation calculation formula and the actual operating power curve, and determine the theoretical annual power generation of the wind turbine generator set according to the annual power generation calculation formula and the theoretical operating power curve of the wind turbine generator set; wherein the annual power generation calculation formula is:

[0105] ;

[0106] Among them, Nh is the annual power generation hours, N is the total number of target intervals, F(V i ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-th target interval, F(V i-1 ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-1th target interval, P i is the average output power of the i-th target interval, P i-1 is the average output power of the i-1th target interval, wherein the Rayleigh cumulative probability distribution function is:

[0107] ;

[0108] Where F(V) is the Rayleigh cumulative probability distribution function of wind speed, V ave is the annual average wind speed at hub height, and V is the wind speed.

[0109] In a specific embodiment, the annual power generation determination module 12 may specifically include:

[0110] The third data calculation unit is used to determine the percentage increase of the power of the wind turbine generator set according to the actual annual power generation and the theoretical annual power generation according to the power increase percentage calculation formula; the power increase percentage calculation formula is:

[0111] ;

[0112] Among them, α i The percentage increase of the power, is the actual annual power generation, is the theoretical annual power generation.

[0113] In a specific embodiment, the optimization function construction module 13 may specifically include:

[0114] The optimization function construction unit is used to construct the target optimization function based on the power increase percentage and the active power of the wind farm; the target optimization function is:

[0115] ;

[0116] Wherein, L is the target optimization function, s i n is the next moment operation state of the wind turbine generator set, s i n-1 is the current operating state of the wind turbine generator set, P i * is the actual output power of the wind turbine at the current wind speed, P AGC is the active power of the wind farm, αi is the percentage increase of the power of the wind turbine generator set, α max is the maximum value of the power increase percentage of the wind turbine group, and c1, c2, and c3 are weight coefficients.

[0117] Furthermore, the present application also discloses an electronic device. Figure 6 This is a structural diagram of an electronic device 20 according to an exemplary embodiment. The content in the diagram cannot be regarded as any limitation on the scope of use of the present application.

[0118] Figure 6 A schematic diagram of the structure of an electronic device 20 provided in an embodiment of the present application. The electronic device 20 may specifically include: at least one processor 21, at least one memory 22, a power supply 23, a communication interface 24, an input / output interface 25, and a communication bus 26. The memory 22 is used to store a computer program, which is loaded and executed by the processor 21 to implement the relevant steps in the wind farm active power distribution method disclosed in any of the aforementioned embodiments. In addition, the electronic device 20 in this embodiment may specifically be an electronic computer.

[0119] In this embodiment, the power supply 23 is used to provide working voltage for each hardware device on the electronic device 20; the communication interface 24 can create a data transmission channel between the electronic device 20 and the external device, and the communication protocol it follows is any communication protocol that can be applied to the technical solution of the present application, and is not specifically limited here; the input and output interface 25 is used to obtain external input data or output data to the outside world, and its specific interface type can be selected according to specific application needs and is not specifically limited here.

[0120] In addition, the memory 22 as a carrier for resource storage may be a read-only memory, a random access memory, a disk or an optical disk, etc. The resources stored thereon may include an operating system 221, a computer program 222, etc., and the storage method may be temporary storage or permanent storage.

[0121] The operating system 221 is used to manage and control the hardware devices on the electronic device 20 and the computer program 222, which can be Windows Server, Netware, Unix, Linux, etc. In addition to the computer program that can be used to complete the wind farm active power distribution method performed by the electronic device 20 disclosed in any of the above embodiments, the computer program 222 can further include computer programs that can be used to complete other specific tasks.

[0122] Furthermore, the present application also discloses a computer-readable storage medium for storing a computer program; wherein, when the computer program is executed by a processor, the wind farm active power distribution method disclosed above is implemented. For the specific steps of the method, reference may be made to the corresponding contents disclosed in the above embodiments, and no further description will be given here.

[0123] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0124] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0125] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.

[0126] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0127] The technical solution provided by the present application is introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea. At the same time, for general technicians in this field, according to the idea of ​​the present application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. A method for allocating active power in a wind farm, It is characterized in that include: Acquire historical operation data of the wind turbine generator set, and determine an actual operation power curve of the wind turbine generator set according to the historical operation data; Calculating the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determining the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set; Determine the percentage of power increase of the wind turbine generator set by the actual annual power generation and the theoretical annual power generation, and construct a target optimization function based on the percentage of power increase and the active power of the wind farm; The number of wind turbines in the wind farm is determined based on the target optimization function, and the active power of the wind farm is distributed according to the number of wind turbines.

2. The method for allocating active power of a wind farm according to claim 1, It is characterized in that The acquiring of historical operation data of the wind turbine generator set and determining the actual operation power curve of the wind turbine generator set according to the historical operation data includes: Acquire historical operation data of the wind turbine generator set, and delete data that meets a preset abnormal condition in the historical operation data to obtain target operation data; The wind speed interval is divided based on preset intervals to obtain target intervals, and the average wind speed and average output power corresponding to each target interval are calculated using the target operation data and the target interval, and the actual operating power curve of the wind turbine is determined according to the average wind speed and average output power corresponding to each target interval.

3. The method for allocating active power of a wind farm according to claim 2, It is characterized in that The preset abnormal conditions include any one or a combination of the following: the wind speed is greater than the preset cut-out wind speed or less than the preset cut-in wind speed, the wind turbine power is less than or equal to zero when the wind speed is less than the preset cut-out wind speed and greater than the preset cut-in wind speed, the status bit of the wind turbine programmable logic controller is a preset shutdown status bit or a preset power limiting status bit, the wind angle is greater than or equal to a first preset angle threshold when the wind speed is less than a first preset wind speed value, and the wind angle is greater than or equal to a second preset angle threshold when the wind speed is greater than or equal to the first preset wind speed value.

4. The method for allocating active power of a wind farm according to claim 2, It is characterized in that The step of calculating the average wind speed and the average output power corresponding to each target interval by using the target operation data and the target interval, and determining the actual operation power curve of the wind turbine generator set according to the average wind speed and the average output power corresponding to each target interval, comprises: The average wind speed of each target interval is calculated using the target operation data and the preset average wind speed calculation formula, and the average output power of each target interval is calculated using the target operation data and the preset average power output calculation formula. The actual operation power curve of the wind turbine is determined according to the average wind speed and average output power corresponding to each target interval; wherein the preset average wind speed calculation formula is: ; Among them, V i is the average wind speed in the i-th target interval, N i is the number of data points in the i-th target interval, V j is the wind speed of the jth data point in the i-th target interval; The preset average output power calculation formula is: ; Among them, P i is the average output power of the target interval i, N i is the number of data points in the i-th target interval, P j is the output power of the jth data point in the i-th target interval.

5. The method for allocating active power of a wind farm according to claim 2, It is characterized in that The calculating the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determining the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set, comprises: The actual annual power generation of the wind turbine is calculated based on the annual power generation calculation formula and the actual operating power curve, and the theoretical annual power generation of the wind turbine is determined according to the annual power generation calculation formula and the theoretical operating power curve of the wind turbine; wherein the annual power generation calculation formula is: ; Among them, N h is the annual power generation hours, N is the total number of target intervals, F(V i ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-th target interval, F(V i-1 ) is the Rayleigh cumulative probability distribution function of the average wind speed in the i-1th target interval, P i is the average output power of the i-th target interval, P i-1 is the average output power of the i-1th target interval, wherein the Rayleigh cumulative probability distribution function is: ; Where F(V) is the Rayleigh cumulative probability distribution function of wind speed, V ave is the annual average wind speed at hub height, and V is the wind speed.

6. The method for allocating active power of a wind farm according to claim 1, It is characterized in that The determining the percentage of power increase of the wind turbine generator set according to the actual annual power generation and the theoretical annual power generation includes: The percentage increase of the power of the wind turbine is determined by the actual annual power generation and the theoretical annual power generation according to the percentage increase calculation formula; the percentage increase calculation formula is: ; Among them, α i The percentage increase of the power, is the actual annual power generation, is the theoretical annual power generation.

7. The method for allocating active power of a wind farm according to any one of claims 1 to 6, It is characterized in that The target optimization function is constructed based on the percentage of the power increase and the active power of the wind farm, including: Constructing the target optimization function based on the power increase percentage and the active power of the wind farm; The objective optimization function is: ; Wherein, L is the target optimization function, s i n is the next moment operation state of the wind turbine generator set, s i n-1 is the current operating state of the wind turbine generator set, P i * is the actual output power of the wind turbine at the current wind speed, P AGC is the active power of the wind farm, α i is the percentage increase of the power of the wind turbine generator set, α max is the maximum value of the percentage increase of the power of the wind turbine generator set, c 1 、c 2 、c 3 is the weight coefficient.

8. A wind farm active power distribution device, It is characterized in that include: A power curve determination module, used to obtain historical operation data of the wind turbine generator set, and determine the actual operation power curve of the wind turbine generator set according to the historical operation data; An annual power generation determination module, used to calculate the actual annual power generation of the wind turbine generator set based on the actual operating power curve, and determine the theoretical annual power generation of the wind turbine generator set according to the theoretical operating power curve of the wind turbine generator set; An optimization function construction module, used to determine the percentage of power increase of the wind turbine generator set according to the actual annual power generation and the theoretical annual power generation, and to construct a target optimization function based on the percentage of power increase and the active power of the wind farm; The active power allocation module is used to determine the number of wind turbines in the wind farm based on the target optimization function, and allocate the active power of the wind farm according to the number of wind turbines.