Construction method of prefabricated ultrahigh ALC batten wall modular assembly structure

CN119308517APending Publication Date: 2025-01-14ZHEJIANG DONGHUI ENVIRONMENTAL TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411655996.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-19
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

During the construction of prefabricated ultra-high ALC strip walls, the bottom of the strip wall is easily damaged due to its low stiffness, which affects the installation quality.

Method used

Using construction table and adjustment mechanism, the end plate is placed on the adjustment frame through the adjustment frame and the clamping assembly, flipped and lowered so that the bottom is facing downward, avoiding direct contact with the ground, and pushing the end plate is pushed up by the pushing assembly. Go to the installation position to ensure flip integrity.

Benefits of technology

It effectively avoids damage to the bottom of the strip wall during the flip process, ensures the integrity and quality of the installation, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119308517A_ABST
    Figure CN119308517A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for manufacturing an ultrahigh ALC batten wall modular assembly structure, the batten wall modular assembly structure comprises a first end plate, a second end plate, a splicing frame and splicing plate bodies, every two adjacent splicing plate bodies are fixedly connected through the corresponding splicing frame, the first end plate and the second end plate are located at the two ends of a batten wall body respectively, and the construction method comprises the steps that a, preparation is conducted before construction; b, clamping an end plate I; c, mounting an end plate I; and d, construction is completed. The construction table is arranged, the first end plate is placed on the adjusting frame, the clamping assembly is used for fixing, the adjusting mechanism controls the first end plate to turn over and descend, the pushing assembly pushes the first end plate to the installation position, then the splicing frame is installed, operation is circulated, installation of the splicing plate body and the second end plate is completed, and in the installation process of the batten wall, the installation efficiency is improved. And during overturning, the bottom of the batten wall cannot be in contact with the ground to cause damage, so that the completeness of the batten wall during construction is ensured.