Geotextile bag breach plugging device capable of being rapidly deployed on site and operation method

By designing a geobag sealing device including vehicle body, turntable, skateboard device and bagging mechanism, the problem of low efficiency of existing breach sealing technology is solved, rapid and effective breach sealing is achieved, and environmental damage is reduced. , improves processing efficiency.

CN119163012APending Publication Date: 2024-12-20HOHAI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411509196.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

The existing breach sealing technology is inefficient, difficult to obtain materials and severe environmental damage. Especially in extreme weather, the treatment efficiency is not high, making it difficult to quickly and effectively block large-scale breaches.

Method used

A geobag sealing and breach device that is quickly deployed on-site is designed, including the vehicle body, turntable, skateboard device and bagging mechanism. The large geobag is quickly slided to the breach through the skateboard device, and the lifting hydraulic rod and hydraulic control of the bagging mechanism are used. The device enables rapid loading and movement, and multiple geobags are connected to coordinate the sealing.

Benefits of technology

Efficient and rapid breach sealing is achieved. Geobags have the function of filtering and soil protection, which can resist the erosion of a larger range of water flow, reduce manual operation, improve processing efficiency, and reduce environmental damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119163012A_ABST
    Figure CN119163012A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of embankment project breach plugging, and particularly relates to a soilbag breach plugging device capable of being rapidly deployed on site and an operation method.The soilbag breach plugging device capable of being rapidly deployed on site comprises a vehicle body; the tail end of the tipping bucket is rotationally arranged on the vehicle body; the sliding plate device is arranged below the tipping bucket; and the bagging mechanism is arranged above the tipping bucket, and a plurality of large geotechnical bags are installed in the bagging mechanism. The invention further discloses an operation method of the geotextile bag breach plugging device capable of being rapidly deployed on site. By means of the device, the soilbag can be rapidly filled, and the large soilbag can be rapidly slid to the breach.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of dike engineering breach plugging, and in particular relates to a geobag breach plugging device that can be quickly deployed on site and an operation method. Background Art

[0002] Due to the extremely uneven distribution of water resources and rainfall, rainfall is mostly concentrated in the summer, which is extremely easy to cause flood disasters. At present, flood disasters caused by heavy rains are gradually showing characteristics such as extreme, sudden and changeable. Under extreme weather and super-standard floods, hidden dangers of infrastructure such as embankment projects are very likely to burst out in a concentrated manner, resulting in breach dangers, and the length of the breach can reach more than 100 meters.

[0003] Breach sealing is an important measure to prevent the further spread of floods and reduce the losses caused by flood disasters. The following points should be noted in breach sealing: First, efficiency and speed are particularly important. Once a breach is formed, it will gradually expand under the action of floods. Therefore, it is necessary to seal it efficiently and quickly, and the sealing materials should be taken locally and nearby as much as possible; secondly, the breach rescue equipment and tools should be reasonably selected, and the use of manpower should be minimized. For example, an excavator can be used to dig soil and bag it, a pump can be used to drain water, and a forklift can be used to transport the filler used to seal the breach, so as to achieve the purpose of quickly sealing the breach.

[0004] At present, the current breach sealing technology and equipment are still relatively primitive, with problems such as difficulty in obtaining materials and low efficiency. When a breach occurs in a dike during the flood season, boulders, trucks and other heavy machinery are often used to throw them into the breach. Boulders need to be transported from a distance, and the difficulty of quarrying is increasing, causing high damage to the environment. Trucks and other heavy machinery slide into the water and are not easy to sink to the bottom under the action of high-speed water flow; existing breach sealing technologies such as steel sheet piles mainly rely on manpower and physical methods. When faced with large-scale breaches, the handling efficiency is not high.

[0005] Therefore, there is an urgent need for a geobag breach sealing device and an operating method that can be quickly deployed on site to solve the problem. Summary of the invention

[0006] The purpose of the present invention is to provide a geobag breach sealing device and an operation method that can be quickly deployed on site to solve the above problems.

[0007] To achieve the above object, the present invention provides the following solutions:

[0008] A geobag breach plugging device that can be quickly deployed on site, comprising:

[0009] Vehicle body;

[0010] A dump bucket, the rear end of which is rotatably arranged on the vehicle body;

[0011] A slide plate device, comprising a movable end slidably arranged below the tipping bucket;

[0012] The bagging mechanism is liftably arranged above the tipping bucket, and a plurality of large geobags are arranged in the bagging mechanism.

[0013] Preferably, the bagging mechanism comprises a combined frame, the combined frame is fixed by a plurality of rectangular channel steels arranged in a matrix, and the large geobags are arranged in corresponding grids of the combined frame;

[0014] The movable ends of the lifting part are fixed to the four corners of the combined frame respectively, and the fixed end of the lifting part is installed above the dump bucket;

[0015] The four lifting parts are connected to a control part.

[0016] As a preferred embodiment, the fixed end of the lifting part is fixedly installed above the tipping bucket.

[0017] As a preferred embodiment, the fixed end of the lifting part is placed above the tipping bucket. When in use, the bagging mechanism is hoisted as a whole above the tipping bucket by a crane. After use, the bagging mechanism is removed as a whole by a crane.

[0018] Preferably, the lifting part comprises a lifting hydraulic rod, a movable end of the lifting hydraulic rod is fixedly connected to a corner of the combined frame, and a fixed end of the lifting hydraulic rod is installed above the dump bucket.

[0019] Preferably, the control unit includes a hydraulic controller, which is connected to the four lifting hydraulic rods, and is used to control the lifting of the four lifting hydraulic rods.

[0020] Preferably, the slide plate device comprises a first telescopic plate slidably arranged at the bottom of the dump bucket;

[0021] The bottom of the dump bucket is provided with a first slide groove for sliding the first telescopic plate, and a first positioning block is fixed to the tail end of the first slide groove, and the first positioning block is used to prevent the first telescopic plate from slipping off the bottom of the dump bucket.

[0022] Preferably, a second telescopic plate is slidably arranged at the bottom of the first telescopic plate, a second sliding groove for sliding the second telescopic plate is arranged at the bottom of the first telescopic plate, a second positioning block is fixed to the tail end of the second sliding groove, and the second positioning block is used to prevent the second telescopic plate from slipping off the first telescopic plate.

[0023] Preferably, middle baffles are detachably connected to both sides of the first telescopic plate.

[0024] As a preferred embodiment, the bottom edge of the middle baffle is connected to the side edge of the first telescopic plate by a latch, so that the middle baffle can rotate relative to the side edge of the first telescopic plate. When in use, the middle baffle is arranged and fixed perpendicular to the top surface of the first telescopic plate.

[0025] Preferably, inner baffles are detachably connected to both sides of the second telescopic plate.

[0026] As a preferred embodiment, the bottom edge of the inner baffle is connected to the side edge of the second telescopic plate by a latch, so that the inner baffle can rotate relative to the side edge of the second telescopic plate. When in use, the inner baffle is arranged and fixed perpendicular to the top surface of the second telescopic plate.

[0027] An operation method of a geobag breach plugging device that can be quickly deployed on site, using the geobag breach plugging device that can be quickly deployed on site, includes the following steps:

[0028] Step 1: Install each of the large geobags in the corresponding opening of the bagging mechanism;

[0029] Step 2: Use on-site excavated soil or nearby solid waste and other engineering waste to fill the large geobags;

[0030] Step 3: After the large geobag is filled and sealed, the bagging mechanism is started to make the lower surface of the bagging mechanism flush with the upper surface of the sealed large geobag;

[0031] Step 4, connecting several large geobags into one, and then repeating the above steps to fill and connect the second layer of large geobags;

[0032] Step 5: After all the large geobags are filled, the slide device is opened and the tipping bucket is tilted. After the tipping bucket reaches a specified inclination angle, the large geobags slide down along the slide device to the breach;

[0033] Step 6: Repeat the above steps until the dangerous situation is resolved.

[0034] Compared with the prior art, the present invention has the following advantages and technical effects:

[0035] 1. The soil is constrained by the large geobag body, which has the function of filtering water and retaining soil. The large geobags in series can resist the scouring of water flow in a larger range.

[0036] 2. Compared with traditional woven bags, the large geobags used can be filled with at least 1 cubic meter of earth at one time. When a breach occurs, this equipment can slide a large number of large geobags into the breach in a short time.

[0037] 3. Multiple large geobags are connected together to play a role in coordinated blocking operations.

[0038] 4. The proposed operation method can reasonably judge the breach operation distance and can quickly slide the large geobag to the breach. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor:

[0040] Figure 1 It is a schematic diagram of the structure of the present invention;

[0041] Figure 2 It is a working process diagram of the present invention;

[0042] Figure 3 This is a structural diagram of the hydraulic cylinder of the present invention;

[0043] Among them, 1. vehicle body; 2. rotatable platform; 3. bagging mechanism; 4. large geobag; 5. slide device; 6. first telescopic plate; 7. second telescopic plate; 10. fixed bottom plate; 11. outer baffle; 12. middle baffle; 13. inner baffle; 14. lifting hydraulic rod; 15. hydraulic controller; 16. combined frame; 17. hydraulic cylinder; 18. piston rod; 19. limit ring. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0046] Reference Figures 1 to 3 The present invention discloses a geobag breach plugging device that can be quickly deployed on site, comprising:

[0047] Car body 1;

[0048] A tipping bucket, the rear end of which is rotatably arranged on the vehicle body 1;

[0049] The slide plate device 5 includes a movable end slidably arranged under the dump bucket;

[0050] The bagging mechanism 3 is liftably arranged above the tipping bucket, and a plurality of large geobags 4 are installed in the bagging mechanism 3 .

[0051] When in use, each large geobag 4 is installed in the corresponding grid of the bagging mechanism 3, and the large geobag 4 is filled by utilizing on-site excavation or selecting solid waste nearby. After the large geobag 4 is filled and sealed, the bagging mechanism 3 is started to make the lower surface of the bagging mechanism 3 flush with the upper surface of the sealed large geobag 4; after several large geobags 4 are connected into one, other large geobags 4 are installed in the corresponding grid of the bagging mechanism 3, and the above steps are repeated to fill and connect the second layer of large geobags 4; after all the large geobags 4 are filled, the slide device 5 is opened, and the tipping bucket is tilted. After the tipping bucket reaches the specified inclination angle, the large geobag 4 slides down along the slide device 5 to the breach.

[0052] Compared with the traditional breach sealing method, the present invention has the following effects:

[0053] 1. The soil is constrained by the large geobag 4, which has the function of filtering water and retaining soil. The large geobags 4 connected in series can resist the scouring of a larger range of water flow.

[0054] 2. Compared with traditional woven bags, the selected large geobags 4 can be filled with at least 1 cubic meter of earth at one time. When a breach occurs, this equipment can slide a large number of large geobags 4 to the breach in a short time.

[0055] 3. Multiple large geobags 4 are linked together to play a role in coordinated blocking operations.

[0056] 4. The proposed operation method can reasonably judge the breach operation distance and can quickly slide the large geobag 4 to the breach.

[0057] Furthermore, the tipping bucket includes a rotatable platform 2, a fixed base plate 10 and a hydraulic cylinder body 17. The fixed base plate 10 is fixedly connected to the rotatable platform 2. The tail end of the rotatable platform 2 is hingedly arranged at the tail end of the vehicle body 1. The front end of the rotatable platform 2 is hingedly connected to the top end of the piston rod 18 of the hydraulic cylinder body 17. The fixed end of the hydraulic cylinder body 17 is hingedly connected to the middle part of the vehicle body 1. The piston rod 18 is extended through the hydraulic action to achieve the purpose of causing the rotatable platform 2 to drive the fixed base plate 10 to tilt.

[0058] The lower end of the hydraulic cylinder 17 is hinged to the chassis of the vehicle body 1; a limiting ring 19 is welded to the bottom of the piston rod 18, and the diameter of the limiting ring 19 is slightly larger than the diameter of the piston rod 18. The limiting ring 19 slides and limits the inner wall of the hydraulic cylinder 17. When the lifting reaches a certain angle, the piston rod 18 is self-locked, and at this time, the limiting ring 19 and the top of the hydraulic cylinder 17 play a limiting role.

[0059] The calculation formula of the lifting angle θ of the rotatable platform 2 is:

[0060]

[0061] Where H is the lifting height and L is the total rail length.

[0062] Furthermore, outer baffles 11 are rotatably connected to both sides of the fixed bottom plate 10 .

[0063] Furthermore, the vehicle body 1 is preferably a modified truck, and the modified truck is a work vehicle specially made to meet the needs of breach sealing.

[0064] Further optimizing the scheme, the bagging mechanism 3 includes a combined frame 16, the combined frame 16 is fixed by a plurality of rectangular channel steels arranged in a matrix, and the large geotextile bag 4 is installed in the corresponding grid of the combined frame 16;

[0065] The movable ends of the lifting part are fixed to the four corners of the combined frame 16, and the fixed end of the lifting part is installed above the dump bucket;

[0066] The four lifting parts are connected to a control part.

[0067] According to a further optimized solution, the lifting part includes a lifting hydraulic rod 14, the movable end of the lifting hydraulic rod 14 is fixedly connected to the corner of the combined frame 16, and the fixed end of the lifting hydraulic rod 14 is installed above the dump bucket.

[0068] According to a further optimization scheme, the control unit includes a hydraulic controller 15 , which is connected to the four lifting hydraulic rods 14 . The hydraulic controller 15 is used to control the lifting of the four lifting hydraulic rods 14 .

[0069] The bagging mechanism 3 includes a lifting hydraulic rod 14, a hydraulic controller 15 and a combined frame 16. The combined frame 16 is fixed by a number of rectangular channel steels arranged in a matrix, forming a plurality of grids for accommodating large geobags 4, and the grids are distributed in a matrix. The bagging mechanism 3 can simultaneously meet the filling of four or more large geobags 4, and can be quickly moved to the breach after bagging is completed.

[0070] The present invention preferably has four slots.

[0071] The size of the large geobag 4 is preferably 2m×1.0m×0.5m.

[0072] Four large geobags 4 can be loaded onto the bagging mechanism 3 at the same time, and each large geobag 4 is preferably loaded with one cubic meter of soil.

[0073] The large geobags 4 are preferably connected in series with reinforced belts to form a series-type large geobag.

[0074] In a further optimized solution, the slide device 5 includes a first telescopic plate 6 slidably arranged at the bottom of the dump bucket;

[0075] A first slide groove for sliding the first telescopic plate 6 is provided at the bottom of the dump bucket, and a first positioning block is fixed to the tail end of the first slide groove, and the first positioning block is used to prevent the first telescopic plate 6 from slipping off the bottom of the dump bucket.

[0076] A further optimized solution is that a second telescopic plate 7 is slidably arranged at the bottom of the first telescopic plate 6, a second slide groove for sliding the second telescopic plate 7 is arranged at the bottom of the first telescopic plate 6, a second positioning block is fixed to the tail end of the second slide groove, and the second positioning block is used to prevent the second telescopic plate 7 from slipping off the first telescopic plate 6.

[0077] According to a further optimized solution, middle baffles 12 are detachably connected to both sides of the first telescopic plate 6 .

[0078] According to a further optimized solution, inner baffles 13 are detachably connected to both sides of the second telescopic plate 7 .

[0079] The slide device 5 includes a fixed section, a first telescopic section, a second telescopic section, a slide groove and a positioning block.

[0080] The large geobags 4 connected in series slide directly into the water along the extended slide plate.

[0081] The fixed section includes a fixed bottom plate 10 and an outer baffle 11;

[0082] The first telescopic section includes a first telescopic plate 6 and a middle baffle 12;

[0083] The second telescopic section includes a second telescopic plate 7 and an inner baffle plate 13 .

[0084] Friction coefficient requirements between large geobag 4 and fixed base plate 10

[0085] μ>tanθ (2)

[0086] The bagging mechanism 3 is controlled by a hydraulic controller to realize the lifting of the combined frame 16; the combined frame 16 is welded by a plurality of rectangular channel steels, each of which is slightly larger than the size of the large geotextile bag 4, and the overall area of ​​the combined frame 16 is

[0087] S=kl×nb (3)

[0088] Where k is the number of frames along the length of the truck, l is the length of a single frame, n is the number of frames along the width of the truck, and b is the width of a single frame.

[0089] A pressing block is provided in the top groove of the combined frame 16, the purpose of which is to fix the large geobag 4 during bagging.

[0090] The lifting hydraulic rods 14 are supported at the four corners of the bottom of the combined frame 16. When the combined frame 16 is raised, each column acts on the fixed bottom plate 10 without supporting the weight of the large geobag 4.

[0091] The fixed bottom plate 10 and the outer baffle plate 11 are connected to the rotatable platform 2. A slide groove is set at the bottom of the rotatable platform 2, and the first telescopic plate 6 is close to the slide groove; similarly, a slide groove is set at the bottom of the first telescopic plate, and the second telescopic plate 7 is close to the slide groove; the first telescopic plate 6 is connected to the middle baffle plate 12; the second telescopic plate 7 is connected to the inner baffle plate 13.

[0092] The positioning block is arranged at the tail end of the slideway. When the telescopic plate is extended to a certain length, the positioning block can fix the bottom plate and the telescopic plate to prevent the telescopic plate from falling out.

[0093] An operation method of a geobag breach plugging device that can be quickly deployed on site, using the geobag breach plugging device that can be quickly deployed on site, includes the following steps:

[0094] Step 1: Install each large geobag 4 in the corresponding opening of the bagging mechanism 3;

[0095] Step 2: Use the excavated soil on site or the solid waste and other engineering waste soil selected nearby to fill the large geobags 4;

[0096] a. According to the size of the special operation vehicle, select the appropriate size of the combined frame 16 and the large geobag 4, and arrange the bagging mechanism 3 on the rotatable platform 2.

[0097] b. Place a large geobag 4 inside each grid, and place the large geobag 4 that exceeds the frame in the top groove of the combined frame 16.

[0098] c. Fill each large geobag 4. There is no strict restriction on the filler in the bag, and various earth and stone materials or solid waste excavated on site or nearby are preferred.

[0099] Step 3: After the large geobag 4 is filled and sealed, the bagging mechanism 3 is started to make the lower surface of the bagging mechanism 3 flush with the upper surface of the sealed large geobag 4;

[0100] After the geobags are filled, the bagging mechanism 3 is started to align the lower surface of the platform with the upper surface of the geobags. At this time, the geobags are basically formed.

[0101] Step 4: Connect several large geobags 4 into one, and then repeat the above steps to fill and connect the second layer of large geobags 4;

[0102] a. Reinforced belts can be used to connect several geobags to form large series-connected geobags.

[0103] b. Repeat the above steps to prepare the second layer of geobags.

[0104] Step 5: After all the large geobags 4 are filled, the slide device 5 is opened and the bucket is tilted. After the bucket reaches a specified inclination angle, the large geobags 4 slide down along the slide device 5 to the breach;

[0105] At this point, the large geobags have been connected in series. However, it is more important to accurately slide the large geobags in series for breach plugging to the breach position. Therefore, it is necessary to calculate the distance between the equipment and the breach before the breach plugging operation and optimize the distance.

[0106] First, it is necessary to clarify the mass mg, volume V, breach depth H, breach flow velocity v, and height h of the slide plate from the water surface of the large series geobag.

[0107] The trajectory of the series-connected large geobag after sliding into the breach is:

[0108] D=(D x ,D y ) (4)

[0109] According to the law of conservation of energy and Newton's second law, the horizontal and vertical motion equations of large series geobags in breach flow can be established:

[0110]

[0111] The unknown coefficients C1 and C2 can be solved by optimization theory:

[0112]

[0113] Based on the above, the optimal distance required for breach sealing using large-scale tandem geobags can be obtained.

[0114] When encountering a breach, move the mobile platform to a safe position, the distance from the breach being no greater than the length of the fully extended telescopic plate. At this time, point the tail of the platform toward the breach, extend the slide plate, and then start the hydraulic lifting system to slowly and evenly raise the platform. When the bottom plate reaches the predetermined inclination angle, the tandem large geobags slide down to the breach.

[0115] Step 6: Repeat the above steps until the dangerous situation is resolved.

[0116] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0117] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A geobag breach plugging device that can be quickly deployed on site, characterized in that: include: Vehicle body (1); A tipping bucket, the rear end of which is rotatably arranged on the vehicle body (1); A slide plate device (5) comprising a movable end slidably arranged below the tipping bucket; A bagging mechanism (3) is liftably arranged above the tipping bucket, and a plurality of large geotextile bags (4) are arranged in the bagging mechanism (3).

2. The geobag breach plugging device for rapid on-site deployment according to claim 1 is characterized by: The bagging mechanism (3) comprises a combined frame (16), the combined frame (16) being fixed by a plurality of rectangular channel steels arranged in a matrix, and the large geotextile bags (4) being arranged in corresponding grid openings of the combined frame (16); The movable ends of the lifting part are fixed to the four corners of the combined frame (16), and the fixed end of the lifting part is installed above the tipping bucket; The four lifting parts are connected to a control part.

3. The geobag breach sealing device for rapid deployment on site according to claim 2 is characterized by: The lifting part comprises a lifting hydraulic rod (14), the movable end of the lifting hydraulic rod (14) is fixedly connected to the corner of the combined frame (16), and the fixed end of the lifting hydraulic rod (14) is installed above the tipping bucket.

4. The geobag breach plugging device for rapid on-site deployment according to claim 3 is characterized by: The control unit comprises a hydraulic controller (15), the hydraulic controller (15) is connected to the four lifting hydraulic rods (14), and the hydraulic controller (15) is used to control the lifting of the four lifting hydraulic rods (14).

5. The geobag breach plugging device for rapid on-site deployment according to claim 1 is characterized by: The slide plate device (5) comprises a first telescopic plate (6) slidably arranged at the bottom of the dump bucket; The bottom of the bucket is provided with a first slide groove for sliding the first telescopic plate (6), and the tail end of the first slide groove is fixed with a first positioning block, and the first positioning block is used to prevent the first telescopic plate (6) from slipping off the bottom of the bucket.

6. The geobag breach plugging device for rapid on-site deployment according to claim 5 is characterized by: A second telescopic plate (7) is slidably arranged at the bottom of the first telescopic plate (6); a second sliding groove for sliding the second telescopic plate (7) is arranged at the bottom of the first telescopic plate (6); a second positioning block is fixed at the tail end of the second sliding groove; the second positioning block is used to prevent the second telescopic plate (7) from slipping off the first telescopic plate (6).

7. The geobag breach plugging device for rapid on-site deployment according to claim 5 is characterized by: Middle baffles (12) are detachably connected to both sides of the first telescopic plate (6).

8. The geobag breach plugging device for rapid on-site deployment according to claim 6 is characterized by: Inner baffles (13) are detachably connected to both sides of the second telescopic plate (7).

9. An operation method of a geobag breach plugging device that can be rapidly deployed on site, using a geobag breach plugging device that can be rapidly deployed on site as claimed in any one of claims 1 to 8, characterized in that: The steps include: Step 1: Install each of the large geotextile bags (4) in the corresponding openings of the bagging mechanism (3); Step 2: Use on-site excavated soil or nearby solid waste and other engineering waste to fill the large geobags (4); Step 3: After the large geobag (4) is filled and sealed, the bagging mechanism (3) is started to make the lower surface of the bagging mechanism (3) flush with the upper surface of the sealed large geobag (4); Step 4: Connect several large geobags (4) into one, and then repeat the above steps to fill and connect the second layer of large geobags (4); Step 5: After all the large geobags (4) are filled, the slide device (5) is opened and the tipping bucket is tilted. After the tipping bucket reaches a specified inclination angle, the large geobags (4) slide down along the slide device (5) to the breach. Step 6: Repeat the above steps until the dangerous situation is resolved.