Positioning and hanging device for box girder installation

By designing a positioning and hanging device for box girder installation, the horizontal accuracy and wind resistance of box girders are achieved by using the bridge pier positioning device and traction counterweight device, the problems of inconvenient installation of box girders, susceptible to wind and difficulty in calibration of reinforcement in the prior art are solved, and installation efficiency and safety are improved.

CN119306117BActive Publication Date: 2025-04-25SHANXI YUNTONG MACHINERY EQUIPMENT MANUFACTURING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411878908.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-04-25
Estimated Expiration
2044-12-19

AI Technical Summary

Technical Problem

The existing positioning and hanging device for box girder installation is not convenient for self-level installation through the bridge pier guidance, it is susceptible to wind influence and causes collision, and it is not convenient to achieve steel bar lifting calibration, resulting in the subsequent casting molding effect.

Method used

A positioning and hanging device for box beam installation is designed, including a bridge pier positioning device and a traction counterweight device. Vertical traction is carried out through the stable structure of the bridge pier to ensure the horizontal accuracy of the box beam installation, and the precise positioning and calibration of the steel bars are achieved through the steel bar positioning parts.

Benefits of technology

The horizontal accuracy and wind resistance of box girder installation are achieved, the installation efficiency and safety are improved, the collision between box girders and bridge piers or adjacent box girders is avoided, and the steel bar hanging and calibration process is simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119306117B_ABST
    Figure CN119306117B_ABST
Patent Text Reader

Abstract

The present invention provides a positioning hanging device for box girder installation, which relates to the technical field of box girder hanging, including a hanging installation part, on which a hanging connection part is installed; on which four lifting control parts are installed; the hanging connection part is used to be hung on a hook of a crane; on which two rotating control parts are rotatably installed, a traction counterweight device is adopted to realize downward traction counterweight work, and at the same time, in cooperation with a pier positioning device, the pier positioning device is directly slidably installed on adjacent piers, and by utilizing the characteristics of the vertical support of the piers, the pier positioning device can only lift and slide vertically, so that the box girder body on the top of the traction support channel steel can be automatically leveled; the problem that the current positioning hanging device for box girder installation is not convenient for realizing the self-leveling installation of pier guidance, usually relies on the adjustment of two cranes, and is very susceptible to collision due to wind force during installation of the box girder is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of box beam hangers, in particular to a positioning and hanging device for installing a box beam. Background Art

[0002] The box girder is hollow inside with flanges on both sides of the upper part. The box girder is a common structural form for large-span bridges and is generally used on bridges with larger spans. During construction, the box girder is usually placed on the pier by hoisting after the pier construction is completed. In the actual construction process, small box girders are widely used. Usually, more than two box girders are placed side by side on the jacks on the piers, and then the rubber bearings supporting the box girder on the piers are installed for support installation. During hoisting, two cranes are usually used to hang the two ends of the box girder respectively, and lift and lower at the same time. After each box girder is docked to the pier, the steel bars set on the side of the box girder are tied together and concrete is poured to make each box girder integrally formed. The current positioning and hanging device for box girder installation is not convenient for self-leveling installation guided by the piers, and usually relies on the adjustment of two cranes. The box girder is very susceptible to collision due to wind force during installation. At the same time, it is also not convenient to realize the steel bar hanging calibration. The steel bars between adjacent box girders are very easy to be misplaced, which requires a long time to adjust, which is time-consuming and labor-intensive, and it is also easy to affect the subsequent pouring and molding effect. Summary of the invention

[0003] The disclosed embodiments relate to a positioning and hanging device for box girder installation. The pier positioning device thereof can realize sliding guidance on the piers, and utilize the stable structure of the piers to vertically pull the box girder, thereby effectively ensuring the horizontal accuracy of the box girder installation. At the same time, the wind resistance stability of the box girder during hoisting is stronger, thereby improving the installation efficiency and being safer.

[0004] In a first aspect of the present disclosure, a positioning and hanging device for box girder installation is provided, which specifically includes a hanging installation member, on which a hanging connection member is installed; on which four lifting control members are installed; the hanging connection member is used to be hung on a hook of a crane; on which two rotating control members are rotatably installed, and the two rotating control members are engaged with the four lifting control members; on which two rotating control members are respectively fixedly installed steel bar positioning members; the steel bar positioning members are used to position adjacent steel bars on the side of the beam box; the hanging installation member A pier positioning device is fixedly installed at the bottom of the component, and the pier positioning device is used for sliding and limiting between the piers supported by two box girders; a traction counterweight device is fixedly installed on the pier positioning device; the traction counterweight device is used for counterweighting and pulling the pier positioning device; the hanging installation component comprises: a supporting channel steel and a limiting guide plate, and the supporting channel steel is provided with two, and two through holes are respectively provided on the two supporting channel steels; two groups of limiting guide plates are respectively fixedly installed on the sides of the two supporting channel steels, and each group of limiting guide plates is installed obliquely in an "eight" shape.

[0005] In at least some embodiments, the lifting control component includes: a lifting control shaft, a sliding mounting block and a control rack, the lifting control shaft is slidably mounted on a hanging mounting frame; a sliding mounting block is fixedly mounted on the lifting control shaft, and the side of the sliding mounting block slides in a slot provided on the hanging mounting frame; a control rack is fixedly mounted on the side of the sliding mounting block; and the bottom of the lifting control shaft passes through the hanging mounting frame.

[0006] In at least some embodiments, the hanging connection member includes: a hanging mounting frame, an installation steel cable, a hanging sleeve and a mounting bolt. There are two hanging mounting frames, and both of the two hanging mounting frames are "U"-shaped structures; the two ends of the two hanging mounting frames are respectively inserted into the two supporting channel steels; an installation steel cable is fixedly installed between the two hanging mounting frames; the two ends of the two hanging mounting frames are respectively provided with threads; a hanging sleeve is sleeved on the installation steel cable; the inner side of the hanging sleeve is coated with lubricating oil; two hanging holes are provided on the top of the hanging sleeve, and the two hanging holes on the top of the hanging sleeve are respectively used to hang on the crane hook; the bottom of the two hanging mounting frames are respectively threadedly connected with two mounting bolts, and the four mounting bolts are respectively attached to the bottom of the supporting channel steel; the two hanging mounting frames are respectively provided with slots for sliding of the lifting control parts; the two hanging mounting frames respectively pass through the four through holes for hanging provided on the box girder body.

[0007] In at least some embodiments, the lifting control component further includes: a return spring, wherein the return spring is fixedly mounted on the sliding mounting block; and the other end of the return spring is mounted on the hanging mounting frame.

[0008] In at least some embodiments, the hanging mounting parts also include: a box girder body and box girder cast steel bars, the limiting guide plate is used to limit the jack under the box girder through the inclined structure; the top of the two supporting channel steels bears the box girder body; the box girder body itself is provided with four through holes for hanging; and a row of box girder cast steel bars are respectively provided on both sides of the box girder body.

[0009] In at least some embodiments, the pier positioning device also includes: a positioning mounting frame, an expansion positioning roller and an opposing screw rod, and the two ends of the expansion mounting columns are respectively fixedly mounted with a positioning mounting frame; four expansion positioning rollers are respectively rotatably mounted on the two positioning mounting frames, and the four expansion positioning rollers are symmetrically installed; opposing screw rods are rotatably mounted on the positioning mounting cylinder; a handle is provided in the middle of the opposing screw rod; both sides of the opposing screw rod are reverse threads; both sides of the opposing screw rod are respectively threadedly connected to the threaded holes of the two expansion mounting columns; the expansion positioning rollers are used to roll and fit the box girder pier.

[0010] In at least some embodiments, the pier positioning device includes: a positioning installation tube, a hanging connecting rope and an expansion installation column, two hanging connecting ropes are fixedly installed on the positioning installation tube, and the other ends of the two hanging connecting ropes are respectively connected to the bottom of two supporting channel steels; rectangular holes are respectively provided at both ends of the positioning installation tube; expansion installation columns are respectively inserted into the rectangular holes at both ends of the positioning installation tube, and threaded holes are respectively provided on the two expansion installation columns.

[0011] In at least some embodiments, the traction counterweight device includes: a counterweight water tank and a water inlet hole, the counterweight water tank stores water inside; the counterweight water tank is fixedly mounted on the positioning mounting tube; the counterweight water tank is used for counterweight traction positioning mounting tube; a water inlet hole is installed on the counterweight water tank; the water inlet hole is closed by a rubber stopper.

[0012] In at least some embodiments, the steel bar positioning member includes: a rotating mounting frame, a cover buckle positioning shell and a steel bar positioning groove, the rotating mounting frame is fixedly mounted on the rotating mounting shaft; a row of cover buckle positioning shells are fixedly mounted on the rotating mounting frame, and a row of cover buckle positioning shells are respectively provided with steel bar positioning grooves; the lower inner sides of the steel bar positioning grooves are inclined structures; the steel bar positioning grooves are used to position the steel bars for casting the box girder.

[0013] In at least some embodiments, the rotating control component includes: a rotating mounting shaft and a control gear, wherein control gears are fixedly mounted on both ends of the rotating mounting shaft; both ends of the rotating mounting shaft are rotatably mounted on two hanging mounting frames; the two control gears are respectively engaged with two control racks on the same side; and the control rack is used to drive the control gear to rotate.

[0014] The present invention provides a positioning and hanging device for box girder installation, which has the following beneficial effects:

[0015] The traction counterweight device used in the present invention can realize the downward traction counterweight work, and at the same time cooperate with the pier positioning device to be directly slidably installed on the adjacent piers. By utilizing the characteristics of the vertical support of the piers, the pier positioning device will only lift and slide vertically, so that the box girder body on the top of the traction support channel steel can be automatically leveled. The center of gravity leveling structure adopted in this structure is less affected by factors such as wind force, and no manual traction and leveling work is required. It is more stable and safe. The box girder body will not collide with the piers or adjacent box girders, and this structure can realize two-way traction work, which is stable and reliable.

[0016] In addition, the steel bar positioning parts used can be used in conjunction with the lifting control parts to perform corresponding positioning work with the adjacent box girder cast steel bars when the box girder main body falls, ensuring the correspondence between the adjacent box girder cast steel bars, which can facilitate the subsequent bundling of steel bars for casting. At the same time, it also performs correction work for some possible steel bar skewness, thereby improving the accuracy and stability of the box girder main body when it is lowered.

[0017] In addition, the used hanging installation parts can support the lifting work at the bottom of the box girder body, and the used limit guide plates can be used to position the jacks used for temporary support at the bottom of the box girder body during the falling process of the box girder body. This can ensure accurate falling positioning and avoid the center of gravity offset between the bottom of the box girder body and the jack, which makes the jack-supported box girder body unstable. No manual operation is required, which is safer and prevents workers from being pinched. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.

[0019] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.

[0020] In the attached picture:

[0021] Figure 1 A schematic diagram showing the overall structure of the present application;

[0022] Figure 2 A schematic diagram showing the bottom structure of the present application;

[0023] Figure 3 A cross-sectional view showing the internal structure of the present application;

[0024] Figure 4 A schematic diagram showing the structure of the hanging installation member of the present application is shown;

[0025] Figure 5 A schematic diagram showing the structure of the hanging connector of the present application is shown;

[0026] Figure 6 This application shows Figure 5 A magnified view of the structure of the middle B region;

[0027] Figure 7 A schematic diagram showing the structure of the rotary control member of the present application is shown;

[0028] Figure 8 This application shows Figure 7 A magnified view of the structure of the middle C region;

[0029] Fig. 9 A schematic diagram showing the structure of the traction counterweight device of the present application is shown;

[0030] Fig.10 A partial cross-sectional view of the bridge pier positioning device of the present application is shown;

[0031] Fig.11 A cross-sectional view of the hanging connection structure of the present application is shown.

[0032] Reference numerals list

[0033] 1. Suspension and mounting parts; 101. Support channel steel; 102. Position limiting guide plate; 103. Box beam body; 104. Box beam casting steel bars; 2. Suspension and mounting parts; 201. Suspension and mounting frame; 202. Installation steel cable; 203. Suspension sleeve; 204. Installation bolts; 3. Lifting and lowering control parts; 301. Lifting and lowering control shaft; 3011. Sliding mounting block; 302. Control rack; 303. Return spring; 4. Rotation control parts; 401 , rotating installation shaft; 402, control gear; 5, steel bar positioning piece; 501, rotating installation frame; 502, cover buckle positioning shell; 503, steel bar positioning groove; 6, bridge pier positioning device; 601, positioning installation cylinder; 602, hanging connecting rope; 603, expansion installation column; 604, positioning installation frame; 6041, expansion positioning roller; 605, opposing screw rod; 7, traction counterweight device; 701, counterweight water tank; 702, water inlet hole. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Example 1: Please refer to Figures 1 to 11 :

[0036] The present invention proposes a positioning hanging device for box girder installation, comprising a hanging installation part 1, on which a hanging connection part 2 is installed; on which four lifting control parts 3 are installed; the hanging connection part 2 is used to be hung on a hook of a crane; two rotating control parts 4 are rotatably installed on the hanging connection part 2, and the two rotating control parts 4 are engaged with the four lifting control parts 3; steel bar positioning parts 5 are respectively fixedly installed on the two rotating control parts 4; the steel bar positioning parts 5 are used to position the adjacent steel bars on the side of the beam box; a bridge pier is fixedly installed at the bottom of the hanging installation part 1 Positioning device 6, the pier positioning device 6 is used for sliding and limiting between the piers supported by two box girders; a traction counterweight device 7 is fixedly installed on the pier positioning device 6; the traction counterweight device 7 is used for counterweighting and pulling the pier positioning device 6; the hanging mounting part 1 includes: a supporting channel steel 101 and a limiting guide plate 102, two supporting channel steels 101 are provided, and two through holes are respectively provided on the two supporting channel steels 101; two groups of limiting guide plates 102 are respectively fixedly installed on the sides of the two supporting channel steels 101, and each group of limiting guide plates 102 is installed obliquely in an "eight" shape.

[0037] In the disclosed embodiment, the hanging installation part 1 also includes: a box beam body 103 and a box beam casting steel bar 104, the limiting guide plate 102 is used to limit the jack under the box beam through the inclined structure; the top of the two supporting channel steels 101 carries the box beam body 103; the box beam body 103 itself has four through holes for hanging; a row of box beam casting steel bars 104 are respectively provided on both sides of the box beam body 103; the hanging connector 2 includes: a hanging mounting frame 201, an installation steel cable 202, a hanging sleeve 203 and a mounting bolt 204, and the hanging mounting frame 201 has two The two hanging and mounting frames 201 are both "U"-shaped structures; the two ends of the two hanging and mounting frames 201 are respectively plugged into the two supporting channel steels 101; an installation steel cable 202 is fixedly installed between the two hanging and mounting frames 201; the two ends of the two hanging and mounting frames 201 are respectively provided with threads; a hanging sleeve 203 is sleeved on the installation steel cable 202; the inner side of the hanging sleeve 203 is coated with lubricating oil; two hanging holes are provided on the top of the hanging sleeve 203, and the two hanging holes on the top of the hanging sleeve 203 are respectively used to hang on the crane hook; the bottom of the two hanging and mounting frames 201 are respectively There are two mounting bolts 204 threadedly connected, and the four mounting bolts 204 are respectively attached to the bottom of the supporting channel steel 101; the two hanging mounting frames 201 are respectively provided with slots for sliding the lifting control member 3; the two hanging mounting frames 201 respectively pass through the four through holes for hanging provided on the box beam body 103, and the used hanging mounting member 1 can be supported at the bottom of the box beam body 103 for lifting work, and the used limiting guide plate 102 can be used for temporary support at the bottom of the box beam body 103 during the falling process of the box beam body 103 The jack is used for positioning, which can ensure accurate falling positioning and avoid the center of gravity offset between the bottom of the box girder body 103 and the jack, which causes the jack to support the box girder body 103 to be unstable. No manual operation is required, which is safer. The hanging connector 2 can be quickly connected to the hanging installation part 1 for assembly, and the steel cable 202 is installed in conjunction with the hanging sleeve 203; it is convenient for adjustment after crane lifting. The installed steel cable 202 can slide inside the hanging sleeve 203, and cooperate with the traction of the pier positioning device 6 to perform horizontal adjustment of the box girder body 103.

[0038] In the embodiment of the present disclosure, the lifting control component 3 includes: a lifting control shaft 301, a sliding mounting block 3011 and a control rack 302. The lifting control shaft 301 is slidably mounted on the hanging mounting frame 201; a sliding mounting block 3011 is fixedly mounted on the lifting control shaft 301, and the side of the sliding mounting block 3011 slides in a groove provided on the hanging mounting frame 201; a control rack 302 is fixedly mounted on the side of the sliding mounting block 3011; the bottom of the lifting control shaft 301 passes through the hanging mounting frame 201; the lifting control component 3 also includes: a return spring 303, the return spring 303 is fixedly mounted on the sliding mounting block 3011; the other end of the return spring 303 Installed on the hanging mounting frame 201; the rotating control member 4 includes: a rotating mounting shaft 401 and a control gear 402, and the two ends of the rotating mounting shaft 401 are respectively fixedly installed with control gears 402; the two ends of the rotating mounting shaft 401 are rotatably installed on the two hanging mounting frames 201; the two control gears 402 are respectively engaged with the two control racks 302 on the same side; the control rack 302 is used to drive the control gear 402 to rotate; the steel bar positioning member 5 includes: a rotating mounting frame 501, a cover buckle positioning shell 502 and a steel bar positioning groove 503, the rotating mounting frame 501 is fixedly installed on the rotating mounting shaft 401; a row of cover buckle positioning shells are fixedly installed on the rotating mounting frame 501 502, and a row of cover buckle positioning shells 502 are respectively provided with steel bar positioning grooves 503; the inner lower sides of the steel bar positioning grooves 503 are inclined structures; the steel bar positioning grooves 503 are used to position the box beam casting steel bars 104, and the steel bar positioning parts 5 used can be used to cooperate with the lifting control parts 3 to perform corresponding positioning work with the adjacent box beam casting steel bars 104 when the box beam body 103 falls, ensuring the correspondence between the adjacent box beam casting steel bars 104, which can facilitate the subsequent bundling of steel bars for casting, and also correct the possible skew of some steel bars. The structure is more reasonable, and the box beam body 103 is used to automatically press and limit the work, ensuring The installation accuracy of the box girder main body 103 is improved, and there is no need for manual subsequent tedious and labor-intensive calibration work of the box girder casting steel bars 104, which is more practical. The steel bar positioning groove 503 opened on the cover buckle positioning shell 502 can be used to correspond to two adjacent box girder casting steel bars 104 one by one to achieve positioning work. Some slightly skewed box girder casting steel bars 104 can be straightened by guiding the inclined surface at the bottom of the steel bar positioning groove 503. The structure is more reasonable, ensuring the alignment between the box girder main bodies 103. The structure is more reasonable, and the box girder casting steel bars 104 are more convenient for workers to tie the steel bars and then cast, which further improves the accuracy and stability of the box girder main body 103 when it is lowered.

[0039] Embodiment 2: On the basis of embodiment 1, the pier positioning device 6 comprises: a positioning installation tube 601, a hanging connecting rope 602 and an expansion installation column 603, two hanging connecting ropes 602 are fixedly installed on the positioning installation tube 601, and the other ends of the two hanging connecting ropes 602 are respectively connected to the bottom of two supporting channel steels 101; rectangular holes are respectively provided at both ends of the positioning installation tube 601; expansion installation columns 603 are respectively inserted into the rectangular holes at both ends of the positioning installation tube 601, and threaded holes are respectively provided on the two expansion installation columns 603; the pier positioning device 6 also comprises: a positioning installation frame 604, an expansion positioning roller 6041 and a counter screw 605, the ends of the two expansion installation columns 603 are respectively fixedly installed with the positioning installation frame 604; two positioning installation Four expansion positioning rollers 6041 are rotatably mounted on the frame 604, and the four expansion positioning rollers 6041 are symmetrically mounted; an opposing screw rod 605 is rotatably mounted on the positioning installation cylinder 601; a handle is provided in the middle of the opposing screw rod 605; the two sides of the opposing screw rod 605 are reversely threaded; the two sides of the opposing screw rod 605 are respectively threadedly connected to the threaded holes of the two expansion installation columns 603; the expansion positioning roller 6041 is used to roll and fit the box girder pier; the traction counterweight device 7 includes: a counterweight water tank 701 and a water inlet 702, and the counterweight water tank 701 stores water; the counterweight water tank 701 is fixedly mounted on the positioning installation cylinder 601; the counterweight water tank 701 is used for counterweight traction positioning installation cylinder 601; the counterweight water tank 701 is equipped with a water inlet 702; the water inlet 702 is sealed by a rubber plug, and the traction counterweight device 7 adopted can realize the downward traction counterweight work, and at the same time cooperate with the bridge pier positioning device 6 to directly slide and install on the adjacent bridge piers. By utilizing the characteristics of the vertical support of the bridge piers, the bridge pier positioning device 6 can only lift and slide vertically, so as to realize the automatic leveling work of the box beam body 103 on the top of the traction support channel steel 101. The center of gravity leveling structure adopted in this structure is less affected by factors such as wind force, and no manual pulling and leveling work is required, which is more stable and safe, avoiding the traditional center of gravity maintenance method of using counterweight or adding mechanical structure, which uses a crane for hoisting, and still cannot avoid the skew effect caused by wind force and normal shaking on the box beam body 103, and it is still easy to collide, while this structure can To achieve bidirectional traction, the lifting and hoisting of the crane is coordinated with the pulling down of the pier positioning device 6, which is stable, reliable and easy to install. By placing the pier positioning device 6 between the piers, the workers manually rotate the opposing screw rods 605 with reverse threads to drive the two expansion installation columns 603 to move in opposite directions, and drive the expansion positioning rollers 6041 to stick to the cylindrical pier for limiting. At this time, the positioning installation cylinder 601 will only be raised and lowered for vertical displacement, and the supporting channel steel 101 is pulled by the hanging connecting rope 602. At this time, if there is an error in the hanging position of the two cranes, the installation steel cable 202 used can slide inside the hanging sleeve 203 for adjustment and adaptation, thereby ensuring the stability and docking accuracy of the box girder body 103 during hoisting, without manual pulling and not affected by wind.

[0040] The working principle of this embodiment is as follows: during the lifting and docking, the box girder body 103 is placed on the transport vehicle and is raised by pads, the bottom of the box girder body 103 is placed into the box girder body 103, and then the hanging and mounting frame 201 is inserted into the box girder body 103, and the supporting channel steel 101 is inserted, and the mounting bolts 204 are tightened for limited installation. Then, the two cranes can be hung on the through holes on the hanging sleeve 203 respectively for lifting work, and the pier positioning device 6 is placed between the piers. By rotating the opposing screw rods 605 with reverse threads, the two expansion mounting columns 603 are driven to move in opposite directions, driving the expansion positioning rollers 6041 to stick to the bridge The pier is limited, at this time, the positioning installation cylinder 601 will only lift and lower vertical displacement, at this time, the counterweight water tank 701 on the positioning installation cylinder 601 can be filled with water through the water inlet hole 702 to increase the counterweight, and the positioning installation cylinder 601 can be pressed vertically downward under the action of gravity to pull the supporting channel steel 101 through the hanging connecting rope 602. At this time, if there is an error in the hanging height position of the two cranes, the installed steel cable 202 used can slide inside the hanging sleeve 203 to adjust and adapt. When the lifting box girder body 103 is close to the pier, the lifting control shaft 301 will first hit the top of the pier, and the lifting control shaft 301 will be pulled by the pier The relative extrusion drives the control rack 302 to mesh with the driving control gear 402, so as to control the rotating installation shaft 401 to drive the cover buckle positioning shell 502 to rotate ninety degrees. At this time, during the rotation process of the cover buckle positioning shell 502, the steel bar positioning groove 503 provided on the cover buckle positioning shell 502 is used to correspond to two adjacent box girder casting steel bars 104 one by one to achieve the positioning work. Some slightly skewed box girder casting steel bars 104 can be straightened by guiding the inclined surface at the bottom of the steel bar positioning groove 503 to ensure that the box girder bodies 103 are aligned with each other, and the structure is more reasonable. At the same time, the box girder casting steel bars 104 on the box girder body 103 are 4 is more convenient for workers to tie the steel bars and then cast, and it also further improves the accuracy and stability of the box beam body 103 when it is lowered. Finally, the support channel steel 101 can be disassembled. When the lifting control shaft 301 does not interfere with the extrusion pier, under the extrusion of the reset spring 303, the rack 302 is engaged to drive the control gear 402 to control the rotating mounting frame 501 to maintain the vertical initial position, which does not affect the connection between the support channel steel 101 and the hanging mounting frame 201 to install the box beam body 103. When installing the hanging mounting frame 201, the steel bar positioning groove 503 is aligned with the box beam casting steel bar 104 on the box beam body 103 to be installed.

[0041] In this article, there are a few points to note:

[0042] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.

[0043] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0044] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.

Claims

1. A positioning hanging device for box girder installation, comprising a hanging installation component (1), wherein a hanging connection component (2) is installed on the hanging installation component (1); the characteristics are: Four lifting control components (3) are installed on the hanging connection component (2); the hanging connection component (2) is used to be hung on a hook of a crane; Two rotating control members (4) are rotatably mounted on the hanging connection member (2), and the two rotating control members (4) are meshed at both ends with the four lifting control members (3); steel bar positioning members (5) are respectively fixedly mounted on the two rotating control members (4); the steel bar positioning members (5) are used to position adjacent steel bars on the side surfaces of the beam box; A pier positioning device (6) is fixedly mounted on the bottom of the hanging mounting member (1), and the pier positioning device (6) is used for sliding and limiting between two piers supported by box beams; A traction counterweight device (7) is fixedly mounted on the bridge pier positioning device (6); the traction counterweight device (7) is used to counterweight and pull the bridge pier positioning device (6); The hanging installation component (1) comprises: a supporting channel steel (101) and a limiting guide plate (102); two supporting channel steels (101) are provided, and two through holes are respectively provided on the two supporting channel steels (101); two groups of limiting guide plates (102) are respectively fixedly installed on the sides of the two supporting channel steels (101), and each group of limiting guide plates (102) is installed obliquely in an "eight" shape; The bridge pier positioning device (6) comprises: a positioning installation cylinder (601), a hanging connection rope (602) and an expansion installation column (603); The pier positioning device (6) further comprises: a positioning mounting frame (604), an expansion positioning roller (6041) and an opposing screw rod (605); the ends of the two expansion mounting columns (603) are respectively fixedly mounted with the positioning mounting frame (604); four expansion positioning rollers (6041) are respectively rotatably mounted on the two positioning mounting frames (604), and the four expansion positioning rollers (6041) are symmetrically mounted; an opposing screw rod (605) is rotatably mounted on the positioning mounting cylinder (601); a handle is provided in the middle of the opposing screw rod (605); both sides of the opposing screw rod (605) are reversely threaded; both sides of the opposing screw rod (605) are respectively threadedly connected to the threaded holes of the two expansion mounting columns (603); the expansion positioning rollers (6041) are used to roll and fit the box girder pier; The traction counterweight device (7) comprises: a counterweight water tank (701) and a water inlet hole (702); the counterweight water tank (701) stores water; the counterweight water tank (701) is fixedly mounted on the positioning installation cylinder (601); the counterweight water tank (701) is used for counterweighting the traction positioning installation cylinder (601); and the counterweight water tank (701) is provided with a water inlet hole (702).

2. The positioning and hanging device for box beam installation according to claim 1, characterized in that: The hanging installation component (1) also includes: a box girder body (103) and box girder casting steel bars (104); the limiting guide plate (102) is used to limit the jack below the box girder through the inclined structure; the top of the two supporting channel steels (101) carries the box girder body (103); the box girder body (103) itself is provided with four through holes for hanging; and a row of box girder casting steel bars (104) are respectively provided on both sides of the box girder body (103).

3. The positioning and hanging device for box beam installation according to claim 2, characterized in that: The hanging connection member (2) comprises: a hanging installation frame (201), an installation steel cable (202), a hanging sleeve (203) and a mounting bolt (204); two hanging installation frames (201) are provided, and both hanging installation frames (201) are of "U"-shaped structure; two ends of the two hanging installation frames (201) are respectively inserted into two through holes on two supporting channel steels (101); an installation steel cable (202) is fixedly installed between the two hanging installation frames (201); two ends of the two hanging installation frames (201) are respectively provided with threads; a hanging sleeve (203) is sleeved on the installation steel cable (202); The inner side of the hanging sleeve (203) is coated with lubricating oil; two hanging holes are provided at the top of the hanging sleeve (203), and the two hanging holes at the top of the hanging sleeve (203) are respectively used to be hung on a crane hook; two mounting bolts (204) are respectively threadedly connected to the bottom of the two hanging mounting frames (201), and the four mounting bolts (204) are respectively attached to the bottom of the supporting channel steel (101); slots for sliding the lifting control member (3) are respectively provided on the two hanging mounting frames (201); and the two hanging mounting frames (201) respectively pass through four through holes for hanging provided on the box beam body (103).

4. The positioning and hanging device for box beam installation according to claim 3, characterized in that: The lifting control component (3) comprises: a lifting control shaft (301), a sliding mounting block (3011) and a control rack (302); the lifting control shaft (301) is slidably mounted on a hanging mounting frame (201); the sliding mounting block (3011) is fixedly mounted on the lifting control shaft (301), and the side surface of the sliding mounting block (3011) slides in a slot provided on the hanging mounting frame (201); the control rack (302) is fixedly mounted on the side surface of the sliding mounting block (3011); and the bottom of the lifting control shaft (301) passes through the hanging mounting frame (201).

5. The positioning and hanging device for box beam installation according to claim 4, characterized in that: The lifting control component (3) further comprises: a return spring (303), wherein the return spring (303) is fixedly mounted on the sliding mounting block (3011); and the other end of the return spring (303) is mounted on the hanging mounting frame (201).

6. The positioning and hanging device for box beam installation according to claim 4, characterized in that: The rotating control member (4) comprises: a rotating mounting shaft (401) and a control gear (402); the two ends of the rotating mounting shaft (401) are respectively fixedly mounted with a control gear (402); the two ends of the rotating mounting shaft (401) are rotatably mounted on two hanging mounting frames (201); the two control gears (402) are respectively meshed with two control racks (302) on the same side; the control racks (302) are used to drive the control gear (402) to rotate.

7. The positioning and hanging device for box beam installation according to claim 6, characterized in that: The steel bar positioning member (5) comprises: a rotating mounting frame (501), a cover buckle positioning shell (502) and a steel bar positioning groove (503); the rotating mounting frame (501) is fixedly mounted on the rotating mounting shaft (401); a row of cover buckle positioning shells (502) are fixedly mounted on the rotating mounting frame (501), and the row of cover buckle positioning shells (502) are respectively provided with steel bar positioning grooves (503); the lower inner sides of the steel bar positioning grooves (503) are inclined structures; the steel bar positioning grooves (503) are used to position the box beam casting steel bars (104).

8. The positioning and hanging device for box beam installation according to claim 1, characterized in that: Two hanging connecting ropes (602) are fixedly installed on the positioning installation tube (601), and the other ends of the two hanging connecting ropes (602) are respectively connected to the bottoms of two supporting channel steels (101); rectangular holes are respectively provided at both ends of the positioning installation tube (601); expansion installation columns (603) are respectively inserted into the rectangular holes at both ends of the positioning installation tube (601), and threaded holes are respectively provided on the two expansion installation columns (603).

Citation Information

Patent Citations

  • Rotatable automatic grappling box girder

    CN107883041A