Novel municipal road roadbed drainage system construction device and construction method
Through the automated control and blade cutting technology of the construction device of the new municipal road subgrade drainage system, the problems of low efficiency and poor quality in traditional construction methods are solved, and efficient and accurate drainage ditch construction is achieved, ensuring construction efficiency and quality.
Patent Information
- Application Number
- CN202411036262.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2044-07-31
AI Technical Summary
The traditional roadbed drainage ditches construction methods have problems such as low construction efficiency, cumbersome formwork disassembly and assembly, and poor dimensional accuracy and surface finish of concrete components, resulting in high costs and poor quality.
The construction device of the new municipal road subgrade drainage system includes the vehicle body, ranging mechanism, positioning mechanism, flow control mechanism and transmission mechanism. Through automated control, the continuous pouring of concrete and the continuous sliding of the skateboard mold are realized to ensure the positioning of the drainage ditch and Accurate inclination and efficient construction through blade cutting and garbage separation components.
It significantly shortens the construction cycle, improves construction efficiency and project quality, ensures the dimensional accuracy and surface finish of concrete components, reduces labor investment and material waste, and achieves efficient construction of drainage ditches.
Smart Images

Figure CN119121752A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of roadbed drainage construction, and more specifically, relates to a novel municipal road roadbed drainage system construction device and construction method. Background Art
[0002] Roadbed drainage ditches are a vital drainage facility in roadbed engineering. Their main function is to collect and drain the water on the road surface and inside the roadbed to ensure the stability of the road structure and driving safety. These drainage facilities prevent water from penetrating into the roadbed material through an effective drainage system, reduce roadbed diseases such as settlement and landslides, and avoid road damage and traffic safety hazards caused by water accumulation.
[0003] Due to the open-air nature of traditional roadbed drainage ditches, debris such as mud, leaves, and garbage carried by rainwater are easily accumulated in the drainage ditches, causing blockages and affecting drainage efficiency. In severe cases, it will cause waterlogging and flooding. In addition, the roadbed drainage ditch is constructed using the traditional formwork casting method, which has the following disadvantages: the traditional formwork casting requires the installation of the formwork first, and then the pouring of concrete. After the concrete reaches a certain strength, the formwork is removed and then transferred to the next location to repeat the above process. This process is time-consuming and has a low construction efficiency. The traditional formwork method requires frequent disassembly and assembly of the formwork, which not only increases manpower requirements but also increases labor intensity. Although the initial investment in traditional formwork may be low, its low construction efficiency leads to an increase in overall labor costs, equipment rental costs, and time costs. The traditional formwork method is prone to errors during the splicing and disassembly of the formwork, which affects the dimensional accuracy and surface finish of the concrete components. The formwork needs to be positioned, reinforced, and adjusted multiple times, and on-site management is cumbersome.
[0004] Therefore, at this stage, there is an urgent need for a new type of municipal road subgrade drainage system construction device and construction method. The device can be suitable for the construction of a new type of municipal road subgrade drainage system. It has high construction efficiency and precise positioning, does not require frequent installation and replacement of templates, and the quality of the finished product is more guaranteed. Summary of the invention
[0005] In view of the high construction cost, complicated steps and poor dimensional accuracy and surface finish of the concrete components of the drainage ditch in the prior art, the present invention provides a novel municipal road subgrade drainage system construction device and construction method to solve such problems.
[0006] To achieve the above-mentioned purpose, the present invention provides a novel municipal road subgrade drainage system construction device, which includes a vehicle body that moves along the outer edge of the groove according to the planned path, and is provided with a control unit; a positioning mechanism that moves along the center line of the road and keeps synchronous displacement with the vehicle body, and provides a positioning reference for a distance measuring mechanism arranged on the top of the vehicle body; a lifting mechanism arranged on the side of the vehicle body, which drives a flow control mechanism to move linearly in the vertical direction; a feed bin is arranged on the top of the flow control mechanism, and a skateboard mold is arranged on the bottom; an elevation measuring mechanism is arranged on the skateboard mold; a transmission mechanism is arranged on the side of the vehicle body and at the rear side of the lifting mechanism, and a blade group is arranged at the bottom; by setting the travel path, travel speed and the elevation parameter values of the starting point and the end point of the skateboard mold, the control unit controls the distance measuring mechanism to detect and the positioning mechanism to move. The flow control mechanism calculates the amount of concrete required by the skateboard mold per unit time by associating it with the vehicle's travel speed, and pours concrete at the required rate to ensure continuous feeding; the concrete is squeezed and shaped by the skateboard mold, and the skateboard mold is driven by the vehicle to move, and the exterior of the formed concrete is smoothed and finished; the control lifting mechanism automatically adjusts the vertical height of the skateboard mold according to the detection data of the elevation measurement mechanism, so as to ensure the accurate positioning and inclination of the roadbed drainage ditch; for every m of roadbed drainage ditch laid, the transmission mechanism drives the blade group to descend to cut out the groove, and takes out the cut concrete, rotates the blade group to align it with the silo, and drops the cut concrete into the feed silo for recycling again, and construction is carried out according to the set path until the drainage ditch is laid.
[0007] Furthermore, the distance measuring mechanism comprises a mounting bracket and a first rangefinder and a second rangefinder arranged at two ends of the top of the mounting bracket; the mounting bracket is a T-shaped bracket; the first rangefinder and the second rangefinder are infrared distance measuring instruments, which compare and detect whether there is a difference in distance data, thereby determining whether the direction of travel of the vehicle body deviates.
[0008] Furthermore, the positioning mechanism includes a positioning trolley and a positioning panel; the positioning trolley moves synchronously with the vehicle body, and a positioning module is provided therein to control the displacement of the positioning trolley along the center line of the road; a smooth layer is provided on the side of the positioning panel close to the vehicle body to reflect the infrared laser emitted by the ranging mechanism, thereby providing a positioning reference for the ranging mechanism.
[0009] Furthermore, the transmission mechanism is arranged on the side of the vehicle body, located at the rear side of the lifting mechanism, and includes a rotating component and a hydraulic transmission component; the rotating component drives the blade group to rotate, so that the blade group is vertically aligned with the groove body or rotated upward to align with the feed bin; the hydraulic transmission component provides hydraulic power for the blade group, driving the blade group to cut a groove on the groove body.
[0010] Furthermore, the blade group includes a vertical blade and an inclined blade, which are driven in sequence by a hydraulic transmission assembly to cut into the formed concrete, cut out a right-angled triangular prism-shaped groove, and enclose and seal the cut concrete to take it out, and the blade group is driven to rotate by a rotating assembly to align the blade group with the feed bin, retract the inclined blade, leave a gap, and allow the cut concrete to fall into the feed bin for recycling again.
[0011] Furthermore, the lifting mechanism is fixed on the side of the vehicle body, and includes a connecting bracket and a hydraulic rod arranged in the vertical direction. The hydraulic rod is communicatively connected to the control unit. One end of the connecting bracket is fixedly connected to the hydraulic rod, and the other end is used to fix the flow control mechanism. The hydraulic rod is controlled by the control unit to drive the connecting bracket to move up and down, so that the skateboard mold at the bottom of the flow control mechanism is displaced to a specified height in the vertical direction.
[0012] Furthermore, the flow control mechanism is fixedly connected to the lifting mechanism, and includes a flow control valve. The flow control valve is communicatively connected to the control unit. The flow control valve adjusts the concrete output flow rate through the control unit, thereby accurately controlling the concrete forming pouring amount of the ditch body.
[0013] According to another aspect of the present invention, a construction method of a novel municipal road subgrade drainage system is also provided, which adopts the above-mentioned construction device for construction and comprises the following steps:
[0014] S1: Lay out the line on the center line of the road, and place the positioning trolley of the positioning mechanism at the corresponding position of the center line of the road;
[0015] S2: Use an excavator to dig a trench along the edge of the roadbed slope according to the drawing requirements. The trench excavation width should be wider than the designed width of the drainage ditch;
[0016] S3: The vehicle enters the field, the distance measuring mechanism is turned on, the first distance meter and the second distance meter respectively detect the distance between the vehicle and the positioning mechanism, and adjust the direction of the vehicle according to the distance difference value;
[0017] S4: The operator sets the travel path, travel speed, and elevation parameter values of the starting point and end point of the skateboard mold;
[0018] S5: The pump truck moves synchronously with the vehicle body and inputs the concrete into the feed bin;
[0019] S6: The flow control mechanism calculates the amount of concrete required by the skateboard mold per unit time by associating it with the vehicle body's travel speed, and pours concrete at the required rate to ensure continuous feeding;
[0020] S7: The concrete is squeezed and molded by the skateboard mold, and the skateboard mold is moved by the vehicle body to smooth and finish the exterior of the molded concrete;
[0021] S8: The distance measuring mechanism detects the distance in real time and controls the vehicle to continuously correct the forward route. The elevation measuring mechanism controls the lifting mechanism to automatically adjust the vertical height of the skateboard mold according to the vehicle's travel distance and the corresponding set elevation parameters, thereby ensuring the accurate positioning and inclination of the roadbed drainage ditch;
[0022] S9: Every time 200m of roadbed drainage ditch is laid, the transmission mechanism drives the blade group to descend to cut out a groove, and take out the cut concrete, rotate the blade group to align it with the silo, and drop the cut concrete into the feed silo for recycling;
[0023] S10: Repeat steps S5-S9 until the trench is laid;
[0024] S11: A trench is excavated 0.5 m downstream of the groove for installing a water storage and flushing pool;
[0025] S12: Install the garbage separation components in the groove to complete the laying of the drainage system.
[0026] According to another aspect of the present invention, there is also provided a novel municipal roadbed drainage system, comprising a ditch body, a groove, a water reservoir and a garbage separation component; the ditch body is a trough-shaped structure with multiple groups of grooves thereon, and adjacent grooves are spaced 200m apart; the water reservoir is located 0.5m downstream of the groove, and is connected to the ditch body through a siphon, so that the accumulated rainwater is discharged into the ditch body to flush out the debris.
[0027] Furthermore, the garbage separation component is used to separate and collect debris in the drainage ditch, and it includes a collection frame, a lifting rod and a filter baffle; the collection frame is a triangular prism structure, which is compatible with the groove structure, and is placed in the groove to collect dirt, garbage, leaves and other debris; the lifting rod is fixed at the bottom of the collection frame, which is convenient for the operator to lift the collection frame out of the groove; the filter baffle is located on the rear side of the top of the collection frame to block dirt, garbage, leaves and other debris, so that the debris falls into the collection frame.
[0028] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:
[0029] 1. Compared with traditional formwork casting, the water system construction device of the present invention adopts full-automatic CNC technology to realize continuous sliding of the skateboard mold and continuous casting of concrete, which significantly shortens the construction period, reduces the number of times the formwork is disassembled and assembled, and reduces labor intensity.
[0030] 2. The drainage system construction device of the present invention detects the distance in real time through the distance measuring mechanism to control the vehicle body to continuously correct the forward route, and controls the lifting mechanism to automatically adjust the vertical height of the skateboard mold according to the vehicle body's travel distance and the corresponding set elevation parameters through the elevation measuring mechanism, thereby ensuring the accurate positioning and inclination of the roadbed drainage ditch; thereby making the drainage ditch size control more accurate and improving the project quality.
[0031] 3. The drainage system construction device of the present invention adjusts the concrete output flow rate through the flow control mechanism and inputs it into the skateboard mold, thereby accurately controlling the concrete molding pouring amount of the ditch body, avoiding the ditch body not being formed due to insufficient pouring amount, or the mold expansion caused by excessive pouring amount, thereby forming cavities, exposed reinforcement and honeycombed concrete on the surface of the ditch body; an appropriate amount of concrete is squeezed and molded by the skateboard mold, and the skateboard mold is driven to move by the vehicle body, and the exterior of the formed concrete is smoothed and polished, ensuring the dimensional accuracy and surface finish of the concrete component.
[0032] 4. The drainage system construction device of the present invention adopts a blade cutting method to cut out grooves, locally modify the appearance of the cast drainage ditch, and make the cut smooth. It can be formed in one construction, avoiding manual correction in the later stage and reducing labor input.
[0033] 5. The drainage system construction device of the present invention can construct a drainage system that uses irregular flushing to flush the garbage and debris accumulated in the drainage ditch into the collection frame at one time; the sunken collection frame prevents garbage from blocking the drainage ditch. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a schematic structural diagram of a novel municipal road subgrade drainage system construction device in an embodiment of the present invention;
[0035] Figure 2 It is a rear view of the roadbed drainage system construction device in the embodiment of the present invention;
[0036] Figure 3 It is a side view of a roadbed drainage system construction device in an embodiment of the present invention;
[0037] Figure 4 It is a structural schematic diagram of a new municipal road subgrade drainage system in an embodiment of the present invention;
[0038] Figure 5 A schematic diagram of the structure of a water reservoir of a drainage system according to an embodiment of the present invention;
[0039] Figure 6 Schematic diagram of the structure of the debris collection mechanism of the drainage system in an embodiment of the present invention
[0040] Figure 7The present invention is a flowchart of a construction method of a new municipal road subgrade drainage system in an embodiment of the present invention.
[0041] In all the drawings, the same reference numerals represent the same technical features, specifically: 1-body, 2-lifting mechanism, 3-distance measuring mechanism, 301-mounting bracket, 302-first distance measuring instrument, 303-second distance measuring instrument, 4-positioning mechanism, 5-elevation measuring mechanism, 6-feeding bin, 7-flow control mechanism, 8-transmission mechanism, 9-blade assembly, 10-groove body, 11-groove, 12-siphon, 13-water reservoir, 14-collection frame, 15-lifting rod, 16-filter baffle. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0043] Example 1
[0044] like Figure 1-3As shown, the present invention discloses a novel construction device for a municipal road subgrade drainage system, comprising a vehicle body 1, a lifting mechanism 2, a distance measuring mechanism 3, a positioning mechanism 4, an elevation measuring mechanism 5, a feed bin 6, a flow control mechanism 7, a transmission mechanism 8 and a blade group 9. The vehicle body 1 moves along the outer edge of the groove according to the planned path. The positioning mechanism 4 moves along the center line of the road, and it moves synchronously with the vehicle body 1. The distance measuring mechanism 3 is arranged on the top of the vehicle body 1 to detect the distance between it and the positioning mechanism 4, so as to adjust the moving direction of the vehicle body 1. The lifting mechanism 2 is arranged on the side of the vehicle body 1, which drives the flow control mechanism 7 to move linearly in the vertical direction; the flow control mechanism 7 is provided with a feed bin 6 on the top and a skateboard mold on the bottom; the elevation measuring mechanism 5 is arranged on the skateboard mold to detect its elevation; the transmission mechanism 8 is arranged on the side of the vehicle body 1, located at the rear side of the lifting mechanism 2, and a blade group 9 is arranged at the bottom. When the construction device of the present invention is operating, the vehicle body 1 moves along the outer edge of the groove according to the planned path, and the distance measuring mechanism 3 and the positioning mechanism 4 cooperate to adjust the travel direction, so that the vehicle body 1 is parallel to the center line of the road and the spacing is consistent; the feed bin 6 receives the concrete material, and injects the corresponding amount of concrete into the skateboard mold through the flow control mechanism 7 to form; the distance measuring mechanism 3 and the positioning mechanism 4 cooperate to correct the travel path, and the height measurement mechanism 5 adjusts the height of the skateboard mold, so that the position of the formed roadbed drainage ditch is accurate; every time 200m of roadbed drainage ditch is laid, the transmission mechanism 8 drives the blade group 9 to descend, digs out a groove 11 on the finalized concrete, the blade group 9 brings the cut concrete back, and the transmission mechanism 8 rotates to pour the concrete into the discharge bin, recovers the concrete, and repeats the above steps until the drainage ditch is laid. The construction device of the present invention adopts slipform construction to realize the continuous sliding of the skateboard mold and the continuous pouring of concrete, which significantly shortens the construction period, and its positioning is accurate, which can ensure the high precision of the size and high surface finish of the concrete component, saving the overall cost.
[0045] In the embodiment of the present invention, the vehicle body 1 is an AGV vehicle, which is provided with a control unit. The control unit integrates artificial intelligence, information processing, and image processing. It can move automatically according to the planned path as needed. A crawler walking mechanism is provided at the bottom, so that the vehicle body 1 has good load-bearing performance and high passability.
[0046] The distance measuring mechanism 3 is used to detect the distance between the vehicle body 1 and the center line of the road, so as to adjust the traveling direction of the vehicle body 1, and includes a mounting bracket 301 and a first distance measuring device 302 and a second distance measuring device 303 provided at both ends of the top of the mounting bracket 301. The mounting bracket 301 is a T-shaped bracket; the first distance measuring device 302 and the second distance measuring device 303 are infrared distance measuring devices, and the two devices compare and detect whether there is a difference in distance data, so as to determine whether the traveling direction of the vehicle body 1 deviates.
[0047] The positioning mechanism 4 includes a positioning trolley and a positioning panel; the positioning trolley moves synchronously with the vehicle body 1, and a positioning module is provided inside the positioning trolley to control the displacement of the positioning trolley along the center line of the road; a smooth layer is provided on the side of the positioning panel close to the vehicle body 1 for reflecting the infrared laser emitted by the ranging mechanism 3, thereby providing a positioning reference for the ranging mechanism 3.
[0048] The lifting mechanism 2 is fixedly arranged on the side of the vehicle body 1, and includes a connecting bracket and a hydraulic rod arranged in the vertical direction. The hydraulic rod is communicated with the control unit. One end of the connecting bracket is fixedly connected to the hydraulic rod, and the other end is used to fix the flow control mechanism 7. Under the control of the control unit, the hydraulic rod drives the connecting bracket to move up and down, so that the skateboard mold at the bottom of the flow control mechanism 7 is displaced to a specified height in the vertical direction.
[0049] The flow control mechanism 7 is fixedly connected to the lifting mechanism 2, and includes a flow control valve. The flow control valve is in communication with the control unit. The flow control valve adjusts the concrete output flow rate through the control unit, thereby accurately controlling the concrete molding pouring amount of the ditch body 10, thereby avoiding that the ditch body 10 is not formed due to insufficient pouring amount, or that the mold is expanded due to excessive pouring amount, thereby forming cavities, exposed reinforcement and honeycombed surface on the surface of the ditch body 10.
[0050] The feed bin 6 is arranged on the top of the flow control mechanism 7, which receives the concrete input from the pump truck. During operation, the concrete pump truck synchronizes with the vehicle body speed, feeds the concrete into the feed bin 6, and then adjusts the concrete output flow rate through the flow control mechanism 7 and inputs it into the skateboard mold, and the concrete pouring is completed by the customized roadbed drainage ditch skateboard mold.
[0051] The skateboard mold is arranged at the bottom of the flow control mechanism 7. The flow control mechanism 7 adjusts the concrete output flow and inputs it into the skateboard mold. The concrete is extruded and molded by the skateboard mold. When the vehicle body 1 drives the skateboard mold to move, the exterior of the molded concrete is smoothed and finished to ensure the dimensional accuracy and surface finish of the ditch body 10 components.
[0052] The elevation measuring mechanism 5 is arranged on the skateboard mold, and is connected to the control unit for communication. It measures the elevation of the skateboard mold in real time and uploads the detection data to the control unit. If the elevation does not match the design, the height of the skateboard mold is automatically adjusted by the lifting mechanism 2. During operation, the elevation of the skateboard mold is detected in real time by the elevation measuring mechanism 5, and under the control of the control unit, the lifting mechanism 2 automatically adjusts the vertical height of the skateboard mold so that the inclination of the formed ditch body 10 meets the design requirements, and the drainage can flow out smoothly along the ditch body 10 in the later stage.
[0053] The transmission mechanism 8 is arranged on the side of the vehicle body 1, at the rear side of the lifting mechanism 2, and includes a rotating assembly and a hydraulic transmission assembly. The rotating assembly drives the blade assembly 9 to rotate, so that the blade assembly 9 is vertically aligned with the groove body 10 or rotated upward to align with the feed bin 6. The hydraulic transmission assembly provides hydraulic power to the blade assembly 9, driving the blade assembly 9 to cut the groove 11 on the groove body 10.
[0054] The blade group 9 is used to cut out the groove 11 and take out the concrete. It includes a vertical blade and an inclined blade. The hydraulic transmission component drives the vertical blade and the inclined blade in sequence to cut into the formed concrete, so as to cut out a right-angled triangular prism-shaped groove 11, and enclose and seal it to take out the cut concrete. The blade group 9 is driven to rotate by the rotating component to align the blade group 9 with the feed bin 6, retract the inclined blade, and leave a gap, so that the cut concrete falls into the feed bin 6 for recycling again.
[0055] When the drainage system construction device of the present invention is in operation, the vehicle body 1 enters the site, and the positioning trolley of the positioning mechanism 4 is placed at the corresponding position of the center line of the road; the operator sets the travel path, as well as the elevation parameter values of the starting point and the end point of the skateboard mold; the distance measuring mechanism 3 is turned on, and the first distance meter 302 and the second distance meter 303 respectively detect the distance with the positioning mechanism 4, and adjust the travel direction of the vehicle body 1 according to the distance difference value; the pump truck moves synchronously with the vehicle body 1, and inputs the concrete material into the feed bin 6; the flow control mechanism 7 adjusts the concrete output flow rate and inputs it into the skateboard mold; the lifting mechanism 2 adjusts the concrete output flow rate according to the vehicle body 1 automatically adjusts the vertical height of the skateboard mold to reach the set elevation parameter value; the concrete is squeezed and molded by the skateboard mold, and the skateboard mold is driven to move by the vehicle body 1, and the exterior of the molded concrete is smoothed and finished to ensure the dimensional accuracy and surface finish of the ditch body 10 components; every time 200m of roadbed drainage ditch is laid, the transmission mechanism 8 drives the blade group 9 to descend to cut out the groove 11, and the cut concrete is taken out, the blade group 9 is rotated to align it with the silo 6, and the cut concrete falls into the feed silo 6 for recycling; the above steps are repeated until the drainage ditch is laid.
[0056] Compared with traditional formwork casting, the drainage system construction device of the present invention adopts full-automatic numerical control technology to achieve continuous sliding of the skateboard mold and continuous casting of concrete, which significantly shortens the construction period, reduces the number of times the formwork is disassembled and assembled, and reduces labor intensity.
[0057] The drainage system construction device of the present invention detects the distance in real time through the distance measuring mechanism 3 to control the vehicle body to continuously correct the forward route, and controls the lifting mechanism 2 to automatically adjust the vertical height of the slide plate mold according to the vehicle body travel distance and the corresponding set elevation parameters through the elevation measuring mechanism 5, thereby ensuring the accurate positioning and inclination of the roadbed drainage ditch; thereby making the drainage ditch size control more accurate and improving the project quality.
[0058] The drainage system construction device of the present invention adjusts the concrete output flow rate through the flow control mechanism 7 and inputs it into the skateboard mold, thereby accurately controlling the concrete molding pouring amount of the ditch body 10, avoiding the ditch body 10 not being formed due to insufficient pouring amount, or the mold expansion caused by excessive pouring amount, thereby forming cavities, exposed reinforcement and honeycombed concrete on the surface of the ditch body 10; an appropriate amount of concrete is squeezed and molded by the skateboard mold, and the skateboard mold is driven to move by the vehicle body 1, and the exterior of the formed concrete is smoothed and polished, ensuring the dimensional accuracy and surface finish of the concrete component.
[0059] The drainage system construction device of the present invention adopts a blade cutting method to cut out the groove 11, locally modify the appearance of the cast drainage ditch, and make the cut part smooth. It can be formed in one construction, avoiding manual correction at a later time and reducing labor input.
[0060] The drainage system construction device of the present invention can construct a drainage system by using irregular flushing to flush the garbage and debris accumulated in the drainage ditch into the collection frame 14 at one time; the sunken collection frame 14 can prevent the garbage from blocking the drainage ditch.
[0061] Example 2
[0062] like Figure 7 As shown, the embodiment of the present invention also provides a construction method of a new municipal road subgrade drainage system, comprising the following steps:
[0063] S1: Lay out the line on the center line of the road, and place the positioning trolley of the positioning mechanism 4 at the corresponding position of the center line of the road;
[0064] S2: Use an excavator to dig a trench along the edge of the roadbed slope according to the drawing requirements. The trench excavation width should be wider than the designed width of the drainage ditch;
[0065] S3: the vehicle 1 enters the field, the distance measuring mechanism 3 is turned on, the first distance measuring device 302 and the second distance measuring device 303 respectively detect the distance between the vehicle 1 and the positioning mechanism 4, and adjust the moving direction of the vehicle 1 according to the distance measuring difference value;
[0066] S4: The operator sets the travel path, travel speed, and elevation parameter values of the starting point and end point of the skateboard mold;
[0067] S5: The pump truck moves synchronously with the vehicle body 1 and inputs the concrete material into the feed bin 6;
[0068] S6: The flow control mechanism 7 calculates the amount of concrete required by the skateboard mold per unit time by associating it with the travel speed of the vehicle body 1, and pours concrete into it at the required rate to ensure continuous feeding;
[0069] S7: The concrete is squeezed and molded by the skateboard mold, and the skateboard mold is driven by the vehicle body 1 to move, and the exterior of the molded concrete is smoothed and finished;
[0070] S8: The distance measuring mechanism 3 detects the distance in real time to control the vehicle body 1 to continuously correct the forward route. The elevation measuring mechanism 5 controls the lifting mechanism 2 to automatically adjust the vertical height of the skateboard mold according to the travel distance of the vehicle body 1 and the corresponding set elevation parameters, thereby ensuring the accurate positioning and inclination of the roadbed drainage ditch;
[0071] S9: After laying 200 m of roadbed drainage ditch, the transmission mechanism 8 drives the blade group 9 to descend and cut out the groove 11, and takes out the cut concrete, rotates the blade group 9 to align it with the silo 6, and drops the cut concrete into the feed silo 6 for recycling;
[0072] S10: Repeat steps S500-S900 until the laying of the trench body 1 is completed;
[0073] S11: digging a trench 0.5 m downstream of the groove 11 for installing a water storage and flushing pool 13;
[0074] S12: Install the garbage separation component in the groove 11 to complete the laying of the drainage system.
[0075] Example 3
[0076] like Figure 4-6 As shown, the present invention also provides a new municipal road subgrade drainage system, which is obtained by the construction method described in Example 2, and includes a ditch body 10, a groove 11, a water reservoir 13 and a garbage separation component. The ditch body 10 is a trough structure, with multiple groups of grooves 11 on it, and the adjacent grooves 11 are spaced 200 meters apart. The water reservoir 13 is located 0.5 meters downstream of the groove 11, and is connected to the ditch body 10 through a siphon 12, and the accumulated rainwater is discharged into the ditch body 10 to flush the debris. The garbage separation component is used to separate and collect debris in the drainage ditch, and includes a collection frame 14, a lifting rod 15 and a filter baffle 16. The collecting frame 14 is a triangular prism structure, which is compatible with the structure of the groove 11. It is placed in the groove 11 to collect debris such as soil, garbage, and leaves. The lifting rod 15 is fixed at the bottom of the collecting frame 14, which can facilitate the operator to lift the collecting frame 14 out of the groove 11. The filtering baffle 16 is located on the rear side of the top of the collecting frame 14 to block debris such as soil, garbage, and leaves, so that the debris falls into the collecting frame 14.
[0077] When the new municipal road subgrade drainage system of the present invention performs drainage operation, the water reservoir 13 stores rainwater during rainy days. When the water level reaches the top of the siphon pipe 12, due to the siphon principle, the stored water will automatically be discharged into the structure 10 in one breath, and the strong water flow will wash the dirt, garbage, leaves and other debris in the drainage ditch to the garbage separation component 200 meters downstream; when the water flow containing debris passes through the garbage separation device, the filter baffle 16 of the garbage separation device will block the debris, and after the water flow passes, it will fall into the collection frame 14 below by gravity. The inclined filter baffle 16 can ensure that garbage and debris are intercepted to the greatest extent. After the debris fills the collection frame 14, the lifting rod 15 can be pulled up to lift the collection frame 14 and dump the internal garbage.
[0078] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A new type of municipal road subgrade drainage system construction device, characterized in that: include: A vehicle body (1) moves along the outer edge of the groove according to a planned path, wherein a control unit is arranged inside the vehicle body; A positioning mechanism (4) that moves along the center line of the road and maintains synchronous displacement with the vehicle body (1), and provides a positioning reference for a distance measuring mechanism (3) disposed on the top of the vehicle body (1); A lifting mechanism (2) is arranged on the side of the vehicle body (1), and drives the flow control mechanism (7) to move linearly in the vertical direction; a feed bin (6) is arranged on the top of the flow control mechanism (7), and a slide plate mold is arranged on the bottom; and an elevation measurement mechanism (5) is arranged on the slide plate mold; A transmission mechanism (8) is arranged on the side of the vehicle body (1) and located at the rear side of the lifting mechanism (2), and a blade assembly (9) is arranged at the bottom thereof; By setting the travel path, travel speed, and the elevation parameter values of the starting point and the end point of the skateboard mold, the control unit controls the distance between the distance measuring mechanism (3) and the positioning mechanism (4), and adjusts the travel direction of the vehicle body (1) according to the distance difference value; the flow control mechanism (7) calculates the amount of concrete required by the skateboard mold per unit time by associating it with the travel speed of the vehicle body (1), and pours concrete at the required rate to ensure continuous feeding; the concrete is squeezed and molded by the skateboard mold, and the skateboard mold is driven to move by the vehicle body (1), and the exterior of the molded concrete is smoothed and finished; the lifting mechanism (2) is controlled to automatically adjust the vertical height of the skateboard mold according to the detection data of the elevation measuring mechanism (5), so as to ensure the accurate positioning and inclination of the roadbed drainage ditch; after laying 200m of the roadbed drainage ditch, the transmission mechanism (8) drives the blade group (9) to descend and cut out the groove (11), and takes out the cut concrete, rotates the blade group (9) to align it with the silo (6), and drops the cut concrete into the feed silo (6) for recycling, and the construction is carried out according to the set path until the drainage ditch is laid.
2. A novel municipal road subgrade drainage system construction device according to claim 1, characterized in that: The distance measuring mechanism (3) comprises a mounting bracket (301) and a first distance meter (302) and a second distance meter (303) arranged at two ends of the top of the mounting bracket (301); the mounting bracket (301) is a T-shaped bracket; the first distance meter (302) and the second distance meter (303) are infrared distance measuring instruments, and the two detect whether there is a difference in distance data by comparing, thereby determining whether the traveling direction of the vehicle body (1) deviates.
3. A novel municipal road subgrade drainage system construction device according to claim 2, characterized in that: The positioning mechanism (4) comprises a positioning trolley and a positioning panel; the positioning trolley moves synchronously with the vehicle body (1), and is provided with a positioning module to control the displacement of the positioning trolley along the center line of the road; the positioning panel is provided with a smooth layer on a side close to the vehicle body (1) for reflecting infrared laser light emitted by the distance measuring mechanism (3), thereby providing a positioning reference for the distance measuring mechanism (3).
4. A novel municipal road subgrade drainage system construction device according to any one of claims 1-3, characterized in that: The transmission mechanism (8) is arranged on the side of the vehicle body (1) and is located at the rear side of the lifting mechanism (2), and comprises a rotating assembly and a hydraulic transmission assembly; the rotating assembly drives the blade assembly (9) to rotate, so that the blade assembly (9) is vertically aligned with the groove body (10) or rotated upward to align with the feed bin (6); the hydraulic transmission assembly provides hydraulic power for the blade assembly (9), driving the blade assembly (9) to cut a groove (11) on the groove body (10).
5. A novel municipal road subgrade drainage system construction device according to any one of claim 4, characterized in that: The blade group (9) comprises a vertical blade and an inclined blade. The hydraulic transmission component drives the vertical blade and the inclined blade in sequence to cut into the formed concrete, cut out a right-angled triangular prism-shaped groove (11), and close and seal the cut concrete to take it out. The blade group (9) is driven to rotate by the rotating component, so that the blade group (9) is aligned with the feed bin (6), and the inclined blade is retracted to leave a gap, so that the cut concrete falls into the feed bin (6) for recycling.
6. A novel municipal road subgrade drainage system construction device according to any one of claims 1-3, characterized in that: The lifting mechanism (2) is fixedly arranged on the side of the vehicle body (1), and comprises a connecting bracket and a hydraulic rod arranged in the vertical direction. The hydraulic rod is communicatively connected to the control unit. One end of the connecting bracket is fixedly connected to the hydraulic rod, and the other end is used to fix the flow control mechanism (7). Under the control of the control unit, the hydraulic rod drives the connecting bracket to move up and down, so that the slide plate mold at the bottom of the flow control mechanism (7) is displaced to a specified height in the vertical direction.
7. A novel municipal road subgrade drainage system construction device according to any one of claims 1-3, characterized in that: The flow control mechanism (7) is fixedly connected to the lifting mechanism (2), and comprises a flow control valve, which is in communication connection with the control unit. The flow control valve adjusts the concrete output flow rate through the control unit, thereby accurately controlling the concrete forming pouring amount of the ditch body (10).
8. A construction method for a new municipal road subgrade drainage system, which uses the construction device according to claims 1-7 for construction, comprising the following steps: S1: Laying out the line on the center line of the road, and placing the positioning trolley of the positioning mechanism (4) at the corresponding position of the center line of the road; S2: Use an excavator to dig a trench along the edge of the roadbed slope according to the drawing requirements. The trench excavation width should be wider than the designed width of the drainage ditch; S3: the vehicle (1) enters the field, the distance measuring mechanism (3) is turned on, the first distance measuring device (302) and the second distance measuring device (303) respectively detect the distance between the vehicle (1) and the positioning mechanism (4), and adjust the moving direction of the vehicle (1) according to the distance measurement difference value; S4: The operator sets the travel path, travel speed, and elevation parameter values of the starting point and end point of the skateboard mold; S5: The pump truck moves synchronously with the vehicle body (1) and inputs the concrete into the feed bin (6); S6: The flow control mechanism (7) calculates the amount of concrete required for the skateboard mold per unit time by associating it with the travel speed of the vehicle body (1), and pours concrete at the required rate to ensure continuous feeding; S7: The concrete is squeezed and molded by the slide plate mold, and the slide plate mold is driven by the vehicle body (1) to move and smooth the exterior of the molded concrete; S8: The distance measuring mechanism (3) detects the distance in real time to control the vehicle body (1) to continuously correct the forward route, and the elevation measuring mechanism (5) controls the lifting mechanism (2) to automatically adjust the vertical height of the slide plate mold according to the travel distance of the vehicle body (1) and the corresponding set elevation parameters, thereby ensuring the accurate positioning and inclination of the roadbed drainage ditch; S9: Every time 200 m of roadbed drainage ditch is laid, the transmission mechanism (8) drives the blade group (9) to descend and cut out the groove (11), and takes out the cut concrete, rotates the blade group (9) to align it with the silo (6), and drops the cut concrete into the feed silo (6) for recycling; S10: Repeat steps S5-S9 until the trench body (1) is laid; S11: digging a trench 0.5 m downstream of the groove 11 for installing a water storage and flushing pool (13); S12: Install the garbage separation assembly in the groove (11) to complete the laying of the drainage system.
9. A novel municipal road subgrade drainage system, obtained by the construction method of claim 8, characterized in that: include: A ditch body (10), a groove (11), a water reservoir (13) and a garbage separation component; the ditch body (10) is a trough-shaped structure with a plurality of grooves (11) thereon, and adjacent grooves (11) are spaced 200 m apart; the water reservoir (13) is located 0.5 m downstream of the groove (11), is connected to the ditch body (10) through a siphon (12), and discharges the accumulated rainwater into the ditch body (10) to flush out the debris.
10. A new municipal road subgrade drainage system according to claim 9, characterized in that: The garbage separation component is used for separating and collecting debris in a drainage ditch, and comprises a collection frame (14), a lifting rod (15) and a filtering baffle (16); the collection frame (14) is a triangular prism structure, adapted to the structure of the groove (11), and is placed in the groove (11) to collect debris such as soil, garbage, leaves, etc.; the lifting rod (15) is fixedly arranged at the bottom of the collection frame (14), so that it is convenient for an operator to lift the collection frame (14) out of the groove (11); the filtering baffle (16) is located at the rear side of the top of the collection frame (14), and blocks debris such as soil, garbage, leaves, etc., so that the debris falls into the collection frame (14).
Citation Information
Patent Citations
Construction method for continuously casting subgrade side ditch through vibrating and stirring type automatic slip form
CN106245488A
Concrete slip-form paver for ditch
CN212405152U
Cast-in-place construction maintenance device for trapezoidal drainage ditch
CN215669967U
Method and apparatus for casting a concrete product
US20040051193A1
Cited By
Concrete pouring device for trench cover plate
CN119635819A