Laying construction system and method for long-distance large-diameter cable in cable trench
By adopting a multi -segment traction device and tension control system in the cable laying system in the cable groove in the cable groove, real -time monitoring and dynamic adjustment of the traction are solved, and the problem of uneven traction and tension out of control has been solved. Powering has improved the safety and efficiency of construction.
Patent Information
- Application Number
- CN202411639831.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-15
- Publication Date
- 2025-01-21
AI Technical Summary
In the existing cable trench, uneven traction force causes damage to the cable surface or internal damage, and the lack of an effective tension control mechanism may lead to excessive stretching or deformation of the cable.
A multi-segment traction device and tension control system are used to monitor the cable tension in real time through a tension sensor and use a closed-loop control algorithm to dynamically adjust the traction force. It is combined with a guide device and a cable support device to ensure smooth movement and uniform stress on the cable during the laying process.
It effectively solves the problem of cable damage caused by uneven traction force, and avoids excessive stretching or deformation of the cable through dynamic tension control, improving the safety and efficiency of the laying process.
Smart Images

Figure CN119340865A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of large-diameter cable laying construction system, in particular to a long-distance large-diameter cable laying construction system and a construction method in a cable trench. Background Art
[0002] The construction system for laying large-diameter cables over long distances in cable trenches usually includes traction devices, guide devices, and auxiliary equipment. The traction device is mainly used to provide continuous pulling force to lay large-diameter cables along the cable trench to the designated location. The guide device is used to prevent the cable from being twisted or damaged during the laying process, ensuring that the cable can smoothly enter the cable trench or pass through narrow bends. Auxiliary equipment, such as tension adjustment devices and cable support systems, are used to protect and stabilize the cables at different laying stages to prevent damage to the cables due to excessive bending or external forces. The working principle of the system is to enable large-diameter cables to be laid smoothly and safely over long distances through automated traction and precise guidance.
[0003] Although this construction system has certain advantages when laying large-diameter cables over long distances, it also has some drawbacks. Uneven traction can cause surface damage or internal damage to the cable, affecting the service life of the cable. When the system is laid in complex terrain, especially in narrow, curved or sloping cable trenches, uneven force on the cable is prone to occur, which increases the difficulty of construction. During long-distance laying, if there is no effective tension control mechanism, the cable may be overstretched or deformed due to uncontrolled tension, affecting the final construction quality. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a construction system and method for laying long-distance and large-diameter cables in cable trenches, which solves the problem that uneven traction force may cause surface damage or internal damage to the cable; without an effective tension control mechanism, the cable may be over-stretched or deformed due to uncontrolled tension.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a long-distance and large-diameter cable laying construction system in a cable trench, comprising:
[0006] The traction device is used to provide stable and adjustable pulling force during the cable laying process to ensure that the cable moves smoothly along the predetermined path;
[0007] The guide device is set at a key position in the cable laying path to prevent the cable from being twisted, deformed or damaged during movement. The surface of the guide wheel is made of polyurethane rubber, which has high friction and wear resistance.
[0008] The tension control system uses multiple tension sensors to monitor the cable tension changes at each laying stage in real time, and uses a closed-loop control algorithm to dynamically adjust the traction force;
[0009] The tension calculation model is used to calculate the traction force during cable laying. The formula is as follows:
[0010]
[0011] Where T is the traction force, W is the cable weight, L is the cable length, μ is the friction coefficient, g is the acceleration of gravity, θ is the path slope angle, Δh is the height difference, and Δx is the horizontal distance;
[0012] Cable support device, with multiple support points set along the cable laying path. The material of the support points is made of carbon fiber composite materials to reduce the weight of the device and enhance the strength, so that the force on the cable at different positions is uniform;
[0013] The control software system interacts with the data of sensors and traction devices. The built-in control algorithm optimizes the traction force distribution according to the real-time monitoring data to prevent uneven force or excessive stretching of the cable.
[0014] The laying path simulation model uses 3D simulation software to globally simulate and optimize cable laying based on the terrain data and cable properties of the laying path, and calculates and optimizes traction and guidance strategies in advance.
[0015] Preferably, the traction device includes a plurality of segmented traction units, and the traction force of each unit can be independently adjusted to adapt to different conditions of the laying path. The traction unit is connected to the central control system via wireless communication to provide real-time feedback of the traction force data of each segment.
[0016] Preferably, the guide device includes a guide wheel, which can adapt to the adjustment of the cable at different laying angles to avoid twisting or compression. The surface of the guide wheel is made of polyurethane rubber to ensure stable movement of the cable during laying and prevent wear.
[0017] Preferably, the tension sensor in the tension control system is based on optical fiber sensor technology, and can accurately measure the stress state of each point of the cable. The tension sensor can automatically identify abnormal tension and adjust the traction force distribution through control software.
[0018] Preferably, the control software system includes an artificial intelligence algorithm that can self-learn based on historical data to optimize traction and guidance strategies, and the simulation model can be updated in real time to adjust the laying strategy and traction distribution according to on-site feedback.
[0019] Preferably, the laying path simulation model uses machine learning to optimize the cable laying path, predict possible high tension points, and provide preventive measures. In the tension calculation formula, the friction coefficient μ can be dynamically adjusted according to the laying environment to adapt to cables of different materials and path conditions.
[0020] Preferably, the tension calculation formula also includes a compensation factor for calculating the additional tension requirement when there is a slope or curve section in the path. The control software system can remotely monitor the laying process and provide abnormal alarms and real-time adjustment suggestions.
[0021] The method for laying a long-distance large-diameter cable in a cable trench comprises the following steps:
[0022] a. Collect data such as the terrain, slope and curvature of the cable laying path, and input this information into 3D simulation software for path modeling. The best traction force distribution and guidance strategy are calculated through simulation to ensure the safety and efficiency of the entire laying process. At the same time, the tension calculation model is used to evaluate the key points in the path and determine the mechanical requirements of each part in actual construction;
[0023] b. Arrange the traction device, guide device and tension sensor at the point. At the same time, install the support device at the appropriate position of the path. Use carbon fiber composite materials to reduce the weight of the equipment and increase the support strength. The layout of the guide device should ensure that the cable will not be damaged due to excessive turning angles during the laying process;
[0024] c. After starting the traction device, the traction force of different path sections is precisely controlled according to the path simulation results. The segmented traction units can be independently adjusted according to the specific conditions of each section. The guide device should cooperate with the traction device to precisely control the movement of the cable. The guide wheel adjusts the angle according to the different bends of the path to ensure that the cable moves smoothly along the predetermined path.
[0025] d. During the cable laying process, the tension control system is started to monitor the cable tension in real time through the optical fiber sensor. The feedback data of the sensor will be automatically transmitted to the control software. The software will dynamically adjust the traction force according to the built-in tension calculation formula to ensure that the cable will not be damaged due to excessive or insufficient tension;
[0026] e. Through the artificial intelligence algorithm built into the control system, traction and guidance control will be continuously optimized during the construction process. The artificial intelligence will automatically adjust the construction strategy based on historical data and real-time sensor feedback to ensure that the tension on the cable is evenly distributed during the entire laying process, further improving the safety and efficiency of construction;
[0027] f. The entire construction process is remotely monitored by the control software system. Any abnormal tension or guide error will trigger a system alarm. The operator can make real-time adjustments through the remote operating system to ensure that the parameters of the traction force and guide device are within a safe range, quickly solve the problem and prevent construction interruptions or accidents;
[0028] g. After the construction is completed, the system automatically generates data reports such as tension changes and traction force distribution during the cable laying process. This report can not only be used as a reference for subsequent maintenance, but also can be used to analyze potential optimization space in the construction process and provide data support and optimization suggestions for future laying projects.
[0029] The present invention provides a construction system and method for laying long-distance and large-diameter cables in cable trenches. It has the following beneficial effects:
[0030] The construction system and method for laying long-distance large-diameter cables in the cable trench successfully solves this problem by introducing a multi-segment traction device and a tension control system. The segmented traction unit in the traction device can independently adjust the traction force according to the actual conditions of different path segments, and ensure the uniform distribution of traction force in each segment through a real-time feedback system, thereby preventing the cable from being subjected to uneven tension during movement. The guide device adopts high-friction and wear-resistant polyurethane rubber material to further prevent the cable from twisting or wearing at bending or corner positions, thereby ensuring stability and safety during cable laying.
[0031] The fiber optic sensor monitors the cable tension changes in real time, and combined with the built-in tension calculation model and artificial intelligence algorithm, dynamic tension control is achieved. The tension is continuously monitored and optimized during the construction process, and the friction coefficient can be adjusted according to different laying conditions and cable materials to avoid excessive stretching or deformation of the cable due to tension out of control. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the internal structure of the present invention. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] like Figure 1As shown, an embodiment of the present invention provides a construction system for laying long-distance large-diameter cables in a cable trench, including a traction device for providing stable and adjustable pulling force during the cable laying process to ensure smooth movement of the cable along a predetermined path. The traction device includes a plurality of segmented traction units, and the traction force of each unit can be independently adjusted to adapt to different conditions of the laying path. The traction unit is connected to a central control system via wireless communication to provide real-time feedback of traction force data of each segment.
[0035] The guide device is arranged at a key position in the cable laying path to prevent the cable from being twisted, deformed or damaged during movement. The surface of the guide wheel is made of polyurethane rubber, which has the characteristics of high friction and wear resistance. The guide device includes a guide wheel, which can adapt to the adjustment of the cable at different laying angles to avoid twisting or compression. The surface of the guide wheel is made of polyurethane rubber to ensure that the cable moves stably during the laying process and prevent wear.
[0036] The tension control system uses multiple tension sensors to monitor the changes in cable tension at each laying stage in real time, and uses a closed-loop control algorithm to dynamically adjust the traction force.
[0037] The tension calculation model is used to calculate the traction force during cable laying. The formula is as follows:
[0038]
[0039] Wherein, T is the traction force, W is the cable weight, L is the cable length, μ is the friction coefficient, g is the acceleration of gravity, θ is the path slope angle, Δh is the height difference, and Δx is the horizontal distance. The tension sensor in the tension control system is based on optical fiber sensor technology and can accurately measure the stress state of each point of the cable. The tension sensor can automatically identify abnormal tension and adjust the traction force distribution through the control software. The tension calculation formula also includes a compensation factor for calculating the additional tension requirement when there is a slope or curve section in the path. The control software system can remotely monitor the laying process and provide abnormal alarms and real-time adjustment suggestions.
[0040] The cable support device sets multiple support points along the cable laying path. The material of the support points is made of carbon fiber composite materials to reduce the weight of the device and enhance the strength, so that the cable is evenly stressed at different positions.
[0041] The control software system interacts with data from sensors and traction devices, and the built-in control algorithm optimizes the distribution of traction force according to real-time monitoring data to prevent uneven force or excessive stretching of the cable. The control software system includes an artificial intelligence algorithm that can self-learn based on historical data, and the simulation model can be updated in real time.
[0042] The laying path simulation model uses three-dimensional simulation software to globally simulate and optimize the cable laying based on the terrain data and cable properties of the laying path, and calculates and optimizes the traction force and guiding strategy in advance. The laying path simulation model uses machine learning to optimize the cable laying path. In the tension calculation formula, the friction coefficient μ can be dynamically adjusted according to the laying environment.
[0043] The method for laying a long-distance large-diameter cable in a cable trench comprises the following steps:
[0044] a. Collect data such as the terrain, slope, and curvature of the cable laying path, and input this information into 3D simulation software for path modeling. The best traction force distribution and guidance strategy are calculated through simulation to ensure the safety and efficiency of the entire laying process. At the same time, the tension calculation model is used to evaluate the key points in the path and determine the mechanical requirements of each part in actual construction.
[0045] b. Arrange the traction device, guide device and tension sensor at certain points. At the same time, install the support device at the appropriate position of the path. Use carbon fiber composite materials to reduce the weight of the equipment and increase the support strength. The layout of the guide device should ensure that the cable will not be damaged due to excessive turning angles during the laying process.
[0046] c. After starting the traction device, the traction force of different path sections is precisely controlled according to the path simulation results. The segmented traction units can be independently adjusted according to the specific conditions of each section. The guide device should cooperate with the traction device to precisely control the movement of the cable. The guide wheel adjusts the angle according to the different bends of the path to ensure that the cable moves smoothly along the established path.
[0047] d. During the cable laying process, the tension control system is started to monitor the cable tension in real time through the optical fiber sensor. The feedback data of the sensor will be automatically transmitted to the control software. The software will dynamically adjust the traction force according to the built-in tension calculation formula to ensure that the cable will not be damaged due to excessive or insufficient tension.
[0048] e. Through the built-in artificial intelligence algorithm of the control system, traction and guidance control will be continuously optimized during the construction process. Artificial intelligence will automatically adjust the construction strategy based on historical data and real-time sensor feedback to ensure that the tension on the cable is evenly distributed during the entire laying process, further improving the safety and efficiency of construction.
[0049] f. The entire construction process is remotely monitored by the control software system. Any abnormal tension or guide error will trigger a system alarm. The operator can make real-time adjustments through the remote operating system to ensure that the parameters of the traction and guide device are within a safe range, quickly solve the problem and prevent construction interruptions or accidents.
[0050] g. After the construction is completed, the system automatically generates data reports such as tension changes and traction force distribution during the cable laying process. This report can not only be used as a reference for subsequent maintenance, but also can be used to analyze potential optimization space in the construction process and provide data support and optimization suggestions for future laying projects.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction system for laying long-distance and large-diameter cables in cable trenches, characterized in that: include: The traction device is used to provide stable and adjustable pulling force during the cable laying process to ensure that the cable moves smoothly along the predetermined path; The guide device is set at a key position in the cable laying path to prevent the cable from being twisted, deformed or damaged during movement. The surface of the guide wheel is made of polyurethane rubber, which has high friction and wear resistance. The tension control system uses multiple tension sensors to monitor the cable tension changes at each laying stage in real time, and uses a closed-loop control algorithm to dynamically adjust the traction force; The tension calculation model is used to calculate the traction force during cable laying. The formula is as follows: Where T is the traction force, W is the cable weight, L is the cable length, μ is the friction coefficient, g is the acceleration of gravity, θ is the path slope angle, Δh is the height difference, and Δx is the horizontal distance; Cable support device, with multiple support points set along the cable laying path. The material of the support points is made of carbon fiber composite materials to reduce the weight of the device and enhance the strength, so that the force on the cable at different positions is uniform; The control software system interacts with the data of sensors and traction devices. The built-in control algorithm optimizes the traction force distribution according to the real-time monitoring data to prevent uneven force or excessive stretching of the cable. The laying path simulation model uses 3D simulation software to globally simulate and optimize cable laying based on the terrain data and cable properties of the laying path, and calculates and optimizes traction and guidance strategies in advance.
2. The long-distance and large-diameter cable laying construction system in the cable trench according to claim 1 is characterized by: The traction device includes a plurality of segmented traction units, and the traction force of each unit can be independently adjusted to adapt to different conditions of the laying path. The traction unit is connected to the central control system via wireless communication to provide real-time feedback on the traction force data of each segment.
3. The long-distance and large-diameter cable laying construction system in the cable trench according to claim 1 is characterized in that: The guide device includes a guide wheel, which can adapt to the adjustment of the cable at different laying angles to avoid twisting or compression. The surface of the guide wheel is made of polyurethane rubber to ensure stable movement of the cable during laying and prevent wear.
4. The long-distance and large-diameter cable laying construction system in a cable trench according to claim 1 is characterized in that: The tension sensor in the tension control system is based on optical fiber sensor technology and can accurately measure the stress state of each point of the cable. The tension sensor can automatically identify abnormal tension and adjust the traction force distribution through control software.
5. The long-distance and large-diameter cable laying construction system in the cable trench according to claim 1 is characterized by: The control software system includes an artificial intelligence algorithm that can self-learn based on historical data, and the simulation model can be updated in real time.
6. The long-distance and large-diameter cable laying construction system in a cable trench according to claim 1 is characterized by: The laying path simulation model uses machine learning to optimize the cable laying path. In the tension calculation formula, the friction coefficient μ can be dynamically adjusted according to the laying environment.
7. The long-distance and large-diameter cable laying construction system in a cable trench according to claim 1 is characterized by: The tension calculation formula also includes a compensation factor for calculating the additional tension requirement when there is a slope or curve section in the path. The control software system can remotely monitor the laying process and provide abnormal alarms and real-time adjustment suggestions.
8. A method for laying a long-distance large-diameter cable in a cable trench, characterized in that: The following steps are involved: a. Collect data such as the terrain, slope and curvature of the cable laying path, and input this information into 3D simulation software for path modeling. The best traction force distribution and guidance strategy are calculated through simulation to ensure the safety and efficiency of the entire laying process. At the same time, the tension calculation model is used to evaluate the key points in the path and determine the mechanical requirements of each part in actual construction; b. Arrange the traction device, guide device and tension sensor at the point. At the same time, install the support device at the appropriate position of the path. Use carbon fiber composite materials to reduce the weight of the equipment and increase the support strength. The layout of the guide device should ensure that the cable will not be damaged due to excessive turning angles during the laying process; c. After starting the traction device, the traction force of different path sections is precisely controlled according to the path simulation results. The segmented traction units can be independently adjusted according to the specific conditions of each section. The guide device should cooperate with the traction device to precisely control the movement of the cable. The guide wheel adjusts the angle according to the different bends of the path to ensure that the cable moves smoothly along the predetermined path. d. During the cable laying process, the tension control system is started to monitor the cable tension in real time through the optical fiber sensor. The feedback data of the sensor will be automatically transmitted to the control software. The software will dynamically adjust the traction force according to the built-in tension calculation formula to ensure that the cable will not be damaged due to excessive or insufficient tension; e. Through the artificial intelligence algorithm built into the control system, traction and guidance control will be continuously optimized during the construction process. The artificial intelligence will automatically adjust the construction strategy based on historical data and real-time sensor feedback to ensure that the tension on the cable is evenly distributed during the entire laying process, further improving the safety and efficiency of construction; f. The entire construction process is remotely monitored by the control software system. Any abnormal tension or guide error will trigger a system alarm. The operator can make real-time adjustments through the remote operating system to ensure that the parameters of the traction force and guide device are within a safe range, quickly solve the problem and prevent construction interruptions or accidents; g. After the construction is completed, the system automatically generates data reports such as tension changes and traction force distribution during the cable laying process. This report can not only be used as a reference for subsequent maintenance, but also can be used to analyze potential optimization space in the construction process and provide data support and optimization suggestions for future laying projects.
Citation Information
Cited By
Multi-motor cooperative control method and system for electric stretching equipment
CN119945207A
Multi-Motor Cooperative Control Method and System for Electric Stretching Equipment
CN119945207B