Anti-slide pile pre-stressed anchor cable construction method

Through the combined structure of the pad plate and the support plate, the installation and tensioning process of prestressed anchor cables is simplified, the problem of long maintenance time of concrete pad piers is solved, and the rapid tensioning and efficient construction of anchor cables are achieved.

CN119243747AInactive Publication Date: 2025-01-03CHINA METALLURGICAL CONSTR ENG GRP
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411661390.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2025-01-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the prestressed anchor cable tensioning process, it takes a long time for the concrete pad piers to achieve the anchor cable tensioning conditions, resulting in inefficient construction.

Method used

Using a combination structure of pad plate and support plate, the anchor cable is corrected and positioned and tensioned by jacks through the combination of reserved holes and anchor cable fixtures, simplifying the installation process and making the concrete pad piers and steel pads of anchor cables fit together. Two is one, the installation can be completed by a single person, and the anchor cable tension is completed through the oil pump control.

Benefits of technology

The installation process before prestressed anchor cable tensioning is simplified, construction efficiency is improved, and the correction and positioning of steel pads and anchor clamps can be completed by a single person, thereby achieving rapid tensioning of anchor cables.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119243747A_ABST
    Figure CN119243747A_ABST
Patent Text Reader

Abstract

The invention discloses a slide-resistant pile pre-stressed anchor cable construction method, and relates to the technical field of engineering construction.The slide-resistant pile pre-stressed anchor cable construction method comprises a cushion plate, supporting plates supported on the side wall of a slide-resistant pile are arranged on the two sides of the cushion plate, and a reserved hole for an anchor cable to penetrate through is formed in the cushion plate. The steel plate is cut into a base plate shape, the supporting plate is machined into a right triangle, and the long right-angle sides of the supporting plate are fixed to the two sides of the base plate; the cushion pier is fixed to the side wall of the anti-slide pile, the supporting plate is supported on the anti-slide pile, the reserved hole is aligned to the anchor cable hole, and the central axis of the anchor cable hole is perpendicular to the cushion plate; an anchor cable clamp penetrates into the reserved hole of the base plate and is fixed; an operator controls the jack to pre-tighten the anchor cable so that the base plate and the anchor cable clamp can be corrected and positioned, and anchor cable tensioning is completed; a concrete cushion pier and a steel cushion plate of the anchor cable are combined into a whole; the device is simple and convenient to mount before the pre-stressed anchor cable is tensioned, and can be mounted by a single person.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of engineering construction, and in particular to a construction method of an anti-slide pile prestressed anchor cable. Background Art

[0002] my country is a mountainous country, with mountains and hills occupying a vast area of ​​land. In the continuous promotion of highway, railway, hydropower, mining and other related engineering construction, we have encountered slope geological disasters. Therefore, the prevention and control of slope disasters has always been a very important topic. The combined structure of prestressed anchor cable and slope anchor has the characteristics of small disturbance, fast construction, safety and reliability among various disaster prevention and control measures. It has been widely used in slope reinforcement. However, it is more common to use post-planted reinforced concrete anchor pads and steel pads as supports during the tensioning of prestressed anchor cables. It takes a long time to maintain the concrete pad to meet the conditions for anchor tensioning. Summary of the invention

[0003] In view of this, an object of the present invention is to provide a construction method of an anti-slide pile prestressed anchor cable.

[0004] The anti-slide pile prestressed anchor cable construction method provided by the present invention adopts the following technical scheme:

[0005] A method for constructing an anti-sliding pile prestressed anchor cable comprises a pad, both sides of which are provided with support plates supported on the side walls of the anti-sliding pile, and the pad is provided with a reserved hole for the anchor cable to pass through. The construction method adopts the following steps:

[0006] S1. Cushion processing: cutting the steel plate into the shape of a cushion plate, processing the support plate into a right triangle, and fixing the long right-angled sides of the support plate on both sides of the cushion plate;

[0007] S2. Fix the cushion pier to the side wall of the anti-sliding pile, support the support plate on the anti-sliding pile, align the reserved hole with the anchor hole, and make the central axis of the anchor hole perpendicular to the cushion plate;

[0008] S3. Insert the anchor cable clamp into the reserved hole of the pad and fix it;

[0009] S4. The operator controls the jack to pre-tighten the anchor cable so that the pad and anchor cable clamp are corrected and positioned to complete the anchor cable tensioning.

[0010] Furthermore, two groups of mounting clamps are arranged on both sides of the pad, and two support plates are respectively installed in the two groups of mounting clamps. The position of the support plates between the mounting clamps is adjustable.

[0011] Furthermore, the acute-angle end of the support plate is rotatably disposed between two mounting clamps, and the support plate can be rotated around the acute-angle end of the support plate between the two mounting clamps to adjust the angle between the pad and the side wall of the anti-slip pile so that the central axis of the anchor hole is perpendicular to the pad, and the support plate can be fixed between the mounting clamps.

[0012] Furthermore, the acute-angle end of the support plate is arranged in the form of an arc.

[0013] Furthermore, a connecting rod is connected to the two support plates at positions away from the acute angle ends, and an arc groove is provided on the mounting clamp plate for the connecting rod to move when the support plates rotate, and the connecting rod passes through the arc groove.

[0014] Furthermore, the two inner mounting plates are slidably arranged on the pad, and locking nuts are threadedly arranged near the two ends of the connecting rod. When the locking nuts are rotated, they can push the mounting plates to move and cooperate with another fixed mounting plate to clamp the support plate.

[0015] In summary, the present invention has at least one of the following beneficial effects: the concrete pad and steel pad of the anchor cable are combined into one; the process of installing this device before prestressed anchor cable tensioning is simple and can be installed by one person; after the anchor clamp is installed in place, the oil pump operator can complete the correction and positioning of the steel pad and the anchor clamp by controlling the jack, and then complete the anchor cable tensioning work. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic diagram of the structure of the embodiment of the present invention;

[0017] Figure 2 The structure of the cushion according to the embodiment of the present invention is shown in FIG. Figure 1 ;

[0018] Figure 3 The structure of the cushion according to the embodiment of the present invention is shown in FIG. Figure 2 .

[0019] Description of reference numerals: DETAILED DESCRIPTION

[0020] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0021] The following is combined with Figure 1 The present invention is described in further detail.

[0022] The embodiment of the present invention discloses a method for constructing an anti-sliding pile prestressed anchor cable. Figure 1 The anti-sliding pile prestressed anchor cable construction method includes a pad 1, and support plates 2 supported on the side walls of the anti-sliding pile are arranged on both sides of the pad 1. The pad 1 is provided with a reserved hole 11 for the anchor cable to pass through. The construction method adopts the following steps:

[0023] Step 1: Processing the pier: cutting the steel plate into the shape of the pier 1, processing the support plate 2 into a right triangle, and fixing the long right-angled sides of the support plate 2 on both sides of the pier 1;

[0024] Step 2: fix the cushion pier to the side wall of the anti-slip pile, support the support plate 2 on the anti-slip pile, align the reserved hole 11 with the anchor hole, and make the central axis of the anchor hole perpendicular to the cushion plate 1;

[0025] Step 3: insert the anchor cable clamp into the reserved hole 11 of the backing plate 1 and fix it;

[0026] Step 4: The operator controls the jack to pre-tighten the anchor cable so that the pad 1 and the anchor cable clamp are corrected and positioned to complete the anchor cable tensioning;

[0027] The concrete pad and steel pad of the anchor cable are combined into one; the installation process of this device before prestressed anchor cable tensioning is simple and can be installed by one person; after the anchor clamp is installed in place, the oil pump operator can complete the correction and positioning of the steel pad and anchor clamp by controlling the jack, and then complete the anchor cable tensioning work.

[0028] In this embodiment, two groups of mounting clamps 12 are arranged on both sides of the base plate 1, and the two support plates 2 are respectively installed in the two groups of mounting clamps 12. The position of the support plate 2 between the mounting clamps 12 is adjustable. By adjusting the position of the support plate 2 between the two mounting clamps 12, the supporting angle of the support plate 2 can be adjusted, so that the base plate 1 can always maintain a vertical state with the central axis of the anchor hole when it is installed on the side wall of the anti-slip pile.

[0029] In this embodiment, the acute-angle end of the support plate 2 is rotatably arranged between two mounting clamps 12. The support plate 2 can be rotated around the acute-angle end of the support plate 2 between the two mounting clamps 12 to adjust the angle between the pad 1 and the side wall of the anti-slip pile so that the central axis of the anchor hole is perpendicular to the pad 1. The support plate 2 can be fixed between the mounting clamps 12. By rotating the support plate 2, the angle of the support plate 2 between the mounting clamps 12 is adjusted. After the angle is adjusted appropriately, the support plate 2 is fixed in the mounting clamps 12.

[0030] In this embodiment, the acute-angle end of the support plate 2 is configured in the form of an arc to prevent the sharp end from causing harm to the operator during use.

[0031] In this embodiment, the two support plates 2 are connected with a connecting rod 3 at a position away from the acute-angle end. The mounting clamp 12 is provided with an arc groove 13 for the connecting rod 3 to move when the support plate 2 rotates. The connecting rod 3 passes through the arc groove 13. The two support plates 2 can be rotated synchronously through the connecting rod 3, so that the supporting angles of the two support plates 2 are the same. At the same time, in order to make the rotation angle of the support plates 2 more accurate, a ruler can also be provided on the side of the arc groove 13. The pad 1 is placed on the anchor hole, and the angle of the pad 1 is adjusted by rotating the support plate 2. After the angle is suitable, the scale position of the connecting rod 3 is recorded. After the pad pier is removed, the support plate 2 is adjusted into place and fixed according to the recorded scale position.

[0032] In this embodiment, the two inner mounting clamps 12 are slidably arranged on the pad 1, and the pad 1 is provided with a T-slot for the mounting clamp 12 to move. The connecting rod 3 is threadedly matched with a locking nut 31 near the two ends. When the locking nut 31 is rotated, it can push the mounting clamp 12 to move and cooperate with another fixed mounting clamp 12 to clamp the support plate 2. When the angle of the support plate 2 needs to be adjusted, the locking nut 31 is loosened so that the movable mounting clamp 12 can leave the support plate 2, so that the support plate 2 can rotate. After the angle is adjusted to a suitable level, the locking nut 31 is tightened. During the tightening process, the locking nut 31 pushes the mounting clamp 12 to move and press against the support plate 2, thereby clamping the support plate 2.

[0033] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A method for constructing an anti-slide pile prestressed anchor cable, characterized in that: The invention comprises a pad (1), support plates (2) supported on the side walls of the anti-sliding piles are arranged on both sides of the pad (1), and a reserved hole (11) for the anchor cable to pass through is arranged on the pad (1). The construction method adopts the following steps: S1, pier processing, cutting the steel plate into the shape of the shim plate (1), processing the support plate (2) into a right triangle, and fixing the long right-angled sides of the support plate (2) on both sides of the shim plate (1); S2, fix the cushion pier to the side wall of the anti-sliding pile, support the support plate (2) on the anti-sliding pile, align the reserved hole (11) with the anchor hole, and make the central axis of the anchor hole perpendicular to the cushion plate (1); S3, inserting the anchor cable clamp into the reserved hole (11) of the backing plate (1) and fixing it; S4. The operator controls the jack to pre-tighten the anchor cable so that the pad (1) and the anchor cable clamp are aligned and positioned, thereby completing the tensioning of the anchor cable.

2. The anti-slide pile prestressed anchor cable construction method according to claim 1, characterized in that: Two groups of mounting clamps (12) are arranged in pairs on both sides of the pad (1); the two support plates (2) are respectively mounted in the two groups of mounting clamps (12); and the positions of the support plates (2) between the mounting clamps (12) are adjustable.

3. The anti-slide pile prestressed anchor cable construction method according to claim 2, characterized in that: The acute angle end of the support plate (2) is rotatably arranged between two mounting clamps (12); the support plate (2) can be rotated around the acute angle end of the support plate (2) between the two mounting clamps (12) to adjust the angle between the pad (1) and the side wall of the anti-slip pile so that the central axis of the anchor cable hole is perpendicular to the pad (1); and the support plate (2) can be fixed between the mounting clamps (12).

4. The anti-slide pile prestressed anchor cable construction method according to claim 3 is characterized in that Said: the acute-angle end of the support plate (2) is arranged in the form of an arc.

5. The anti-slide pile prestressed anchor cable construction method according to claim 3 is characterized in that The two support plates (2) are connected to connecting rods (3) at positions away from the acute angle ends, the mounting clamping plate (12) is provided with an arc groove (13) for the connecting rod (3) to move when the support plates (2) rotate, and the connecting rod (3) passes through the arc groove (13).

6. The anti-slide pile prestressed anchor cable construction method according to claim 5, characterized in that: The two inner mounting clamps (12) are slidably arranged on the pad (1), and the connecting rod (3) is threadedly provided with locking nuts (31) near the two ends. When the locking nuts (31) are rotated, they can push the mounting clamp (12) to move and cooperate with another fixed mounting clamp (12) to clamp and fix the support plate (2).

Citation Information

Patent Citations

  • Anchor cable base

    CN109853589A

  • Emergency device for rapid stress of anchor cable based on anchor rod and using method thereof

    CN111305202A

  • Pre-stressed anchor cable anchorage device installation auxiliary device

    CN215801603U

  • Angle-changeable anchor cable base plate

    CN218091618U

  • Hidden type anchor sealing structure of pile-anchor support

    CN218148417U