Photovoltaic power station equipment upgrading management method and device, computer equipment and medium

By obtaining and analyzing the parameters and upgrade information of photovoltaic power plant equipment and determining and upgrading target equipment, the problem that equipment performance and production capacity cannot meet the requirements is solved, and the equipment performance and production capacity are improved and service life is extended.

CN119250799APending Publication Date: 2025-01-03CHINA THREE GORGES CORPORATION

Patent Information

Application Number
CN202411395234.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2025-01-03

AI Technical Summary

Technical Problem

With the rapid increase in demand for photovoltaic power plant equipment, the performance and production capacity cannot meet the requirements.

Method used

By obtaining the equipment parameters and upgrade information of photovoltaic power plant equipment, determining the target equipment that can be upgraded based on the equipment category, performance parameter attenuation rate and service life, and calculating its upgraded performance parameters based on the upgrade information to achieve timely upgrade of equipment parameters , ensure that equipment performance and production capacity meet current technical requirements.

Benefits of technology

The performance and production capacity of photovoltaic power plant equipment have been achieved to meet the current technical requirements, extend the service life of the equipment, and improve power generation efficiency and economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119250799A_ABST
    Figure CN119250799A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electronics, and discloses a photovoltaic power station equipment upgrading management method and device, computer equipment and a medium. According to the method provided by the invention, target equipment capable of being upgraded in a photovoltaic power station is determined based on the equipment category, the equipment performance parameter attenuation rate and the service life of each piece of equipment in the photovoltaic power station; target equipment performance parameters after the target equipment is upgraded are determined based on the upgrading information corresponding to the different types of equipment and the equipment performance parameters before the target equipment is upgraded, and upgrading management is carried out on the target equipment based on the upgraded target equipment performance parameters. According to the invention, timely upgrading of the equipment parameters of the equipment capable of being upgraded in the photovoltaic power station is realized, and the equipment performance and the productivity of the photovoltaic power station are ensured to meet the current technical requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electronic technology, and in particular to a photovoltaic power station equipment upgrade management method, device, computer equipment and medium. Background Art

[0002] After years of development, the technological level of my country's photovoltaic industry has been continuously upgraded, the scale of industrial manufacturing and installed capacity has continued to expand, and the cost per kilowatt-hour has been rapidly reduced. It is of great significance to scientifically and rationally deal with the photovoltaic capacity problem and resolve the potential risks in the industry. Promote the renewal of new energy, especially equipment and technological transformation in the photovoltaic field. Actively and orderly promote the transformation and upgrading of photovoltaic power stations, and support the configuration and utilization of equipment. Strengthen the orderly promotion of the retirement and transformation and upgrading of photovoltaic power generation equipment that has reached or is approaching the end of its life in photovoltaic power stations, and improve installed capacity, power generation efficiency and economy.

[0003] Among the related technologies, due to the long photovoltaic industry chain, rapid technological iteration, and different construction cycles of each link, the demand for photovoltaic power generation and energy storage is increasing rapidly. At a certain stage, the performance and production capacity of photovoltaic power station equipment may not meet the requirements. Summary of the invention

[0004] In view of this, the present invention provides a photovoltaic power station equipment upgrade management method, device, computer equipment and medium to solve the problem that the performance and production capacity of photovoltaic power station equipment cannot meet the requirements due to the rapid increase in demand for photovoltaic power generation and energy storage in related calculations.

[0005] In a first aspect, the present invention provides a method for managing equipment upgrades in a photovoltaic power station, the method comprising: obtaining equipment parameters of each device in the photovoltaic power station and upgrade information corresponding to different categories of equipment, the equipment parameters including equipment category, equipment performance parameters before upgrade, equipment performance parameter decay rate, and service life; determining at least one target device that can be upgraded from a plurality of devices based on the equipment category, equipment performance parameter decay rate, and service life of each device; determining target device performance parameters of the target device after the upgrade based on the device performance parameters corresponding to the target device before the upgrade and the upgrade information corresponding to the target device; and performing upgrade management on the target device based on the upgraded target device performance parameters.

[0006] The photovoltaic power station equipment upgrade management method provided by the present invention determines at least one target device that can be upgraded among multiple devices based on the equipment category, equipment performance parameter decay rate and service life of each device in the photovoltaic power station; determines the target device performance parameters after the target device is upgraded based on the equipment performance parameters before the upgrade corresponding to the target device and the upgrade information corresponding to the target device; and manages the target device based on the upgraded target device performance parameters. The method provided by the present invention determines the target devices that can be upgraded in the photovoltaic power station based on the equipment category, equipment performance parameter decay rate and service life of each device in the photovoltaic power station; determines the target device performance parameters after the target device is upgraded based on the upgrade information corresponding to different types of devices and the equipment performance parameters before the target device is upgraded; manages the target device based on the upgraded target device performance parameters, thereby realizing the timely upgrade of the equipment parameters of the devices that can be upgraded in the photovoltaic power station, and ensuring that the performance and production capacity of the photovoltaic power station equipment meet the current technical requirements.

[0007] In an optional embodiment, based on the device category, device performance parameter range and service life of each device, the step of determining at least one target device that can be upgraded among multiple devices includes: obtaining upgrade constraint information corresponding to different categories of devices, the upgrade constraint information including device performance parameter decay rate thresholds and service life thresholds corresponding to different categories of devices; based on the device performance parameter decay rate and service life of each device and the device performance parameter decay rate threshold and service life threshold of the corresponding device, determining at least one target device that can be upgraded among multiple devices.

[0008] The method provided in this optional implementation manner can accurately determine the equipment that can be upgraded in a photovoltaic power station based on the equipment performance parameter attenuation rate thresholds and service life thresholds corresponding to different categories of equipment, thereby facilitating subsequent upgrade management of the equipment in the photovoltaic power station.

[0009] In an optional embodiment, the step of determining the target device performance parameters of the target device after the upgrade based on the device performance parameters corresponding to the target device before the upgrade and the upgrade information corresponding to the target device includes: obtaining a predicted value of a performance parameter degradation of the target device; determining a value range of the device performance parameters of the target device based on the predicted value of the performance parameter degradation of the target device and the device performance parameters before the upgrade; and determining the target device performance parameters of the target device after the upgrade based on the value range of the device performance parameters of the target device and the upgrade information.

[0010] In an optional implementation, the target device performance parameters of the target device after the upgrade are determined based on the device performance parameter value range of the target device and the upgrade information, including: determining the target device performance parameter value range of the target device after the upgrade based on the device performance parameter value range of the target device and the upgrade information; if there is an overlapping range between the device performance parameter value range of the target device and the target device performance parameter value range, determining the target device performance parameters of the target device after the upgrade based on the device performance parameter value range and the target device performance parameter value range.

[0011] In an optional embodiment, the method further includes: based on the device category, device performance parameter attenuation rate and service life of each device, determining the devices that cannot be upgraded among the multiple devices as devices to be updated; if there is no overlapping range between the device performance parameter value range of the target device and the target device performance parameter value range, judging whether the target device is a device to be updated and obtaining a judgment result.

[0012] In a second aspect, the present invention provides a photovoltaic power station equipment upgrade management device, the device comprising: an acquisition module, used to acquire equipment parameters of each device in the photovoltaic power station and upgrade information corresponding to different categories of equipment, the equipment parameters including equipment category, equipment performance parameters before upgrade, equipment performance parameter decay rate and service life; a first determination module, used to determine at least one target device that can be upgraded among multiple devices based on the equipment category, equipment performance parameter decay rate and service life of each device; a second determination module, used to determine the target device performance parameters of the target device after the upgrade based on the device performance parameters corresponding to the target device before the upgrade and the upgrade information corresponding to the target device; an upgrade management module, used to perform upgrade management on the target device based on the upgraded target device performance parameters.

[0013] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the photovoltaic power station equipment upgrade management method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0014] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the photovoltaic power station equipment upgrade management method of the first aspect or any corresponding embodiment thereof.

[0015] In a fifth aspect, the present invention provides a computer program product, including computer instructions, which are used to enable a computer to execute the photovoltaic power station equipment upgrade management method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 is a flow chart of a photovoltaic power station equipment upgrade management method according to an embodiment of the present invention;

[0018] Figure 2 is a flow chart of another photovoltaic power station equipment upgrade management method according to an embodiment of the present invention;

[0019] Figure 3 is a structural block diagram of a photovoltaic power station equipment upgrade management device according to an embodiment of the present invention;

[0020] Figure 4 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0022] Among the related technologies, due to the long photovoltaic industry chain, rapid technological iteration, and different construction cycles of each link, the demand for photovoltaic power generation and energy storage is increasing rapidly. At a certain stage, the performance and production capacity of photovoltaic power station equipment may not meet the requirements.

[0023] In view of this, a photovoltaic power station equipment upgrade management method provided in an embodiment of the present application can be applied to a server to realize the upgrade management of photovoltaic power station equipment. The method provided by the present invention determines the target equipment that can be upgraded in the photovoltaic power station based on the equipment category, equipment performance parameter attenuation rate and service life of each device in the photovoltaic power station, and determines the target equipment performance parameters after the target equipment is upgraded based on the upgrade information corresponding to the different categories of equipment and the equipment performance parameters before the target equipment is upgraded. The target equipment is upgraded and managed based on the upgraded target equipment performance parameters, thereby realizing the timely upgrade of the equipment parameters of the equipment that can be upgraded in the photovoltaic power station, and ensuring that the equipment performance and production capacity of the photovoltaic power station meet the current technical requirements.

[0024] According to an embodiment of the present invention, an embodiment of a photovoltaic power station equipment upgrade management method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0025] In this embodiment, a photovoltaic power station equipment upgrade management method is provided, which can be used for the above-mentioned server. Figure 1 is a flow chart of a photovoltaic power station equipment upgrade management method according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0026] Step S101, obtaining equipment parameters of each device in the photovoltaic power station and upgrade information corresponding to different types of equipment, wherein the equipment parameters include equipment type, equipment performance parameters before upgrade, equipment performance parameter attenuation rate and service life.

[0027] Exemplarily, a photovoltaic power station may be a photovoltaic power station that performs equipment upgrade management. The photovoltaic power station includes multiple types of equipment. In the embodiment of the present application, each type of equipment generally includes equipment with different functions of the photovoltaic power station, such as photovoltaic components, energy storage equipment, detection equipment, conversion equipment, etc. Each type of equipment corresponds to different upgrade information. The upgrade information is determined according to the actual new needs of the photovoltaic power station, mainly the adjustment information of the equipment parameters.

[0028] Step S102, based on the device category, device performance parameter decay rate and service life of each device, at least one target device that can be upgraded is determined from multiple devices.

[0029] Exemplarily, in an embodiment of the present application, thresholds for the attenuation rate and the service life are determined. When the threshold range is exceeded, it is considered that the device cannot be upgraded and needs to be updated (replaced). If the device does not exceed the thresholds for the attenuation rate and the service life, the corresponding device is determined as a target device that can be upgraded.

[0030] Step S103: determining the target device performance parameters after the target device is upgraded based on the device performance parameters corresponding to the target device before the upgrade and the upgrade information corresponding to the target device.

[0031] Exemplarily, in an embodiment of the present application, based on the device type of the target device, the upgrade information corresponding to the target device is determined, and based on the upgrade information, the performance parameters of the target device after the target device is upgraded are determined.

[0032] Step S104: performing upgrade management on the target device based on the upgraded performance parameters of the target device.

[0033] Exemplarily, in the embodiment of the present application, the target device is upgraded and managed using the upgraded performance parameters of the target device so that the performance of the target device meets the requirements.

[0034] The photovoltaic power station equipment upgrade management method provided in the present embodiment determines the target equipment that can be upgraded in the photovoltaic power station based on the equipment category, equipment performance parameter attenuation rate and service life of each equipment in the photovoltaic power station, and determines the target equipment performance parameters after the target equipment is upgraded based on the upgrade information corresponding to the different categories of equipment and the equipment performance parameters of the target equipment before the upgrade, and manages the target equipment based on the upgraded target equipment performance parameters, thereby realizing timely upgrade of the equipment parameters of the equipment that can be upgraded in the photovoltaic power station and ensuring that the equipment performance and production capacity of the photovoltaic power station meet the current technical requirements.

[0035] In this embodiment, a photovoltaic power station equipment upgrade management method is provided, which can be used for the above-mentioned server. Figure 2 is a flow chart of a photovoltaic power station equipment upgrade management method according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:

[0036] Step S201, obtaining the equipment parameters of each device in the photovoltaic power station and the upgrade information corresponding to different types of equipment, the equipment parameters include equipment type, equipment performance parameters before upgrade, equipment performance parameter attenuation rate and service life. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.

[0037] Step S202: determining at least one target device that can be upgraded from a plurality of devices based on the device category, device performance parameter decay rate, and service life of each device.

[0038] Specifically, the above step S202 includes:

[0039] Step S2021, obtaining upgrade constraint information corresponding to different types of equipment, wherein the upgrade constraint information includes device performance parameter attenuation rate thresholds and service life thresholds corresponding to different types of equipment.

[0040] Exemplarily, in an embodiment of the present application, before the equipment is upgraded, the equipment type and the corresponding equipment performance parameter attenuation rate and service life are determined through equipment parameters, and the thresholds of the attenuation rate and service life are determined based on the requirements of the type of photovoltaic field to which the current equipment belongs.

[0041] Step S2022, based on the device performance parameter decay rate, service life of each device and the device performance parameter decay rate threshold and service life threshold of the corresponding device, at least one target device that can be upgraded is determined from multiple devices.

[0042] Exemplarily, in the embodiment of the present application, when the device performance parameter attenuation rate and service life of the device do not exceed the threshold range, it is considered that the device can be upgraded.

[0043] Step S203: Determine the target device performance parameters after the target device is upgraded based on the device performance parameters before the upgrade corresponding to the target device and the upgrade information corresponding to the target device. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.

[0044] Specifically, the above step S203 includes:

[0045] Step S2031, obtaining a predicted value of a performance parameter degradation of a target device.

[0046] Exemplarily, in an embodiment of the present application, the predicted value of the performance parameter degradation of the target device can be determined by historical information on changes in the device performance parameters.

[0047] Step S2032: determining a value range of the device performance parameter of the target device based on the predicted value of the performance parameter degradation of the target device and the device performance parameter before the upgrade.

[0048] Exemplarily, in the embodiment of the present application, based on the predicted value of the performance parameter degradation of the target device and the device performance parameter before the upgrade, the value range of the device performance parameter can be determined, including the maximum value and the minimum value (min, max).

[0049] Step S2033: determining the target device performance parameters after the target device is upgraded based on the device performance parameter value range of the target device and the upgrade information.

[0050] In some optional implementations, the above step S2033 includes:

[0051] Step a1: determining a target device performance parameter value range after the target device is upgraded based on the device performance parameter value range of the target device and the upgrade information.

[0052] Exemplarily, in the embodiment of the present application, the required parameter value range after the upgrade is calculated based on the upgrade information (increase and decrease of fixed values ​​or percentages).

[0053] Step a2: if there is an overlap between the device performance parameter value range of the target device and the target device performance parameter value range, determine the target device performance parameters after the target device is upgraded based on the device performance parameter value range and the target device performance parameter value range.

[0054] Exemplarily, in an embodiment of the present application, the target device may include multiple performance parameters that need to be adjusted. If there is an overlapping range between the value ranges of the device performance parameters of the multiple parameters that need to be adjusted of the target device and the value range of the target device performance parameters, it is considered that the target device can be upgraded, and the parameters are adjusted based on the value range of the target device performance parameters to determine the target device performance parameters after the upgrade.

[0055] In some optional embodiments, the method further comprises:

[0056] Step b1, based on the device category, device performance parameter decay rate and service life of each device, determine the devices that cannot be upgraded among the multiple devices as devices to be updated. Exemplarily, in an embodiment of the present application, when the device performance parameter decay rate and / or service life of the device exceeds the threshold range, it is considered that the device cannot be upgraded and needs to be updated (replaced). For example, the current device is an energy storage device, which is a core device. If the parameter decay rate exceeds 20% and the service life exceeds 5 years, it is considered that the energy storage device cannot be upgraded and needs to be updated.

[0057] Step b2, if there is no overlap between the device performance parameter value range of the target device and the target device performance parameter value range, determine whether the target device is a device to be updated, and obtain a judgment result. Exemplarily, in an embodiment of the present application, if there is no overlap between the device performance parameter value range of one or more parameters and the target device performance parameter value range, the adjustment range of the target device performance parameter value range of the parameter is determined according to the current device level, and the new target device performance parameter value range is calculated according to the adjustment range. Subsequently, a value range judgment is performed based on the new target device performance parameter value range and the device performance parameter value range. If the required value range of the new parameter partially overlaps with the actual maximum value range, the parameter adjustment and device upgrade work are continued. If there is still no overlap, the current device upgrade work is stopped and marked as a device that needs to be updated (replaced). In order to ensure the overall operating efficiency and safety of the power station, the target device performance parameter value range of the core equipment of the photovoltaic power station cannot be adjusted. If there is no overlap between the device performance parameter value range of one or more parameters and the target device performance parameter value range, and the level of the target device is greater than the preset level, and the target device meets the preset conditions, the target device will be treated as a device to be updated. The preset level can be determined based on demand.

[0058] Step b3: determining a value range of a device performance parameter of the updated device based on the device type of the device to be updated.

[0059] For example, in the embodiment of the present application, for the device to be updated, the type of the device is determined, and the new parameter value range of the upgraded device of the type is obtained as the recommended parameter value range after the current device is updated. If there is no upgraded device of the type to which the device belongs, the parameter value range is selected based on historical data or pre-defined standard data.

[0060] The photovoltaic power station equipment upgrade management method provided by the present invention is described below through a specific embodiment.

[0061] Example:

[0062] Device A is a device to be upgraded, and belongs to the energy storage device type. According to the system parameters of device A, the attenuation rate of the parameters is 2%, and the service life is 1 year, which meets the standard that the attenuation rate of the device to be upgraded does not exceed 10%, and the service life does not exceed 5 years. It is an upgradeable device. The parameters to be upgraded of device A are parameter a, parameter b, and parameter c. The current actual value ranges are (10-15), (30-50), and (100-150) respectively. The maximum value ranges (min-max) of parameter a, parameter b, and parameter c in device A are (30-50), (35-60), and (115-170) respectively.

[0063] Case 1: The upgrade information is that for energy storage type equipment, the value range of parameters a and b increases by 20, and the value range of parameter c expands by 10% (that is, the minimum value decreases by 10%, and the maximum value increases by 10%);

[0064] Based on the upgrade information, the required parameter value ranges of the upgraded parameter a (+10), parameter b (+10), and parameter c (-10%, +10%) are calculated, which are (20-25), (40-60), and (90-165), respectively;

[0065] After comparing the required parameter value range with the maximum value range, it is determined that the value ranges of the three parameters are completely or partially overlapped, and all of them are upgradeable parameters, that is, the device is an upgrade device.

[0066] Get the value ranges of the upgrade parameters: parameter a (20-25), parameter b (40-60), and parameter c (115-165).

[0067] Case 2: The upgrade information is that for energy storage type equipment, the value range of parameters a and b increases by 35, and the value range of parameter c expands by 20% (that is, the minimum value decreases by 20%, and the maximum value increases by 20%);

[0068] Based on the upgrade information, the required parameter value ranges of the upgraded parameter a (+35), parameter b (+35), and parameter c (-20%, +20%) are calculated, which are (45-50), (65-85), and (80-180), respectively;

[0069] After comparing the required parameter value range with the maximum value range, it is determined that the value ranges of parameter a and parameter c overlap in whole or in part, and are parameters that can be upgraded;

[0070] However, the value range of parameter b does not overlap, and device A is a core device of the photovoltaic power station with a high level of importance. Therefore, in order to ensure the overall operating efficiency and safety of the power station, the parameter value range of the high-level equipment cannot be changed, that is, the device is a non-upgradeable device, that is, a device to be updated (replaced) (device A is an energy storage device).

[0071] If device A is a detection device, that is, it is in the important level of the photovoltaic power station, so on the basis of the normal operation of the high-level core equipment, the value range of the medium-level equipment can be adjusted by 10%. That is: the required parameter value range (65-85) of the upgraded parameter b calculated based on the upgrade information is adjusted to the required parameter value range (58-76) and the maximum value range (35-60), which partially overlaps and meets the upgrade parameter requirements, that is, the device belongs to the upgraded device (device A is a detection device).

[0072] Therefore, the value ranges of the upgrade parameters are obtained as parameter a (45-50), parameter b (58-60), and parameter c (115-170).

[0073] Device update step: After analyzing the devices to be updated based on the system parameters of the devices and calculating the parameter value ranges based on the upgrade information, device parameter recommendations are made for the above-mentioned updated devices as the basis for parameter selection for subsequent device updates (replacements). Specifically:

[0074] For the device to be updated, determine the type of the device, and obtain the new parameter value range of the upgraded device of the type as the recommended parameter value range of the current device after the update. If there is no upgraded device of the type to which the device belongs, select the parameter value range based on historical data or pre-defined standard data.

[0075] In this embodiment, a photovoltaic power station equipment upgrade management device is also provided, which is used to implement the above embodiments and preferred implementations, and the descriptions that have been made will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0076] This embodiment provides a photovoltaic power station equipment upgrade management device, such as Figure 3 As shown, including:

[0077] The acquisition module 301 is used to acquire the equipment parameters of each device in the photovoltaic power station and the upgrade information corresponding to different types of equipment. The equipment parameters include equipment type, equipment performance parameters before upgrade, equipment performance parameter attenuation rate and service life;

[0078] A first determination module 302 is used to determine at least one target device that can be upgraded from a plurality of devices based on the device category, device performance parameter decay rate, and service life of each device;

[0079] A second determination module 303 is used to determine the target device performance parameters after the target device is upgraded based on the device performance parameters before the upgrade corresponding to the target device and the upgrade information corresponding to the target device;

[0080] The upgrade management module 304 is used to manage the upgrade of the target device based on the upgraded performance parameters of the target device.

[0081] In some optional implementations, the first determining module 302 includes:

[0082] The first acquisition submodule is used to acquire upgrade constraint information corresponding to different types of equipment, wherein the upgrade constraint information includes device performance parameter attenuation rate thresholds and service life thresholds corresponding to different types of equipment;

[0083] The first determination submodule is used to determine at least one target device that can be upgraded from multiple devices based on the device performance parameter decay rate, service life of each device and the device performance parameter decay rate threshold and service life threshold of the corresponding device.

[0084] In some optional implementations, the second determining module 303 includes:

[0085] The second acquisition submodule is used to obtain the predicted value of the performance parameter degradation of the target device;

[0086] A second determination submodule is used to determine a value range of a device performance parameter of the target device based on a predicted value of a performance parameter degradation of the target device and the device performance parameter before the upgrade;

[0087] The third determination submodule is used to determine the target device performance parameter after the target device is upgraded based on the device performance parameter value range of the target device and the upgrade information.

[0088] In some optional implementations, the third determining submodule includes:

[0089] A first determining unit, configured to determine a target device performance parameter value range after the target device is upgraded based on the device performance parameter value range of the target device and the upgrade information;

[0090] The second determining unit is configured to determine the target device performance parameters after the target device is upgraded based on the device performance parameter value range and the target device performance parameter value range if there is an overlap between the device performance parameter value range of the target device and the target device performance parameter value range.

[0091] In some optional embodiments, the above device further includes:

[0092] A third determination module is used to determine the devices that cannot be upgraded among the multiple devices as the devices to be updated based on the device category, device performance parameter decay rate and service life of each device;

[0093] The fourth determination module is used to determine whether the target device is a device to be updated if there is no overlap between the device performance parameter value range of the target device and the target device performance parameter value range, and obtain a determination result.

[0094] In some optional embodiments, the above device further includes:

[0095] The sixth determination module is used to determine the value range of the device performance parameter of the updated device based on the device type of the device to be updated.

[0096] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0097] The photovoltaic power station equipment upgrade management device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0098] The embodiment of the present invention also provides a computer device having the above Figure 3 The photovoltaic power station equipment upgrade management device shown.

[0099] See also Figure 4 , Figure 4 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 4As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.

[0100] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0101] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0102] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0103] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0104] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0105] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0106] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0107] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A photovoltaic power station equipment upgrade management method, characterized in that: The method comprises: Obtaining equipment parameters of each device in the photovoltaic power station and upgrade information corresponding to different types of equipment, wherein the equipment parameters include equipment type, equipment performance parameters before upgrade, equipment performance parameter attenuation rate, and service life; Determine at least one target device that can be upgraded from the plurality of devices based on the device category, device performance parameter decay rate, and service life of each device; Determine the target device performance parameter after the target device is upgraded based on the device performance parameter before the upgrade corresponding to the target device and the upgrade information corresponding to the target device; The target device is upgraded and managed based on the upgraded target device performance parameters.

2. The method according to claim 1, characterized in that The step of determining at least one target device that can be upgraded from a plurality of devices based on the device category, device performance parameter range, and service life of each device includes: Acquire upgrade constraint information corresponding to different types of equipment, wherein the upgrade constraint information includes device performance parameter attenuation rate thresholds and service life thresholds corresponding to different types of equipment; Based on the device performance parameter decay rate and service life of each device and the device performance parameter decay rate threshold and service life threshold of the corresponding device, at least one target device that can be upgraded is determined among the multiple devices.

3. The method according to claim 1, characterized in that The step of determining the target device performance parameter after the target device is upgraded based on the device performance parameter before the upgrade corresponding to the target device and the upgrade information corresponding to the target device comprises: Obtaining a predicted value of performance parameter degradation of a target device; Determining a range of values ​​of the device performance parameters of the target device based on the predicted value of the performance parameter degradation of the target device and the device performance parameters before the upgrade; The target device performance parameter after the target device is upgraded is determined based on the device performance parameter value range of the target device and the upgrade information.

4. The method according to claim 3, characterized in that The determining the target device performance parameter after the target device is upgraded based on the device performance parameter value range of the target device and the upgrade information includes: Determine a target device performance parameter value range after the target device is upgraded based on the device performance parameter value range of the target device and the upgrade information; If there is an overlap between the device performance parameter value range of the target device and the target device performance parameter value range, the target device performance parameter of the target device after the upgrade is determined based on the device performance parameter value range and the target device performance parameter value range.

5. The method according to claim 4, characterized in that The method further comprises: Based on the device category, device performance parameter attenuation rate, and service life of each device, determine the devices that cannot be upgraded among the multiple devices as devices to be updated; If there is no overlap between the device performance parameter value range of the target device and the target device performance parameter value range, it is determined whether the target device is a device to be updated, and a determination result is obtained.

6. The method according to claim 5, characterized in that The method further comprises: The value range of the device performance parameter of the updated device is determined based on the device type of the device to be updated.

7. A photovoltaic power station equipment upgrade management device, characterized in that: The device comprises: An acquisition module is used to acquire equipment parameters of each device in the photovoltaic power station and upgrade information corresponding to different types of equipment, wherein the equipment parameters include equipment type, equipment performance parameters before upgrade, equipment performance parameter attenuation rate and service life; A first determination module is used to determine at least one target device that can be upgraded from a plurality of devices based on the device category, device performance parameter decay rate, and service life of each device; A second determination module, configured to determine a target device performance parameter after the target device is upgraded based on the device performance parameter before the upgrade corresponding to the target device and the upgrade information corresponding to the target device; An upgrade management module is used to perform upgrade management on the target device based on the performance parameters of the upgraded target device.

8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the photovoltaic power station equipment upgrade management method according to any one of claims 1 to 6 by executing the computer instructions.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the photovoltaic power station equipment upgrade management method according to any one of claims 1 to 6.

10. A computer program product, characterized in that The method comprises computer instructions, wherein the computer instructions are used to enable a computer to execute the photovoltaic power station equipment upgrade management method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Module upgrading method and device, medium, equipment and program product

    CN115051915A

  • Optical storage and charging equipment upgrading method and system, electronic equipment and readable storage medium

    CN116841579A

Cited By

  • Old photovoltaic equipment management device and method

    CN119941449A