Safety protection tool for welding of wind tower door frame

By designing a liftable wind tower door frame welding safety protection tooling, the problems of excessive load loading of workers, falling risks and temporary protection construction safety during wind tower door frame welding are solved, and a safe and convenient construction environment for workers is achieved.

CN119188107APending Publication Date: 2024-12-27CHENGXI SHIPYARD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411428209.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

During the welding of the wind tower door frame, workers bear too much weight when climbing the tower, the tools are placed in a mess, and the work area is limited, which increases the risk of falling. In addition, the existing temporary protection requires workers to go up the tower in advance without safety protection, which increases the risk of injury. .

Method used

Design a safety protection tool for welding wind tower door frames, which can be assembled through threaded connections to form a liftable working platform, store welding tools, reduce the load on workers, provide sufficient operating areas, and lift them on the tower after being assembled on the ground to avoid workers from climbing. Climbing and building.

Benefits of technology

It reduces the risk of workers climbing and falling, improves the safety and convenience of the work area, reduces the injury rate of workers, simplifies the construction process, and reduces the difficulty of work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119188107A_ABST
    Figure CN119188107A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wind tower door frame welding safety protection, and discloses a wind tower door frame welding safety protection tool which comprises a first fixator, a first bolt and reinforcing ribs, a first threaded hole is formed in the front face of the first fixator, and the inner wall of the first threaded hole is in threaded connection with the first bolt; and the first fixer is in threaded connection with a reinforcing rib through a first bolt. According to the wind tower door frame welding safety protection tool, through assembling of the first fixing device, the second fixing device, the reinforcing ribs, the supporting leg modules, the workbench and the hanging device, the device can be assembled on the ground firstly and then hoisted to a wind tower in a hoisting mode, workers do not need to climb up with materials before welding construction, and the labor intensity of workers is reduced. Therefore, the risk of injury and falling possibly caused by temporary protection erected by workers is reduced, and meanwhile the problem that the workers need to convey materials for erecting the temporary protection, and consequently the working intensity is increased is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind tower door frame welding safety protection, in particular to a wind tower door frame welding safety protection tooling. Background Art

[0002] Wind tower door frame welding is a door frame welding technology used in wind turbine tower manufacturing. This technology involves the use of specific welding equipment and processes to ensure the precise manufacture and installation of the door frame. The door frame welding of wind tower projects is manual welding and double-sided welding. Therefore, the welders need to stand above the tower to operate the outer weld of the wind tower door frame. The risk of slipping and falling of welders is very high, so safety protection tooling needs to be designed to ensure the safety of welders.

[0003] The door frame welding of the existing wind tower project is done by manual welding between the door frame parts on the wind tower, but manual welding directly on the wind tower is too dangerous. Workers need to carry a large number of welding tools when welding, which will increase the weight of the workers when they climb up the wind tower. When the complicated tools are spread out on the wind tower, it will also affect the movement of the workers; secondly, when the workers are welding the door frame of the wind tower project, the workers stand directly on the wind tower. There is no area around the wind tower body for workers to weld, and the workers' working area is limited, which not only increases the difficulty of the workers' work, but also increases the risk of falling. The existing wind tower door frame welding safety protection is basically a temporary protection built on the wind tower, and the disassembly and assembly of the existing temporary protection requires workers to go up to the wind tower first and then build it, which also results in the builders having no safety protection and being prone to the risk of falling first, and the materials need to be transported up little by little, which undoubtedly increases the difficulty of the workers' work. Summary of the invention

[0004] 1. Technical issues to be resolved In view of the deficiencies in the prior art, the present invention provides a wind tower door frame welding safety protection tooling, which has a device that can carry most of the welding materials by itself, and the welding materials and tools can be manually sorted and hung for storage, which is convenient for workers to move; the device has a sufficient operating area so that workers can work with peace of mind, and at the same time, the risk of workers accidentally falling is greatly reduced; the device is easy to assemble, and can be hoisted and installed after being assembled on the ground, thereby reducing the injury rate of workers and reducing the workload of workers. It solves the problems of workers having too many tools and equipment, which increases the burden of workers crawling; tools are too messy to be deployed, which easily causes troubles to workers' movement; workers have a limited working area, and working directly on the wind tower will increase the difficulty of construction for workers, and will also increase the risk of accidental falling; most of the protection built on the wind tower is temporary, and workers need to assemble it on the wind tower in advance. This will increase the injury rate of workers without safety measures, and the transportation of construction materials will also increase the workload of workers.

[0005] (II) Technical solution In order to achieve the above-mentioned purpose of wind tower door frame welding safety protection, the present invention provides the following technical solutions: a wind tower door frame welding safety protection tooling, including a first fixer, a first threaded hole is opened on the front side of the first fixer, a first bolt is threadedly connected to the inner wall of the first threaded hole, the first fixer is threadedly connected to a reinforcing rib through the first bolt, a second threaded hole is opened on the front side of the reinforcing rib, a second bolt is threadedly connected to the inner wall of the second threaded hole, and the reinforcing rib is threadedly connected to the second fixer through the second bolt.

[0006] Preferably, a third threaded hole is formed on the side of the first and second fixers, a third bolt is threadedly connected to the inner wall of the third threaded hole, and the first and second fixers are threadedly connected to the supporting leg fixer via the third bolt.

[0007] Preferably, a supporting foot is fixedly connected to the front side of the supporting foot fixture, a first hole is formed on the top of the supporting foot fixture, and the first hole, the first fixture and the second fixture are adapted to each other.

[0008] Preferably, a side surface of the first fixture is fixedly connected to a positioning workbench, the first fixture is fixedly connected to the second fixture via the positioning workbench, and an inner wall of the positioning workbench is fixedly connected to a welding workbench.

[0009] Preferably, a fourth threaded hole is opened on the top of the positioning workbench, a fourth bolt is threadedly connected to the inner wall of the fourth threaded hole, and the positioning workbench is threadedly connected to the rest platform through the fourth bolt.

[0010] Preferably, the bottom of the rest platform is fixedly connected to a first threaded hole base, a fifth threaded hole is opened on the side of the threaded hole base, the inner wall of the fifth threaded hole is threadedly connected to a fifth bolt, and the threaded hole base is threadedly connected to an oblique support rod through the fifth bolt.

[0011] Preferably, a sixth threaded hole is opened on the side of the oblique support rod, the inner wall of the sixth threaded hole is threadedly connected with a sixth bolt, the oblique support rod is threadedly connected to a second threaded hole base through the sixth bolt, and the top of the second threaded hole base is fixedly connected to a positioning workbench.

[0012] Preferably, a threaded sleeve is fixedly connected to the top of the positioning workbench, a threaded column is threadedly connected to the inner wall of the threaded sleeve, and a vertical pole is fixedly connected to the top of the threaded column.

[0013] Preferably, a first object hanger and a second object hanger are fixedly connected to the side surface of the vertical pole in sequence from the top, a second hole is opened on the top of the first object hanger, and a chain ring is installed on the inner wall of the second hole.

[0014] Preferably, a chain is installed on the inner wall of the chain ring, a hole base is installed on the chain ring through the chain, and a tool bag is fixedly connected to the bottom of the hole base.

[0015] (III) Beneficial effects Compared with the prior art, the present invention provides a wind tower door frame welding safety protection tooling, which has the following beneficial effects: 1. The wind tower door frame welding safety protection tooling is assembled through the connection of a threaded sleeve, a threaded column, a vertical pole, a first hanger, a second hanger, a chain ring, a chain, a hole base and a tool bag, so that workers can roll up the required welding equipment in advance and store it in the tool bag and the second hanger, so that workers only need to climb directly to the wind tower through a ladder, which to a certain extent reduces the weight of the workers climbing. When the workers climb to the top of the wind tower, because the welding tools are stored and organized, the workers can take the corresponding tools they need, so that the work area will not become chaotic. This ensures the safety of the workers' movement in the work area to a certain extent and makes the workers' movement more convenient.

[0016] 2. The wind tower door frame welding safety protection tooling forms a complete workbench through the assembly and connection of the first fixture, the positioning workbench, the second fixture, the welding workbench, the fourth bolt, the rest platform, the first threaded hole base, the fifth bolt, the oblique support rod, the sixth bolt and the second threaded hole base, so that workers have enough operating area and operating space, which enables workers to construct the door frame in a stable area, which increases the workers' working area to a certain extent and reduces the difficulty of their work. At the same time, because the welding construction is not directly carried out on the wind tower body, but on the work platform, the workers will not slip and fall because they are too absorbed in their work and fail to observe the edge of the wind tower. This ensures the personal safety of the workers to a certain extent and reduces the risk of accidents by the workers.

[0017] 3. The wind tower door frame welding safety protection tooling, through the assembly of the first fixer, the second fixer, the reinforcement rib, the support leg module, the workbench and the hanging device, enables the device to be assembled on the ground first, and then hoisted to the wind tower by lifting. Workers are no longer required to climb up with materials before welding construction, thereby reducing the risk of accidental injuries and falls caused by workers setting up temporary protection. At the same time, it also solves the problem of increased work intensity caused by workers needing to transport materials for setting up temporary protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] FIG1 is a schematic diagram of an assembly of a wind tower safety protection tooling provided by the present invention; FIG2 is a schematic diagram of a wind tower door frame welding safety protection tooling structure proposed by the present invention; FIG3 is a schematic diagram of a reinforcing rib explosion structure proposed by the present invention; FIG4 is a schematic diagram of an exploded structure of a support leg device proposed by the present invention; FIG5 is a schematic diagram of an exploded structure of a workbench proposed by the present invention; FIG. 6 is a schematic diagram of the explosion structure of a hanging device proposed by the present invention.

[0019] In the figure: 1. first fixer; 2. first bolt; 3. reinforcing rib; 4. second bolt; 5. second fixer; 6. third bolt; 7. support foot fixer; 8. support foot; 9. positioning workbench; 10. welding workbench; 11. fourth bolt; 12. resting table; 13. first threaded hole base; 14. fifth bolt; 15. oblique support rod; 16. sixth bolt; 17. second threaded hole base; 18. threaded sleeve; 19. threaded column; 20. vertical rod; 21. first hanger; 22. second hanger; 23. chain ring; 24. chain; 25. hole base; 26. tool bag. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] Please refer to a wind tower door frame welding safety protection tooling shown in Figures 1-3, which includes a first fixer 1, a first threaded hole is opened on the front side of the first fixer 1, a first bolt 2 is threadedly connected to the inner wall of the first threaded hole, the first fixer 1 is threadedly connected to a reinforcing rib 3 through the first bolt 2, a second threaded hole is opened on the front side of the reinforcing rib 3, a second bolt 4 is threadedly connected to the inner wall of the second threaded hole, and the reinforcing rib 3 is threadedly connected to a second fixer 5 through the second bolt 4.

[0022] The reinforcing rib 3 is first placed on the first fixture 1 and the second fixture 5, and the two ends of the reinforcing rib 3 are aligned with the first fixture 1 and the second fixture 5 respectively, and then the first bolt 2 is passed through the reinforcing rib 3 and screwed into the first threaded hole to complete the assembly between the reinforcing rib 3 and the first fixture 1, and then the second bolt 4 is screwed into the second threaded hole and continued to rotate until it is screwed into the second fixture 5 to complete the assembly between the second fixture 5 and the reinforcing rib 3, thereby completing the assembly between the reinforcing rib 3 and the first fixture 1 and the second fixture 5.

[0023] After the reinforcing ribs 3 are assembled between the first fixture 1 and the second fixture 5, the device is hoisted onto the wind tower and hoisted to a position on the door frame of the wind tower by hoisting equipment to complete the operation process.

[0024] As shown in Figure 4, a third threaded hole is opened on the side of the first fixture 1 and the second fixture 5, and the inner wall of the third threaded hole is threadedly connected with a third bolt 6. The first fixture 1 and the second fixture 5 are threadedly connected with a supporting foot fixture 7 through the third bolt 6. The front of the supporting foot fixture 7 is fixedly connected with a supporting foot 8. The top of the supporting foot fixture 7 is opened with a first hole, and the first hole, the first fixture 1 and the second fixture 5 are adapted to each other.

[0025] By putting the supporting foot fixture 7 onto the first fixture 1 and the second fixture 5, and the supporting foot 8 is welded to the supporting foot fixture 7 by welding, after the supporting foot fixture 7 is put onto the first fixture 1 and the second fixture 5, the third threaded holes on the supporting foot fixture 7 and the first fixture 1 and the second fixture 5 are aligned, and then the third bolt 6 is passed through the supporting foot fixture 7 and screwed into the first fixture 1 and the second fixture 5 to complete the installation.

[0026] By installing the supporting foot fixture 7 onto the first fixture 1 and the second fixture 5, after the first fixture 1 and the second fixture 5 are hung at appropriate positions on the wind tower body, the height position of the supporting fixture 7 between the first fixture 1 and the second fixture 5 is adjusted, so that the supporting foot 8 can be firmly pressed against the ground.

[0027] As shown in Figures 5 and 6, the side of the first fixture 1 is fixedly connected to a positioning workbench 9, the first fixture 1 is fixedly connected to the second fixture 5 through the positioning workbench 9, the inner wall of the positioning workbench 9 is fixedly connected to a welding workbench 10, a fourth threaded hole is opened on the top of the positioning workbench 9, the inner wall of the fourth threaded hole is threadedly connected to a fourth bolt 11, the positioning workbench 9 is threadedly connected to a resting platform 12 through the fourth bolt 11, the bottom of the resting platform 12 is fixedly connected to a first threaded hole base 13, a fifth threaded hole is opened on the side of the threaded hole base, the inner wall of the fifth threaded hole is threadedly connected to a fifth bolt 14, the threaded hole base is threadedly connected to an oblique support rod 15 through the fifth bolt 14, a sixth threaded hole is opened on the side of the oblique support rod 15, the inner wall of the sixth threaded hole is threadedly connected to a sixth bolt 16, the oblique support rod 15 is threadedly connected to a second threaded hole base 17 through the sixth bolt 16, and the top of the second threaded hole base 17 is fixedly connected to the positioning workbench 9.

[0028] The positioning workbench 9 is welded between the first fixture 1 and the second fixture 5 by welding, and the welding workbench 10 is welded on the positioning workbench 9. The rest table 12 is placed on the positioning workbench 9 and aligned with the fourth threaded hole, and then the fourth bolt 11 is passed through the rest table 12 and screwed into the fourth threaded hole and tightened to complete the assembly of the rest table 12 on the positioning workbench 9. The first threaded hole base 13 is welded to the bottom of the rest table 12, and the second threaded hole base 17 is welded on the positioning workbench 1. The oblique support rod 15 is placed on the first threaded hole base 13 and the second threaded hole base 17 and aligned with the fifth threaded hole on the first threaded hole base 13 and the sixth threaded hole on the second threaded hole base 17, and then the fifth bolt 14 and the sixth bolt 16 are screwed into the fifth threaded hole and the sixth threaded hole respectively to complete the assembly of the oblique support rod 15 between the positioning workbench 9 and the rest table 12.

[0029] After the workbench is assembled between the first fixture 1 and the second fixture 5, the top of a common climbing ladder on the market is installed on the rest platform 12, and the bottom of the climbing ladder is against the ground, so that workers can climb up to the rest platform 12 along the climbing ladder, and then walk to the welding workbench 10 to weld the door frame. The workers adjust the position back and forth on the positioning workbench 9 and the welding workbench 10 to better complete the welding and complete the process operation.

[0030] By assembling and connecting the first fixture 1, the positioning workbench 9, the second fixture 5, the welding workbench 10, the fourth bolt 11, the rest platform 12, the first threaded hole base 13, the fifth bolt 14, the oblique support rod 15, the sixth bolt 16 and the second threaded hole base 17, a complete workbench is formed, which can provide workers with sufficient operating area and operating space, so that workers can construct the door frame in a stable area, which increases the workers' working area to a certain extent and reduces the difficulty of their work. At the same time, because the welding construction is not directly carried out on the wind tower body, but on the work platform, the workers will not fall down due to being too absorbed in their work and not noticing the edge of the wind tower. This ensures the personal safety of the workers to a certain extent and reduces the risk of accidents by the workers.

[0031] A threaded sleeve 18 is fixedly connected to the top of the positioning workbench 9, a threaded column 19 is threadedly connected to the inner wall of the threaded sleeve 18, a vertical pole 20 is fixedly connected to the top of the threaded column 19, a first hanger 21 and a second hanger 22 are fixedly connected to the sides of the vertical pole 20 in sequence from top to bottom, a second hole is opened on the top of the first hanger 21, a chain ring 23 is installed on the inner wall of the second hole, a chain 24 is installed on the inner wall of the chain ring 23, a hole base 25 is installed on the chain ring 23 through the chain 24, and a tool bag 26 is fixedly connected to the bottom of the hole base 25.

[0032] The threaded sleeve 18 is welded to the top of the positioning workbench 9, the threaded column 19 is integrally formed with the vertical pole 20, the first object hanger 21 and the second object hanger 22 are also integrally formed with the vertical pole 20, one end of the chain 24 is first buckled into the chain ring 23, and then one end of the chain 24 is buckled into the hole base 25, the hole base 25 is integrally formed with the tool bag 26, the chain ring 23 is buckled into the first object hanger 21, and the installation is completed.

[0033] The worker screws the vertical pole 20 into the threaded sleeve 18 through the threaded column 19, and then classifies the welding tools according to size and length, and puts different parts and materials of the welding tools into the tool bag 26 respectively, and then winds the cables and the like and puts them on the second hanger 22 to complete the process operation.

[0034] By connecting and assembling the threaded sleeve 18, the threaded column 19, the vertical pole 20, the first hanger 21, the second hanger 22, the chain ring 23, the chain 24, the hole base 25 and the tool bag 26, the workers can roll up the required welding equipment in advance and store it in the tool bag 26 and the second hanger 22, so that the workers only need to climb directly to the wind tower with a ladder, which to a certain extent reduces the weight of the workers climbing. When the workers climb to the top of the wind tower, because the welding tools are all stored and organized, the workers can just take the corresponding tools they need, so that the work area will not become chaotic. This to a certain extent ensures the safety of the workers' movement in the work area and makes the workers' movement more convenient.

[0035] Through the assembly of the first fixture 1, the second fixture 5, the reinforcement rib 3, the support leg module, the workbench and the hanging device, the device can be assembled on the ground first and then lifted to the wind tower by hoisting. Workers are no longer required to climb up with materials before welding, thereby reducing the risk of accidental injuries and falls caused by workers setting up temporary protection. At the same time, it also solves the problem of increased work intensity caused by workers needing to transport materials for setting up temporary protection.

[0036] In summary, the wind tower door frame welding safety protection tooling is to place the reinforcing rib 3 on the first fixer 1 and the second fixer 5 first, and align the two ends of the reinforcing rib 3 with the first fixer 1 and the second fixer 5 respectively, and then pass the first bolt 2 through the reinforcing rib 3 and screw it into the first threaded hole to complete the assembly between the reinforcing rib 3 and the first fixer 1, and then screw the second bolt 4 into the second threaded hole and continue to rotate until it is screwed into the second fixer 5 to complete the assembly between the second fixer 5 and the reinforcing rib 3, thereby completing the assembly between the reinforcing rib 3 and the first fixer 1 and the second fixer 5, and by The support foot fixture 7 is put on the first fixture 1 and the second fixture 5, and the support foot 8 is welded to the support foot fixture 7 by welding. After the support foot fixture 7 is put on the first fixture 1 and the second fixture 5, the third threaded hole on the support foot fixture 7 and the first fixture 1 and the second fixture 5 is aligned, and then the third bolt 6 is passed through the support foot fixture 7 and screwed into the first fixture 1 and the second fixture 5 to complete the installation. The positioning workbench 9 is welded between the first fixture 1 and the second fixture 5 by welding, and the welding workbench 10 is welded on the positioning workbench. 9, place the rest table 12 on the positioning workbench 9, and align it with the fourth threaded hole, then pass the fourth bolt 11 through the rest table 12 and screw it into the fourth threaded hole, tighten it, and complete the assembly of the rest table 12 on the positioning workbench 9. The first threaded hole base 13 is welded to the bottom of the rest table 12, and the second threaded hole base 17 is welded on the positioning workbench 1, place the oblique support rod 15 on the first threaded hole base 13 and the second threaded hole base 17 and align it with the fifth threaded hole on the first threaded hole base 13 and the sixth threaded hole on the second threaded hole base 17, and then tighten the fifth bolt 11. 4 and the sixth bolt 16 are screwed into the fifth threaded hole and the sixth threaded hole respectively to complete the assembly of the oblique support rod 15 between the positioning workbench 9 and the rest platform 12. The threaded sleeve 18 is welded to the top of the positioning workbench 9. The threaded column 19 is integrally formed with the vertical pole 20. The first hanging device 21 and the second hanging device 22 are also integrally formed with the vertical pole 20. First buckle one end of the chain 24 into the chain ring 23, and then buckle one end of the chain 24 into the hole base 25. The hole base 25 is integrally formed with the tool bag 26. Buckle the chain ring 23 into the first hanging device 21 to complete the installation.

[0037] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise one" do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A wind tower door frame welding safety protection tool, comprising a first fixer (1), characterized in that: A first threaded hole is formed on the front surface of the first fixer (1), a first bolt (2) is threadedly connected to the inner wall of the first threaded hole, the first fixer (1) is threadedly connected to a reinforcing rib (3) via the first bolt (2), a second threaded hole is formed on the front surface of the reinforcing rib (3), a second bolt (4) is threadedly connected to the inner wall of the second threaded hole, and the reinforcing rib (3) is threadedly connected to a second fixer (5) via the second bolt (4).

2. A wind tower door frame welding safety protection tooling according to claim 1, characterized in that: A third threaded hole is provided on the side of the first fixer (1) and the second fixer (5), a third bolt (6) is threadedly connected to the inner wall of the third threaded hole, and the first fixer (1) and the second fixer (5) are threadedly connected to the support foot fixer (7) via the third bolt (6).

3. A wind tower door frame welding safety protection tooling according to claim 2, characterized in that: The front side of the support foot fixer (7) is fixedly connected to a support foot (8), the top of the support foot fixer (7) is provided with a first hole, and the first hole, the first fixer (1) and the second fixer (5) are mutually adapted.

4. A wind tower door frame welding safety protection tooling according to claim 1, characterized in that: A positioning workbench (9) is fixedly connected to the side of the first fixture (1), the first fixture (1) is fixedly connected to the second fixture (5) via the positioning workbench (9), and a welding workbench (10) is fixedly connected to the inner wall of the positioning workbench (9).

5. A wind tower door frame welding safety protection tooling according to claim 4, characterized in that: A fourth threaded hole is provided on the top of the positioning workbench (9), a fourth bolt (11) is threadedly connected to the inner wall of the fourth threaded hole, and the positioning workbench (9) is threadedly connected to the rest platform (12) via the fourth bolt (11).

6. A wind tower door frame welding safety protection tooling according to claim 5, characterized in that: The bottom of the rest platform (12) is fixedly connected to a first threaded hole base (13), a side surface of the threaded hole base is provided with a fifth threaded hole, an inner wall of the fifth threaded hole is threadedly connected to a fifth bolt (14), and the threaded hole base is threadedly connected to an oblique support rod (15) via the fifth bolt (14).

7. A wind tower door frame welding safety protection tooling according to claim 6, characterized in that: A sixth threaded hole is formed on the side of the oblique support rod (15), a sixth bolt (16) is threadedly connected to the inner wall of the sixth threaded hole, the oblique support rod (15) is threadedly connected to a second threaded hole base (17) via the sixth bolt (16), and a positioning workbench (9) is fixedly connected to the top of the second threaded hole base (17).

8. A wind tower door frame welding safety protection tooling according to claim 4, characterized in that: A threaded sleeve (18) is fixedly connected to the top of the positioning workbench (9), a threaded column (19) is threadedly connected to the inner wall of the threaded sleeve (18), and a vertical rod (20) is fixedly connected to the top of the threaded column (19).

9. A wind tower door frame welding safety protection tooling according to claim 8, characterized in that: A first object hanger (21) and a second object hanger (22) are fixedly connected to the side surface of the vertical pole (20) in sequence from the top, a second hole is provided at the top of the first object hanger (21), and a chain ring (23) is installed on the inner wall of the second hole.

10. A wind tower door frame welding safety protection tooling according to claim 9, characterized in that: A chain (24) is installed on the inner wall of the chain ring (23), a hole base (25) is installed on the chain ring (23) via the chain (24), and a tool bag (26) is fixedly connected to the bottom of the hole base (25).

Citation Information

Cited By

  • Wind power tower door frame welding supporting and hoisting device

    CN121104513A

  • Wind power tower cylinder door frame welding support and hoisting device

    CN121104513B