Query control method and server for multi-source power grid data

By performing permission verification and multi-dimensional data screening in the power grid data server, comprehensive power grid data is generated, which solves the problem of frequent queries in power grid data queries and improves the security, convenience and comprehensiveness of queries.

CN119293311BActive Publication Date: 2025-09-09GUANGDONG POWER GRID CO LTD INFORMATION CENT
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411184248.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2025-09-09
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

During the power grid data query process, the data query skills of the demand personnel are limited, resulting in multiple triggering of query requests, which reduces the query efficiency and convenience of multi-source power grid data.

Method used

When receiving a query request, the server verifies the authority of the person in need, and filters the related power grid data according to the multi-dimensional information of the target power grid data and the query purpose, generates comprehensive power grid data, considers the query authority and data fusion relationship, and improves the query security and convenience.

Benefits of technology

Through permission verification and multi-dimensional data screening, the security, convenience and comprehensiveness of multi-source power grid data queries are improved, and the reliability and efficiency of queries are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119293311B_ABST
    Figure CN119293311B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data processing technology, and discloses a query control method and server for multi-source power grid data, including: when receiving a power grid data query request, the server verifies the data query authority of the person in need, and when the verification is passed, analyzes the power grid data query request to obtain the target power grid data that the person in need needs to query, and filters the associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the query purpose corresponding to the predetermined power grid data query request; the server generates comprehensive power grid data that needs to be fed back to the person in need based on the target power grid data and the associated power grid data, and sends the comprehensive power grid data to the query terminal corresponding to the person in need. It can be seen that the present invention can improve the security of multi-source power grid data queries while also improving the comprehensiveness of multi-source power grid data queries.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data query technology, and in particular to a query control method and server for multi-source power grid data. Background Art

[0002] With the rapid development of the Internet, the Internet of Things, and artificial intelligence, the power grid system is becoming increasingly large, and the sources of power grid data involved in the power grid system are becoming more and more numerous and diverse, which leads to an increasing amount of power grid data.

[0003] In actual applications, based on different purposes, the demand personnel can query the power grid data. When querying, the demand personnel can log in to the server used to store the power grid data through authorization information (such as authorized user name and password). After successful login, the demand personnel sends a power grid data query request to the server, and the server returns the queried power grid data to the demand personnel based on the aforementioned power grid data query request.

[0004] Practice has found that when the demand personnel query power grid data, the power grid data returned by the server is usually the data specified by the demand personnel. Considering that the demand personnel have limited data query skills, they are usually required to trigger the power grid data query request multiple times, which is not conducive to improving the query efficiency and convenience of multi-source power grid data. Summary of the Invention

[0005] The present invention provides a query control method and server for multi-source power grid data, which can improve the security of multi-source power grid data query while also improving the comprehensiveness of multi-source power grid data query.

[0006] A first aspect of the present invention discloses a query control method for multi-source power grid data, which is applied to a server for controlling multi-source power grid data. The method includes:

[0007] When receiving a power grid data query request triggered by a certain person in need, the server verifies the data query authority of the person in need, and when the data query authority verification is passed, analyzes the power grid data query request to obtain the target power grid data that the person in need needs to query;

[0008] The server filters the associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request;

[0009] The server generates comprehensive power grid data that needs to be fed back to the person in need based on the target power grid data and the associated power grid data, and sends the comprehensive power grid data to a query terminal corresponding to the person in need.

[0010] As an optional implementation manner, in the first aspect of the present invention, the server generates comprehensive power grid data that needs to be fed back to the demand person based on the target power grid data and the associated power grid data, including:

[0011] The server determines whether the requesting person has query authority for the associated power grid data;

[0012] When it is determined that the requesting person does not have the query authority for the associated power grid data, the server performs a matching data processing operation on the associated power grid data to update the associated power grid data. The server determines whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose. If it is determined that the data fusion operation is necessary, the server performs the data fusion operation on the target power grid data and the associated power grid data to obtain the comprehensive power grid data that needs to be fed back to the requesting person.

[0013] When it is determined that the requesting person has query authority for the associated power grid data, the server executes the step of determining whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose;

[0014] When it is determined that the data fusion operation does not need to be performed, the server determines the target power grid data and the associated power grid data as comprehensive power grid data that needs to be fed back to the person in need.

[0015] As an optional embodiment, in the first aspect of the present invention, the server filters the associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request, including:

[0016] The server determines the query purpose of the requester according to the power grid data query request;

[0017] The server filters, according to the query purpose, first associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data;

[0018] The server filters, from the database, second associated power grid data corresponding to the target power grid data according to the multi-dimensional information corresponding to the first associated power grid data;

[0019] The server filters third associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the target power grid data;

[0020] The server determines the associated power grid data corresponding to the target power grid data according to the first associated power grid data, the second associated power grid data, and the third associated power grid data.

[0021] As an optional implementation manner, in the first aspect of the present invention, the server determines the query purpose of the requester according to the power grid data query request, including:

[0022] The server analyzes the power grid data query request to determine the initial query purpose corresponding to the requester;

[0023] The server obtains multi-dimensional trigger parameters when the demand person triggers the power grid data query request, and calculates the trigger clarity of the demand person for the power grid data query request according to the multi-dimensional trigger parameters;

[0024] If the trigger clarity is greater than or equal to a preset clarity threshold, the server determines the initial query purpose as the query purpose of the person in need;

[0025] If the trigger clarity is less than the preset clarity threshold, the server determines the query purpose of the person in need based on a big data analysis method and in combination with the power grid data query request and the multi-dimensional trigger parameters.

[0026] As an optional embodiment, in the first aspect of the present invention, the method further comprises:

[0027] After generating the integrated power grid data, the server divides the integrated power grid data into a first category of power grid data and a second category of power grid data according to the query purpose, wherein the first category of power grid data includes power grid data in the integrated power grid data whose matching degree with the query purpose is higher than or equal to a preset matching degree threshold, and the second category of power grid data includes remaining power grid data in the integrated power grid data except the first category of power grid data;

[0028] The server generates direct output control parameters for the first type of power grid data and guided output control parameters for the second type of power grid data, and sends the direct output control parameters and the guided output control parameters to a query terminal corresponding to the person in need.

[0029] As an optional embodiment, in the first aspect of the present invention, the method further comprises:

[0030] The server receives an operation instruction triggered by a person at the query terminal side for the integrated power grid data fed back by the query terminal;

[0031] The server determines, based on the trigger parameter corresponding to the operation instruction, whether the integrated power grid data meets the operation requirements of the person at the query terminal side;

[0032] When it is determined that the integrated power grid data does not meet the operation requirements, the server screens new power grid data from the database according to the operation requirements and the integrated power grid data and feeds back the new power grid data to the query terminal.

[0033] As an optional implementation manner, in the first aspect of the present invention, after determining that the integrated power grid data does not meet the operation requirements, the method further includes:

[0034] The server obtains, based on the power grid data query request, the operation instruction, and the integrated power grid data, an impact factor of the integrated power grid data not meeting the operation requirement, and determines a degree of correlation between the impact factor and an associated power grid data screening strategy used by the server;

[0035] When the degree of association is greater than or equal to a preset degree threshold, the server adjusts the associated power grid data screening strategy according to the influencing factor, and screens new associated power grid data according to the adjusted associated power grid data screening strategy, and triggers the execution of the steps of generating comprehensive power grid data that needs to be fed back to the person in need based on the target power grid data and the associated power grid data, and sending the comprehensive power grid data to the query terminal corresponding to the person in need.

[0036] A second aspect of the present invention discloses a server for managing and controlling multi-source power grid data, the server comprising:

[0037] The authority verification module is used to verify the data query authority of a certain person when receiving a power grid data query request triggered by the person;

[0038] A demand analysis module is configured to analyze the power grid data query request and obtain the target power grid data required to be queried by the requester when the authority verification module passes the data query authority verification;

[0039] a data screening module, configured to screen associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and a predetermined query purpose corresponding to the power grid data query request;

[0040] A comprehensive determination module, configured to generate comprehensive power grid data that needs to be fed back to the demand person based on the target power grid data and the associated power grid data;

[0041] The query feedback module is used to send the comprehensive power grid data to the query terminal corresponding to the person in need.

[0042] As an optional implementation manner, in the second aspect of the present invention, the specific manner in which the comprehensive determination module generates the comprehensive grid data that needs to be fed back to the demand person based on the target grid data and the associated grid data includes:

[0043] Determining whether the requesting person has query authority for the associated power grid data;

[0044] When it is determined that the requesting person does not have the query authority for the associated power grid data, a matching data processing operation is performed on the associated power grid data to update the associated power grid data. The server determines whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose. If it is determined that the data fusion operation is necessary, the data fusion operation is performed on the target power grid data and the associated power grid data to obtain the comprehensive power grid data that needs to be fed back to the requesting person.

[0045] When it is determined that the requesting person has the query authority for the associated power grid data, performing the step of determining whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose;

[0046] When it is determined that the data fusion operation does not need to be performed, the target power grid data and the associated power grid data are determined as comprehensive power grid data that needs to be fed back to the person in need.

[0047] As an optional embodiment, in the second aspect of the present invention, the data screening module screens the associated power grid data corresponding to the target power grid data from the database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request. The specific manner includes:

[0048] Determining the query purpose of the requester according to the power grid data query request;

[0049] According to the query purpose, filtering first associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data;

[0050] Filtering second associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the first associated power grid data;

[0051] filtering third associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the target power grid data;

[0052] The associated power grid data corresponding to the target power grid data is determined according to the first associated power grid data, the second associated power grid data, and the third associated power grid data.

[0053] As an optional implementation, in the second aspect of the present invention, the specific manner in which the data screening module determines the query purpose of the requester according to the power grid data query request includes:

[0054] Analyze the power grid data query request to determine the initial query purpose corresponding to the requester;

[0055] Acquire multi-dimensional trigger parameters when the demander triggers the power grid data query request, and calculate the trigger clarity of the demander for the power grid data query request based on the multi-dimensional trigger parameters;

[0056] If the trigger clarity is greater than or equal to a preset clarity threshold, the initial query purpose is determined as the query purpose of the requesting person;

[0057] If the trigger clarity is less than the preset clarity threshold, the query purpose of the requester is determined based on a big data analysis method and in combination with the power grid data query request and the multi-dimensional trigger parameters.

[0058] As an optional implementation manner, in the second aspect of the present invention, the server further includes:

[0059] A control parameter generation module is used to divide the comprehensive power grid data into a first category of power grid data and a second category of power grid data according to the query purpose after the comprehensive determination module generates the comprehensive power grid data, wherein the first category of power grid data includes power grid data in the comprehensive power grid data whose matching degree with the query purpose is higher than or equal to a preset matching degree threshold, and the second category of power grid data includes the remaining power grid data in the comprehensive power grid data except the first category of power grid data; generate direct output control parameters for the first category of power grid data and guided output control parameters for the second category of power grid data, and send the direct output control parameters and the guided output control parameters to the query terminal corresponding to the person in need.

[0060] As an optional implementation manner, in the second aspect of the present invention, the server further includes:

[0061] A screening and optimization module is used to receive the operation instructions triggered by the personnel on the query terminal side for the comprehensive power grid data fed back by the query terminal, and judge whether the comprehensive power grid data meets the operation requirements of the personnel on the query terminal side according to the trigger parameters corresponding to the operation instructions. When it is judged that the comprehensive power grid data does not meet the operation requirements, new power grid data is screened from the database according to the operation requirements and the comprehensive power grid data and fed back to the query terminal.

[0062] As an optional embodiment, in the second aspect of the present invention, the screening optimization module is also used to, after determining that the integrated power grid data does not meet the operational requirements, obtain the impact factor of the integrated power grid data not meeting the operational requirements based on the power grid data query request, the operational instruction and the integrated power grid data, and determine the degree of correlation between the impact factor and the associated power grid data screening strategy used by the server; when the degree of correlation is greater than or equal to a preset degree threshold, adjust the associated power grid data screening strategy according to the impact factor, and screen new associated power grid data according to the adjusted associated power grid data screening strategy, and trigger the execution of the generation of the integrated power grid data that needs to be fed back to the demand personnel based on the target power grid data and the associated power grid data, and send the integrated power grid data to the query terminal corresponding to the demand personnel.

[0063] A third aspect of the present invention discloses another server for managing and controlling multi-source power grid data, the server comprising:

[0064] a memory storing executable program code;

[0065] a processor coupled to the memory;

[0066] The processor calls the executable program code stored in the memory to execute the steps of any one of the query and control methods for multi-source power grid data described in the first aspect of the present invention.

[0067] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps of the query and control method for multi-source power grid data described in any one of the first aspects of the present invention.

[0068] Compared with the prior art, the present invention has the following beneficial effects:

[0069] The present invention is applied to a server for managing and controlling multi-source power grid data. Specifically, when receiving a power grid data query request triggered by a person with a multi-source power grid data query demand, the server first verifies the power grid data query authority of the person in need, and then performs subsequent operations after verification, which is conducive to improving the query security of multi-source power grid data. In addition, after the power grid data query authority is verified, in addition to analyzing the target power grid data required to be directly queried by the power grid data query request, the server can also filter the related power grid data corresponding to the target power grid data according to the multi-dimensional information corresponding to the target power grid data and the query purpose corresponding to the person in need, and finally determine the need to feedback to the person in need based on the target power grid data and the related power grid data. The comprehensive power grid data of the target grid data and its corresponding associated power grid data are generated, which is conducive to improving the query convenience and comprehensiveness of the multi-source power grid data while improving the query security of the multi-source power grid data; in addition, when generating the comprehensive power grid data based on the target power grid data and its corresponding associated power grid data, the query authority of the demand personnel for the associated power grid data and the data fusion relationship between the target power grid data and the associated power grid data are further considered, which is conducive to improving the security and reliability of the comprehensive power grid data fed back to the demand personnel, and thus is conducive to improving the query efficiency and query convenience of the multi-source power grid data by the demand personnel; in addition, when screening the associated power grid data corresponding to the target power grid data, different associated power grid data are screened from multiple dimensions and angles, and then based on The accuracy and comprehensiveness of the determination of the associated power grid data corresponding to the target power grid data can be determined based on the associated power grid data of multiple dimensions; in addition, the query purpose of the demand personnel can be intelligently determined based on the multi-dimensional trigger parameters when the demand personnel triggers the power grid data query request, which improves the matching degree between the determined query purpose and the actual needs of the demand personnel, thereby helping to improve the query reliability of multi-source power grid data; in addition, in addition to providing the comprehensive power grid data to the demand personnel, the comprehensive power grid data can be further classified and different output control parameters can be generated for different classification results, which can not only meet the query needs of the demand personnel for multi-source power grid data, but also improve the query of related power grid data in the comprehensive power grid data. Efficiency and safety; in addition, after the comprehensive power grid data is fed back to the query terminal corresponding to the demand personnel, it is also possible to realize intelligent judgment of the satisfaction degree of the personnel on the query terminal side with the comprehensive power grid data based on the trigger parameters corresponding to the operation instructions of the personnel on the query terminal side. If the satisfaction degree is low, new power grid data is automatically screened and fed back to the query terminal, which is conducive to improving the matching degree between the screened power grid data and the operation requirements of the personnel on the query terminal side; in addition, if the satisfaction degree of the personnel on the query terminal side is low with the comprehensive power grid data, the corresponding influencing factors can be further intelligently analyzed, and then the adaptive optimization operation of the associated data screening strategy is performed according to the influencing factors, which is conducive to improving the optimization reliability of the associated data screening strategy. BRIEF DESCRIPTION OF THE DRAWINGS

[0070] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0071] Figure 1 This is a flow chart of a method for querying and controlling multi-source power grid data disclosed in an embodiment of the present invention;

[0072] Figure 2 This is a schematic diagram of the structure of a server disclosed in an embodiment of the present invention;

[0073] Figure 3 It is a structural diagram of another server disclosed in an embodiment of the present invention;

[0074] Figure 4 This is a structural diagram of another server disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0075] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.

[0076] The terms "first," "second," and so on, in the description and claims of the present invention and the accompanying drawings are used to distinguish between different items, not to describe a specific order. Furthermore, the terms "including," "having," and any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, apparatus, product, or end comprising a series of steps or elements is not limited to the listed steps or elements but may optionally include steps or elements not listed therein, or may optionally include other steps or elements inherent to such process, method, product, or end.

[0077] References herein to "embodiments" mean that a particular feature, structure, or characteristic described in connection with the embodiments may be included in at least one embodiment of the present invention. The appearance of this phrase in various places in the specification does not necessarily refer to the same embodiment, nor does it constitute a separate or alternative embodiment that is mutually exclusive of other embodiments. It is understood, both explicitly and implicitly, by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0078] The present invention discloses a query control method and server for multi-source power grid data. When receiving a power grid data query request triggered by a person with a multi-source power grid data query demand, the method can first verify the power grid data query authority of the person in need, and then perform subsequent operations after verification, which is conducive to improving the query security of the multi-source power grid data. In addition, after the power grid data query authority is verified, in addition to analyzing the target power grid data required for direct query by the power grid data query request, the associated power grid data corresponding to the target power grid data can also be screened according to the multi-dimensional information corresponding to the target power grid data and the query purpose corresponding to the person in need, and the comprehensive power grid data that needs to be fed back to the person in need is finally determined based on the target power grid data and the associated power grid data. In this way, while improving the query security of the multi-source power grid data, it is also conducive to improving the query convenience and query comprehensiveness of the multi-source power grid data. The following are detailed descriptions.

[0079] Example 1

[0080] See also Figure 1 , Figure 1 This is a flow chart of a method for querying and controlling multi-source power grid data disclosed in an embodiment of the present invention. Figure 1 The described method is applied to a server for controlling multi-source power grid data, which can be a local server or a cloud server, and is not limited in the embodiment of the present invention. Figure 1 As shown, the query control method for multi-source power grid data may include the following operations:

[0081] 101. When receiving a power grid data query request triggered by a certain person in need, the server verifies the data query authority of the person in need. When the data query authority verification is passed, the server analyzes the power grid data query request to obtain the target power grid data that the person in need needs to query.

[0082] In an embodiment of the present invention, as an optional implementation, the server verifies the data query authority of the requesting person mainly including:

[0083] The server verifies the login name and password of the person who requested the grid data query. If the login name and password pass the verification, the server determines the identity of the person who requested the grid data query based on the login name and password, and obtains the latest data query permission corresponding to the person who requested the grid data query based on the identity information.

[0084] The server determines whether the latest data query permission corresponding to the requesting person covers the query permission of the target power grid data required by the power grid data query request;

[0085] If it is determined that the latest data query permission corresponding to the demand person covers the query permission of the target power grid data, the server obtains the update time of the aforementioned latest data query permission. If the time between the update time and the current time is less than or equal to the preset time threshold, it is determined that the data query permission check has passed; if the time between the update time and the current time is greater than the preset time threshold, the first power grid data operation record of the demand person in the historical time period and the second power grid data operation record of the group members to which the demand person belongs in the historical time period are collected; wherein, the start time of the aforementioned historical time period is not earlier than the aforementioned update time, and the end time of the aforementioned historical time period is not later than the current time;

[0086] The server updates the latest data query authority corresponding to the demand person based on the first power grid data operation record and the second power grid data operation record, and triggers the above-mentioned operation of judging whether the latest data query authority corresponding to the demand person covers the query authority of the target power grid data required to be queried by the power grid data query request. If the judgment result is yes, it is determined that the data query authority verification is passed. If the judgment result is no, it is fed back prompting the demand person to adjust the target power grid data required to be queried by the power grid data query request.

[0087] Optionally, the group member to which the requesting person belongs is a target person in the group to which the requesting person belongs, whose relationship with the requesting person indicates that the target person is managed by the requesting person. This means that the requesting person is responsible for the grid data operations performed by the group members. Furthermore, optionally, the first grid data operation record and the second grid data operation record may each include a triggered grid data operation instruction, trigger parameters corresponding to the grid data operation instruction, and a grid data operation result corresponding to the grid data operation instruction.

[0088] It can be seen that this optional implementation method provides a power grid data query authority verification method different from the prior art, which is conducive to improving the verification accuracy and verification reliability of the power grid data query authority of the person in need.

[0089] 102. The server filters associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and a predetermined query purpose corresponding to the power grid data query request.

[0090] In an embodiment of the present invention, the multi-dimensional information corresponding to the target power grid data may include a combination of one or more of the following: the source of original data reporting corresponding to the target power grid data, the time span information corresponding to the target power grid data, the regional attributes corresponding to the target power grid data, the generation type of the target power grid data, the data verification identifier corresponding to the target power grid data, the usage attributes corresponding to the target power grid data, and the publicly available attributes corresponding to the target power grid data. Further optionally, the generation type of the target power grid data is used to indicate whether the target power grid data is the originally reported power grid data, or is obtained after performing a data fusion operation (such as a power grid data calculation operation) on multiple originally reported power grid data. The data verification identifier corresponding to the target power grid data is used to indicate whether the target power grid data has been verified. Whether it has been verified can reflect the accuracy of the target power grid data on the one hand, and the importance of the target power grid data, such as the degree of importance or the level of importance, on the other hand.

[0091] 103. The server generates comprehensive grid data that needs to be fed back to the demand personnel based on the target grid data and the related grid data.

[0092] 104. The server sends the comprehensive power grid data to the query terminal corresponding to the person in need.

[0093] It can be seen that the method described in the embodiment of the present invention can first verify the grid data query authority of the person in need of multi-source grid data query when receiving a grid data query request triggered by a person with multi-source grid data query needs, and then perform subsequent operations after verification, which is conducive to improving the query security of multi-source grid data. In addition, after the grid data query authority verification is passed, in addition to analyzing the target grid data required to be directly queried by the grid data query request, the related grid data corresponding to the target grid data can also be screened according to the multi-dimensional information corresponding to the target grid data and the query purpose corresponding to the person in need, and finally determine the comprehensive grid data that needs to be fed back to the person in need based on the target grid data and the related grid data. In this way, while improving the query security of multi-source grid data, it is also conducive to improving the query convenience and comprehensiveness of multi-source grid data.

[0094] In an optional embodiment, the server generates comprehensive grid data that needs to be fed back to the demand personnel based on the target grid data and the associated grid data, which may include:

[0095] The server determines whether the requesting person has the query authority for the associated power grid data;

[0096] When it is determined that the requesting person does not have the query authority for the associated power grid data, the server performs matching data processing operations (such as key data hiding operations, etc.) on the associated power grid data to update the associated power grid data. The server determines whether it is necessary to perform data fusion operations on the target power grid data and the associated power grid data based on the query purpose. If it is determined that data fusion operations are necessary, data fusion operations (such as data calculation operations, threshold update operations, etc.) are performed on the target power grid data and the associated power grid data to obtain comprehensive power grid data that needs to be fed back to the requesting person.

[0097] When it is determined that the requesting person has the query authority for the associated power grid data, the server performs a step of determining whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose;

[0098] When it is determined that the data fusion operation does not need to be performed, the server determines the target power grid data and the associated power grid data as the comprehensive power grid data that needs to be fed back to the person in need.

[0099] It can be seen that when this optional embodiment generates comprehensive power grid data based on the target power grid data and its corresponding associated power grid data, it further considers the query authority of the demand personnel for the associated power grid data and the data fusion relationship between the target power grid data and the associated power grid data, which is conducive to improving the security and reliability of the comprehensive power grid data fed back to the demand personnel, and further helps to improve the query efficiency and convenience of the demand personnel in querying multi-source power grid data.

[0100] In another optional embodiment, the server filters associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data based on the multi-dimensional information corresponding to the target power grid data and a predetermined query purpose corresponding to the power grid data query request, which may include:

[0101] The server determines the query purpose of the requester based on the power grid data query request, such as for generating a power grid system operation report and / or serving as a basis for power grid system optimization;

[0102] The server selects first associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the query purpose;

[0103] The server filters the second associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the first associated power grid data;

[0104] The server filters the third associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the target power grid data;

[0105] The server determines the associated power grid data corresponding to the target power grid data according to the first associated power grid data, the second associated power grid data, and the third associated power grid data.

[0106] Further optionally, before the server filters the second associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the first associated power grid data, the method may further include:

[0107] The server determines the level of the associated data corresponding to the required person based on the personnel information corresponding to the required person and the query purpose of the required person. If the level of the associated data is greater than or equal to the preset level threshold, it triggers the execution of the above-mentioned step of screening the second associated power grid data corresponding to the target power grid data from the database based on the multi-dimensional information corresponding to the first associated power grid data.

[0108] It can be seen that this optional embodiment can also screen different associated power grid data from multiple dimensions and angles when screening the associated power grid data corresponding to the target power grid data, and then determine the accuracy and comprehensiveness of the associated power grid data corresponding to the target power grid data based on the associated power grid data of multiple dimensions.

[0109] In another optional embodiment, the server determines the query purpose of the requester according to the power grid data query request, which may include:

[0110] The server analyzes the power grid data query request to determine the initial query purpose corresponding to the requester;

[0111] The server obtains multi-dimensional trigger parameters (such as trigger duration, at least one operation before successfully triggering the grid data query request, and the operation speed of each of the aforementioned operations) when the requester triggers the grid data query request, and calculates the trigger clarity of the requester's request for the grid data query based on the multi-dimensional trigger parameters. The higher the trigger clarity, the higher the match between the initial query purpose and the requester's query requirements, and the lower the trigger clarity, the lower the match between the initial query purpose and the requester's query requirements.

[0112] If the trigger clarity is greater than or equal to the preset clarity threshold, the server determines the initial query purpose as the query purpose of the requester;

[0113] If the trigger clarity is less than the preset clarity threshold, the server determines the query purpose of the person in need based on big data analysis and combined with the power grid data query request and multi-dimensional trigger parameters.

[0114] It can be seen that this optional embodiment can also intelligently determine the query purpose of the demand person based on the multi-dimensional trigger parameters when the demand person triggers the power grid data query request, thereby improving the matching degree between the determined query purpose and the actual needs of the demand person, and thus helping to improve the query reliability of multi-source power grid data.

[0115] In yet another optional embodiment, the method may further include:

[0116] After generating the comprehensive power grid data, the server divides the comprehensive power grid data into first-category power grid data and second-category power grid data according to the query purpose, wherein the first-category power grid data includes power grid data in the comprehensive power grid data whose matching degree with the query purpose is higher than or equal to a preset matching degree threshold, and the second-category power grid data includes the remaining power grid data in the comprehensive power grid data except the first-category power grid data;

[0117] The server generates direct output control parameters for the first type of power grid data and guided output control parameters for the second type of power grid data, and sends the direct output control parameters and guided output control parameters to the query terminal corresponding to the person in need.

[0118] Among them, the direct output control parameters of the first type of power grid data are used to control the query terminal to directly output the first type of power grid data, and the guided output control parameters of the second type of power grid data are used to control the query terminal to guide the demand personnel to trigger the corresponding operation after outputting the first type of power grid data to further output the second type of power grid data according to the operation triggered by the demand personnel that meets the preset requirements.

[0119] It can be seen that in addition to providing comprehensive power grid data to the demand personnel, this optional embodiment can further classify the comprehensive power grid data and generate different output control parameters for different classification results. It can not only meet the demand personnel's query needs for multi-source power grid data, but also improve the query efficiency and security of related power grid data in the comprehensive power grid data.

[0120] In yet another optional embodiment, the method may further include:

[0121] The server receives the operation instructions triggered by the personnel at the query terminal side for the integrated power grid data fed back by the query terminal;

[0122] The server determines whether the comprehensive power grid data meets the operational requirements of the query terminal personnel based on the trigger parameters corresponding to the operation instruction;

[0123] When it is determined that the integrated power grid data does not meet the operation requirements, the server selects new power grid data from the database according to the operation requirements and the integrated power grid data and feeds it back to the query terminal.

[0124] It can be seen that after this optional embodiment feeds back the comprehensive power grid data to the query terminal corresponding to the person in need, it can also realize intelligent judgment of the satisfaction degree of the personnel on the query terminal side with the comprehensive power grid data based on the trigger parameters corresponding to the operation instructions of the personnel on the query terminal side. If the satisfaction degree is low, new power grid data will be automatically screened and fed back to the query terminal, which is conducive to improving the matching degree between the screened power grid data and the operation requirements of the personnel on the query terminal side.

[0125] In yet another optional embodiment, after determining that the integrated power grid data does not meet the operation requirements, the method may further include:

[0126] The server obtains the impact factor of the integrated power grid data not meeting the operation requirements based on the power grid data query request, the operation instruction and the integrated power grid data, and determines the degree of correlation between the impact factor and the associated power grid data screening strategy used by the server;

[0127] When the degree of association is greater than or equal to a preset degree threshold, the server adjusts the associated power grid data screening strategy according to the influencing factor, and screens new associated power grid data according to the adjusted associated power grid data screening strategy, and triggers the execution of the steps of generating comprehensive power grid data that needs to be fed back to the demand person based on the target power grid data and the associated power grid data, and sending the comprehensive power grid data to the query terminal corresponding to the demand person.

[0128] It can be seen that in this optional embodiment, if the personnel on the query terminal side are less satisfied with the comprehensive power grid data, the corresponding influencing factors can be further intelligently analyzed, and then the adaptive optimization operation of the associated data screening strategy can be performed according to the influencing factors, which is conducive to improving the optimization reliability of the associated data screening strategy.

[0129] Example 2

[0130] See also Figure 2 , Figure 2 This is a schematic diagram of the structure of a server disclosed in an embodiment of the present invention. Figure 2 The server described is used to manage and control multi-source power grid data. The server can be a local server or a cloud server, which is not limited in the embodiment of the present invention. Figure 2 As shown, the server may include:

[0131] The authority verification module 201 is used to verify the data query authority of a certain person when receiving a power grid data query request triggered by the person;

[0132] The demand analysis module 202 is used to analyze the power grid data query request and obtain the target power grid data required by the requester when the authority verification module 201 passes the data query authority verification;

[0133] The data screening module 203 is configured to screen related power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request;

[0134] Comprehensive determination module 204, for generating comprehensive grid data that needs to be fed back to the demand personnel based on the target grid data and the associated grid data;

[0135] The query feedback module 205 is used to send the comprehensive power grid data to the query terminal corresponding to the person in need.

[0136] As an optional implementation, the specific manner in which the authority verification module 201 verifies the data query authority of the requesting person may include:

[0137] The authority verification module 201 verifies the login name and password of the person requesting power grid data query. If the login name and password pass the verification, the identity information of the person requesting power grid data query is determined based on the login name and password, and the latest data query authority corresponding to the person requesting power grid data query is obtained based on the identity information.

[0138] The authority verification module 201 determines whether the latest data query authority corresponding to the requesting person covers the query authority of the target power grid data required by the power grid data query request;

[0139] If it is determined that the latest data query permission corresponding to the demand person covers the query permission of the target power grid data, the permission verification module 201 obtains the update time of the aforementioned latest data query permission. If the time between the update time and the current time is less than or equal to the preset time threshold, it is determined that the data query permission verification is passed; if the time between the update time and the current time is greater than the preset time threshold, the first power grid data operation record of the demand person in the historical time period and the second power grid data operation record of the group members to which the demand person belongs in the historical time period are collected; wherein the start time of the aforementioned historical time period is not earlier than the aforementioned update time, and the end time of the aforementioned historical time period is not later than the current time;

[0140] The authority verification module 201 updates the latest data query authority corresponding to the demand person according to the first power grid data operation record and the second power grid data operation record, and triggers the above-mentioned operation of judging whether the latest data query authority corresponding to the demand person covers the query authority of the target power grid data required to be queried by the power grid data query request. If the judgment result is yes, it is determined that the data query authority verification is passed. If the judgment result is no, prompt information is fed back to prompt the demand person to adjust the target power grid data required to be queried by the power grid data query request.

[0141] Optionally, the group member to which the requesting person belongs is a target person in the group to which the requesting person belongs, whose relationship with the requesting person indicates that the target person is managed by the requesting person. This means that the requesting person is responsible for the grid data operations performed by the group members. Furthermore, optionally, the first grid data operation record and the second grid data operation record may each include a triggered grid data operation instruction, trigger parameters corresponding to the grid data operation instruction, and a grid data operation result corresponding to the grid data operation instruction.

[0142] It can be seen that this optional implementation method provides a power grid data query authority verification method different from the prior art, which is conducive to improving the verification accuracy and verification reliability of the power grid data query authority of the person in need.

[0143] It can be seen that the server described in the embodiment of the present invention can verify the grid data query authority of the person in need of multi-source grid data query when receiving the grid data query request triggered by the person in need of multi-source grid data query, and then perform subsequent operations after verification, which is conducive to improving the query security of multi-source grid data. In addition, after the grid data query authority verification is passed, in addition to analyzing the target grid data required to be directly queried by the grid data query request, the related grid data corresponding to the target grid data can also be filtered according to the multi-dimensional information corresponding to the target grid data and the query purpose corresponding to the person in need, and finally determine the comprehensive grid data that needs to be fed back to the person in need based on the target grid data and the related grid data. In this way, while improving the query security of multi-source grid data, it is also conducive to improving the query convenience and comprehensiveness of multi-source grid data.

[0144] In an optional embodiment, the comprehensive determination module 204 generates the comprehensive power grid data to be fed back to the requesting personnel based on the target power grid data and the associated power grid data in a specific manner including:

[0145] Determine whether the person in need has the authority to query the associated power grid data;

[0146] When it is determined that the person in need does not have the query authority for the associated power grid data, a matching data processing operation is performed on the associated power grid data to update the associated power grid data. The server determines whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose. If it is determined that the data fusion operation is necessary, the data fusion operation is performed on the target power grid data and the associated power grid data to obtain the comprehensive power grid data that needs to be fed back to the person in need; when it is determined that the person in need has the query authority for the associated power grid data, an operation is performed to determine whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose.

[0147] When it is determined that the data fusion operation does not need to be performed, the server determines the target power grid data and the associated power grid data as the comprehensive power grid data that needs to be fed back to the person in need.

[0148] It can be seen that when this optional embodiment generates comprehensive power grid data based on the target power grid data and its corresponding associated power grid data, it further considers the query authority of the demand personnel for the associated power grid data and the data fusion relationship between the target power grid data and the associated power grid data, which is conducive to improving the security and reliability of the comprehensive power grid data fed back to the demand personnel, and further helps to improve the query efficiency and convenience of the demand personnel in querying multi-source power grid data.

[0149] In another optional embodiment, the data screening module 203 screens the associated power grid data corresponding to the target power grid data from the database storing the multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request. Specifically, the method includes:

[0150] Determine the query purpose of the person in need based on the power grid data query request;

[0151] According to the query purpose, first associated power grid data corresponding to the target power grid data is filtered from a database storing multi-source power grid data;

[0152] Filtering second associated power grid data corresponding to the target power grid data from a database according to the multi-dimensional information corresponding to the first associated power grid data;

[0153] Filtering third associated power grid data corresponding to the target power grid data from a database according to the multi-dimensional information corresponding to the target power grid data;

[0154] The associated power grid data corresponding to the target power grid data is determined according to the first associated power grid data, the second associated power grid data, and the third associated power grid data.

[0155] It can be seen that this optional embodiment can also screen different associated power grid data from multiple dimensions and angles when screening the associated power grid data corresponding to the target power grid data, and then determine the accuracy and comprehensiveness of the associated power grid data corresponding to the target power grid data based on the associated power grid data of multiple dimensions.

[0156] In another optional embodiment, the specific manner in which the data screening module 203 determines the query purpose of the requester according to the power grid data query request includes:

[0157] Analyze the grid data query request to determine the initial query purpose corresponding to the requester;

[0158] Obtaining multi-dimensional trigger parameters when the demander triggers a power grid data query request, and calculating the trigger clarity of the demander's request for the power grid data query based on the multi-dimensional trigger parameters;

[0159] If the trigger clarity is greater than or equal to the preset clarity threshold, the initial query purpose is determined as the query purpose of the requester;

[0160] If the trigger clarity is less than the preset clarity threshold, the query purpose of the demander is determined based on big data analysis and combined with the power grid data query request and multi-dimensional trigger parameters.

[0161] It can be seen that this optional embodiment can also intelligently determine the query purpose of the demand person based on the multi-dimensional trigger parameters when the demand person triggers the power grid data query request, thereby improving the matching degree between the determined query purpose and the actual needs of the demand person, and thus helping to improve the query reliability of multi-source power grid data.

[0162] In another optional embodiment, Figure 3 As shown, the server may also include:

[0163] The control parameter generation module 206 is used to divide the comprehensive power grid data into the first category of power grid data and the second category of power grid data according to the query purpose after the comprehensive determination module 204 generates the comprehensive power grid data. The first category of power grid data includes the power grid data in the comprehensive power grid data whose matching degree with the query purpose is higher than or equal to the preset matching degree threshold, and the second category of power grid data includes the remaining power grid data in the comprehensive power grid data except the first category of power grid data; generate direct output control parameters for the first category of power grid data and guided output control parameters for the second category of power grid data, and send the direct output control parameters and guided output control parameters to the query terminal corresponding to the person in need.

[0164] It can be seen that in addition to providing comprehensive power grid data to the demand personnel, this optional embodiment can further classify the comprehensive power grid data and generate different output control parameters for different classification results. It can not only meet the demand personnel's query needs for multi-source power grid data, but also improve the query efficiency and security of related power grid data in the comprehensive power grid data.

[0165] In another optional embodiment, Figure 3 As shown, the server also includes:

[0166] The screening optimization module 207 is used to receive the operation instructions triggered by the personnel on the query terminal side for the comprehensive power grid data fed back by the query terminal, and judge whether the comprehensive power grid data meets the operation requirements of the personnel on the query terminal side according to the trigger parameters corresponding to the operation instructions. When it is judged that the comprehensive power grid data does not meet the operation requirements, new power grid data is screened from the database according to the operation requirements and the comprehensive power grid data and fed back to the query terminal.

[0167] It can be seen that after this optional embodiment feeds back the comprehensive power grid data to the query terminal corresponding to the person in need, it can also realize intelligent judgment of the satisfaction degree of the personnel on the query terminal side with the comprehensive power grid data based on the trigger parameters corresponding to the operation instructions of the personnel on the query terminal side. If the satisfaction degree is low, new power grid data will be automatically screened and fed back to the query terminal, which is conducive to improving the matching degree between the screened power grid data and the operation requirements of the personnel on the query terminal side.

[0168] In this optional embodiment, further optionally, the screening optimization module 207 is also used to obtain the impact factor of the integrated power grid data not meeting the operation requirements based on the power grid data query request, operation instructions and integrated power grid data after determining that the integrated power grid data does not meet the operation requirements, and determine the degree of correlation between the impact factor and the associated power grid data screening strategy used by the server; when the correlation degree is greater than or equal to the preset degree threshold, adjust the associated power grid data screening strategy according to the impact factor, and screen new associated power grid data according to the adjusted associated power grid data screening strategy, and trigger the execution of the target power grid data and the associated power grid data to generate the integrated power grid data that needs to be fed back to the demand personnel, and send the integrated power grid data to the query terminal corresponding to the demand personnel.

[0169] It can be seen that in this optional embodiment, if the personnel on the query terminal side are less satisfied with the comprehensive power grid data, the corresponding influencing factors can be further intelligently analyzed, and then the adaptive optimization operation of the associated data screening strategy can be performed according to the influencing factors, which is conducive to improving the optimization reliability of the associated data screening strategy.

[0170] Example 3

[0171] See also Figure 4 , Figure 4 A schematic diagram of the structure of another server disclosed in an embodiment of the present invention. Figure 4 The server described is used to manage and control multi-source power grid data. The server can be a local server or a cloud server, which is not limited in the embodiment of the present invention. Figure 4 As shown, the server may include:

[0172] A memory 301 storing executable program code;

[0173] a processor 302 coupled to the memory 301;

[0174] The processor 302 calls the executable program code stored in the memory 301 to execute the steps of any one of the query and control methods for multi-source power grid data described in the first embodiment.

[0175] Example 4

[0176] An embodiment of the present invention discloses a computer storage medium storing computer instructions. When the computer instructions are called, they are used to execute the steps of any one of the query and control methods for multi-source power grid data described in the first embodiment.

[0177] The device embodiments described above are merely illustrative. Modules described as separate components may or may not be physically separate, and components shown as modules may or may not be physical modules, i.e., they may be located in one place or distributed across multiple network modules. Some or all of the modules may be selected based on actual needs to achieve the objectives of the present embodiment. Persons of ordinary skill in the art will be able to understand and implement the present invention without inventive effort.

[0178] Through the detailed description of the above embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus the necessary general hardware platform, or of course, by means of hardware. Based on this understanding, the above technical solution, in essence, or the portion that contributes to the prior art, can be embodied in the form of a software product, which can be stored in a computer-readable storage medium, including a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium capable of carrying or storing data.

[0179] Finally, it should be noted that the query control method and server for multi-source power grid data disclosed in the embodiment of the present invention only discloses a preferred embodiment of the present invention, which is only used to illustrate the technical solution of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that it is still possible to modify the technical solutions recorded in the aforementioned embodiments, or to replace some of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention.

Claims

1. A query control method for multi-source power grid data, characterized in that: The method is applied to a server for managing and controlling multi-source power grid data, and the method includes: When receiving a power grid data query request triggered by a certain person in need, the server verifies the data query authority of the person in need, and when the data query authority verification is passed, analyzes the power grid data query request to obtain the target power grid data that the person in need needs to query; The server filters the associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request; The server generates comprehensive power grid data that needs to be fed back to the person in need based on the target power grid data and the associated power grid data, and sends the comprehensive power grid data to a query terminal corresponding to the person in need; The server generates comprehensive grid data that needs to be fed back to the demander based on the target grid data and the associated grid data, including: The server determines whether the requesting person has query authority for the associated power grid data; When it is determined that the requesting person does not have the query authority for the associated power grid data, the server performs a matching data processing operation on the associated power grid data to update the associated power grid data. The server determines whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose. If it is determined that the data fusion operation is necessary, the server performs the data fusion operation on the target power grid data and the associated power grid data to obtain the comprehensive power grid data that needs to be fed back to the requesting person. When it is determined that the requesting person has query authority for the associated power grid data, the server executes the step of determining whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose; When it is determined that the data fusion operation does not need to be performed, the server determines the target power grid data and the associated power grid data as comprehensive power grid data that needs to be fed back to the demand person; Furthermore, the server filters associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and a predetermined query purpose corresponding to the power grid data query request, including: The server determines the query purpose of the requester according to the power grid data query request; The server filters, according to the query purpose, first associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data; The server filters, from the database, second associated power grid data corresponding to the target power grid data according to the multi-dimensional information corresponding to the first associated power grid data; The server filters third associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the target power grid data; The server determines the associated power grid data corresponding to the target power grid data according to the first associated power grid data, the second associated power grid data, and the third associated power grid data.

2. The query control method for multi-source power grid data according to claim 1, characterized in that: The server determines the query purpose of the requester according to the power grid data query request, including: The server analyzes the power grid data query request to determine the initial query purpose corresponding to the requester; The server obtains multi-dimensional trigger parameters when the demand person triggers the power grid data query request, and calculates the trigger clarity of the demand person for the power grid data query request according to the multi-dimensional trigger parameters; If the trigger clarity is greater than or equal to a preset clarity threshold, the server determines the initial query purpose as the query purpose of the person in need; If the trigger clarity is less than the preset clarity threshold, the server determines the query purpose of the person in need based on a big data analysis method and in combination with the power grid data query request and the multi-dimensional trigger parameters.

3. The query control method for multi-source power grid data according to claim 2, characterized in that: The method further comprises: After generating the integrated power grid data, the server divides the integrated power grid data into a first category of power grid data and a second category of power grid data according to the query purpose, wherein the first category of power grid data includes power grid data in the integrated power grid data whose matching degree with the query purpose is higher than or equal to a preset matching degree threshold, and the second category of power grid data includes remaining power grid data in the integrated power grid data except the first category of power grid data; The server generates direct output control parameters for the first type of power grid data and guided output control parameters for the second type of power grid data, and sends the direct output control parameters and the guided output control parameters to a query terminal corresponding to the person in need.

4. The query control method for multi-source power grid data according to claim 3, characterized in that: The method further comprises: The server receives an operation instruction triggered by a person at the query terminal side for the integrated power grid data fed back by the query terminal; The server determines, based on the trigger parameter corresponding to the operation instruction, whether the integrated power grid data meets the operation requirements of the person at the query terminal side; When it is determined that the integrated power grid data does not meet the operation requirements, the server screens new power grid data from the database according to the operation requirements and the integrated power grid data and feeds back the new power grid data to the query terminal.

5. The query control method for multi-source power grid data according to claim 4, characterized in that: After determining that the integrated power grid data does not meet the operation requirements, the method further includes: The server obtains, based on the power grid data query request, the operation instruction, and the integrated power grid data, an impact factor of the integrated power grid data not meeting the operation requirement, and determines a degree of correlation between the impact factor and an associated power grid data screening strategy used by the server; When the degree of association is greater than or equal to a preset degree threshold, the server adjusts the associated power grid data screening strategy according to the influencing factor, and screens new associated power grid data according to the adjusted associated power grid data screening strategy, and triggers the execution of the steps of generating comprehensive power grid data that needs to be fed back to the person in need based on the target power grid data and the associated power grid data, and sending the comprehensive power grid data to the query terminal corresponding to the person in need.

6. A server, characterized in that: The server is used to manage and control multi-source power grid data, and the server includes: The authority verification module is used to verify the data query authority of a certain person when receiving a power grid data query request triggered by the person; A demand analysis module is configured to analyze the power grid data query request and obtain the target power grid data required to be queried by the requester when the authority verification module passes the data query authority verification; a data screening module, configured to screen associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and a predetermined query purpose corresponding to the power grid data query request; A comprehensive determination module, configured to generate comprehensive power grid data that needs to be fed back to the demand person based on the target power grid data and the associated power grid data; A query feedback module, configured to send the integrated power grid data to a query terminal corresponding to the person in need; The specific manner in which the comprehensive determination module generates the comprehensive power grid data that needs to be fed back to the demander based on the target power grid data and the associated power grid data includes: Determining whether the requesting person has query authority for the associated power grid data; When it is determined that the requesting person does not have the query authority for the associated power grid data, a matching data processing operation is performed on the associated power grid data to update the associated power grid data. The server determines whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose. If it is determined that the data fusion operation is necessary, the data fusion operation is performed on the target power grid data and the associated power grid data to obtain the comprehensive power grid data that needs to be fed back to the requesting person. When it is determined that the requesting person has the query authority for the associated power grid data, performing the step of determining whether it is necessary to perform a data fusion operation on the target power grid data and the associated power grid data according to the query purpose; When it is determined that the data fusion operation does not need to be performed, the target power grid data and the associated power grid data are determined as the comprehensive power grid data that needs to be fed back to the demand person; Furthermore, the data screening module screens the associated power grid data corresponding to the target power grid data from the database storing multi-source power grid data according to the multi-dimensional information corresponding to the target power grid data and the predetermined query purpose corresponding to the power grid data query request, specifically in the following manner: Determining the query purpose of the requester according to the power grid data query request; According to the query purpose, filtering first associated power grid data corresponding to the target power grid data from a database storing multi-source power grid data; Filtering second associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the first associated power grid data; filtering third associated power grid data corresponding to the target power grid data from the database according to the multi-dimensional information corresponding to the target power grid data; The associated power grid data corresponding to the target power grid data is determined according to the first associated power grid data, the second associated power grid data, and the third associated power grid data.

7. A server, characterized in that: The server is used to manage and control multi-source power grid data, and the server includes: a memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the steps of the query control method for multi-source power grid data according to any one of claims 1 to 5.

8. A computer storage medium, characterized in that The computer storage medium stores computer instructions, and when the computer instructions are called, the steps of the query control method for multi-source power grid data according to any one of claims 1 to 5 are executed.

Citation Information

Patent Citations

  • Resource data processing method and device based on block chain, and server

    CN115442135A

  • Power grid comprehensive dispatching operation information log management platform, control method thereof and medium

    CN118171804A