Load processing method and device

By obtaining telemetry information of the distribution network, automatically judge and perform load transfer, the problems of slow load transfer speed and poor reliability caused by manual judgment in the existing technology are solved, and fast and accurate load transfer is achieved, which improves the distribution network. power supply reliability.

CN119209551APending Publication Date: 2024-12-27GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411387232.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

In the prior art, it is manually determined whether the power load on the line of the distribution network needs to be transferred, resulting in slower judgment and transfer speeds, which leads to poor reliability of the distribution network power supply.

Method used

By obtaining telemetry information of the substation in the distribution network, determining the voltage values ​​of multiple buses and the three-phase current values ​​of the low switch and outgoing switch, it is automatically determined whether the power load needs to be transferred to realize automatic load transfer.

Benefits of technology

It improves the speed and accuracy of load transfer, improves the power supply reliability of the distribution network, reduces the need for manual intervention, quickly deals with power grid failures, and improves the stability of regional power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119209551A_ABST
    Figure CN119209551A_ABST
Patent Text Reader

Abstract

The invention discloses a load processing method and device, and relates to the technical field of power distribution networks. The method comprises the following steps: acquiring telemetering information of a transformer substation in the power distribution network, and determining voltage values of a plurality of buses corresponding to the transformer substation in the power distribution network according to the telemetering information of the transformer substation in the power distribution network; obtaining a three-phase current value of each transformer low switch in the transformer substation in the power distribution network according to the telemetering information of the transformer substation in the power distribution network; obtaining a three-phase current value of each outgoing line switch in the power distribution network according to telemetry information of a transformer substation in the power distribution network; and determining a detection result of the plurality of buses based on the voltage values of the plurality of buses, the three-phase current value of each transformer-down switch and the three-phase current value of each outgoing line switch. Through application of the method and the device, the problem that the power supply reliability of the power distribution network is poorer due to the fact that the load judgment and transfer speed is lower because whether the power load on the line of the power distribution network needs to be transferred or not is judged manually in the related technology is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power distribution networks, and in particular to a method and device for processing a load. Background Art

[0002] In recent years, power grid automation technology has developed rapidly, and automated switches are widely used in distribution network load transfer, programmed operation, remote rapid operation and power restoration, etc. In the operation of the power grid, it is often necessary to transfer the load of the 10kV medium voltage part from station A to stations B, C, D... for power supply, or from bus a to bus b, c, d... for power supply due to main network equipment failure (such as main transformer failure, 110kV bus, 110kV line, etc.) or section load limitation. For example, Figure 1 It is a schematic diagram of bus load transfer provided by the prior art, such as Figure 1 As shown, the load of 10 kV aM (ie, 10 kV a bus) can be transferred to 10 kV bM (ie, 10 kV b bus) and / or 10 kV cM (ie, 10 kV c bus).

[0003] Moreover, in the related technologies, it is generally necessary to manually judge whether the substation or busbar is under pressure based on the information sent by the substation and feeder automation switch, and then manually analyze the switches to be operated according to the connection relationship of the power grid topology, and check whether the 10kV line, busbar, 110kV line and other equipment on the opposite side will be overloaded after the transfer, and then perform manual remote control operations to transfer the load. However, the analysis process in the related technologies requires a lot of manual analysis and manual remote control operations, which puts high demands on the technical requirements and operational proficiency of the dispatching and operating personnel. Especially when the power grid fails, this has a great impact on the power supply reliability of the power supply area. The fault needs to be handled quickly, and it is completely dependent on manual handling. It is no longer suitable for social development. It is urgent to realize rapid regional load rapid transfer and rapid power restoration to improve regional power supply reliability.

[0004] In addition, the key process of judging whether the power grid equipment is in a faulty state and whether it is necessary to start batch transfer of loads in the relevant technology still requires human participation in the judgment to prevent the false start or missed start of the "batch transfer of loads" process. However, this has a great impact on the rapid batch transfer processing of power grid faults, which will delay the load transfer speed and reduce the power supply reliability.

[0005] Currently, no effective solution has been proposed to the problem that in the related art, whether it is necessary to transfer the power load on the distribution network line is determined manually, resulting in slow judgment and load transfer, and further leading to poor reliability of power supply using the distribution network. Summary of the invention

[0006] The main purpose of the present application is to provide a load processing method and device to solve the problem in the related art that manual judgment is required on whether the power load on the line of the distribution network needs to be transferred, resulting in slow judgment and load transfer, and further leading to poor reliability of power supply using the distribution network.

[0007] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for processing a load is provided. The method includes: obtaining telemetry information of a substation in a distribution network, and determining the voltage values ​​of multiple busbars corresponding to the substation in the distribution network according to the telemetry information of the substation in the distribution network; obtaining the three-phase current value of each low-voltage switch in the substation in the distribution network according to the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; obtaining the three-phase current value of each outgoing switch in the distribution network according to the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each busbar corresponding to the substation in the distribution network; determining the detection results of the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars.

[0008] Furthermore, based on the voltage values ​​of the multiple busbars, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing line switch, the detection results of the multiple busbars are determined, including: based on the voltage values ​​of the multiple busbars, determining the initial voltage value of each busbar corresponding to the substation in the distribution network; obtaining the latest voltage value of each busbar corresponding to the substation in the distribution network; judging whether the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and whether the latest voltage value of each busbar is less than a first preset value, to obtain a judgment result; based on the judgment result, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing line switch, determining the detection results of the multiple busbars.

[0009] Further, based on the judgment result, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of the multiple busbars are determined, including: if the judgment result indicates that the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and / or the latest voltage value of each busbar is not less than the first preset value, then the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; if the judgment result indicates that the latest voltage value of at least one busbar is different from the initial voltage value, and the latest voltage value of the at least one busbar is less than the first preset value, then the identification information of the at least one busbar is obtained; based on the identification information of the at least one busbar, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of the multiple busbars are determined.

[0010] Further, based on the identification information of the at least one bus, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing line switch, determining the detection results of the multiple busbars includes: based on the identification information of the at least one busbar, determining the status information of the target device corresponding to the at least one busbar, wherein the target device includes at least one of the following: the transformer and target line connected to the at least one busbar, and the substation corresponding to the at least one busbar; judging whether the target device corresponding to the at least one busbar is in a target state, wherein the target state includes at least one of the following: maintenance state, debugging state, setting state and blocking state; if the target device corresponding to the at least one busbar is in the target state, determining the detection result as no need to transfer the power load on the multiple busbars; if the target device corresponding to the at least one busbar is not in the target state, determining the detection results of the multiple busbars based on the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing line switch.

[0011] Further, based on the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, determining the detection results of the multiple busbars includes: based on the three-phase current value of each transformer lowering switch, according to a preset period, re-collecting the three-phase current value of each transformer lowering switch in the substation in the distribution network to obtain a target three-phase current value of each transformer lowering switch; determining the target three-phase current value of the transformer lowering switch corresponding to the at least one busbar based on the target three-phase current value of each outgoing switch; based on the three-phase current value of each outgoing switch, according to the preset period, re-collecting the three-phase current value of each outgoing switch in the distribution network to obtain a target three-phase current value of each outgoing switch; determining the target three-phase current value of the outgoing switch connected to the at least one busbar based on the target three-phase current value of each outgoing switch; determining the detection results of the multiple busbars based on the target three-phase current value of the transformer lowering switch corresponding to the at least one busbar and the target three-phase current value of the outgoing switch connected to the at least one busbar.

[0012] Furthermore, based on the target three-phase current value of the variable-voltage switch corresponding to the at least one bus and the target three-phase current value of the outgoing switch connected to the at least one bus, determining the detection results of the multiple busbars includes: obtaining the latest three-phase current value of the variable-voltage switch corresponding to the at least one busbar, and judging whether the latest three-phase current value of the variable-voltage switch corresponding to the at least one busbar is the same as the target three-phase current value of the variable-voltage switch corresponding to the at least one busbar, and whether the latest three-phase current value of the variable-voltage switch corresponding to the at least one busbar is less than a second preset value; if the latest three-phase current value of the variable-voltage switch corresponding to the at least one busbar is the same as the target three-phase current value of the variable-voltage switch corresponding to the at least one busbar, If the target three-phase current values ​​of the transformer lowering switches corresponding to a bus are the same, and / or the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is not less than the second preset value, the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; if the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is different from the target three-phase current value of the transformer lowering switch corresponding to at least one bus, and the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is less than the second preset value, the detection results of the multiple busbars are determined based on the target three-phase current value of the outgoing switch connected to the at least one bus.

[0013] Furthermore, according to the target three-phase current value of the outgoing switch connected to the at least one bus, determining the detection results of the multiple busbars includes: obtaining the latest three-phase current value of the outgoing switch connected to the at least one bus, and judging whether the latest three-phase current value of the outgoing switch connected to the at least one bus is the same as the target three-phase current value of the outgoing switch connected to the at least one bus, and whether the latest three-phase current value of the outgoing switch connected to the at least one bus is less than a third preset value; if the latest three-phase current value of the outgoing switch connected to the at least one bus is the same as the target three-phase current value of the outgoing switch connected to the at least one bus, If the target three-phase current value of the outgoing switch connected to the at least one bus is the same, and / or the latest three-phase current value of the outgoing switch connected to the at least one bus is not less than the third preset value, then the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; if the latest three-phase current value of the outgoing switch connected to the at least one bus is different from the target three-phase current value of the outgoing switch connected to the at least one bus, and the latest three-phase current value of the outgoing switch connected to the at least one bus is less than the third preset value, then the detection result is determined to be that the power load on the at least one bus needs to be transferred.

[0014] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a load processing device is provided. The device includes: a first processing unit, which is used to obtain telemetry information of a substation in a distribution network, and determine the voltage values ​​of multiple buses corresponding to the substation in the distribution network according to the telemetry information of the substation in the distribution network; a first acquisition unit, which is used to obtain the three-phase current value of each low-voltage switch in the substation in the distribution network according to the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; a second acquisition unit, which is used to obtain the three-phase current value of each outgoing switch in the distribution network according to the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each bus corresponding to the substation in the distribution network; a first determination unit, which is used to determine the detection results of the multiple buses based on the voltage values ​​of the multiple buses, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple buses.

[0015] Further, the first determination unit includes: a first determination subunit, used to determine the initial voltage value of each bus corresponding to the substation in the distribution network based on the voltage values ​​of the multiple busbars; a first acquisition subunit, used to acquire the latest voltage value of each bus corresponding to the substation in the distribution network; a first judgment subunit, used to judge whether the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and whether the latest voltage value of each busbar is less than a first preset value, to obtain a judgment result; a second determination subunit, used to determine the detection results of the multiple busbars based on the judgment result, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing line switch.

[0016] Further, the second determination sub-unit includes: a first determination sub-unit, which is used to determine that the detection result is that there is no need to transfer the power load on the multiple busbars if the judgment result indicates that the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and / or the latest voltage value of each busbar is not less than the first preset value; a first acquisition sub-unit, which is used to obtain the identification information of the at least one busbar if the judgment result indicates that the latest voltage value of at least one busbar is different from the initial voltage value, and the latest voltage value of the at least one busbar is less than the first preset value; a second determination sub-unit, which is used to determine the detection results of the multiple busbars based on the identification information of the at least one busbar, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch.

[0017] Further, the second determination sub-subunit includes: a first determination module, used to determine the status information of the target device corresponding to the at least one busbar based on the identification information of the at least one busbar, wherein the target device includes at least one of the following: the transformer and the target line connected to the at least one busbar, and the substation corresponding to the at least one busbar; a first judgment module, used to judge whether the target device corresponding to the at least one busbar is in a target state, wherein the target state includes at least one of the following: maintenance state, debugging state, setting state and blocking state; a second determination module, used to determine that the detection result is that there is no need to transfer the power load on the multiple buses if the target device corresponding to the at least one busbar is in the target state; a third determination module, used to determine the detection results of the multiple buses based on the three-phase current value of each transformer and the three-phase current value of each outgoing switch if the target device corresponding to the at least one busbar is not in the target state.

[0018] Further, the third determination module includes: a first acquisition submodule, which is used to re-collect the three-phase current value of each lowering switch in the substation in the distribution network based on the three-phase current value of each lowering switch according to a preset period to obtain the target three-phase current value of each lowering switch; a first determination submodule, which is used to determine the target three-phase current value of the lowering switch corresponding to the at least one bus according to the target three-phase current value of each lowering switch; a second acquisition submodule, which is used to re-collect the three-phase current value of each outgoing switch in the distribution network according to the preset period based on the three-phase current value of each outgoing switch to obtain the target three-phase current value of each outgoing switch; a second determination submodule, which is used to determine the target three-phase current value of the outgoing switch connected to the at least one bus according to the target three-phase current value of each outgoing switch; a third determination submodule, which is used to determine the detection results of the multiple buses according to the target three-phase current value of the lowering switch corresponding to the at least one bus and the target three-phase current value of the outgoing switch connected to the at least one bus.

[0019] Further, the third determination submodule includes: a first processing submodule, used to obtain the latest three-phase current value of the variable switch corresponding to the at least one bus, and determine whether the latest three-phase current value of the variable switch corresponding to the at least one bus is the same as the target three-phase current value of the variable switch corresponding to the at least one bus, and whether the latest three-phase current value of the variable switch corresponding to the at least one bus is less than a second preset value; a first determination submodule, used to determine if the latest three-phase current value of the variable switch corresponding to the at least one bus is the same as the target three-phase current value of the variable switch corresponding to the at least one bus, and / or the latest three-phase current value of the transformer corresponding to the at least one bus is not less than the second preset value, then the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; the second determination submodule is used to determine the detection results of the multiple busbars based on the target three-phase current value of the outgoing switch connected to the at least one bus if the latest three-phase current value of the transformer corresponding to the at least one bus is different from the target three-phase current value of the transformer corresponding to the at least one bus, and the latest three-phase current value of the transformer corresponding to the at least one bus is less than the second preset value.

[0020] Furthermore, the second determination submodule includes: a first processing submodule, used to obtain the latest three-phase current value of the outgoing switch connected to the at least one bus, and to determine whether the latest three-phase current value of the outgoing switch connected to the at least one bus is the same as the target three-phase current value of the outgoing switch connected to the at least one bus, and whether the latest three-phase current value of the outgoing switch connected to the at least one bus is less than a third preset value; a first determination submodule, used to determine whether the latest three-phase current value of the outgoing switch connected to the at least one bus is the same as the target three-phase current value of the outgoing switch connected to the at least one bus. The current values ​​are the same, and / or the latest three-phase current value of the outgoing switch connected to the at least one bus is not less than the third preset value, then the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; the second determination sub-module is used to determine that the detection result is that the power load on the at least one busbar needs to be transferred if the latest three-phase current value of the outgoing switch connected to the at least one busbar is different from the target three-phase current value of the outgoing switch connected to the at least one busbar, and the latest three-phase current value of the outgoing switch connected to the at least one busbar is less than the third preset value.

[0021] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a computer-readable storage medium is provided, wherein the storage medium stores a program, wherein the program executes any one of the above-mentioned load processing methods.

[0022] In order to achieve the above-mentioned purpose, according to another aspect of the present application, an electronic device is provided, which includes one or more processors and a memory, and the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement any one of the load processing methods described above.

[0023] Through the present application, the following steps are adopted: obtaining telemetry information of a substation in a distribution network, and determining voltage values ​​of a plurality of busbars corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network; obtaining a three-phase current value of each low-voltage switch in the substation in the distribution network based on the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; obtaining a three-phase current value of each outgoing switch in the distribution network based on the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each busbar corresponding to the substation in the distribution network; determining detection results of a plurality of busbars based on the voltage values ​​of a plurality of busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the plurality of busbars, thereby solving the problem in the related art that whether it is necessary to transfer the power load on the line of the distribution network is manually determined, resulting in a slow speed of judging and transferring the load, and further resulting in poor reliability of power supply using the distribution network. By determining the voltage values ​​of multiple busbars corresponding to the substations in the distribution network based on the telemetry information of the substations in the distribution network, and obtaining the three-phase current value of each transformer substation in the distribution network and the three-phase current value of each outgoing line switch in the distribution network, and then determining whether it is necessary to transfer the power load on the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each transformer substation and the three-phase current value of each outgoing line switch, it is possible to automatically determine whether it is necessary to transfer the power load on the lines of the distribution network without manual intervention, thereby improving the speed of determining whether to transfer the load and the speed of transferring the load, thereby achieving the effect of improving the reliability of power supply of the distribution network. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0025] Figure 1 It is a schematic diagram of busbar load transfer provided according to the prior art;

[0026] Figure 2 is a flow chart of a load processing method provided according to an embodiment of the present application;

[0027] Figure 3 is a schematic diagram of a substation transmission line in this embodiment;

[0028] Figure 4 is a flow chart of a load batch transfer control startup method provided in accordance with an embodiment of the present application;

[0029] Figure 5is a schematic diagram of a load processing device provided according to an embodiment of the present application;

[0030] Figure 6 is a schematic diagram of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION

[0031] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0032] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0033] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0034] It should be noted that the relevant information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data for display, data for analysis, etc.) involved in this disclosure are all information and data authorized by the user or fully authorized by all parties. For example, an interface is set between this system and the relevant user or organization. Before obtaining relevant information, it is necessary to send an acquisition request to the aforementioned user or organization through the interface, and obtain relevant information after receiving the consent information fed back by the aforementioned user or organization.

[0035] For the convenience of description, some nouns or terms involved in the embodiments of the present application are explained below:

[0036] Batch load transfer: refers to a technology that uses automated equipment or systems to cooperate with each other to achieve rapid transfer of power loads on distribution lines due to problems such as power grid equipment failure, section overload, and power grid risk.

[0037] The present invention is described below in conjunction with preferred implementation steps. Figure 2 is a flow chart of a load processing method provided in an embodiment of the present application, such as Figure 2 As shown, the method comprises the following steps:

[0038] Step S201, obtaining telemetry information of a substation in a distribution network, and determining voltage values ​​of a plurality of buses corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network.

[0039] For example, the 10kV bus voltage values ​​of all substations, the three-phase current values ​​of all substation transformer lowering switches, and the three-phase current values ​​of all 10kV outgoing line switches can be used as monitoring object points, and the telemetry values ​​of the monitoring object points can be obtained, and the telemetry values ​​of the monitoring object points (corresponding to the above-mentioned telemetry information) can include the voltage value of the 10kV bus (corresponding to the voltage values ​​of the above-mentioned multiple buses), the three-phase current value of the transformer lowering switch, and the three-phase current value of the 10kV outgoing line switch.

[0040] Step S202, according to the telemetry information of the substation in the distribution network, obtain the three-phase current value of each low-voltage switch in the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network.

[0041] For example, the telemetry value (corresponding to the telemetry information mentioned above) may include the three-phase current value of the variable-lower switch (corresponding to the three-phase current value of each variable-lower switch mentioned above).

[0042] Step S203, obtaining the three-phase current value of each outgoing switch in the distribution network according to the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each bus corresponding to the substation in the distribution network.

[0043] For example, the telemetry value (corresponding to the telemetry information mentioned above) may include the three-phase current value of the 10 kV outgoing line switch (corresponding to the three-phase current value of each outgoing line switch mentioned above).

[0044] Step S204, based on the voltage values ​​of the multiple busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, determine the detection results of the multiple busbars, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars.

[0045] For example, it is possible to automatically determine whether it is necessary to transfer the power load on the distribution network lines based on the voltage value of the 10kV bus (corresponding to the voltage values ​​of the multiple busbars mentioned above), the three-phase current value of the step-down switch (corresponding to the three-phase current value of each step-down switch mentioned above) and the three-phase current value of the 10kV outgoing switch (corresponding to the three-phase current value of each outgoing switch mentioned above).

[0046] Through the above-mentioned steps S201 to S204, the voltage values ​​of multiple busbars corresponding to the substation in the distribution network are determined based on the telemetry information of the substation in the distribution network, and the three-phase current value of each transformer substation in the distribution network and the three-phase current value of each outgoing switch in the distribution network are obtained. Then, according to the voltage values ​​of the multiple busbars, the three-phase current value of each transformer substation and the three-phase current value of each outgoing switch, it is determined whether it is necessary to transfer the power load on the multiple busbars, so that it can automatically determine whether it is necessary to transfer the power load on the line of the distribution network without manual intervention, thereby improving the speed of determining whether to transfer the load and the speed of transferring the load, thereby achieving the effect of improving the reliability of power supply of the distribution network.

[0047] Optionally, in the load processing method provided in the embodiment of the present application, based on the voltage values ​​of multiple busbars, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing line switch, the detection results of multiple busbars are determined, including: based on the voltage values ​​of multiple busbars, the initial voltage value of each busbar corresponding to the substation in the distribution network is determined; the latest voltage value of each busbar corresponding to the substation in the distribution network is obtained; it is judged whether the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and whether the latest voltage value of each busbar is less than a first preset value, to obtain a judgment result; based on the judgment result, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing line switch, the detection results of multiple busbars are determined.

[0048] For example, the signal-free collection period T can be set to 30 seconds (settable); the maximum signal collection period Tmax can be set to 100 seconds (settable); the busbar voltage loss threshold can be set to 30% (settable); the telemetry section refresh period Ts can be set to 5 seconds (settable); and the 10kV busbar voltage values ​​of all substations, the three-phase current values ​​of all substation transformer lowering switches, and the three-phase current values ​​of all 10kV outgoing line switches can be used as monitoring object points; then the telemetry values ​​of the monitoring object points (corresponding to the above-mentioned telemetry information, that is, the voltage value of the 10kV busbar, the three-phase current value of the transformer lowering switch, and the three-phase current value of the 10kV outgoing line switch) can be maintained. It exists in the cache area; then read the latest values ​​of all monitored object points (10kV bus voltage) (corresponding to the latest voltage value of each bus mentioned above), compare the voltage value in the cache area (corresponding to the initial voltage value of each bus mentioned above), whether there is a change and the latest value is less than 30% of the rated value (corresponding to the first preset value mentioned above), and according to the comparison result (corresponding to the above judgment result), the three-phase current value of the low-voltage switch (corresponding to the three-phase current value of each low-voltage switch mentioned above) and the three-phase current value of the 10kV outgoing line switch (corresponding to the three-phase current value of each outgoing line switch mentioned above), judge whether it is necessary to transfer the power load on the line of the distribution network.

[0049] In summary, by comparing the latest bus voltage value with the bus voltage value stored in the buffer area, it can be quickly and accurately determined whether the power load on the line of the distribution network needs to be transferred.

[0050] Optionally, in the load processing method provided in the embodiment of the present application, based on the judgment result, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined, including: if the judgment result indicates that the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and / or the latest voltage value of each busbar is not less than a first preset value, then the detection result is determined to be that there is no need to transfer the power loads on multiple busbars; if the judgment result indicates that the latest voltage value of at least one busbar is different from the initial voltage value, and the latest voltage value of at least one busbar is less than the first preset value, then the identification information of at least one busbar is obtained; based on the identification information of at least one busbar, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined.

[0051] For example, if there is no change in the comparison of the latest value (corresponding to the latest voltage value of each bus mentioned above) of all monitored object points (10kV bus voltage) and the voltage value in the buffer area (corresponding to the initial voltage value of each bus mentioned above), and / or the latest value (corresponding to the latest voltage value of each bus mentioned above) is not less than 30% of the rated value (corresponding to the first preset value mentioned above), it is determined that there is no need to transfer the power load on the line of the distribution network; if there is a change in the comparison of the latest value (corresponding to the latest voltage value of at least one bus mentioned above) of all monitored object points (10kV bus voltage) and the voltage value in the buffer area (corresponding to the latest voltage value of at least one bus mentioned above), and the latest value (corresponding to the latest voltage value of at least one bus mentioned above) is less than 30% of the rated value (corresponding to the first preset value mentioned above), then the changed bus (corresponding to at least The method further comprises the following steps: first, determining the voltage jump bus ID (identification, identity recognition, identification), and the voltage values ​​before and after the jump, and finding the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation connected to the voltage jump bus (corresponding to at least one bus mentioned above), and finding out whether the above equipment has signs such as "maintenance", "debugging", "setting", and "data blocking" (corresponding to the above identification information); and then judging whether it is necessary to transfer the power load on the line of the distribution network according to whether the above equipment has signs such as "maintenance", "debugging", "setting", and "data blocking" (corresponding to the above identification information), the three-phase current value of the transformer lowering switch (corresponding to the three-phase current value of each transformer lowering switch mentioned above), and the three-phase current value of the 10kV outgoing line switch (corresponding to the three-phase current value of each outgoing line switch mentioned above).

[0052] In summary, by comparing the latest voltage value of the bus with the bus voltage value stored in the cache, the voltage jump bus can be quickly and accurately determined, and the identification information of the device connected to the voltage jump bus can be easily obtained.

[0053] Optionally, in the load processing method provided in the embodiment of the present application, based on the identification information of at least one bus, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, determining the detection results of multiple busbars includes: based on the identification information of at least one bus, determining the status information of the target device corresponding to at least one bus, wherein the target device includes at least one of the following: a transformer and a target line connected to at least one bus, and a substation corresponding to at least one bus; judging whether the target device corresponding to at least one bus is in a target state, wherein the target state includes at least one of the following: a maintenance state, a debugging state, a setting state and a blocking state; if the target device corresponding to at least one bus is in the target state, determining the detection result is that there is no need to transfer the power loads on multiple buses; if the target device corresponding to at least one bus is not in the target state, determining the detection results of multiple buses based on the three-phase current value of each transformer and the three-phase current value of each outgoing switch.

[0054] For example, if the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) connected to the voltage jump bus (corresponding to at least one of the above-mentioned buses) have signs such as "maintenance" or "debugging" or "setting" or "data blocking" (corresponding to the above-mentioned identification information), it can be determined that the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) connected to the voltage jump bus (corresponding to at least one of the above-mentioned buses) are in maintenance state or debugging state or setting state or blocking state (corresponding to the above-mentioned target state), and there is no need to transfer the power load on the line of the distribution network at this time; if the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) connected to the voltage jump bus (corresponding to at least one of the above-mentioned buses) are in maintenance state or debugging state or setting state or blocking state (corresponding to the above-mentioned target state), it can be determined that the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) connected to the voltage jump bus (corresponding to at least one of the above-mentioned buses) are in maintenance state or debugging state or setting state or blocking state. , 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) do not have "maintenance" or "debugging" or "setting" or "data blocking" signs (corresponding to the above-mentioned identification information), it can be determined that the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) connected to the voltage jump bus (corresponding to at least one of the above-mentioned busbars) are not in maintenance state or debugging state or setting state or blocking state (corresponding to the above-mentioned target state), and then it can be determined whether it is necessary to transfer the power load on the line of the distribution network based on the three-phase current value of the transformer lowering switch (corresponding to the three-phase current value of each of the above-mentioned transformer lowering switches) and the three-phase current value of the 10kV outgoing line switch (corresponding to the three-phase current value of each of the above-mentioned outgoing line switches).

[0055] Through the above-mentioned solution, the status information of the device connected to the voltage jump bus can be quickly and accurately determined according to the identification information of the device connected to the voltage jump bus.

[0056] Optionally, in the load processing method provided in the embodiment of the present application, based on the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, determining the detection results of multiple busbars includes: based on the three-phase current value of each transformer lowering switch, according to a preset period, re-collecting the three-phase current value of each transformer lowering switch in the substation in the distribution network to obtain a target three-phase current value of each transformer lowering switch; determining the target three-phase current value of the transformer lowering switch corresponding to at least one busbar based on the target three-phase current value of each outgoing switch; based on the three-phase current value of each outgoing switch, according to a preset period, re-collecting the three-phase current value of each outgoing switch in the distribution network to obtain the target three-phase current value of each outgoing switch; determining the target three-phase current value of the outgoing switch connected to at least one busbar based on the target three-phase current value of each outgoing switch; determining the detection results of multiple busbars based on the target three-phase current value of the transformer lowering switch corresponding to at least one busbar and the target three-phase current value of the outgoing switch connected to at least one busbar.

[0057] For example, if the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation and other equipment (corresponding to the above-mentioned target equipment) connected to the voltage jump bus (corresponding to at least one of the above-mentioned buses) do not have signs such as "maintenance" or "debugging" or "setting" or "data blocking" (corresponding to the above-mentioned identification information), then all substation 10kV bus voltage values, all substation low-voltage switches' three-phase current values ​​and all 10kV outgoing line switches' three-phase current values ​​in the buffer area can be stored in the waiting area; and start collecting and recording the substation All alarm signals and telemetry information in the power station are collected until the signal-to-signal interval time is greater than the collection period T, or the collection period time is greater than or equal to the maximum signal collection period Tmax, and the signal collection is terminated; then, the three-phase current of the variable-voltage switch corresponding to the collected voltage jump bus (corresponding to the target three-phase current value of the variable-voltage switch corresponding to at least one of the above-mentioned buses) and the three-phase current of the outgoing switch connected to the voltage jump bus (corresponding to the target three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) can be used to determine whether it is necessary to transfer the power load on the distribution network line.

[0058] Through the above scheme, the three-phase current of the lowering switch corresponding to the voltage jump bus and the three-phase current of the outgoing switch connected to the voltage jump bus can be easily collected.

[0059] Optionally, in the load processing method provided in the embodiment of the present application, based on the target three-phase current value of the transformer corresponding to at least one bus and the target three-phase current value of the outgoing switch connected to at least one bus, determining the detection results of multiple busbars includes: obtaining the latest three-phase current value of the transformer corresponding to at least one bus, and judging whether the latest three-phase current value of the transformer corresponding to at least one bus is the same as the target three-phase current value of the transformer corresponding to at least one bus, and whether the latest three-phase current value of the transformer corresponding to at least one bus is less than a second preset value; if the latest three-phase current value of the transformer corresponding to at least one bus is less than a second preset value, then the target three-phase current value of the transformer corresponding to at least one bus is determined; If the new three-phase current value is the same as the target three-phase current value of the transformer lowering switch corresponding to at least one bus, and / or the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is not less than the second preset value, the detection result is determined to be that there is no need to transfer the power load on multiple busbars; if the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is different from the target three-phase current value of the transformer lowering switch corresponding to at least one bus, and the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is less than the second preset value, the detection results of multiple buses are determined based on the target three-phase current value of the outgoing switch connected to at least one bus.

[0060] For example, find the three-phase current of the voltage-changing switch corresponding to the voltage jump bus, compare the latest three-phase current value of the voltage-changing switch (corresponding to the latest three-phase current value of the voltage-changing switch corresponding to at least one of the above-mentioned buses) with the current value in the area to be processed (corresponding to the target three-phase current value of the voltage-changing switch corresponding to at least one of the above-mentioned buses), and check whether there is any change and whether the latest value is less than 1A (corresponding to the second preset value mentioned above); if the latest three-phase current value of the voltage-changing switch (corresponding to the latest three-phase current value of the voltage-changing switch corresponding to at least one of the above-mentioned buses) and the current value in the area to be processed (corresponding to the target three-phase current value of the voltage-changing switch corresponding to at least one of the above-mentioned buses) have no change, and / or the latest value (corresponding to the latest three-phase current value of the voltage-changing switch corresponding to at least one of the above-mentioned buses) has no change. ) is not less than 1A (corresponding to the above-mentioned second preset value), there is no need to transfer the power load on the lines of the distribution network; if the latest three-phase current value of the transformer lowering switch (corresponding to the latest three-phase current value of the transformer lowering switch corresponding to at least one of the above-mentioned buses) and the current value in the to-be-processed area (corresponding to the target three-phase current value of the transformer lowering switch corresponding to at least one of the above-mentioned buses) has changed and the latest value (corresponding to the latest three-phase current value of the transformer lowering switch corresponding to at least one of the above-mentioned buses) is less than 1A (corresponding to the above-mentioned second preset value), then according to the three-phase current of the outgoing switch connected to the voltage jump bus (corresponding to the target three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses), it is determined whether it is necessary to transfer the power load on the lines of the distribution network.

[0061] Through the above scheme, according to the three-phase current of the voltage-changing switch corresponding to the voltage jump bus, it can be quickly and accurately determined whether the power load on the line of the distribution network needs to be transferred.

[0062] Optionally, in the load processing method provided in the embodiment of the present application, determining the detection results of multiple busbars based on the target three-phase current value of the outgoing switch connected to at least one busbar includes: obtaining the latest three-phase current value of the outgoing switch connected to at least one busbar, and judging whether the latest three-phase current value of the outgoing switch connected to at least one busbar is the same as the target three-phase current value of the outgoing switch connected to at least one busbar, and whether the latest three-phase current value of the outgoing switch connected to at least one busbar is less than a third preset value; if the latest three-phase current value of the outgoing switch connected to at least one busbar is less than a third preset value, If the three-phase current value is the same as the target three-phase current value of the outgoing switch connected to at least one bus, and / or the latest three-phase current value of the outgoing switch connected to at least one bus is not less than the third preset value, then the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; if the latest three-phase current value of the outgoing switch connected to at least one bus is different from the target three-phase current value of the outgoing switch connected to at least one bus, and the latest three-phase current value of the outgoing switch connected to at least one bus is less than the third preset value, then the detection result is determined to be that the power load on at least one bus needs to be transferred.

[0063] For example, if the latest three-phase current value of the variable-voltage switch (corresponding to the latest three-phase current value of the variable-voltage switch corresponding to at least one of the above-mentioned buses) is different from the current value in the to-be-processed area (corresponding to the target three-phase current value of the variable-voltage switch corresponding to at least one of the above-mentioned buses) and the latest value (corresponding to the latest three-phase current value of the variable-voltage switch corresponding to at least one of the above-mentioned buses) is less than 1A (corresponding to the second preset value mentioned above), then the three-phase current of the outgoing switch connected to the voltage jump bus is found, and the latest three-phase current value of the outgoing switch (corresponding to the latest three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) is compared with the current value in the to-be-processed area (corresponding to the target three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses), to see if there is a change and whether the latest value is less than 1A (corresponding to the third preset value mentioned above); if the latest three-phase current value of the outgoing switch (corresponding to the latest three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) is different from the current value in the to-be-processed area If the current value (corresponding to the target three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) does not change, and / or the latest value (corresponding to the latest three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) is not less than 1A (corresponding to the third preset value mentioned above), there is no need to transfer the power load on the line of the distribution network; if the latest three-phase current value of the outgoing switch (corresponding to the latest three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) and the current value in the to-be-processed area (corresponding to the target three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) change and the latest value (corresponding to the latest three-phase current value of the outgoing switch connected to at least one of the above-mentioned buses) is less than 1A (corresponding to the third preset value mentioned above), it is necessary to transfer the power load on the line of the distribution network, locate the voltage jump bus as the target bus for the required batch load transfer, start the batch transfer processing process, and complete all fault start-up judgment processes.

[0064] Through the above scheme, it is possible to quickly and accurately determine whether it is necessary to transfer the power load on the line of the distribution network according to the three-phase current of the outgoing switch connected to the voltage jump bus.

[0065] For example, this embodiment proposes "a method for starting load batch transfer control", which enables the system to automatically determine the fault status of the power grid and automatically start batch transfer analysis to increase the batch transfer speed in the above situation and improve regional power supply reliability.

[0066] Moreover, this embodiment is aimed at the key process of starting batch load transfer, most of which requires manual participation in judgment to prevent the problem of false start or missed start. Through this embodiment, the manual judgment to start the "batch load transfer" function is transformed into automatic system judgment, and the expert experience is systematized to improve the accuracy and timeliness of judgment, so as to increase the speed of batch transfer in the event of power grid equipment failure, improve regional power supply reliability, shorten power outage time, and reduce the impact of power grid equipment failure.

[0067] In addition, the loss of voltage in the local substation and busbar is not necessarily caused by equipment failure at the local station, for example, Figure 3 is a schematic diagram of the substation transmission line in this embodiment, such as Figure 3 As shown, if the L2 line fails and the substation ST3 is powered by the transmission line L2, there will be no equipment protection action signal for ST3 in the substation. Therefore, the diagnosis of substation pressure loss and busbar pressure loss failure is mainly based on the change of telemetry status, combined with some pressure loss signals in the substation as a comprehensive auxiliary judgment, and the substation pressure loss is inferred. After diagnosing the pressure loss, the "load batch transfer control" function is activated to complete the subsequent load batch transfer and realize rapid power restoration. And Figure 3 KG1, KG2, KG3, KG4, KG5 and KG6 in the figure all represent switches in the circuit. Figure 3 ST1, ST2, ST3 and ST4 in the figure all represent substations. Figure 3 L1, L2 and L3 in the figure all represent power supply lines.

[0068] For example, Figure 4 is a flow chart of a method for starting a load batch transfer control according to an embodiment of the present application. Figure 4 As shown, the load batch transfer control startup method includes the following steps:

[0069] Step 1: Set the no-signal collection period T = 30 seconds (settable); set the maximum signal collection period Tmax = 100 seconds (settable); set the busbar voltage loss threshold to 30% (settable); set the telemetry section refresh period Ts = 5 seconds (settable); take the 10kV busbar voltage values ​​of all substations, the three-phase current values ​​of all substation transformer switches, and the three-phase current values ​​of all 10kV outgoing line switches as monitoring object points;

[0070] Step 2: Save the telemetry value of the monitored object point in the buffer area, refresh the buffer area in the next cycle, and jump to step 3;

[0071] Step 3: Obtain the electrical relationship of 110kV / 220kV lines, busbars, and main transformers from the automation master station system, and search for the 10kV busbars corresponding to the above equipment and the corresponding main transformer low-voltage switches according to the electrical connection relationship; search for the 10kV outgoing line switches connected to the 10kV busbars, form a switch list, and jump to step 4;

[0072] Step 4: Read the latest values ​​of all monitoring object points (10kV bus voltage), compare the voltage values ​​in the buffer area, and check whether there is any change and whether the latest value is less than 30% of the rated value. If yes, record the changed bus ID (Identification), the voltage value before and after the jump, and jump to step 5 for judgment; if no, delay Ts and jump to step 2 for the next collection value comparison;

[0073] Step 5: Find the main transformer, 110kV bus, 110kV line, 220kV line, 220kV bus and corresponding substation connected to the voltage jump bus, and check whether the above equipment has signs such as "maintenance", "debugging", "setting numbers", and "data blocking"; if so, after Ts delay, jump to step 2 for collection; if not, jump to step 6 for processing;

[0074] Step 6: Store all 10kV bus voltage values ​​of the substations in the buffer area, the three-phase current values ​​of all substation transformer switches, and the three-phase current values ​​of all 10kV outgoing line switches in the waiting area; and start collecting and recording all alarm signals and telemetry information in the substation until the interval between signals is greater than the collection cycle T, or the collection cycle time is greater than or equal to the maximum signal collection cycle Tmax, end signal collection, and jump to step 7 to start processing;

[0075] Step 7: Find the three-phase current of the low-voltage switch corresponding to the voltage jump bus, compare the latest three-phase current value of the low-voltage switch with the current value in the area to be processed, and check whether there is any change and whether the latest value is less than 1A. If yes, jump to step 8. If not, after Ts delay, jump to step 2 for collection;

[0076] Step 8: Find the three-phase current of the outgoing switch connected to the voltage jump bus, compare the latest three-phase current value of the outgoing switch with the current value in the area to be processed, and check whether there is any change and whether the latest value is less than 1A. If yes, jump to step 9; if not, after Ts delay, jump to step 2 for collection;

[0077] Step 9: Locate the voltage jump bus as the target bus for the required batch load transfer, and start the batch transfer process;

[0078] At this point, the entire fault startup judgment process is completed.

[0079] Therefore, through this embodiment, the computer system can be used to realize the judgment of the start-up of the batch transfer control of the pressure loss fault load, thereby improving the reliability of the power supply of the power grid. Moreover, compared with the past, this embodiment can only confirm whether it is necessary to start the batch pressure loss transfer processing flow by manual judgment, but the manual judgment processing speed is slow and the reliability is poor. In view of the problem that requires manual judgment and start-up, this embodiment systematizes the expert judgment experience through the extraction and judgment of system data, realizes the automatic judgment and start-up of the batch pressure loss transfer start-up, and improves the reliability of the power supply of the power grid.

[0080] At the same time, in addition to being completely implemented by computer without manual intervention, the batch transfer control of pressure loss fault loads can be started very quickly, greatly reducing the power outage time caused by power grid faults and maximizing the power supply reliability of the regional power grid.

[0081] In summary, the load processing method provided in the embodiment of the present application obtains the telemetry information of the substation in the distribution network, and determines the voltage values ​​of multiple busbars corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network; obtains the three-phase current value of each low-voltage switch in the substation in the distribution network based on the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; obtains the three-phase current value of each outgoing switch in the distribution network based on the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each busbar corresponding to the substation in the distribution network; based on the voltage values ​​of multiple busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, determines the detection results of multiple busbars, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars, which solves the problem in the related art that manually judges whether it is necessary to transfer the power load on the line of the distribution network, resulting in slow judgment and load transfer, and then resulting in poor reliability of power supply using the distribution network. By determining the voltage values ​​of multiple busbars corresponding to the substations in the distribution network based on the telemetry information of the substations in the distribution network, and obtaining the three-phase current value of each transformer substation in the distribution network and the three-phase current value of each outgoing line switch in the distribution network, and then determining whether it is necessary to transfer the power load on the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each transformer substation and the three-phase current value of each outgoing line switch, it is possible to automatically determine whether it is necessary to transfer the power load on the lines of the distribution network without manual intervention, thereby improving the speed of determining whether to transfer the load and the speed of transferring the load, thereby achieving the effect of improving the reliability of power supply of the distribution network.

[0082] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0083] The embodiment of the present application also provides a load processing device. It should be noted that the load processing device of the embodiment of the present application can be used to execute the load processing method provided in the embodiment of the present application. The load processing device provided in the embodiment of the present application is introduced below.

[0084] Figure 5 Schematic diagram of a load processing device provided according to an embodiment of the present application. Figure 5 As shown, the device includes: a first processing unit 501, a first acquiring unit 502, a second acquiring unit 503 and a first determining unit 504.

[0085] Specifically, the first processing unit 501 is used to obtain telemetry information of the substation in the distribution network, and determine the voltage values ​​of multiple buses corresponding to the substation in the distribution network according to the telemetry information of the substation in the distribution network;

[0086] A first acquisition unit 502 is used to acquire the three-phase current value of each low-voltage switch in the substation in the distribution network according to the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network;

[0087] The second acquisition unit 503 is used to acquire the three-phase current value of each outgoing switch in the distribution network according to the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each bus corresponding to the substation in the distribution network;

[0088] The first determination unit 504 is used to determine the detection results of the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars.

[0089] In summary, the load processing device provided in the embodiment of the present application obtains the telemetry information of the substation in the distribution network through the first processing unit 501, and determines the voltage values ​​of multiple buses corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network; the first acquisition unit 502 obtains the three-phase current value of each low-voltage switch in the substation in the distribution network based on the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; the second acquisition unit 503 obtains the three-phase current value of each outgoing line switch in the distribution network based on the telemetry information of the substation in the distribution network Three-phase current value, wherein each outgoing line switch is an outgoing line switch connected to each bus corresponding to the substation in the distribution network; the first determination unit 504 determines the detection results of the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each substation and the three-phase current value of each outgoing line switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars, which solves the problem in the related art that whether it is necessary to transfer the power load on the line of the distribution network is manually determined, resulting in slow judgment and transfer of the load, and further resulting in poor reliability of power supply using the distribution network. By determining the voltage values ​​of multiple busbars corresponding to the substations in the distribution network based on the telemetry information of the substations in the distribution network, and obtaining the three-phase current value of each transformer substation in the distribution network and the three-phase current value of each outgoing line switch in the distribution network, and then determining whether it is necessary to transfer the power load on the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each transformer substation and the three-phase current value of each outgoing line switch, it is possible to automatically determine whether it is necessary to transfer the power load on the lines of the distribution network without manual intervention, thereby improving the speed of determining whether to transfer the load and the speed of transferring the load, thereby achieving the effect of improving the reliability of power supply of the distribution network.

[0090] Optionally, in the load processing device provided in the embodiment of the present application, the first determination unit includes: a first determination subunit, used to determine the initial voltage value of each bus corresponding to the substation in the distribution network based on the voltage values ​​of multiple busbars; a first acquisition subunit, used to obtain the latest voltage value of each bus corresponding to the substation in the distribution network; a first judgment subunit, used to judge whether the latest voltage value of each bus is the same as the initial voltage value of each busbar, and whether the latest voltage value of each busbar is less than a first preset value, to obtain a judgment result; a second determination subunit, used to determine the detection results of multiple buses based on the judgment result, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch.

[0091] Optionally, in the load processing device provided in the embodiment of the present application, the second determination sub-unit includes: a first determination sub-unit, which is used to determine that the detection result is that there is no need to transfer the power loads on multiple busbars if the judgment result indicates that the latest voltage value of each bus is the same as the initial voltage value of each busbar, and / or the latest voltage value of each busbar is not less than a first preset value; a first acquisition sub-unit, which is used to obtain the identification information of at least one busbar if the judgment result indicates that the latest voltage value of at least one busbar is different from the initial voltage value, and the latest voltage value of at least one busbar is less than the first preset value; a second determination sub-unit, which is used to determine the detection results of multiple buses based on the identification information of at least one busbar, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch.

[0092] Optionally, in the load processing device provided in the embodiment of the present application, the second determination sub-unit includes: a first determination module, used to determine the status information of the target device corresponding to at least one bus based on the identification information of at least one bus, wherein the target device includes at least one of the following: a transformer and a target line connected to at least one bus, and a substation corresponding to at least one bus; a first judgment module, used to judge whether the target device corresponding to at least one bus is in a target state, wherein the target state includes at least one of the following: a maintenance state, a debugging state, a setting state and a blocking state; a second determination module, used to determine that the detection result is that there is no need to transfer the power loads on multiple buses if the target device corresponding to at least one bus is in the target state; a third determination module, used to determine the detection results of multiple buses based on the three-phase current value of each transformer and the three-phase current value of each outgoing switch if the target device corresponding to at least one bus is not in the target state.

[0093] Optionally, in the load processing device provided in the embodiment of the present application, the third determination module includes: a first acquisition submodule, which is used to re-collect the three-phase current value of each substation in the distribution network based on the three-phase current value of each substation according to a preset period, and obtain the target three-phase current value of each substation; a first determination submodule, which is used to determine the target three-phase current value of the substation corresponding to at least one bus according to the target three-phase current value of each substation; a second acquisition submodule, which is used to re-collect the three-phase current value of each outgoing switch in the distribution network based on the three-phase current value of each outgoing switch according to a preset period, and obtain the target three-phase current value of each outgoing switch; a second determination submodule, which is used to determine the target three-phase current value of the outgoing switch connected to at least one bus according to the target three-phase current value of each outgoing switch; a third determination submodule, which is used to determine the detection results of multiple buses according to the target three-phase current value of the substation corresponding to at least one bus and the target three-phase current value of the outgoing switch connected to at least one bus.

[0094] Optionally, in the load processing device provided in the embodiment of the present application, the third determination submodule includes: a first processing submodule, used to obtain the latest three-phase current value of the variable switch corresponding to at least one bus, and to determine whether the latest three-phase current value of the variable switch corresponding to at least one bus is the same as the target three-phase current value of the variable switch corresponding to at least one bus, and whether the latest three-phase current value of the variable switch corresponding to at least one bus is less than a second preset value; the first determination submodule, used to determine whether the latest three-phase current value of the variable switch corresponding to at least one bus is the same as the target three-phase current value of the variable switch corresponding to at least one bus. If the target three-phase current value of the transformer corresponding to at least one bus is the same, and / or the latest three-phase current value of the transformer corresponding to at least one bus is not less than the second preset value, then the detection result is determined to be that there is no need to transfer the power load on the multiple busbars; the second determination submodule is used to determine the detection results of the multiple buses according to the target three-phase current value of the outgoing switch connected to at least one bus if the latest three-phase current value of the transformer corresponding to at least one bus is different from the target three-phase current value of the transformer corresponding to at least one bus, and the latest three-phase current value of the transformer corresponding to at least one bus is less than the second preset value.

[0095] Optionally, in the load processing device provided in the embodiment of the present application, the second determination submodule includes: a first processing submodule, used to obtain the latest three-phase current value of the outgoing switch connected to at least one bus, and to determine whether the latest three-phase current value of the outgoing switch connected to at least one bus is the same as the target three-phase current value of the outgoing switch connected to at least one bus, and whether the latest three-phase current value of the outgoing switch connected to at least one bus is less than a third preset value; the first determination submodule, used to determine whether the latest three-phase current value of the outgoing switch connected to at least one bus is the same as the target three-phase current value of the outgoing switch connected to at least one bus. The target three-phase current values ​​of the connected outgoing switches are the same, and / or the latest three-phase current value of the outgoing switch connected to at least one bus is not less than a third preset value, then the detection result is determined to be that there is no need to transfer the power load on multiple busbars; the second determination sub-module is used to determine that the detection result is that the power load on at least one bus needs to be transferred if the latest three-phase current value of the outgoing switch connected to at least one bus is different from the target three-phase current value of the outgoing switch connected to at least one bus, and the latest three-phase current value of the outgoing switch connected to at least one bus is less than the third preset value.

[0096] The load processing device includes a processor and a memory. The above-mentioned first processing unit 501, first acquisition unit 502, second acquisition unit 503 and first determination unit 504 are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.

[0097] The processor contains a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and the reliability of power supply of the distribution network can be improved by adjusting the kernel parameters.

[0098] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0099] An embodiment of the present invention provides a computer-readable storage medium on which a program is stored. When the program is executed by a processor, the load processing method is implemented.

[0100] An embodiment of the present invention provides a processor, which is used to run a program, wherein the load processing method is executed when the program is running.

[0101] like Figure 6As shown, an embodiment of the present invention provides an electronic device, the device includes a processor, a memory and a program stored in the memory and executable on the processor, and the processor implements the following steps when executing the program: obtaining telemetry information of a substation in a distribution network, and determining voltage values ​​of a plurality of busbars corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network; obtaining a three-phase current value of each low-voltage switch in the substation in the distribution network based on the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; obtaining a three-phase current value of each outgoing switch in the distribution network based on the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each busbar corresponding to the substation in the distribution network; determining detection results of the plurality of busbars based on the voltage values ​​of the plurality of busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power loads on the plurality of busbars.

[0102] When the processor executes the program, the following steps are also implemented: based on the voltage values ​​of multiple busbars, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined, including: based on the voltage values ​​of multiple busbars, the initial voltage value of each busbar corresponding to the substation in the distribution network is determined; the latest voltage value of each busbar corresponding to the substation in the distribution network is obtained; it is judged whether the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and whether the latest voltage value of each busbar is less than a first preset value, and a judgment result is obtained; based on the judgment result, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined.

[0103] When the processor executes the program, the following steps are also implemented: based on the judgment result, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined, including: if the judgment result indicates that the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and / or the latest voltage value of each busbar is not less than the first preset value, then the detection result is determined to be that there is no need to transfer the power load on multiple busbars; if the judgment result indicates that the latest voltage value of at least one busbar is different from the initial voltage value, and the latest voltage value of at least one busbar is less than the first preset value, then the identification information of at least one busbar is obtained; based on the identification information of at least one busbar, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined.

[0104] When the processor executes the program, the following steps are also implemented: based on the identification information of at least one bus, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined, including: based on the identification information of at least one busbar, the status information of the target device corresponding to at least one busbar is determined, wherein the target device includes at least one of the following: the transformer and target line connected to at least one busbar, and the substation corresponding to at least one busbar; judging whether the target device corresponding to at least one busbar is in the target state, wherein the target state includes at least one of the following: maintenance state, debugging state, setting state and blocking state; if the target device corresponding to at least one busbar is in the target state, then determining the detection result is that there is no need to transfer the power load on multiple buses; if the target device corresponding to at least one busbar is not in the target state, then determining the detection results of multiple buses based on the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch.

[0105] When the processor executes the program, the following steps are also implemented: based on the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined, including: based on the three-phase current value of each transformer lowering switch, according to a preset period, the three-phase current value of each transformer lowering switch in the substation in the distribution network is re-collected to obtain the target three-phase current value of each transformer lowering switch; based on the target three-phase current value of each transformer lowering switch, the three-phase current value of each outgoing switch in the distribution network is re-collected to obtain the target three-phase current value of each outgoing switch; based on the three-phase current value of each outgoing switch, according to a preset period, the target three-phase current value of each outgoing switch is determined; based on the target three-phase current value of each outgoing switch, the target three-phase current value of the outgoing switch connected to at least one bus is determined; based on the target three-phase current value of the transformer lowering switch corresponding to at least one bus and the target three-phase current value of the outgoing switch connected to at least one bus, the detection results of multiple busbars are determined.

[0106] When the processor executes the program, the following steps are also implemented: according to the target three-phase current value of the variable-voltage switch corresponding to at least one bus and the target three-phase current value of the outgoing switch connected to at least one bus, the detection results of the plurality of busbars are determined, including: obtaining the latest three-phase current value of the variable-voltage switch corresponding to at least one busbar, and judging whether the latest three-phase current value of the variable-voltage switch corresponding to at least one busbar is the same as the target three-phase current value of the variable-voltage switch corresponding to at least one busbar, and whether the latest three-phase current value of the variable-voltage switch corresponding to at least one busbar is less than a second preset value; if the latest three-phase current value of the variable-voltage switch corresponding to at least one busbar is less than a second preset value, If the phase current value is the same as the target three-phase current value of the transformer lowering switch corresponding to at least one bus, and / or the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is not less than the second preset value, the detection result is determined to be that there is no need to transfer the power load on multiple busbars; if the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is different from the target three-phase current value of the transformer lowering switch corresponding to at least one bus, and the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is less than the second preset value, the detection results of multiple buses are determined based on the target three-phase current value of the outgoing switch connected to at least one bus.

[0107] When the processor executes the program, the following steps are also implemented: according to the target three-phase current value of the outgoing switch connected to at least one bus, determining the detection results of the plurality of busbars includes: obtaining the latest three-phase current value of the outgoing switch connected to at least one bus, and judging whether the latest three-phase current value of the outgoing switch connected to at least one bus is the same as the target three-phase current value of the outgoing switch connected to at least one bus, and whether the latest three-phase current value of the outgoing switch connected to at least one bus is less than a third preset value; if the latest three-phase current value of the outgoing switch connected to at least one bus is the same as the target three-phase current value of the outgoing switch connected to at least one bus, If the target three-phase current value of the outgoing switch connected to at least one bus is the same, and / or the latest three-phase current value of the outgoing switch connected to at least one bus is not less than a third preset value, it is determined that the detection result is that there is no need to transfer the power load on the multiple busbars; if the latest three-phase current value of the outgoing switch connected to at least one bus is different from the target three-phase current value of the outgoing switch connected to at least one bus, and the latest three-phase current value of the outgoing switch connected to at least one bus is less than the third preset value, it is determined that the detection result is that the power load on at least one bus needs to be transferred.

[0108] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0109] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that initializes the following method steps: obtaining telemetry information of a substation in a distribution network, and determining voltage values ​​of a plurality of busbars corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network; obtaining a three-phase current value of each low-voltage switch in the substation in the distribution network based on the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; obtaining a three-phase current value of each outgoing switch in the distribution network based on the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each busbar corresponding to the substation in the distribution network; determining detection results for a plurality of busbars based on the voltage values ​​of the plurality of busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the plurality of busbars.

[0110] When executed on a data processing device, it is also suitable for executing a program that is initialized with the following method steps: based on the voltage values ​​of multiple busbars, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined, including: based on the voltage values ​​of multiple busbars, the initial voltage value of each busbar corresponding to the substation in the distribution network is determined; the latest voltage value of each busbar corresponding to the substation in the distribution network is obtained; it is judged whether the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and whether the latest voltage value of each busbar is less than a first preset value, to obtain a judgment result; based on the judgment result, the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, the detection results of multiple busbars are determined.

[0111] When executed on a data processing device, it is also suitable for executing an initialized program having the following method steps: based on the judgment result, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, determining the detection results of multiple busbars includes: if the judgment result indicates that the latest voltage value of each busbar is the same as the initial voltage value of each busbar, and / or the latest voltage value of each busbar is not less than a first preset value, then determining the detection result is that there is no need to transfer the power load on the multiple busbars; if the judgment result indicates that the latest voltage value of at least one busbar is different from the initial voltage value, and the latest voltage value of at least one busbar is less than the first preset value, then obtaining the identification information of at least one busbar; based on the identification information of at least one busbar, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, determining the detection results of multiple busbars.

[0112] When executed on a data processing device, it is also suitable for executing a program initialized with the following method steps: based on the identification information of at least one bus, the three-phase current value of each transformer and the three-phase current value of each outgoing switch, determining the detection results of multiple busbars includes: based on the identification information of at least one bus, determining the status information of the target device corresponding to at least one bus, wherein the target device includes at least one of the following: a transformer and a target line connected to at least one bus, and a substation corresponding to at least one bus; judging whether the target device corresponding to at least one bus is in a target state, wherein the target state includes at least one of the following: a maintenance state, a debugging state, a setting state and a blocking state; if the target device corresponding to at least one bus is in the target state, determining the detection result is that there is no need to transfer the power loads on the multiple buses; if the target device corresponding to at least one bus is not in the target state, determining the detection results of the multiple buses based on the three-phase current value of each transformer and the three-phase current value of each outgoing switch.

[0113] When executed on a data processing device, it is also suitable for executing a program that is initialized with the following method steps: based on the three-phase current value of each transformer lowering switch and the three-phase current value of each outgoing switch, determining the detection results of multiple busbars includes: based on the three-phase current value of each transformer lowering switch, according to a preset period, re-collecting the three-phase current value of each transformer lowering switch in the substation in the distribution network to obtain the target three-phase current value of each transformer lowering switch; based on the target three-phase current value of each transformer lowering switch, according to a preset period, re-collecting the three-phase current value of each outgoing switch in the distribution network to obtain the target three-phase current value of each outgoing switch; based on the three-phase current value of each outgoing switch, according to a preset period, determining the target three-phase current value of the outgoing switch connected to at least one busbar, and determining the detection results of multiple busbars based on the target three-phase current value of the transformer lowering switch corresponding to at least one busbar and the target three-phase current value of the outgoing switch connected to at least one busbar.

[0114] When executed on a data processing device, it is also suitable for executing a program that is initialized with the following method steps: based on the target three-phase current value of the variable-lower switch corresponding to at least one bus and the target three-phase current value of the outgoing switch connected to at least one bus, determining the detection results of multiple busbars includes: obtaining the latest three-phase current value of the variable-lower switch corresponding to at least one bus, and judging whether the latest three-phase current value of the variable-lower switch corresponding to at least one bus is the same as the target three-phase current value of the variable-lower switch corresponding to at least one bus, and whether the latest three-phase current value of the variable-lower switch corresponding to at least one bus is less than a second preset value; if the variable-lower switch corresponding to at least one bus If the latest three-phase current value of the low-voltage switch is the same as the target three-phase current value of the low-voltage switch corresponding to at least one bus, and / or the latest three-phase current value of the low-voltage switch corresponding to at least one bus is not less than the second preset value, the detection result is determined to be that there is no need to transfer the power load on multiple busbars; if the latest three-phase current value of the low-voltage switch corresponding to at least one bus is different from the target three-phase current value of the low-voltage switch corresponding to at least one bus, and the latest three-phase current value of the low-voltage switch corresponding to at least one bus is less than the second preset value, the detection results of multiple buses are determined based on the target three-phase current value of the outgoing switch connected to at least one bus.

[0115] When executed on a data processing device, the method is also suitable for executing a program that is initialized with the following method steps: according to the target three-phase current value of the outgoing switch connected to at least one bus, determining the detection results of multiple busbars includes: obtaining the latest three-phase current value of the outgoing switch connected to at least one bus, and judging whether the latest three-phase current value of the outgoing switch connected to at least one bus is the same as the target three-phase current value of the outgoing switch connected to at least one bus, and whether the latest three-phase current value of the outgoing switch connected to at least one bus is less than a third preset value; if the latest three-phase current value of the outgoing switch connected to at least one bus is less than a third preset value, If the three-phase current value of the outgoing switch connected to at least one bus is the same as the target three-phase current value of the outgoing switch connected to at least one bus, and / or the latest three-phase current value of the outgoing switch connected to at least one bus is not less than the third preset value, then the detection result is determined to be that there is no need to transfer the power load on multiple busbars; if the latest three-phase current value of the outgoing switch connected to at least one bus is different from the target three-phase current value of the outgoing switch connected to at least one bus, and the latest three-phase current value of the outgoing switch connected to at least one bus is less than the third preset value, then the detection result is determined to be that the power load on at least one bus needs to be transferred.

[0116] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0117] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0118] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0119] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0120] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0121] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0122] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0123] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0124] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0125] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A method for processing a load, characterized in that: include: Acquire telemetry information of a substation in a distribution network, and determine voltage values ​​of a plurality of buses corresponding to the substation in the distribution network based on the telemetry information of the substation in the distribution network; According to the telemetry information of the substation in the distribution network, the three-phase current value of each low-voltage switch in the substation in the distribution network is obtained, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; According to the telemetry information of the substation in the distribution network, the three-phase current value of each outgoing switch in the distribution network is obtained, wherein each outgoing switch is an outgoing switch connected to each bus corresponding to the substation in the distribution network; Based on the voltage values ​​of the multiple busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, the detection results of the multiple busbars are determined, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars.

2. The method according to claim 1, characterized in that Based on the voltage values ​​of the plurality of busbars, the three-phase current value of each low-voltage switch, and the three-phase current value of each outgoing switch, determining the detection results of the plurality of busbars includes: Based on the voltage values ​​of the plurality of buses, determining an initial voltage value of each bus corresponding to a substation in the distribution network; Obtaining the latest voltage value of each bus corresponding to the substation in the distribution network; Determine whether the latest voltage value of each bus is the same as the initial voltage value of each bus, and whether the latest voltage value of each bus is less than a first preset value, and obtain a determination result; Based on the judgment result, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing line switch, the detection results of the plurality of busbars are determined.

3. The method according to claim 2, characterized in that Based on the judgment result, the three-phase current value of each low-voltage switch and the three-phase current value of each outlet switch, determining the detection results of the plurality of busbars includes: If the judgment result indicates that the latest voltage value of each bus is the same as the initial voltage value of each bus, and / or the latest voltage value of each bus is not less than the first preset value, then the detection result is determined to be that there is no need to transfer the power loads on the multiple busbars; If the judgment result indicates that the latest voltage value of at least one bus is different from the initial voltage value, and the latest voltage value of the at least one bus is less than the first preset value, then obtaining identification information of the at least one bus; Based on the identification information of the at least one bus, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, the detection results of the plurality of busbars are determined.

4. The method according to claim 3, characterized in that Based on the identification information of the at least one bus, the three-phase current value of each low-voltage switch, and the three-phase current value of each outgoing switch, determining the detection results of the plurality of busbars includes: Based on the identification information of the at least one bus, determine the status information of the target device corresponding to the at least one bus, wherein the target device includes at least one of the following: a transformer and a target line connected to the at least one bus, and a substation corresponding to the at least one bus; Determining whether the target device corresponding to the at least one bus is in a target state, wherein the target state includes at least one of the following: an inspection state, a debugging state, a setting state, and a blocking state; If the target device corresponding to the at least one bus is in the target state, determining that the detection result is that there is no need to transfer the power loads on the multiple bus bars; If the target device corresponding to the at least one bus is not in the target state, the detection results of the multiple busbars are determined based on the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch.

5. The method according to claim 4, characterized in that Based on the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, determining the detection results of the plurality of busbars includes: Based on the three-phase current value of each transformer lower switch, the three-phase current value of each transformer lower switch in the substation in the distribution network is recollected according to a preset period to obtain a target three-phase current value of each transformer lower switch; Determine the target three-phase current value of the lowering switch corresponding to the at least one bus according to the target three-phase current value of each lowering switch; Based on the three-phase current value of each outgoing switch, according to the preset period, re-collect the three-phase current value of each outgoing switch in the distribution network to obtain the target three-phase current value of each outgoing switch; Determining the target three-phase current value of the outgoing switch connected to the at least one busbar according to the target three-phase current value of each outgoing switch; The detection results of the multiple busbars are determined according to the target three-phase current value of the step-down switch corresponding to the at least one busbar and the target three-phase current value of the outgoing switch connected to the at least one busbar.

6. The method according to claim 5, characterized in that Determining the detection results of the plurality of busbars according to the target three-phase current value of the low-voltage switch corresponding to the at least one busbar and the target three-phase current value of the outgoing switch connected to the at least one busbar comprises: Obtain the latest three-phase current value of the variable switch corresponding to the at least one bus, and determine whether the latest three-phase current value of the variable switch corresponding to the at least one bus is the same as the target three-phase current value of the variable switch corresponding to the at least one bus, and whether the latest three-phase current value of the variable switch corresponding to the at least one bus is less than a second preset value; If the latest three-phase current value of the variable-voltage switch corresponding to the at least one bus is the same as the target three-phase current value of the variable-voltage switch corresponding to the at least one bus, and / or the latest three-phase current value of the variable-voltage switch corresponding to the at least one bus is not less than the second preset value, it is determined that the detection result is that there is no need to transfer the power loads on the multiple buses; If the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is different from the target three-phase current value of the transformer lowering switch corresponding to at least one bus, and the latest three-phase current value of the transformer lowering switch corresponding to at least one bus is less than the second preset value, then the detection results of the multiple buses are determined based on the target three-phase current value of the outgoing switch connected to the at least one bus.

7. The method according to claim 6, characterized in that Determining the detection results of the plurality of busbars according to the target three-phase current value of the outgoing switch connected to the at least one busbar comprises: Obtaining the latest three-phase current value of the outgoing switch connected to the at least one bus, and determining whether the latest three-phase current value of the outgoing switch connected to the at least one bus is the same as the target three-phase current value of the outgoing switch connected to the at least one bus, and whether the latest three-phase current value of the outgoing switch connected to the at least one bus is less than a third preset value; If the latest three-phase current value of the outgoing switch connected to the at least one bus is the same as the target three-phase current value of the outgoing switch connected to the at least one bus, and / or the latest three-phase current value of the outgoing switch connected to the at least one bus is not less than the third preset value, it is determined that the detection result is that there is no need to transfer the power loads on the multiple busbars; If the latest three-phase current value of the outgoing switch connected to the at least one bus is different from the target three-phase current value of the outgoing switch connected to the at least one bus, and the latest three-phase current value of the outgoing switch connected to the at least one bus is less than the third preset value, then the detection result is determined to be that the power load on the at least one bus needs to be transferred.

8. A load processing device, characterized in that: include: A first processing unit is used to obtain telemetry information of a substation in a distribution network, and determine voltage values ​​of a plurality of buses corresponding to the substation in the distribution network according to the telemetry information of the substation in the distribution network; A first acquisition unit is used to acquire the three-phase current value of each low-voltage switch in the substation in the distribution network according to the telemetry information of the substation in the distribution network, wherein each low-voltage switch is used to adjust the voltage output by the substation in the distribution network; A second acquisition unit is used to acquire the three-phase current value of each outgoing switch in the distribution network according to the telemetry information of the substation in the distribution network, wherein each outgoing switch is an outgoing switch connected to each bus corresponding to the substation in the distribution network; The first determination unit is used to determine the detection results of the multiple busbars based on the voltage values ​​of the multiple busbars, the three-phase current value of each low-voltage switch and the three-phase current value of each outgoing switch, wherein the detection results are used to indicate whether it is necessary to transfer the power load on the multiple busbars.

9. A computer-readable storage medium, characterized in that: The storage medium stores a program, wherein the program executes the load processing method according to any one of claims 1 to 7.

10. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the load processing method described in any one of claims 1 to 7.