Data processing method and system for engineering project management

Through the data processing methods and systems for automated processing of engineering project management, the problems of inefficiency and inconsistent approval standards caused by relying on manual engineering project management processes in the existing technology are solved, and efficient approval process and standardized processing plan generation are achieved, which improves the Work efficiency.

CN119180618APending Publication Date: 2024-12-24HUATENG JIANXIN TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411497774.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-12-24

AI Technical Summary

Technical Problem

The existing engineering project management process relies on manual labor, is inefficient, has inconsistent approval standards, and has a long time to generate the plan, which affects work efficiency.

Method used

Through a data processing method and system, we automatically process project planning and management applications, generate processing plans based on preset approval rules, reduce manpower investment and time consumption, and ensure standardization and consistency of approval work.

Benefits of technology

It realizes the efficient processing of project planning and management applications in an automated process, standardizes the approval process, automatically generates processing plans, reduces manpower investment and time consumption, ensures the standardization and consistency of approval work, and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119180618A_ABST
    Figure CN119180618A_ABST
Patent Text Reader

Abstract

The invention discloses a data processing method and system for engineering project management. The method comprises the following steps: acquiring a project planning request of project planning equipment for a target engineering project; the project planning request is sent to at least one piece of approval end equipment according to a preset approval rule; generating an engineering project scheme corresponding to the target engineering project according to the project planning request and an examination and approval result of the examination and approval end equipment; acquiring a project management application sent by a management device; and generating a handling scheme corresponding to the project management application according to the project management application and a corresponding management approval rule. Therefore, the project planning and management application can be efficiently processed through the automatic process, the approval process is standardized, and the corresponding handling scheme is automatically generated, so that the human input and the time consumption can be reduced, the standardization and the consistency of the approval work are ensured, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering data processing, and in particular to a data processing method and system for engineering project management. Background Art

[0002] With the improvement of people's material living standards and the development of science and technology, the number of construction projects is also increasing. How to achieve reasonable and efficient management of construction projects is an important problem. However, the existing project management process is too dependent on manual work, inefficient, inconsistent approval standards, high uncertainty in approval results, and it takes a long time to generate a handling plan, which affects work efficiency. It can be seen that the existing technology has defects and needs to be solved urgently. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a data processing method and system for engineering project management, which can reduce manpower input and time consumption, ensure the standardization and consistency of approval work, and improve work efficiency.

[0004] In order to solve the above technical problems, the first aspect of the present invention discloses a data processing method for engineering project management, the method comprising: Obtaining a project planning request for a target engineering project from a project planning device; the project planning request is used to be sent to at least one approval end device according to a preset approval rule; Generate a project plan corresponding to the target project according to the project planning request and the approval result of the approval terminal device; Obtain the project management application sent by the management device; A handling plan corresponding to the project management application is generated according to the project management application and the corresponding management approval rules.

[0005] As an optional implementation, in the first aspect of the present invention, the project planning request includes the project name, planning category, planning person in charge, planning preparer, planning date requirement, planning approval requirement and planning scheme; the planning category is project quality planning, project safety planning, project technical planning or project schedule planning.

[0006] As an optional implementation, in the first aspect of the present invention, the project management application includes at least one of an urgent problem solving management application, a safety management application, a quality management application, a progress management application, a technical management application, an engineering equipment management application, a data management application, and a supervision and rectification management application.

[0007] As an optional implementation mode, in the first aspect of the present invention, the safety management application includes at least one of daily inspection addition, submission of safety log, submission of safety briefing, execution of safety briefing, safety training application, acceptance application, fire management application, foundation pit management application, high formwork management application, lifting equipment management application, dormitory management application and work injury management application; The quality management application includes at least one of adding quality inspection, submitting construction log, technical briefing application, quality training application, acceptance application, process handover acceptance application, hidden acceptance application, acceptance application for important sub-projects, completion acceptance application and submission of concrete slump information; The progress management application includes at least one of a newly added overall progress plan, a newly added monthly progress plan, a newly added weekly progress plan, an overall progress implementation management application, a daily progress implementation management application, and a weekly progress implementation management application; The technical management application includes at least one of adding a construction plan, approving a construction plan, adding a completion drawing, and approving a completion drawing; The data management application includes at least one of viewing regulatory documents, adding regulatory documents, viewing correspondence documents, adding correspondence documents, viewing internal documents, and adding internal documents; The engineering equipment management application includes at least one of adding new engineering equipment and allocating engineering equipment.

[0008] As an optional implementation manner, in the first aspect of the present invention, generating a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules includes: According to the application type and application content of the project management application, based on the preset approval correspondence rules, determine multiple approval users corresponding to the project management application; Determine the approval importance parameter corresponding to each of the approving users according to the historical approval records of each of the approving users; Determine the approval deadline and reminder plan corresponding to each of the approving users according to the approval importance parameter; The approval deadlines and reminder plans corresponding to all the approving users corresponding to the project management application are determined as the handling plan corresponding to the project management application.

[0009] As an optional implementation manner, in the first aspect of the present invention, determining the approval importance parameter corresponding to each of the approving users according to the historical approval records of each of the approving users includes: For each of the approving users, obtaining the historical approval records corresponding to the approving user; Calculate the average approval time corresponding to each record in the historical approval records, and calculate the average historical approval time corresponding to the approving user; Calculate the average of the matching degrees between the approval result and the final implementation result corresponding to each record in the historical approval record, and calculate the average accuracy rate of the historical approval corresponding to the approving user; The product of the user level value corresponding to the approving user, the historical average approval time, and the historical average approval accuracy is calculated to obtain the approval importance parameter corresponding to the approving user.

[0010] As an optional implementation, in the first aspect of the present invention, determining the approval period and reminder scheme corresponding to each of the approving users according to the approval importance parameter includes: For each of the approving users, calculating a parameter weight that is inversely proportional to the approval importance parameter of the approving user; Calculate the product of the parameter weight and the preset first time period parameter to obtain the approval period of the approving user; Calculate the product of the parameter weight and a preset second time period parameter to obtain a reminder interval; the second time period parameter is smaller than the first time period parameter; The approving user will be reminded at the reminder interval within the approval period, and a reminder plan corresponding to the approving user will be determined.

[0011] A second aspect of the present invention discloses a data processing system for engineering project management, the system comprising: A first acquisition module is used to acquire a project planning request for a target engineering project from a project planning device; the project planning request is used to be sent to at least one approval end device according to a preset approval rule; A first generating module, configured to generate a project plan corresponding to the target project according to the project planning request and the approval result of the approval terminal device; The second acquisition module is used to acquire the project management application sent by the management device; The second generating module is used to generate a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules.

[0012] As an optional implementation, in the second aspect of the present invention, the project planning request includes the project name, planning category, planning person in charge, planning preparer, planning date requirement, planning approval requirement and planning scheme; the planning category is project quality planning, project safety planning, project technical planning or project schedule planning.

[0013] As an optional implementation, in the second aspect of the present invention, the project management application includes at least one of an urgent problem solving management application, a safety management application, a quality management application, a progress management application, a technical management application, an engineering equipment management application, a data management application, and a supervision and rectification management application.

[0014] As an optional implementation, in the second aspect of the present invention, the safety management application includes at least one of daily inspection addition, submission of safety log, submission of safety briefing, execution of safety briefing, safety training application, acceptance application, fire management application, foundation pit management application, high formwork management application, lifting equipment management application, dormitory management application and work injury management application; The quality management application includes at least one of adding quality inspection, submitting construction log, technical briefing application, quality training application, acceptance application, process handover acceptance application, hidden acceptance application, acceptance application for important sub-projects, completion acceptance application and submission of concrete slump information; The progress management application includes at least one of a newly added overall progress plan, a newly added monthly progress plan, a newly added weekly progress plan, an overall progress implementation management application, a daily progress implementation management application, and a weekly progress implementation management application; The technical management application includes at least one of adding a construction plan, approving a construction plan, adding a completion drawing, and approving a completion drawing; The data management application includes at least one of viewing regulatory documents, adding regulatory documents, viewing correspondence documents, adding correspondence documents, viewing internal documents, and adding internal documents; The engineering equipment management application includes at least one of adding new engineering equipment and allocating engineering equipment.

[0015] As an optional implementation, in the second aspect of the present invention, the second generation module generates a specific manner of a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules, including: According to the application type and application content of the project management application, based on the preset approval correspondence rules, determine multiple approval users corresponding to the project management application; Determine the approval importance parameter corresponding to each of the approving users according to the historical approval records of each of the approving users; Determine the approval deadline and reminder plan corresponding to each of the approving users according to the approval importance parameter; The approval deadlines and reminder plans corresponding to all the approving users corresponding to the project management application are determined as the handling plan corresponding to the project management application.

[0016] As an optional implementation, in the second aspect of the present invention, the second generating module determines the specific manner of the approval importance parameter corresponding to each of the approving users according to the historical approval records of each of the approving users, including: For each of the approving users, obtaining the historical approval records corresponding to the approving user; Calculate the average approval time corresponding to each record in the historical approval records, and calculate the average historical approval time corresponding to the approving user; Calculate the average of the matching degrees between the approval result and the final implementation result corresponding to each record in the historical approval record, and calculate the average accuracy rate of the historical approval corresponding to the approving user; The product of the user level value corresponding to the approving user, the historical average approval time, and the historical average approval accuracy is calculated to obtain the approval importance parameter corresponding to the approving user.

[0017] As an optional implementation, in the second aspect of the present invention, the second generation module determines the specific manner of the approval period and reminder scheme corresponding to each of the approving users according to the approval importance parameter, including: For each of the approving users, calculating a parameter weight that is inversely proportional to the approval importance parameter of the approving user; Calculate the product of the parameter weight and the preset first time period parameter to obtain the approval period of the approving user; Calculate the product of the parameter weight and a preset second time period parameter to obtain a reminder interval; the second time period parameter is smaller than the first time period parameter; The approving user will be reminded at the reminder interval within the approval period, and a reminder plan corresponding to the approving user will be determined.

[0018] The third aspect of the present invention discloses another data processing system for engineering project management, the system comprising: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute part or all of the steps in the data processing method for engineering project management disclosed in the first aspect of the present invention.

[0019] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute some or all of the steps in the data processing method for engineering project management disclosed in the first aspect of the present invention.

[0020] Compared with the prior art, the present invention has the following beneficial effects: The present invention can efficiently process project planning and management applications through automated processes, standardize the approval process, and automatically generate corresponding handling plans, thereby reducing manpower input and time consumption, ensuring the standardization and consistency of approval work, and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 It is a flow chart of a data processing method for engineering project management disclosed in an embodiment of the present invention; Figure 2 It is a structural schematic diagram of a data processing system for engineering project management disclosed in an embodiment of the present invention; Figure 3 It is a structural schematic diagram of another data processing system for engineering project management disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0023] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or terminal including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or terminals.

[0025] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0026] The present invention discloses a data processing method and system for engineering project management, which can efficiently process project planning and management applications through an automated process, standardize the approval process, and automatically generate corresponding handling plans, thereby reducing manpower input and time consumption, ensuring the standardization and consistency of approval work, and improving work efficiency. The following are detailed descriptions.

[0027] Embodiment 1 See also Figure 1 , Figure 1 1 is a flow chart of a data processing method for engineering project management disclosed in an embodiment of the present invention. Figure 1 The described method can be applied to corresponding data processing devices, data processing terminals, and data processing servers, and the server can be a local server or a cloud server, and the embodiments of the present invention are not limited to the following. Figure 1 As shown, the data processing method for engineering project management may include the following operations: 101. Obtain a project planning request for a target engineering project from a project planning device.

[0028] Optionally, the project planning request is used to be sent to at least one approval end device according to preset approval rules.

[0029] 102. Generate a project plan corresponding to the target project based on the project planning request and the approval result of the approval end device.

[0030] 103. Obtain the project management application sent by the management device.

[0031] 104. Based on the project management application and the corresponding management approval rules, generate the corresponding processing plan for the project management application.

[0032] It can be seen that the implementation of the method described in the embodiment of the present invention can efficiently process project planning and management applications through automated processes, standardize the approval process, and automatically generate corresponding processing plans, thereby reducing manpower input and time consumption, ensuring the standardization and consistency of approval work, and improving work efficiency.

[0033] As an optional embodiment, the project planning request includes the project name, planning category, planning person in charge, planning preparer, planning date requirement, planning approval requirement and planning scheme; the planning category is project quality planning, project safety planning, project technical planning or project schedule planning.

[0034] As an optional embodiment, the project management application includes at least one of an urgent problem solving management application, a safety management application, a quality management application, a progress management application, a technical management application, an engineering equipment management application, a data management application, and a supervision and rectification management application.

[0035] Through the above embodiments, the content that a project planning request should include is clarified, which helps to carry out project planning more accurately, thereby assisting in implementing management processes, reducing manpower input and time consumption, ensuring standardization and consistency of approval work, and improving work efficiency.

[0036] As an optional embodiment, the safety management application includes at least one of daily inspection addition, submission of safety log, submission of safety briefing, execution of safety briefing, safety training application, acceptance application with a sign, fire management application, foundation pit management application, large formwork management application, lifting equipment management application, dormitory management application and work injury management application; the quality management application includes at least one of quality inspection addition, construction log submission, technical briefing application, quality training application, acceptance application with a sign, process handover acceptance application, hidden acceptance application, acceptance application for important sub-projects, completion acceptance application and submission of concrete slump information; the progress management application includes at least one of adding a general progress plan, adding a monthly progress plan, adding a weekly progress plan, a general progress implementation management application, a daily progress implementation management application and a weekly progress implementation management application; the technical management application includes at least one of adding a construction plan, approving a construction plan, adding a completion drawing and approving a completion drawing; the information management application includes at least one of viewing regulatory documents, adding regulatory documents, viewing correspondence documents, adding correspondence documents, viewing internal documents and adding internal documents; the engineering equipment management application includes at least one of adding engineering equipment and allocating engineering equipment.

[0037] Through the above embodiments, various types of management applications are covered, such as safety management applications, quality management applications, etc., which helps to more comprehensively cover all aspects of engineering project management, thereby assisting in the implementation of management processes, reducing manpower input and time consumption, ensuring the standardization and consistency of approval work, and improving work efficiency.

[0038] As an optional embodiment, according to the project management application and the corresponding management approval rules, a handling plan corresponding to the project management application is generated, including: According to the application type and application content of the project management application, based on the preset approval correspondence rules, multiple approval users corresponding to the project management application are determined; According to the historical approval records of each approving user, determine the approval importance parameters corresponding to each approving user; According to the approval importance parameters, determine the approval deadline and reminder plan for each approving user; The approval deadlines and reminder plans corresponding to all approval users corresponding to the project management application are determined as the processing plans corresponding to the project management application.

[0039] Through the above embodiment, through the preset approval correspondence rules, the approval responsibilities corresponding to different approval users can be clarified, and the efficiency of the approval work can be improved, thereby assisting in the implementation of management processes, reducing manpower input and time consumption, ensuring the standardization and consistency of approval work, and improving work efficiency.

[0040] As an optional embodiment, the approval importance parameter corresponding to each approving user is determined according to the historical approval record of each approving user, including: For each approving user, obtain the historical approval records corresponding to the approving user; Calculate the average approval time corresponding to each record in the historical approval records, and calculate the average historical approval time corresponding to the approving user; Calculate the average matching degree between the approval result and the final implementation result corresponding to each record in the historical approval record, and calculate the average accuracy rate of the historical approval corresponding to the approving user; The product of the user level value corresponding to the approving user, the average time required for historical approvals, and the average accuracy rate of historical approvals is calculated to obtain the approval importance parameter corresponding to the approving user.

[0041] Through the above embodiment, by analyzing the historical approval records of the approving users, the importance of the approval can be quantified, providing a basis for the formulation of approval deadlines and reminder plans, thereby assisting in the implementation of management processes, reducing manpower input and time consumption, ensuring the standardization and consistency of approval work, and improving work efficiency.

[0042] As an optional embodiment, according to the approval importance parameter, the approval deadline and reminder scheme corresponding to each approving user are determined, including: For each approving user, a parameter weight inversely proportional to the approval importance parameter of the approving user is calculated; Calculate the product of the parameter weight and the preset first time period parameter to obtain the approval period of the approving user; Calculate the product of the parameter weight and the preset second time period parameter to obtain the reminder interval; the second time period parameter is less than the first time period parameter; The approving user will be reminded at the reminder interval within the approval period, and a reminder plan corresponding to the approving user will be determined.

[0043] Through the above embodiment, by calculating the approval importance parameters, the approval period and reminder plan can be optimized to ensure the timeliness and effectiveness of the approval work, thereby assisting in the implementation of management processes, reducing manpower input and time consumption, ensuring the standardization and consistency of the approval work, and improving work efficiency.

[0044] Embodiment 2 See also Figure 2 , Figure 2 1 is a schematic diagram of a data processing system for engineering project management disclosed in an embodiment of the present invention. Figure 2 The described system can be applied to corresponding data processing devices, data processing terminals, and data processing servers, and the server can be a local server or a cloud server, which is not limited in the embodiments of the present invention. Figure 2 As shown, the system may include: The first acquisition module 201 is used to acquire a project planning request for a target engineering project from a project planning device; the project planning request is used to be sent to at least one approval end device according to a preset approval rule; The first generating module 202 is used to generate a project plan corresponding to the target project according to the project planning request and the approval result of the approval terminal device; The second acquisition module 203 is used to acquire the project management application sent by the management device; The second generating module 204 is used to generate a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules.

[0045] As an optional embodiment, the project planning request includes the project name, planning category, planning person in charge, planning preparer, planning date requirement, planning approval requirement and planning scheme; the planning category is project quality planning, project safety planning, project technical planning or project schedule planning.

[0046] As an optional embodiment, the project management application includes at least one of an urgent problem solving management application, a safety management application, a quality management application, a progress management application, a technical management application, an engineering equipment management application, a data management application, and a supervision and rectification management application.

[0047] As an optional embodiment, the safety management application includes at least one of daily inspection addition, submission of safety log, submission of safety briefing, execution of safety briefing, safety training application, acceptance application, fire management application, foundation pit management application, high formwork management application, lifting equipment management application, dormitory management application and work injury management application; The quality management application includes at least one of the following: adding quality inspection, submitting construction log, applying for technical disclosure, applying for quality training, applying for acceptance by raising a sign, applying for acceptance by process handover, applying for hidden acceptance, applying for acceptance by important sub-projects, applying for completion acceptance, and submitting concrete slump information; The progress management application includes at least one of a newly added general progress plan, a newly added monthly progress plan, a newly added weekly progress plan, a general progress implementation management application, a daily progress implementation management application, and a weekly progress implementation management application; The technical management application includes at least one of adding a construction plan, approving a construction plan, adding a completion drawing, and approving a completion drawing; The application for information management includes at least one of viewing regulatory documents, adding regulatory documents, viewing correspondence documents, adding correspondence documents, viewing internal documents, and adding internal documents; The application for engineering equipment management includes at least one of adding new engineering equipment and transferring engineering equipment.

[0048] As an optional embodiment, the second generating module 204 generates a specific method of a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules, including: According to the application type and application content of the project management application, based on the preset approval correspondence rules, multiple approval users corresponding to the project management application are determined; According to the historical approval records of each approving user, determine the approval importance parameters corresponding to each approving user; According to the approval importance parameters, determine the approval deadline and reminder plan for each approving user; The approval deadlines and reminder plans corresponding to all approval users corresponding to the project management application are determined as the processing plans corresponding to the project management application.

[0049] As an optional embodiment, the second generating module 204 determines the specific method of the approval importance parameter corresponding to each approving user according to the historical approval record of each approving user, including: For each approving user, obtain the historical approval records corresponding to the approving user; Calculate the average approval time corresponding to each record in the historical approval records, and calculate the average historical approval time corresponding to the approving user; Calculate the average matching degree between the approval result and the final implementation result corresponding to each record in the historical approval record, and calculate the average accuracy rate of the historical approval corresponding to the approving user; The product of the user level value corresponding to the approving user, the average time required for historical approvals, and the average accuracy rate of historical approvals is calculated to obtain the approval importance parameter corresponding to the approving user.

[0050] As an optional embodiment, the second generation module 204 determines the specific manner of the approval period and reminder scheme corresponding to each approving user according to the approval importance parameter, including: For each approving user, a parameter weight inversely proportional to the approval importance parameter of the approving user is calculated; Calculate the product of the parameter weight and the preset first time period parameter to obtain the approval period of the approving user; Calculate the product of the parameter weight and the preset second time period parameter to obtain the reminder interval; the second time period parameter is less than the first time period parameter; The approving user will be reminded at the reminder interval within the approval period, and a reminder plan corresponding to the approving user will be determined.

[0051] Embodiment 3 See also Figure 3 , Figure 3 FIG. 1 is a schematic diagram of another data processing system for engineering project management disclosed in an embodiment of the present invention. Figure 3 As shown, the system may include: A memory 301 storing executable program codes; a processor 302 coupled to the memory 301; The processor 302 calls the executable program code stored in the memory 301 to execute part or all of the steps in the data processing method for engineering project management disclosed in the first embodiment of the present invention.

[0052] Embodiment 4 An embodiment of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute some or all steps of the data processing method for engineering project management disclosed in the first embodiment of the present invention.

[0053] The system embodiment described above is only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, that is, they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without paying creative labor.

[0054] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0055] Finally, it should be noted that the data processing method and system for engineering project management disclosed in the embodiments of the present invention are only preferred embodiments of the present invention, and are only used to illustrate the technical solution of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features therein may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A data processing method for engineering project management, characterized in that: The method comprises: Obtaining a project planning request for a target engineering project from a project planning device; the project planning request is used to be sent to at least one approval end device according to a preset approval rule; Generate a project plan corresponding to the target project according to the project planning request and the approval result of the approval terminal device; Obtain the project management application sent by the management device; A handling plan corresponding to the project management application is generated according to the project management application and the corresponding management approval rules.

2. The data processing method for engineering project management according to claim 1, characterized in that: The project planning request includes the project name, planning category, planning person in charge, planning preparer, planning date requirement, planning approval requirement and planning scheme; the planning category is project quality planning, project safety planning, project technical planning or project schedule planning.

3. The data processing method for engineering project management according to claim 1, characterized in that: The project management application includes at least one of an urgent problem solving management application, a safety management application, a quality management application, a progress management application, a technical management application, an engineering equipment management application, a data management application, and a supervision and rectification management application.

4. The data processing method for engineering project management according to claim 3, characterized in that: The safety management application includes at least one of daily inspection addition, submission of safety log, submission of safety briefing, execution of safety briefing, safety training application, acceptance application, fire management application, foundation pit management application, high formwork management application, lifting equipment management application, dormitory management application and work injury management application; The quality management application includes at least one of adding quality inspection, submitting construction log, technical briefing application, quality training application, acceptance application, process handover acceptance application, hidden acceptance application, acceptance application for important sub-projects, completion acceptance application and submission of concrete slump information; The progress management application includes at least one of a newly added overall progress plan, a newly added monthly progress plan, a newly added weekly progress plan, an overall progress implementation management application, a daily progress implementation management application, and a weekly progress implementation management application; The technical management application includes at least one of adding a construction plan, approving a construction plan, adding a completion drawing, and approving a completion drawing; The data management application includes at least one of viewing regulatory documents, adding regulatory documents, viewing correspondence documents, adding correspondence documents, viewing internal documents, and adding internal documents; The engineering equipment management application includes at least one of adding new engineering equipment and allocating engineering equipment.

5. The data processing method for engineering project management according to claim 1, characterized in that: The step of generating a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules includes: According to the application type and application content of the project management application, based on the preset approval correspondence rules, determine multiple approval users corresponding to the project management application; Determine the approval importance parameter corresponding to each of the approving users according to the historical approval records of each of the approving users; Determine the approval deadline and reminder plan corresponding to each of the approving users according to the approval importance parameter; The approval deadlines and reminder plans corresponding to all the approving users corresponding to the project management application are determined as the handling plan corresponding to the project management application.

6. The data processing method for engineering project management according to claim 5, characterized in that: Determining the approval importance parameter corresponding to each of the approving users according to the historical approval records of each of the approving users includes: For each of the approving users, obtaining the historical approval records corresponding to the approving user; Calculate the average approval time corresponding to each record in the historical approval records, and calculate the average historical approval time corresponding to the approving user; Calculate the average of the matching degrees between the approval result and the final implementation result corresponding to each record in the historical approval record, and calculate the average accuracy rate of the historical approval corresponding to the approving user; The product of the user level value corresponding to the approving user, the historical average approval time, and the historical average approval accuracy is calculated to obtain the approval importance parameter corresponding to the approving user.

7. The data processing method for engineering project management according to claim 6, characterized in that: Determining the approval deadline and reminder scheme corresponding to each of the approving users according to the approval importance parameter includes: For each of the approving users, calculating a parameter weight that is inversely proportional to the approval importance parameter of the approving user; Calculate the product of the parameter weight and the preset first time period parameter to obtain the approval period of the approving user; Calculate the product of the parameter weight and a preset second time period parameter to obtain a reminder interval; the second time period parameter is smaller than the first time period parameter; The approving user will be reminded at the reminder interval within the approval period, and a reminder plan corresponding to the approving user will be determined.

8. A data processing system for engineering project management, characterized in that: The system comprises: A first acquisition module is used to acquire a project planning request for a target engineering project from a project planning device; the project planning request is used to be sent to at least one approval end device according to a preset approval rule; A first generating module, configured to generate a project plan corresponding to the target project according to the project planning request and the approval result of the approval terminal device; The second acquisition module is used to acquire the project management application sent by the management device; The second generating module is used to generate a handling plan corresponding to the project management application according to the project management application and the corresponding management approval rules.

9. A data processing system for engineering project management, characterized in that: The system comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the data processing method for engineering project management according to any one of claims 1 to 7.

10. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, and when the computer instructions are called, they are used to execute the data processing method for engineering project management as described in any one of claims 1-7.

Citation Information

Patent Citations

  • Project process management method and system

    CN113793135A

  • Project approval method and device, equipment and storage medium

    CN115809850A

  • Work supervision information issuing method, system and device and medium

    CN117196270A

  • EPC general contract project construction informatization management method

    CN117436800A

  • Method applied to enterprise OA collaborative workflow optimization

    CN118761745A