Screen projection delay measurement method and device
The method enhances screen projection delay measurement accuracy by employing uppercase numerals, OCR, and neural networks to filter out duplicate and error frames, providing a precise and reliable delay assessment.
Patent Information
- Application Number
- CN202411360173.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-12-06
AI Technical Summary
Existing methods for measuring screen projection delay suffer from low accuracy due to the use of traditional Arabic digital timers with few sampling points and fluctuating shooting frequencies, leading to repeated and blurred images.
A method using a stopwatch with uppercase numerals, combined with optical character recognition (OCR) and neural networks, identifies and removes duplicate and error frames to calculate accurate screen projection delay, and generates a comprehensive measurement report.
Improves the accuracy of screen projection delay measurement by increasing sampling points and filtering out redundant data, resulting in a precise and reliable delay assessment.
Smart Images

Figure CN119094744A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer software, and specifically to a method and device for measuring screen projection delay. Background Art
[0002] Screen projection is a technology used to achieve screen sharing and multi-screen interaction. Specifically, it displays the screen of one terminal device (such as a mobile phone, tablet or computer, etc.) on another terminal device. The output content includes various multimedia information such as video, audio, and documents. Due to factors such as the network environment and application operations, there is often a delay in the images displayed on the screens of the two devices. The delay value of video screen projection refers to the total time from the start of the screen projection sending end to display the video, sending the video stream to the receiving end, the receiving end decoding the video stream, and finally displaying the video on the screen.
[0003] In the related art, the method for measuring screen projection delay is usually to shoot two screens, and obtain the display time difference of the timing tools on the two screens in the photo through optical character recognition to determine the screen projection delay.
[0004] However, since the traditional Arabic digital timer has fewer sampling points and due to the fluctuation of shooting frequency, the photos taken will be repeated and blurred, resulting in low accuracy of the measured screen projection delay. Summary of the invention
[0005] The present application provides a method and device for measuring video projection delay, which can improve the accuracy of the measured projection delay.
[0006] In a first aspect, an embodiment of the present application provides a method for measuring screen projection delay, the method comprising:
[0007] Cast the first screen to the second screen, and play a stopwatch in uppercase numerals on the first screen;
[0008] Record the first screen and the second screen to obtain a video file;
[0009] Identify the video file frame by frame, obtain the timestamp corresponding to the stopwatch on each screen in each frame, remove duplicate frames and error frames, and calculate the screen projection delay of each remaining frame;
[0010] Based on all screen projection delays, a measurement report of the screen projection delay is obtained.
[0011] In combination with the first aspect, in one implementation, the step of identifying the video file frame by frame to obtain a timestamp corresponding to a stopwatch on each screen in each frame includes:
[0012] For each frame of the video file, cutting out a first picture including a stopwatch on each screen;
[0013] The time text corresponding to the stopwatch on each screen in the first picture is recognized by OCR to obtain the time stamp corresponding to the stopwatch on each screen in each frame.
[0014] In combination with the first aspect, in one implementation, the method further includes:
[0015] If OCR cannot recognize the time text corresponding to the stopwatch on each screen in the first image, the first image is recognized by a preset neural network model to obtain the timestamp corresponding to the stopwatch on each screen in each frame.
[0016] In combination with the first aspect, in one implementation, removing the timestamp corresponding to the duplicate frame includes:
[0017] If the timestamp of the first screen corresponding to the current frame is the same as the timestamp of the first screen corresponding to the previous frame or the next frame;
[0018] Alternatively, the timestamp of the second screen corresponding to the current frame is the same as the timestamp of the second screen corresponding to the previous frame or the next frame;
[0019] Remove the timestamp corresponding to the current frame.
[0020] In combination with the first aspect, in one implementation, removing the timestamp corresponding to the error frame includes:
[0021] If the timestamp of the first screen or the second screen corresponding to the current frame does not conform to the preset format;
[0022] Alternatively, the timestamp of the first screen corresponding to the current frame is smaller than the timestamp of the first screen corresponding to the previous frame;
[0023] Alternatively, the timestamp of the second screen corresponding to the current frame is smaller than the timestamp of the second screen corresponding to the previous frame;
[0024] Remove the timestamp corresponding to the current frame.
[0025] In combination with the first aspect, in one implementation, calculating the screen projection delay of each remaining frame includes:
[0026] According to the difference between the timestamp of the first screen and the timestamp of the second screen, the screen projection delay of each remaining frame is obtained.
[0027] In combination with the first aspect, in one implementation, obtaining a measurement report of screen projection delay according to all screen projection delays includes:
[0028] All projection delays are sorted according to the measurement time and divided into multiple data sets according to the preset intervals;
[0029] From each data set, a preset number of projection delays are randomly selected and the first mean is calculated;
[0030] According to all the first means, the total mean of the screen projection delay is obtained;
[0031] The maximum screen projection delay, the minimum screen projection delay, the variance of the screen projection delay, and the total mean of the screen projection delay are recorded in the screen projection delay measurement report.
[0032] In combination with the first aspect, in one implementation, obtaining a total mean of screen projection delays according to all first mean values includes:
[0033] Preset a screen projection delay threshold, and select a first mean value that is less than or equal to the delay threshold to add to the first data set;
[0034] The mean of each first mean in the first data set is calculated to obtain the total mean of the screen projection delay.
[0035] In combination with the first aspect, in one implementation, the method further includes:
[0036] The number of repeated frames and error frames are counted respectively, and recorded in the measurement report of the screen projection delay.
[0037] In a second aspect, an embodiment of the present application provides a screen projection delay measurement device, characterized in that the device includes:
[0038] A screen projection module, used to project the first screen to the second screen, and play a stopwatch in uppercase numerals on the first screen;
[0039] A recording module, used for recording the first screen and the second screen to obtain a video file;
[0040] An analysis module is used to identify the video file frame by frame, obtain the timestamp corresponding to the stopwatch on each screen in each frame, remove duplicate frames and error frames, and calculate the screen projection delay of each remaining frame;
[0041] The statistics module is used to obtain a measurement report of the screen projection delay based on all screen projection delays.
[0042] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:
[0043] This application replaces the traditional Arabic numeral timer with a capital numeral stopwatch, increases the sampling points of the time text, and thus improves the accuracy of optical character recognition. At the same time, by removing the timestamps corresponding to the repeated frames and error frames in the recorded video file, filtering out the repeated and ambiguous data, and storing the remaining correct data in the measurement report, the accuracy of the measured projection delay is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1This is a flow chart of the screen projection delay measurement method according to an embodiment of the present application;
[0045] Figure 2 This is a structural diagram of a video recording system of a method for measuring screen projection delay according to an embodiment of the present application;
[0046] Figure 3 This is an OCR recognition flow chart of the screen projection delay measurement method according to an embodiment of the present application;
[0047] Figure 4 This is a structural schematic diagram of the screen projection delay measurement device according to an embodiment of the present application. DETAILED DESCRIPTION
[0048] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0049] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below in conjunction with the accompanying drawings.
[0050] First, please refer to Figure 1 , Figure 1 The following is a flow chart of the method for measuring screen projection delay according to an embodiment of the present application. The method for measuring screen projection delay according to this embodiment includes the following steps:
[0051] Step S1: Project the first screen onto the second screen, and play a stopwatch in capital letters on the first screen.
[0052] Step S2: Record the first screen and the second screen to obtain a video file.
[0053] Step S3: Identify the video file frame by frame, obtain the timestamp corresponding to the stopwatch on each screen in each frame, remove duplicate frames and error frames, and calculate the screen projection delay of each remaining frame.
[0054] Step S4: Obtain a measurement report of the screen projection delay based on all screen projection delays.
[0055] This method replaces the traditional Arabic numeral timer with a stopwatch with uppercase numerals, increases the sampling points of the time text, and thus improves the accuracy of optical character recognition. At the same time, by removing the timestamps corresponding to the repeated frames and error frames in the recorded video file, filtering out the repeated and ambiguous data, and storing the remaining correct data in the measurement report, the accuracy of the measured projection delay is improved.
[0056] In some embodiments, in the above step S1, the specific process of projecting the first screen to the second screen is:
[0057] First, obtain the real picture buffer of the first screen and encode it into H264 format data.
[0058] The data in H264 format is then transmitted to the device with the second screen via the network.
[0059] Finally, the data in H264 format is decoded into YUV format, drawn through OpenGL and displayed on the second screen. It should be noted that since all the above steps of screen projection take time, there will inevitably be a delay between the images on the first screen and the second screen. The first screen and the second screen can be the screens of terminal devices such as computers, mobile phones or car computers. The devices corresponding to the first screen and the second screen can transmit data through wireless networks, Bluetooth and SLB / SLE (Super Low Bandwidth / Super Low Energy, Star Flash Basic Access Technology / Star Flash Low Power Access Technology).
[0060] In a more specific embodiment, in the above step S2, please refer to Figure 2 , Figure 2 This is a structural diagram of a video recording system for the method for measuring screen projection delay in an embodiment of the present application. Figure 2 The video recording system in the system records the first screen and the second screen to obtain a video file.
[0061] exist Figure 2 In the example, the video source is connected to the sending device and the output device respectively through the USB-typec cable, and the sending device and the output device are configured and managed on the video source. The sending device is connected to the HDMI (High-Definition Multimedia Interface) splitter through the HDMI_IN interface. The receiving device outputs video data to display B through the HDMI_OUT interface; the video source outputs video data to the HDMI splitter through the HDMI_OUT interface, and the HDMI splitter outputs video data to display A through the HDMI_OUT interface. The sending device and the receiving device communicate through the air interface based on the Star Flash protocol stack.
[0062] Display A is a first screen, and display B is a second screen. The first screen and the second screen are recorded by a high-speed camera at 60 frames per second to obtain a video file with a duration of one hour.
[0063] In some embodiments, in the above step S3, the video file is identified frame by frame to obtain the timestamp corresponding to the stopwatch on each screen in each frame, including the following steps:
[0064] First, for each frame of the video file, the first picture containing the stopwatch on each screen is cut out.
[0065] Afterwards, the time text corresponding to the stopwatch on each screen in the first picture is identified by OCR to obtain the time stamp corresponding to the stopwatch on each screen in each frame.
[0066] It should be noted that, since the OCR image recognition technology has a higher recognition rate when more feature points are extracted, in order to improve the accuracy of recognizing the time text in the stopwatch, this method uses a stopwatch with uppercase numerals to mark the time on two screens instead of using a stopwatch with Arabic numerals to indicate the time.
[0067] In some embodiments, in the above step S3, if OCR cannot recognize the time text corresponding to the stopwatch on each screen in the first image, the first image is recognized by a preset neural network model to obtain the timestamp corresponding to the stopwatch on each screen in each frame.
[0068] Specifically, the preset neural network model can be a convolutional neural network model such as AlexNet, VGG, ResNet, Inception, etc.
[0069] In some embodiments, in the above step S3, removing the timestamps corresponding to the duplicate frames includes the following steps:
[0070] If the timestamp of the first screen corresponding to the current frame is the same as the timestamp of the first screen corresponding to the previous frame or the next frame.
[0071] Alternatively, the timestamp of the second screen corresponding to the current frame is the same as the timestamp of the second screen corresponding to the previous frame or the next frame.
[0072] When any of the above two conditions is met, the timestamp corresponding to the current frame is removed.
[0073] It should be noted that the timestamp of the first screen corresponding to the current frame here refers to the timestamp converted from the time text of the stopwatch on the first screen of the current frame. In this embodiment, other descriptions about timestamps can be understood with reference to the above explanation. The timestamp corresponding to the current frame includes the timestamp of the first screen corresponding to the current frame and the timestamp of the second screen corresponding to the current frame.
[0074] Since it is difficult to ensure that the frame rate and stopwatch time are completely synchronized during video recording, there will be a certain number of duplicate frames, that is, the stopwatch time is the same on two or more consecutive frames. By removing duplicate frames, the redundant data in the screen projection delay report can be effectively reduced, which can reduce the statistical and calculation time while ensuring the accuracy of the screen projection delay.
[0075] In some embodiments, in the above step S3, removing the timestamp corresponding to the error frame includes:
[0076] If the timestamp of the first screen or the second screen corresponding to the current frame does not conform to the preset format.
[0077] Alternatively, the timestamp of the first screen corresponding to the current frame is smaller than the timestamp of the first screen corresponding to the previous frame.
[0078] Alternatively, the timestamp of the second screen corresponding to the current frame is smaller than the timestamp of the second screen corresponding to the previous frame.
[0079] When any of the above three conditions is met, the timestamp corresponding to the current frame is removed.
[0080] It should be noted that the timestamp of the first screen corresponding to the current frame here refers to the timestamp converted from the time text of the stopwatch on the first screen of the current frame. In this embodiment, other descriptions about timestamps can be understood with reference to the above explanation. The timestamp corresponding to the current frame includes the timestamp of the first screen corresponding to the current frame and the timestamp of the second screen corresponding to the current frame.
[0081] During long-term video recording, the recording device may experience frame rate fluctuations, resulting in partially blurred images. In this case, it is difficult for OCR to accurately identify the time on the stopwatch in the image and convert it into the corresponding timestamp. By removing error frames, the error data in the screen projection delay report can be effectively reduced, which reduces the statistical and calculation time while ensuring the accuracy of the screen projection delay.
[0082] In some embodiments, in the above step S3, calculating the screen projection delay of each remaining frame includes the following steps:
[0083] According to the difference between the timestamp of the first screen and the timestamp of the second screen, the screen projection delay of each remaining frame is obtained.
[0084] In a more specific embodiment, please refer to Figure 3 , Figure 3 This is an OCR recognition flow chart of the screen projection delay measurement method of the embodiment of the present application. In the above steps, the video file is recognized frame by frame by OCR to obtain the timestamp corresponding to the stopwatch on each screen in each frame, including the following steps:
[0085] Step A01: Input parameters. The parameters include the video file and the time text area corresponding to the two screens. The time text area is determined by the position of the stopwatch to ensure that the time text displayed on the stopwatch can be fully captured.
[0086] Step A02: Create an OCR module.
[0087] Step A03: Create a cv2 video frame acquisition module.
[0088] Step A04: Take out a frame of video through the cv2 video frame module.
[0089] Step A05: According to the preset time text area, a picture containing the time text is cut out from the frame of video.
[0090] Step A06: Call the OCR module to recognize the time text in the image and obtain the timestamp corresponding to the time text.
[0091] Step A07: Determine whether the format and content of the timestamp are correct. If so, proceed to step A08; if not, return to step A04.
[0092] Step A08: Record the timestamp, the screen corresponding to the timestamp, and the video time corresponding to the timestamp.
[0093] It should be noted that, in the above step A07, if any of the following conditions is met, the format and content of the timestamp are considered incorrect:
[0094] The length of the timestamp is different from the length of the time displayed by the stopwatch.
[0095] The timestamp of the first screen corresponding to the frame is smaller than the timestamp of the second screen.
[0096] The timestamp of the first screen corresponding to the frame is smaller than the timestamp of the first screen corresponding to the previous frame.
[0097] The timestamp of the second screen corresponding to the frame is smaller than the timestamp of the second screen corresponding to the previous frame.
[0098] In some embodiments, in the above step S4, obtaining a measurement report of screen projection delay according to all screen projection delays includes the following steps:
[0099] S41: Sort all screen projection delays according to the measurement time, and divide them into multiple data sets according to preset intervals.
[0100] S42: Randomly select a preset number of screen projection delays from each data set and calculate a first mean.
[0101] S43: Obtain a total mean of the screen projection delay based on all first mean values.
[0102] S44: Record the maximum screen projection delay, the minimum screen projection delay, the variance of the screen projection delay, and the total mean of the screen projection delay into the measurement report of the screen projection delay.
[0103] It should be noted that the maximum screen projection delay can reflect the delay in the worst case of screen projection. Generally speaking, in the worst case of screen projection, you can observe with the naked eye that the images on the two screens are not synchronized. The minimum screen projection delay can reflect the delay in the best case of screen projection. The total mean of the screen projection delay can reflect the average delay of screen projection during the entire recording time. The variance of the screen projection delay can reflect the transmission stability between the corresponding devices of the first screen and the second screen, and determine the extent to which environmental factors interfere with data transmission during screen projection.
[0104] Specifically, in the above step S42, a preset number of screen projection delays are randomly selected, specifically, 10 screen projection delays are selected from every 60 consecutive screen projection delays.
[0105] In some embodiments, in the above step S43, obtaining the total mean of the screen projection delay according to all the first mean values includes the following steps:
[0106] First, a screen projection delay threshold is preset, and a first mean value that is less than or equal to the delay threshold is selected and added to the first data set.
[0107] Afterwards, the mean of each first mean in the first data set is calculated to obtain the total mean of the screen projection delay.
[0108] In some embodiments, in the above step S4, the method further includes:
[0109] The number of repeated frames and error frames are counted separately, and the number of repeated frames and error frames are recorded in the measurement report of the screen projection delay.
[0110] In some embodiments, after counting the number of repeated frames and error frames, it is necessary to calculate the valid frame number and the effective data rate. The calculation method is: valid frame number = total frame number - repeated frame number - error frame number, effective data rate = valid frame number / total length of the video file * number of frames per second of the video file.
[0111] In a second aspect, an embodiment of the present application provides a screen projection delay measurement device, which includes a screen projection module, a recording module, an analysis module and a statistical module.
[0112] The above-mentioned screen projection module is used to project the first screen to the second screen, and play a stopwatch in uppercase numerals on the first screen.
[0113] The recording module is used to record the first screen and the second screen to obtain a video file;
[0114] The above analysis module is used to identify the video file frame by frame, obtain the timestamp corresponding to the stopwatch on each screen in each frame, remove duplicate frames and error frames, and calculate the screen projection delay of each remaining frame;
[0115] The above statistical module is used to obtain a measurement report of the screen projection delay based on all screen projection delays.
[0116] In a more specific embodiment, please refer to the screen projection delay measurement device Figure 4 , Figure 4 This is a structural schematic diagram of the screen projection delay measurement device according to an embodiment of the present application.
[0117] exist Figure 4 In the example, the source PC is used as the output of the video data of the stopwatch containing uppercase numerals, and the video data is sent to the hardware development platform (sender) and display A through the HDMI one-to-two splitter.
[0118] The hardware development platform (sender) sends the video data to the hardware development platform (receiver) through the Star Flash wireless transmission technology, and the hardware development platform (receiver) renders the video data on display B.
[0119] Adjust the camera position to ensure that the camera can clearly record the images of monitor A and monitor B at the same time, and continue recording the video until the preset time is reached. Then import the recorded video file into the image recognition software, identify the timestamp corresponding to each frame, remove duplicate frames and error frames, calculate the screen projection delay of each remaining frame, and obtain the screen projection delay measurement report based on all screen projection delays.
[0120] It should be noted that the serial numbers of the above-mentioned embodiments of the present application are only for description and do not represent the advantages or disadvantages of the embodiments.
[0121] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD) as described above, and includes a number of instructions for a terminal device to execute the methods described in each embodiment of the present application.
[0122] The terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices. The terms "first", "second" and "third" are used to distinguish different objects, etc., and do not represent a sequence, nor do they limit "first", "second" and "third" to different types.
[0123] In the description of the embodiments of the present application, "exemplary", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary", "for example" or "for example" is intended to present related concepts in a specific way.
[0124] In the description of the embodiments of the present application, unless otherwise specified, “ / ” means or, for example, A / B can mean A or B; the “and / or” in the text is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, “multiple” refers to two or more than two.
[0125] In some processes described in the embodiments of the present application, multiple operations or steps that appear in a specific order are included, but it should be understood that these operations or steps may not be executed in the order in which they appear in the embodiments of the present application or in parallel, and the sequence number of the operation is only used to distinguish the different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations or steps may be executed in sequence or in parallel, and these operations or steps may be combined.
[0126] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for measuring screen projection delay, characterized in that: The method comprises: Cast the first screen to the second screen, and play a stopwatch in uppercase numerals on the first screen; Record the first screen and the second screen to obtain a video file; Identify the video file frame by frame, obtain the timestamp corresponding to the stopwatch on each screen in each frame, remove duplicate frames and error frames, and calculate the screen projection delay of each remaining frame; Based on all screen projection delays, a measurement report of the screen projection delay is obtained.
2. The screen projection delay measurement method according to claim 1, characterized in that: The step of identifying the video file frame by frame to obtain the time stamp corresponding to the stopwatch on each screen in each frame includes: For each frame of the video file, cutting out a first picture including a stopwatch on each screen; The time text corresponding to the stopwatch on each screen in the first picture is recognized by OCR to obtain the time stamp corresponding to the stopwatch on each screen in each frame.
3. The screen projection delay measurement method according to claim 2, characterized in that: Also includes: If OCR cannot recognize the time text corresponding to the stopwatch on each screen in the first image, the first image is recognized by a preset neural network model to obtain the time stamp corresponding to the stopwatch on each screen in each frame.
4. The screen projection delay measurement method according to claim 1, characterized in that: Remove the timestamps corresponding to duplicate frames, including: If the timestamp of the first screen corresponding to the current frame is the same as the timestamp of the first screen corresponding to the previous frame or the next frame; Alternatively, the timestamp of the second screen corresponding to the current frame is the same as the timestamp of the second screen corresponding to the previous frame or the next frame; Remove the timestamp corresponding to the current frame.
5. The screen projection delay measurement method according to claim 1, characterized in that: Remove the timestamp corresponding to the error frame, including: If the timestamp of the first screen or the second screen corresponding to the current frame does not conform to the preset format; Alternatively, the timestamp of the first screen corresponding to the current frame is smaller than the timestamp of the first screen corresponding to the previous frame; Alternatively, the timestamp of the second screen corresponding to the current frame is smaller than the timestamp of the second screen corresponding to the previous frame; Remove the timestamp corresponding to the current frame.
6. The screen projection delay measurement method according to claim 1, characterized in that: The calculation of the screen projection delay of each remaining frame includes: According to the difference between the timestamp of the first screen and the timestamp of the second screen, the screen projection delay of each remaining frame is obtained.
7. The screen projection delay measurement method according to claim 1, characterized in that: The measurement report of screen projection delay is obtained according to all screen projection delays, including: All projection delays are sorted according to the measurement time and divided into multiple data sets according to the preset intervals; From each data set, a preset number of projection delays are randomly selected and the first mean is calculated; According to all the first means, the total mean of the screen projection delay is obtained; The maximum screen projection delay, the minimum screen projection delay, the variance of the screen projection delay, and the total mean of the screen projection delay are recorded in the screen projection delay measurement report.
8. The screen projection delay measurement method according to claim 7, characterized in that: The total mean of the screen projection delay is obtained according to all the first mean values, including: Preset a screen projection delay threshold, and select a first mean value that is less than or equal to the delay threshold to add to the first data set; The mean of each first mean in the first data set is calculated to obtain the total mean of the screen projection delay.
9. The screen projection delay measurement method according to claim 1, characterized in that: Also includes: The number of repeated frames and error frames are counted separately and recorded in the measurement report of the screen projection delay.
10. A screen projection delay measurement device based on the method according to any one of claims 1 to 9, characterized in that: The device comprises: A screen projection module, used to project the first screen to the second screen, and play a stopwatch in uppercase numerals on the first screen; A recording module, used for recording the first screen and the second screen to obtain a video file; An analysis module is used to identify the video file frame by frame, obtain the timestamp corresponding to the stopwatch on each screen in each frame, remove duplicate frames and error frames, and calculate the screen projection delay of each remaining frame; The statistics module is used to obtain a measurement report of the screen projection delay based on all screen projection delays.
