Construction method of unit type high-altitude fast assembling and hanging scaffold

Through the construction method of unit-type high-altitude rapid assembly and hanging scaffolding, prefabricated modules and adjustable spherical joint nodes, the problems of medium and high investment, long construction period and high altitude risks in the existing technology are solved, and efficient, safe and economical aerial structure bottom construction is achieved and repair.

CN119221683AActive Publication Date: 2024-12-31SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411630886.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-15
Publication Date
2024-12-31
Estimated Expiration
2044-11-15

AI Technical Summary

Technical Problem

The existing suspended scaffolding has high investment costs, long construction periods, strict lower ground bearing capacity requirements and high altitude falling objects in the bottom decoration and maintenance of aerial structures, resulting in difficulties in later maintenance.

Method used

The construction method of unit-type high-altitude rapid assembly of suspended scaffolding is adopted. The prefabricated standard unit module is assembled, and the combination of fenced and unfenced standard units is used to transform lateral protection into bottom protection, so as to quickly build a suspended scaffolding platform and set up detachable lateral protection. Tray board.

Benefits of technology

It realizes the rapid, safe and economical formation of an overall suspended scaffolding in high altitude, reduces the risk of assembling a bulk part, improves construction efficiency and safety, and facilitates the installation and maintenance of the bottom of the aerial structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119221683A_ABST
    Figure CN119221683A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method of a unit-type high-altitude quickly-assembled suspended scaffold. The construction method comprises the steps that standard units with fences and standard units without fences are assembled; the standard unit with the fence is lifted to a high-altitude designated position; lifting the plurality of fence-free standard units to the corresponding positions of the side surfaces of the fence-containing standard units according to the shape of a Chinese character'pin '; turning down the side edge turnable grating of the standard unit with the fence, and connecting the side edge turnable grating with the hook on the side edge of the bottom of the standard unit without the fence; and the steps are repeated, the suspended scaffold platform is built, and finally detachable lateral protective guard plates are arranged on the periphery of the platform. Standard unit type modules are prefabricated and then hoisted, lateral protection of the unit modules is converted into bottom protection at the high altitude, assembly of spare parts is avoided in the high-altitude assembly process, objects are not prone to falling, and the whole high-altitude suspension type scaffold can be rapidly formed. According to the invention, the installation and maintenance work of bottom veneers of aerial structures such as corridors and the like under all working conditions can be efficiently, safely, quickly and economically realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of suspended scaffolds, and particularly to a construction method for a unitized high-altitude rapid-assembly suspended scaffold. Background Art

[0002] In recent years, aerial structures such as skywalks between buildings have been widely used because they do not occupy ground space. Facing the high-operation problems brought by the construction of the decorative finishes at the bottom of aerial structures and the subsequent maintenance, at present, most methods such as erecting full-floor scaffolds and vertical aerial work platforms are adopted as the climbing measures for operators. However, the high-altitude bulk-assembly method generally used for suspended scaffolds has, on the one hand, high investment in measures and long construction periods, and on the other hand, has strict requirements for the bearing capacity of the lower ground corresponding to the aerial structure, and the risks of high-altitude falling objects during the erection and demolition processes are huge. Finally, after the building is completed, the ground under the aerial structure is often greened and generally paved. If constructed in these ways, the subsequent maintenance of the bottom of the aerial structure will be very difficult. Summary of the Invention

[0003] To solve the technical problems existing in the prior art, the present invention provides a construction method for a unitized high-altitude rapid-assembly suspended scaffold.

[0004] To achieve the above object, the technical solution of the present invention is as follows:

[0005] A construction method for a unitized high-altitude rapid-assembly suspended scaffold includes the following steps:

[0006] Step 1, assembling a standard unit with a fence and a standard unit without a fence;

[0007] Step 2, lifting the standard unit with a fence to a specified high-altitude position;

[0008] Step 3, lifting multiple standard units without a fence to the corresponding positions on the sides of the standard unit with a fence in a "pin" shape;

[0009] Step 4, turning down the flip-up grille on the side of the standard unit with a fence and connecting it to the hook on the bottom side of the standard unit without a fence;

[0010] Step 5, repeating the above steps to build the suspended scaffold platform, and finally setting detachable lateral guardrails around the platform.

[0011] As a preferred technical solution, the fenceless standard unit includes a bottom fixed rod, a bottom fixed grid, a hanging rod and an adjustable spherical joint node. In step one, the steps of assembling the fenceless standard unit include enclosing four bottom fixed rods into a rectangular frame; installing another bottom fixed rod on a diagonal line of the rectangular frame; installing the bottom fixed grid in the rectangular frame; setting the adjustable spherical joint nodes at the four corners of the rectangular frame; connecting the ends of the four bottom fixed rods of the rectangular frame with adjustable spherical joint nodes; setting the hanging rod vertically, and installing the bottom end of the hanging rod on each adjustable spherical joint node.

[0012] As a preferred technical solution, the adjustable spherical joint node includes a spherical inner joint and a spherical outer shell, the end of the bottom fixed rod is fixedly connected to the spherical outer shell, the spherical inner joint is arranged in the spherical outer shell, and the bottom end of the suspension rod is fixed on the spherical inner joint.

[0013] As a preferred technical solution, the cross-sectional shape of the spherical shell is a major arc, and the center of the spherical inner joint is located inside the spherical shell.

[0014] As a preferred technical solution, the fenced standard unit includes all the components and structures of the unfenced standard unit, and also includes a flipping mechanism and a side flippable grille. The side flippable grille is axially rotatably connected to the bottom fixed rod through the flipping mechanism.

[0015] As a preferred technical solution, a hook matching the side flip grille is provided on the bottom fixed rod of the fenceless standard unit, and the side flip grille is connected to the bottom fixed rod of the fenceless standard unit through the hook after being flipped.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] The present invention prefabricates standard unit modules and then hoists them, converts the lateral protection of the unit modules into bottom protection at high altitude, and does not require assembly of loose parts during the high altitude assembly process, which is not likely to cause objects to fall from high altitudes, and can quickly form an overall high altitude suspended scaffold. The present invention can efficiently, safely, quickly and economically realize the installation and maintenance of the bottom facing of aerial structures such as corridors under all working conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the assembly structure of a standard unit without a fence in the construction method of the unit-type high-altitude rapid assembly suspension scaffold of the present invention;

[0019] Figure 2 It is a schematic diagram of the assembly structure of a fence standard unit in the construction method of the unit-type high-altitude rapid assembly suspension scaffold of the present invention;

[0020] Figure 3It is a schematic structural diagram of an adjustable spherical joint node in the unit type high-altitude rapid assembly suspension scaffold of the present invention;

[0021] Figure 4 It is an operation schematic diagram of Step 3 in the construction method of the unit type high-altitude rapid assembly suspension scaffold of the present invention;

[0022] Figure 5 It is an operation schematic diagram of Step 4 in the construction method of the unit type high-altitude rapid assembly suspension scaffold of the present invention;

[0023] Figure 6 It is an operation schematic diagram of Step 5 in the construction method of the unit type high-altitude rapid assembly suspension scaffold of the present invention.

[0024] In the figure: 1. Bottom fixing rod; 2. Bottom fixing grille; 3. Suspension rod; 4. Adjustable spherical joint node; 41. Spherical inner joint; 42. Spherical outer shell; 5. Flipping mechanism; 6. Side flippable grille. Specific embodiments

[0025] The technical solution of the present invention will be further described below in conjunction with specific embodiments:

[0026] A construction method for a unit type high-altitude rapid assembly suspension scaffold includes the following steps:

[0027] Step 1, as shown in Figure 1 and Figure 2 , assemble the fence standard unit and the non-fence standard unit;

[0028] Step 2, lift the fence standard unit to the designated high-altitude position;

[0029] Step 3, as shown in Figure 4 , lift multiple non-fence standard units to the corresponding positions on the sides of the fence standard unit in a "pin" shape;

[0030] Step 4, as shown in Figure 5 , turn down the side flippable grille 6 of the fence standard unit and connect it to the hook on the bottom side of the non-fence standard unit;

[0031] Step 5, as shown in Figure 6 , repeat the above steps to build the suspension scaffold platform, and finally set up detachable side guardrail plates around the platform.

[0032] The fenceless standard unit includes a bottom fixed rod 1, a bottom fixed grid 2, a hanging rod 3 and an adjustable spherical joint node 4. The bottom fixed rod 1 encloses a rectangular frame. A longer bottom fixed rod 1 is also installed on a diagonal line of the rectangular frame to improve the stability of the rectangular frame. The bottom fixed grid 2 is installed in the rectangular frame. The adjustable spherical joint node 4 is located at the four corners of the rectangular frame. The ends of the bottom fixed rod 1 are connected through the adjustable spherical joint nodes 4. The hanging rod 3 is vertically arranged and the bottom end is installed on each adjustable spherical joint node 4.

[0033] like Figure 3 As shown, the adjustable spherical joint node 4 includes a spherical inner joint 41 and a spherical outer shell 42, the end of the bottom fixed rod 1 is fixedly connected to the spherical outer shell 42, the spherical inner joint 41 is arranged in the spherical outer shell 42, and the bottom end of the suspension rod 3 is fixed on the spherical inner joint 41, thereby improving the adjustable spherical joint node connecting the suspension rod 3 and the bottom fixed rod 1.

[0034] The cross-sectional shape of the spherical outer shell 42 is a major arc, and the center of the spherical inner joint 41 is located inside the spherical outer shell 42 to prevent the spherical inner joint 41 from detaching from the spherical outer shell 42 .

[0035] The fenced standard unit includes all the components and structures of the unfenced standard unit, and also includes a flipping mechanism 5 and a side flippable grille 6. The assembly steps of the fenced standard unit are as follows: on the basis of the unfenced standard unit, the flipping mechanism 5 is installed on the four sides of the bottom rectangular frame, i.e., the four bottom fixed rods 1, and the side flippable grille 6 is connected to the flipping mechanism 5. Through the flipping mechanism 5, the side flippable grille 6 can be axially rotated around the bottom fixed rod 1.

[0036] The bottom fixing rod 1 of the standard unit without fence is provided with a hook matching with the side flip grille 6, and the side flip grille 6 is connected to the bottom fixing rod 1 of the standard unit without fence through the hook after flipping. In actual operation, the hook can also be replaced with a buckle, so that the side flip grille 6 of the standard unit with fence is connected to the bottom fixing rod 1 of the standard unit without fence in a buckle-type manner.

[0037] This embodiment is only a further explanation of the invention rather than a limitation of the invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed. However, as long as they are within the scope of the claims of the invention, they are protected by the patent law.

Claims

1. A construction method for a unitized high-altitude rapid assembly suspension scaffold, characterized in that: The method includes the following steps: Step 1, assembling the standard unit with a fence and the standard unit without a fence; Step 2, lifting the standard unit with a fence to a designated high-altitude position; Step 3, lifting multiple standard units without a fence to the corresponding positions on the sides of the standard unit with a fence in a "pin" shape; Step 4, turning down the side flippable grille of the standard unit with a fence and connecting it to the hook on the bottom side of the standard unit without a fence; Step 5, repeating the above steps to build the suspended scaffolding platform, and finally setting up detachable lateral guardrail plates around the platform.

2. The construction method of the unitized high-altitude rapid assembly suspension scaffolding according to claim 1 is characterized in that: The standard unit without a fence includes a bottom fixed rod, a bottom fixed grille, a suspension rod, and an adjustable spherical joint node. In Step 1, the steps of assembling the standard unit without a fence include surrounding four bottom fixed rods to form a rectangular frame; installing another bottom fixed rod on one diagonal of the rectangular frame; installing the bottom fixed grille within the rectangular frame; setting the adjustable spherical joint nodes at the four corners of the rectangular frame; connecting the ends of the four bottom fixed rods of the rectangular frame with adjustable spherical joint nodes; arranging the suspension rod vertically and installing the bottom end of the suspension rod on each adjustable spherical joint node.

3. The unitized high-altitude rapid assembly suspension scaffolding according to claim 2 is characterized in that: The adjustable spherical joint node includes a spherical inner joint and a spherical outer shell. The end of the bottom fixed rod is fixedly connected to the spherical outer shell. The spherical inner joint is arranged within the spherical outer shell, and the bottom end of the suspension rod is fixed on the spherical inner joint.

4. The unitized high-altitude rapid assembly suspension scaffolding according to claim 3 is characterized in that: The cross-sectional shape of the spherical outer shell is a major arc, and the center of the sphere of the spherical inner joint is located within the spherical outer shell.

5. The unitized high-altitude rapid assembly suspension scaffolding according to claim 4 is characterized in that: The standard unit with a fence includes all the components and structures of the standard unit without a fence, and further includes a flipping mechanism and a side flippable grille. The side flippable grille is axially rotatably connected to the bottom fixed rod through the flipping mechanism.

6. The unitized high-altitude rapid assembly suspension scaffolding according to claim 5 is characterized in that: A hook matching the side flippable grille is provided on the bottom fixed rod of the standard unit without a fence. After being flipped, the side flippable grille is connected to the bottom fixed rod of the standard unit without a fence through the hook.

Citation Information

Patent Citations

  • Cantilever unit type scaffold convenient to combine, dismount and mount

    CN113550550A

  • Two-hinge-turning-plate guard rail for widening scaffold

    CN201129027Y

  • Adjustable extension plate

    CN206319572U

  • Suspended Scaffolding and Platform for the Boiler

    KR1020130043139A

  • Hanging scaffolding for boiler and method for assembling aerial scaffolding

    KR1020140092727A