Visual management method and system of distribution station based on industrial Internet of Things
Through the visual management method of distribution stations based on the industrial Internet of Things, virtual three-dimensional diagrams are constructed, data is analyzed, management and control levels and inspection routes are determined, real-time data is collected and visualized, the shortcomings of manual inspection of distribution stations are solved, intelligent management and visual management are realized, and efficiency and intelligence are improved.
Patent Information
- Application Number
- CN202411805449.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2044-12-10
AI Technical Summary
The maintenance and management of existing distribution stations relies on manual inspection, and there are problems such as real-time monitoring difficulties, equipment failures and lag in environmental abnormalities. The degree of intelligence is low and cannot effectively support smart distribution networks.
Using the visual management method of distribution stations based on the Industrial Internet of Things, virtual three-dimensional diagrams are constructed through three-dimensional drawings, equipment and power data are analyzed, control levels are determined and equipment is marked, inspection routes are determined, real-time status data is collected, and visual display is performed through virtual three-dimensional diagrams.
It realizes intelligent management and visual management of distribution stations, improves equipment supervision and inspection efficiency, can promptly detect equipment operation abnormalities and environmental changes, and supports the development of smart distribution networks.
Smart Images

Figure CN119295055B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of power distribution stations and relates to visualization management technology, specifically to a visualization management method and system for power distribution stations based on industrial Internet of Things. Background Art
[0002] A distribution station is a site that delivers electricity to electrical equipment or users. It is located at the end of the power grid and is a point on a radial network, connected to the substation above and to various electrical equipment below. It generally has a small capacity and a voltage level below 35 kV. It is divided into two categories. Most of them are used for dispatching, dispatching various lines, and balancing the load of each line; there are also some independent ones that play a role in changing the transmission method. With the rapid development of electricity, distribution stations are also playing an increasingly important role.
[0003] In the existing technology, the maintenance and management of distribution stations is still mainly done by manual inspections. However, manual inspections cannot monitor in real time, cannot detect equipment failures in a timely manner, and cannot detect environmental anomalies in a timely manner. Manual inspections have serious maintenance lags, and the degree of intelligence of manual inspections is low, which cannot provide effective data support for smart distribution networks in the power sector.
[0004] In order to improve the above defects, the present invention proposes a visual management method and system for distribution stations based on industrial Internet of Things. Summary of the invention
[0005] In view of the deficiencies in the prior art, the object of the present invention is to provide a visual management method and system for distribution stations based on industrial Internet of Things.
[0006] The technical problems to be solved by the present invention are:
[0007] How to realize intelligent management and visual management of distribution stations based on industrial Internet of Things.
[0008] In the first aspect, the purpose of the present invention can be achieved by the following technical solution: a visual management method for distribution stations based on industrial Internet of Things, the visual management method for distribution stations is as follows:
[0009] Step S10, constructing a virtual three-dimensional diagram of the power distribution station according to the three-dimensional drawing;
[0010] Step S20, obtaining equipment supervision values of electrical equipment in the distribution station according to equipment data analysis and obtaining equipment importance values of electrical equipment in the distribution station according to power data analysis;
[0011] Step S30, visually marking the electrical equipment in the distribution station according to the control level;
[0012] Step S40, determining the inspection route of the electrical equipment in the distribution station according to the control level, and collecting real-time status data of the electrical equipment in the distribution station based on the inspection route;
[0013] Step S50, judging the equipment operation status of the electrical equipment in the power distribution station based on the real-time status data, and visually displaying the equipment operation status through a virtual three-dimensional diagram.
[0014] Furthermore, the operation data includes the time the electrical equipment in the substation has been put into use, the number of abnormal operation and damage caused by foreign objects, and the number of environmental abnormalities at the location of the substation;
[0015] The power data include the number of power-consuming devices connected to the electrical equipment in the distribution station, the number of power users and the power radiation area.
[0016] Furthermore, the calculation process of the equipment supervision value and the equipment importance value is specifically as follows:
[0017] Step S201, marking the electrical equipment in the power distribution station as i, where i is the number of the electrical equipment;
[0018] Step S202, obtaining the time when the electrical equipment in the power distribution station is put into use, and subtracting the time when the electrical equipment in the power distribution station is put into use from the current time to obtain the time Ti of the electrical equipment in the power distribution station being put into use;
[0019] Step S203, then obtain the number of abnormal operation times YCi and the number of damages caused by foreign objects WCi of the electrical equipment in the distribution station, as well as the number of environmental abnormalities HCi where the distribution station is located;
[0020] Step S204, the equipment supervision value SJi of the electrical equipment in the distribution station is calculated by a formula, and the specific formula is as follows:
[0021] SJi=Ti×a1+(YCi+WCi+HCi)×a2; where a1 and a2 are weight coefficients, and a1<a2;
[0022] Step S205, obtaining the number of electric devices YSi, the number of electric users YHi and the electric radiation area connected to the electric equipment in the distribution station, and superimposing the areas of the electric radiation areas to obtain the electric radiation area YMi of the electric equipment in the distribution station;
[0023] Step S206, using the formula SZi=YSi×b1+YHi×b2+YMi×b3 to calculate the equipment importance value SZi of the electrical equipment in the distribution station; wherein b1, b2 and b3 are all weight coefficients, b1<b2<b3.
[0024] Furthermore, the step S30 includes the following sub-steps:
[0025] Step S301, obtaining the equipment supervision value SJi and equipment importance value SZi of the electrical equipment in the distribution station;
[0026] Step S302, the visible value KSi of the electrical equipment in the distribution station is calculated by a formula, and the specific formula is as follows:
[0027] KSi=SJi×c1+SZi×c2; where c1 and c2 are weight coefficients, and c1=c2;
[0028] Step S303, determining whether the control level of the electrical equipment is the third control level, the second control level, or the first control level according to the equipment visibility value;
[0029] Step S304: Visually mark the electrical equipment according to the control level. The visual mark is specifically:
[0030] If the control level of the electrical equipment is the first control level, the electrical equipment in the virtual three-dimensional diagram will be marked in red;
[0031] If the control level of the electrical equipment is the second control level, the electrical equipment in the virtual three-dimensional diagram will be marked in orange;
[0032] If the control level of the electrical equipment is the third control level, the electrical equipment in the virtual three-dimensional diagram will be marked in yellow.
[0033] Furthermore, the control intensity of the first control level is higher than that of the second control level, and the control intensity of the second control level is higher than that of the third control level.
[0034] Furthermore, the inspection route is determined as follows:
[0035] Step S401, obtaining the device visible value of the electrical equipment corresponding to the first control level, traversing and comparing the device visible values to obtain the maximum value among the device visible values, and taking the electrical equipment corresponding to the maximum value as the first inspection object of the inspection route;
[0036] Step S402, obtaining the adjacent electrical devices of the electrical device that is the first inspection object, and comparing the control levels of the adjacent electrical devices;
[0037] Step S403: If there are no adjacent electrical devices with the same control level, electrical devices are selected as the next inspection object according to the control level from high to low;
[0038] If there are adjacent electrical equipment with the same control level, the control level is used as the first selection factor, and then the equipment visibility value is used as the second selection factor. The electrical equipment is selected as the next inspection object from the largest to the smallest according to the equipment visibility value;
[0039] Step S404, determine the inspection order of the electrical equipment in the distribution station in turn, add the inspection times to the virtual three-dimensional map, and connect them in turn according to the inspection order to obtain the inspection route of the electrical equipment in the virtual three-dimensional map.
[0040] Furthermore, the real-time status data is the real-time temperature value and real-time humidity value of the electrical equipment in the power distribution room at different time points.
[0041] Furthermore, the step S50 includes the following sub-steps:
[0042] Step S501, obtaining real-time temperature values and real-time humidity values of electrical equipment in the power distribution station at different time points;
[0043] Step S502, comparing the real-time temperature values corresponding to all time points with the temperature interval value, and comparing the real-time humidity values corresponding to all time points with the humidity interval value, if the real-time temperature value corresponding to any time point does not belong to the temperature interval value or the real-time humidity value corresponding to any time point does not belong to the humidity interval value, then generating an abnormal operation signal;
[0044] Step S503: If the real-time temperature values corresponding to all time points belong to the temperature interval value, and the real-time humidity values corresponding to all time points belong to the humidity interval value, then proceed to the next step.
[0045] Furthermore, the step S50 further includes the following sub-steps:
[0046] Step S504, calculate the real-time temperature change rate WS between adjacent time points by formula t and real-time humidity change rate SS t , the formula is as follows:
[0047] WS t =|WD t+1 -WD t | / (T t+1 -T t ); In the formula, T t+1 is the next time point, T t is the current time point, WD t is the real-time temperature value corresponding to the current time point, WD t+1 is the real-time temperature value corresponding to the next time point;
[0048] SS t =|SD t+1 -SD t | / (T t+1 -T t ); in the formula, SD t is the real-time humidity value corresponding to the current time point, SD t+1 The real-time humidity value corresponding to the next time point;
[0049] Step S505, if the real-time temperature change rate between any adjacent time points does not belong to the preset temperature change rate interval or the real-time humidity change rate between any adjacent time points does not belong to the preset humidity change rate interval, then an operation abnormality signal is generated;
[0050] Step S506, if the real-time temperature change rate between all adjacent time points belongs to the preset temperature change rate interval or the real-time humidity change rate between all adjacent time points belongs to the preset humidity change rate interval, then a normal operation signal is generated;
[0051] Step S507: If the corresponding electrical device generates an abnormal operation signal, the red mark corresponding to the electrical device in the virtual three-dimensional map flashes;
[0052] If the corresponding electrical equipment generates a normal operation signal, no operation is performed.
[0053] In a second aspect, the purpose of the present invention can also be achieved by the following technical solutions: a visual management system for a distribution station based on the industrial Internet of Things, comprising:
[0054] A virtual construction module is used to construct a virtual three-dimensional diagram of the power distribution station based on the three-dimensional drawings;
[0055] A data analysis module, used to obtain equipment supervision values of electrical equipment in the distribution station based on equipment data analysis and to obtain equipment important values of electrical equipment in the distribution station based on power data analysis;
[0056] Intelligent marking module, used to visually mark electrical equipment in the distribution station according to the control level;
[0057] The route determination module is used to determine the inspection route of the electrical equipment in the distribution station according to the control level, and collect the real-time status data of the electrical equipment in the distribution station based on the inspection route;
[0058] The status judgment module is used to judge the equipment operation status of electrical equipment in the distribution station based on real-time status data, and visualize the equipment operation status through a virtual three-dimensional diagram.
[0059] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0060] 1. The present invention constructs a virtual three-dimensional diagram of the distribution station based on the three-dimensional drawing, and then obtains the equipment supervision value of the electrical equipment in the distribution station based on the equipment data analysis and the equipment important value of the electrical equipment in the distribution station based on the power data analysis, and visually marks the electrical equipment in the distribution station according to the control level, so as to realize the differentiated visualization of the electrical equipment in the distribution station;
[0061] 2. The present invention also determines the inspection route of the electrical equipment in the distribution station according to the control level, and then collects the real-time status data of the electrical equipment in the distribution station based on the inspection route, so as to realize the orderly collection of the corresponding data of the electrical equipment in the distribution station, and finally judges the equipment operation status of the electrical equipment in the distribution station based on the real-time status data, and visualizes the equipment operation status through a virtual three-dimensional diagram. The present invention realizes the intelligent management and visual management of the distribution station. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0063] Figure 1 is a flow chart of the method of the present invention;
[0064] Figure 2 is a flowchart of the sub-steps corresponding to step S3 in the present invention;
[0065] Figure 3 It is the overall system block diagram of the present invention. DETAILED DESCRIPTION
[0066] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0067] Example 1, please refer to Figure 1-Figure 2 As shown, the technical solution provided by the present invention is: a visual management method for distribution stations based on industrial Internet of Things, and the visual management method for distribution stations is specifically as follows:
[0068] Step S10, constructing a virtual three-dimensional diagram of the power distribution station according to the three-dimensional drawing;
[0069] In practice, the virtual three-dimensional diagram can be used to collect the structural information of the distribution station and the object specification information of the internal objects, and then input the structural information and object specification information into the three-dimensional modeling software to establish a three-dimensional model of the distribution station. At the same time, it can also be obtained through digital twin technology, using physical models, IoT nodes and other data to build a digital twin model of the distribution station, and realize the three-dimensional visualization of the distribution station through augmented reality technology;
[0070] Step S20, obtaining equipment supervision values of electrical equipment in the distribution station according to equipment data analysis and obtaining equipment importance values of electrical equipment in the distribution station according to power data analysis;
[0071] It should be specifically noted that the equipment data and power data may be specifically stored in relevant memories or storage devices. The above-mentioned electrical equipment includes but is not limited to high-voltage switchgear, transformers, etc., wherein the operation data is the commissioning time, the number of operation abnormalities and the number of damage caused by external objects of the electrical equipment in the distribution station, and the number of environmental abnormalities at the location of the distribution station. Operation abnormality refers to the abnormal operation state of the electrical equipment itself, such as high temperature inside the electrical equipment, etc., and damage caused by external objects refers to damage to the electrical equipment caused by external objects, such as insects and rodents entering the interior of the electrical equipment and causing damage to the line. Environmental abnormality refers to abnormalities in the environment at the location of the electrical equipment, such as high temperature environment, water immersion, etc. In this embodiment, only the above-mentioned data are shown for subsequent visual marking; the power data is the number of electrical equipment connected to the electrical equipment in the distribution station, the number of electricity users, and the power radiation area;
[0072] In this embodiment, the calculation process of the device supervision value and the device importance value is as follows:
[0073] Step S201, marking the electrical equipment in the power distribution station as i, where i is the number of the electrical equipment;
[0074] Step S202, obtaining the time when the electrical equipment in the power distribution station is put into use, and subtracting the time when the electrical equipment in the power distribution station is put into use from the current time to obtain the time Ti of the electrical equipment in the power distribution station being put into use;
[0075] Step S203, then obtain the number of abnormal operation times YCi and the number of damages caused by foreign objects WCi of the electrical equipment in the distribution station, as well as the number of environmental abnormalities HCi where the distribution station is located;
[0076] Step S204, substitute the above parameters into the formula, and calculate the equipment supervision value SJi of the electrical equipment in the distribution station through the formula. The specific formula is as follows:
[0077] SJi=Ti×a1+(YCi+WCi+HCi)×a2; where a1 and a2 are weight coefficients, and a1<a2. In practice, a1 can be 0.3 and a2 can be 0.7. The equipment supervision value is used to reflect the degree of management and supervision of electrical equipment. That is, the larger the equipment supervision value, the more the electrical equipment needs to be managed or monitored.
[0078] Step S205, obtaining the number of electric devices YSi, the number of electric users YHi and the electric radiation area connected to the electric equipment in the distribution station, and superimposing the areas of the electric radiation areas to obtain the electric radiation area YMi of the electric equipment in the distribution station;
[0079] In practice, for example, if an electrical device supplies power to two communities, the area of the two communities can be added together to obtain the power radiation area of the electrical device;
[0080] Step S206, using the formula SZi=YSi×b1+YHi×b2+YMi×b3 to calculate the equipment importance value SZi of the electrical equipment in the distribution station; wherein b1, b2 and b3 are all weight coefficients, b1<b2<b3.
[0081] Step S30, visually marking the electrical equipment in the distribution station according to the control level;
[0082] In this embodiment, step S30 includes the following sub-steps:
[0083] Step S301, obtaining the equipment supervision value SJi and equipment importance value SZi of the electrical equipment in the distribution station obtained by the above calculation;
[0084] Step S302, the visible value KSi of the electrical equipment in the distribution station is calculated by a formula, and the specific formula is as follows:
[0085] KSi=SJi×c1+SZi×c2; where c1 and c2 are weight coefficients, and c1=c2;
[0086] Step S303, calibrating the control level of the corresponding electrical equipment according to the visible value of the equipment, specifically:
[0087] When the device visibility value is less than the first threshold, the control level of the electrical equipment is the third control level;
[0088] When the device visibility value is greater than or equal to the first threshold and less than the second threshold, the control level of the electrical equipment is the second control level;
[0089] When the device visibility value is greater than or equal to the second threshold, the control level of the electrical equipment is the first control level; wherein the first threshold is less than the second threshold, the control intensity of the first control level is higher than the control intensity of the second control level, and the control intensity of the second control level is higher than the control intensity of the third control level;
[0090] Step S304: Visually mark the electrical equipment according to the control level. The visual mark is specifically:
[0091] If the control level of the electrical equipment is the first control level, the electrical equipment in the virtual three-dimensional diagram will be marked in red;
[0092] If the control level of the electrical equipment is the second control level, the electrical equipment in the virtual three-dimensional diagram will be marked in orange;
[0093] If the control level of the electrical equipment is the third control level, the electrical equipment in the virtual three-dimensional diagram will be marked in yellow.
[0094] Step S40, determining the inspection route of the electrical equipment in the distribution station according to the control level, and collecting real-time status data of the electrical equipment in the distribution station based on the inspection route;
[0095] In this embodiment, the real-time status data is the real-time temperature value and real-time humidity value of the electrical equipment in the power distribution room at different time points. In addition, relevant data such as real-time voltage value, real-time current value, and real-time dust value can also be collected and used for status analysis of the electrical equipment. In specific implementation, the real-time status data can be collected through various sensors configured on the electrical equipment, and the real-time status data can be sent to the analysis platform for analysis through the gateway;
[0096] In a specific embodiment, the process of determining the inspection route is as follows:
[0097] Step S401, obtaining the device visible value of the electrical equipment corresponding to the first control level, traversing and comparing the device visible values to obtain the maximum value among the device visible values, and taking the electrical equipment corresponding to the maximum value as the first inspection object of the inspection route;
[0098] Step S402, obtaining the adjacent electrical devices of the electrical device that is the first inspection object, and comparing the control levels of the adjacent electrical devices;
[0099] Step S403: If there are no adjacent electrical devices with the same control level, electrical devices are selected as the next inspection object according to the control level from high to low;
[0100] If there are adjacent electrical equipment with the same control level, the control level is used as the first selection factor, and then the equipment visibility value is used as the second selection factor. The electrical equipment is selected as the next inspection object from the largest to the smallest according to the equipment visibility value;
[0101] Step S404, sequentially determine the inspection order of the electrical equipment in the distribution station, and add the inspection times to the virtual three-dimensional map, and sequentially connect them according to the inspection order to obtain the inspection route of the electrical equipment in the virtual three-dimensional map;
[0102] It should be specifically explained that the inspection route in this embodiment is not an actual inspection route, but a collection route for real-time status data corresponding to each electrical equipment in the power distribution station.
[0103] Step S50, judging the equipment operation status of the electrical equipment in the power distribution station based on the real-time status data, and visually displaying the equipment operation status through a virtual three-dimensional diagram;
[0104] In this embodiment, step S50 includes the following sub-steps:
[0105] Step S501, obtaining real-time temperature values and real-time humidity values of electrical equipment in the power distribution station at different time points;
[0106] Step S502, comparing the real-time temperature values corresponding to all time points with the temperature interval value, and comparing the real-time humidity values corresponding to all time points with the humidity interval value, if the real-time temperature value corresponding to any time point does not belong to the temperature interval value or the real-time humidity value corresponding to any time point does not belong to the humidity interval value, then generating an abnormal operation signal;
[0107] Specifically, this embodiment only analyzes the temperature and humidity exceeding the standard of the electrical equipment in the distribution station. In practice, the low temperature of the electrical equipment in the distribution station can also be analyzed;
[0108] Step S503: If the real-time temperature values corresponding to all time points belong to the temperature interval value, and the real-time humidity values corresponding to all time points belong to the humidity interval value, proceed to the next step;
[0109] Step S504, calculate the real-time temperature change rate WS between adjacent time points by formula t and real-time humidity change rate SS t , the formula is as follows:
[0110] WS t =|WD t+1 -WD t | / (T t+1 -T t ); In the formula, T t+1 is the next time point, T t is the current time point, WD t is the real-time temperature value corresponding to the current time point, WD t+1 is the real-time temperature value corresponding to the next time point;
[0111] SS t =|SD t+1 -SD t | / (T t+1 -T t ); in the formula, SD t is the real-time humidity value corresponding to the current time point, SD t+1 The real-time humidity value corresponding to the next time point;
[0112] Step S505, if the real-time temperature change rate between any adjacent time points does not belong to the preset temperature change rate interval or the real-time humidity change rate between any adjacent time points does not belong to the preset humidity change rate interval, then an operation abnormality signal is generated;
[0113] Step S506, if the real-time temperature change rate between all adjacent time points belongs to the preset temperature change rate interval or the real-time humidity change rate between all adjacent time points belongs to the preset humidity change rate interval, then a normal operation signal is generated;
[0114] Step S507: If the corresponding electrical device generates an abnormal operation signal, the red mark corresponding to the electrical device in the virtual three-dimensional map flashes;
[0115] If the corresponding electrical equipment generates a normal operation signal, no operation is performed.
[0116] In this application, if corresponding calculation formulas appear, the above calculation formulas are all dimensionless and take their numerical calculations. The weight coefficients, proportional coefficients and other coefficients in the formulas are set to a result value obtained by quantifying each parameter. The size of the weight coefficient and the proportional coefficient can be determined as long as it does not affect the proportional relationship between the parameter and the result value.
[0117] Embodiment 2, as Figure 3 As shown, based on another concept of the same invention, a distribution station visualization management system based on industrial Internet of Things is now proposed, including:
[0118] A virtual construction module is used to construct a virtual three-dimensional diagram of the power distribution station based on the three-dimensional drawings;
[0119] A data analysis module, used to obtain equipment supervision values of electrical equipment in the distribution station based on equipment data analysis and to obtain equipment important values of electrical equipment in the distribution station based on power data analysis;
[0120] In this embodiment, the data analysis module includes the following working process: obtaining the commissioning time of the electrical equipment in the distribution station, subtracting the commissioning time from the current time to obtain the commissioning time of the electrical equipment in the distribution station, and then obtaining the number of operating abnormalities and the number of damages caused by external objects of the electrical equipment in the distribution station, as well as the number of environmental abnormalities at the location of the distribution station, calculating the equipment supervision value of the electrical equipment in the distribution station, obtaining the number of electrical equipment connected to the electrical equipment in the distribution station, the number of electricity users and the electricity radiation area, and superimposing the areas of the electricity radiation areas to obtain the electricity radiation area of the electrical equipment in the distribution station, and then calculating the equipment importance value of the electrical equipment in the distribution station.
[0121] Intelligent marking module, used to visually mark electrical equipment in the distribution station according to the control level;
[0122] In this embodiment, the intelligent marking module includes the following working process: obtaining the equipment supervision value and equipment importance value of the electrical equipment in the distribution station, calculating the equipment visual value of the electrical equipment in the distribution station, determining whether the control level of the electrical equipment is the third control level, the second control level or the first control level based on the equipment visual value, and visually marking the electrical equipment in combination with the control level. The visual marking is specifically: if the control level of the electrical equipment is the first control level, the electrical equipment in the virtual three-dimensional map is marked in red; if the control level of the electrical equipment is the second control level, the electrical equipment in the virtual three-dimensional map is marked in orange; if the control level of the electrical equipment is the third control level, the electrical equipment in the virtual three-dimensional map is marked in yellow.
[0123] The route determination module is used to determine the inspection route of the electrical equipment in the distribution station according to the control level, and collect the real-time status data of the electrical equipment in the distribution station based on the inspection route;
[0124] In this embodiment, the process of determining the inspection route is as follows: obtain the device visible value of the electrical equipment corresponding to the first control level, traverse and compare the device visible values to obtain the maximum value in the device visible value, use the electrical equipment corresponding to the maximum value as the first inspection object of the inspection route, and then obtain the adjacent electrical equipment of the electrical equipment used as the first inspection object, compare the control levels of the adjacent electrical equipment, if there are no adjacent electrical equipment with the same control level, select the electrical equipment as the next inspection object according to the control level from high to low, if there are adjacent electrical equipment with the same control level, use the control level as the first selection factor, and then use the device visible value as the second selection factor, select the electrical equipment as the next inspection object from large to small according to the device visible value, determine the inspection order of the electrical equipment in the distribution station in turn, add the inspection times to the virtual three-dimensional map, and connect them in sequence according to the inspection order to obtain the inspection route of the electrical equipment in the virtual three-dimensional map.
[0125] The status judgment module is used to judge the equipment operation status of the electrical equipment in the distribution station based on the real-time status data, and visualize the equipment operation status through a virtual three-dimensional diagram;
[0126] In this embodiment, the judgment process of the state judgment module is as follows:
[0127] The real-time temperature value and real-time humidity value of the electrical equipment in the distribution station at different time points are obtained, and the real-time temperature values corresponding to all time points are compared with the temperature interval value, and the real-time humidity values corresponding to all time points are compared with the humidity interval value. If the real-time temperature value corresponding to any time point does not belong to the temperature interval value or the real-time humidity value corresponding to any time point does not belong to the humidity interval value, an abnormal operation signal is generated. If the real-time temperature values corresponding to all time points belong to the temperature interval value, and the real-time humidity values corresponding to all time points belong to the humidity interval value, the real-time temperature change rate and the real-time humidity change rate between adjacent time points are calculated. When the real-time temperature change rate between any adjacent time points does not belong to the preset temperature change rate interval or the real-time humidity change rate between any adjacent time points does not belong to the preset humidity change rate interval, an abnormal operation signal is generated. When the real-time temperature change rate between all adjacent time points belongs to the preset temperature change rate interval or the real-time humidity change rate between all adjacent time points belongs to the preset humidity change rate interval, a normal operation signal is generated. Finally, if the corresponding electrical equipment generates an abnormal operation signal, the red mark corresponding to the electrical equipment in the virtual three-dimensional diagram flashes. If the corresponding electrical equipment generates a normal operation signal, no operation is performed.
[0128] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A visual management method for distribution stations based on industrial Internet of Things, characterized in that: The specific method of visual management of distribution stations is as follows: Step S10, constructing a virtual three-dimensional diagram of the power distribution station according to the three-dimensional drawing; Step S20, obtaining the equipment supervision value of the electrical equipment in the distribution station according to the equipment data analysis and obtaining the equipment important value of the electrical equipment in the distribution station according to the power data analysis; the operation data are the commissioning time, the number of operation abnormalities and the number of damages caused by foreign objects of the electrical equipment in the distribution station, and the number of environmental abnormalities at the location of the distribution station; the power data are the number of electrical equipment connected to the electrical equipment in the distribution station, the number of electricity users and the power radiation area; The calculation process of the equipment supervision value and the equipment importance value is as follows: Step S201, marking the electrical equipment in the power distribution station as i, where i is the number of the electrical equipment; Step S202, obtaining the time when the electrical equipment in the power distribution station is put into use, and subtracting the time when the electrical equipment is put into use from the current time to obtain the time Ti of the electrical equipment in the power distribution station being put into use; Step S203, then obtain the number of abnormal operation times YCi and the number of damages caused by foreign objects WCi of the electrical equipment in the distribution station, as well as the number of environmental abnormalities HCi where the distribution station is located; Step S204, the equipment supervision value SJi of the electrical equipment in the distribution station is calculated by a formula, and the specific formula is as follows: SJi=Ti×a1+(YCi+WCi+HCi)×a2; where a1 and a2 are weight coefficients, and a1<a2; Step S205, obtaining the number of electric devices YSi, the number of electric users YHi and the electric radiation area connected to the electric equipment in the distribution station, and superimposing the areas of the electric radiation areas to obtain the electric radiation area YMi of the electric equipment in the distribution station; Step S206, using the formula SZi=YSi×b1+YHi×b2+YMi×b3 to calculate the equipment importance value SZi of the electrical equipment in the distribution station; wherein b1, b2 and b3 are all weight coefficients, b1<b2<b3; Step S30, visually marking the electrical equipment in the distribution station according to the control level; Wherein, the step S30 includes the following sub-steps: Step S301, obtaining the equipment supervision value SJi and equipment importance value SZi of the electrical equipment in the distribution station; Step S302, the visible value KSi of the electrical equipment in the distribution station is calculated by a formula, and the specific formula is as follows: KSi=SJi×c1+SZi×c2; where c1 and c2 are weight coefficients, and c1=c2; Step S303, determining whether the control level of the electrical equipment is the third control level, the second control level, or the first control level according to the equipment visibility value; Step S304: Visually mark the electrical equipment in combination with the control level. The visual mark is specifically: If the control level of the electrical equipment is the first control level, the electrical equipment in the virtual three-dimensional diagram will be marked in red; If the control level of the electrical equipment is the second control level, the electrical equipment in the virtual three-dimensional diagram will be marked in orange; If the control level of the electrical equipment is the third control level, the electrical equipment in the virtual three-dimensional diagram will be marked in yellow; Step S40, determining the inspection route of the electrical equipment in the distribution station according to the control level, and collecting real-time status data of the electrical equipment in the distribution station based on the inspection route; The process of determining the inspection route is as follows: Step S401, obtaining the device visible value of the electrical equipment corresponding to the first control level, traversing and comparing the device visible values to obtain the maximum value among the device visible values, and taking the electrical equipment corresponding to the maximum value as the first inspection object of the inspection route; Step S402, obtaining the adjacent electrical devices of the electrical device that is the first inspection object, and comparing the control levels of the adjacent electrical devices; Step S403: If there are no adjacent electrical devices with the same control level, electrical devices are selected as the next inspection object according to the control level from high to low; If there are adjacent electrical equipment with the same control level, the control level is used as the first selection factor, and then the equipment visibility value is used as the second selection factor. The electrical equipment is selected as the next inspection object from the largest to the smallest according to the equipment visibility value; Step S404, sequentially determine the inspection order of the electrical equipment in the distribution station, and add the inspection times to the virtual three-dimensional map, and sequentially connect them according to the inspection order to obtain the inspection route of the electrical equipment in the virtual three-dimensional map; Step S50, judging the equipment operation status of the electrical equipment in the power distribution station based on the real-time status data, and visually displaying the equipment operation status through a virtual three-dimensional diagram.
2. The method for visual management of distribution stations based on industrial Internet of Things according to claim 1 is characterized in that: The control intensity of the first control level is higher than that of the second control level, and the control intensity of the second control level is higher than that of the third control level.
3. The method for visual management of distribution stations based on industrial Internet of Things according to claim 1 is characterized in that: The real-time status data are the real-time temperature and humidity values of the electrical equipment in the power distribution room at different time points.
4. The method for visual management of distribution stations based on industrial Internet of Things according to claim 3 is characterized in that: The step S50 includes the following sub-steps: Step S501, obtaining real-time temperature values and real-time humidity values of electrical equipment in the power distribution station at different time points; Step S502, comparing the real-time temperature values corresponding to all time points with the temperature interval value, and comparing the real-time humidity values corresponding to all time points with the humidity interval value, if the real-time temperature value corresponding to any time point does not belong to the temperature interval value or the real-time humidity value corresponding to any time point does not belong to the humidity interval value, then generating an abnormal operation signal; Step S503: If the real-time temperature values corresponding to all time points belong to the temperature interval value, and the real-time humidity values corresponding to all time points belong to the humidity interval value, then proceed to the next step.
5. The method for visual management of distribution stations based on industrial Internet of Things according to claim 4 is characterized in that: The step S50 further includes the following sub-steps: Step S504, calculate the real-time temperature change rate WSt and the real-time humidity change rate SSt between adjacent time points by using the formula, the specific formula is as follows: WSt=|WDt +1 -WDt| / (Tt +1 -Tt); in the formula, Tt +1 is the next time point, Tt is the current time point, WDt is the real-time temperature value corresponding to the current time point, WDt +1 is the real-time temperature value corresponding to the next time point; SSt=|SDt +1 -SDt| / (Tt +1 -Tt); in the formula, SDt is the real-time humidity value corresponding to the current time point, SDt +1 The real-time humidity value corresponding to the next time point; Step S505, if the real-time temperature change rate between any adjacent time points does not belong to the preset temperature change rate interval or the real-time humidity change rate between any adjacent time points does not belong to the preset humidity change rate interval, then an operation abnormality signal is generated; Step S506, if the real-time temperature change rate between all adjacent time points belongs to the preset temperature change rate interval or the real-time humidity change rate between all adjacent time points belongs to the preset humidity change rate interval, then a normal operation signal is generated; Step S507: If the corresponding electrical device generates an abnormal operation signal, the red mark corresponding to the electrical device in the virtual three-dimensional map flashes; If the corresponding electrical equipment generates a normal operation signal, no operation is performed.
6. The visual management system of distribution station based on industrial Internet of Things is characterized by: In combination with the method for visual management of distribution stations based on industrial Internet of Things according to any one of claims 1 to 5, the method comprises: A virtual construction module is used to construct a virtual three-dimensional diagram of the power distribution station based on the three-dimensional drawings; A data analysis module, used to obtain equipment supervision values of electrical equipment in the distribution station based on equipment data analysis and to obtain equipment important values of electrical equipment in the distribution station based on power data analysis; Intelligent marking module, used to visually mark electrical equipment in the distribution station according to the control level; The route determination module is used to determine the inspection route of the electrical equipment in the distribution station according to the control level, and collect the real-time status data of the electrical equipment in the distribution station based on the inspection route; The status judgment module is used to judge the equipment operation status of electrical equipment in the distribution station based on real-time status data, and visualize the equipment operation status through a virtual three-dimensional diagram.
Citation Information
Patent Citations
Power transformation equipment operation supervision system and method based on text analysis
CN116502623A
Power distribution station room visualization system and method based on digital twinborn technology
CN118468241A
Intelligent management and control method for power distribution station house based on digital-analog deep fusion
CN118691266A